Amendment 0001 - Exhibit A - SRWTP Stockpile Data - SREL_23 Dec 19.pdf
PDF 32 MB Posted
- Attached to
- Sacramento River East Levee (SREL) Contract 1
- Solicitation number
- W9123820B0003
About this file
This solicitation is for a construction contract along various segments of the Sacramento River East Levee totaling approximately 3.0 miles in length. The scope of work includes degrading and reconstructing over 2 miles of levee to support construction of both Deep Mix Method and slurry trench cutoff walls. Additional work includes constructing drained stability berms and seepage berms, reusing excavated soils as necessary for levee fill and importing additional fill, managing and disposing of excess excavated soils, removing and replacing over 2 miles of paved bike paths, potholing and protecting and removing and replacing existing utilities, removing all temporary facilities, and restoring and seeding all disturbed areas. The contract requires the line of flood protection be fully restored no later than October 31, 2020, with work at Miller Park to be completed after Labor Day. The contractor must complete all work within one construction season, which will likely require multiple cutoff wall headings be constructed concurrently.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .