Pricing Schedule.pdf
PDF 208 KB Posted
- Attached to
- Sacramento River East Levee (SREL) Contract 1
- Solicitation number
- W9123820B0003
About this file
This document contains pricing schedules for a federal construction contract solicitation to repair segments of the Sacramento River East Levee. The work includes degrading and reconstructing over 2 miles of levee, constructing stability berms, installing cutoff walls using various methods like deep mix and slurry trench, reusing excavated soils as fill, managing excess soils, removing and replacing paved paths and utilities, restoring disturbed areas, and completing all work by 31 October 2020. The solicitation is issued by the US Army Corps of Engineers Sacramento District and involves line items for mobilization, traffic control, clearing, excavation, embankment fill, various cutoff wall installations, surface course installation, erosion control seeding and other items across multiple contract line items. Pricing and estimated quantities are provided for each work item.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing Schedule - American River Common Features 2016 - Sacramento River East Levee, Contract 1
CLIN 0001 - CUTOFF: SB Wall to (-35' to -30')
Contract Line
Item No.
Item Description Estimated
Quantity Unit Unit Price Total Price
1.1 Mobilization and
Demobilization 1 JOB $ $
1.2 Traffic Control 1 JOB $ $
1.3 Storm Water Pollution
Control 1 JOB $ $
1.4 Vibration Monitoring 1 JOB $ $
1.5 Clearing and Grubbing* 1.5 AC $ $
1.6 Tree Stump Removal 11 EA $ $
1.7 Stripping* 1,192 CY $ $
1.8 Remove Asphalt
Concrete* 990 SY $ $
1.9 Remove Stairway 1 EA $ $
1.10 Levee Excavation (Levee Degrade and Cutoff Trench)*
15,998 CY
1.11 SB Cutoff Wall* 59,314 SF $ $
1.12 Levee Embankment Fill
(Soil Type 1)* 15,299 CY $ $
1.13 Class 2 Aggregate Base* 670 TN $ $
1.14 Asphalt Concrete Paving* 190 TN $ $
1.15 Striping* 1,040 LF $ $
1.16 Erosion Control Seeding* 1.5 AC $ $
TOTAL $
NOTE: AC is acre, CY is cubic yard, TN is ton, SF is square Foot, and SY is square yard.
*Indicates quantity is estimated and subject to Federal Acquisition Regulation clause 52.211-18 Variation in Estimated Quantity.
CLIN 2 - CUTOFF: DMM Wall to (-95' to -15')
Line Item No.
Item Description Estimated Quantity
Unit Unit Price Total Price
2.1 Mobilization and
Demobilization
1 JOB $ $
2.2 Traffic Control 1 JOB $ $
2.3 Storm Water Pollution
Control
1 JOB $ $
2.4 Vibration Monitoring 1 JOB $ $
2.5 Clearing and Grubbing* 5.4 AC $ $
2.6 Tree Stump Removal 2 EA $ $
2.7 Stripping * 4,363 CY $ $
2.8 Remove Stairway 5 EA $ $
2.9 Remove Aggregate
Surfacing*
3,978 SY $ $
2.10 Remove and Dispose
Existing Standpipe (STA 1291+35)
1 JOB $ $
2.11 Levee Excavation (Levee
Degrade and Cutoff Trench)*
13,058 CY $ $
2.12 DMM Cutoff Wall* 204,830 SF $ $
2.13 Levee Embankment Fill
(Soil Type 1)*
12,074 CY $ $
2.14 Class 3 Aggregate
Surface Course*
1,547 TN $ $
2.15 Erosion Control Seeding* 5.4 AC $ $
TOTAL $
CLIN 0003 - CUTOFF: DMM to (-105')
Line Item
No.
Item Description Estimated
Quantity Unit Unit Price Total Price
3.1 Mobilization and
Demobilization 1 JOB $ $
3.2 Traffic Control 1 JOB $ $
3.3 Storm Water Pollution
Control 1 JOB $ $
3.4 Vibration Monitoring 1 JOB $ $
3.5 Clearing and Grubbing * 2.7 AC $ $
3.6 Stripping * 1,319 CY $ $
3.7 Remove Asphalt
Concrete* 740 SY $ $
3.8 Remove Aggregate
Surfacing* 1,579 SY $ $
3.9 Remove and Dispose Grouted 8" Pipe (STA 1534+81)
1 JOB
3.10 Remove and Dispose 6" Steel Irrigation Pipe
(STA 1540+27)
JOB $ $
3.11 Remove and Replace 3" Electrical Conduit (STA 1549+54)
JOB $ $
3.12
Remove and Dispose 8" Steel Pipe Encased in Concrete (STA 1547+61)
JOB $ $
3.13 Levee Excavation (Levee Degrade and Cutoff Trench)*
7,040
CY $ $
3.14 DMM Cutoff Wall* 166,500 SF $ $
3.15 Levee Embankment Fill
(Soil Type 1)* 7,332 CY $ $
3.16 Class 3 Aggregate
Surface Course* 1,141 TN $ $
3.17 Erosion Control
Seeding* 2.7 AC $ $
CLIN 0004 - CUTOFF: SB Wall and SCCB Wall to (-55' to -30')
No.
Item Description Estimated
Quantity Unit Unit Price Total Price
4.1 Mobilization and
Demobilization 1 JOB $ $
4.2 Traffic Control 1 JOB $ $
4.3 Storm Water Pollution
Control 1 JOB $ $
4.4 Vibration Monitoring 1 JOB $ $
4.5 Clearing and
Grubbing* 18.5 AC $ $
4.6 Stripping* 9,488 CY $ $
4.7 Remove Asphalt
Concrete* 8,637 SY $ $
4.8 Remove Concrete Retaining Wall (STA 1549+80)
JOB $ $
4.9 Remove Aggregate
Surfacing* 1,111 SY $ $
4.10 Remove Curb* 78 LF $ $
4.11 Remove and Dispose - Irrigation Line
(STA 1552+10)
JOB $ $
4.12
Remove and Dispose Abandoned 2" Electrical Conduit
(STA 1634+00)
JOB $ $
4.13
Remove and Dispose Abandoned 10" Steel Electrical Pipe
(STA 1635+16)
JOB $ $
4.14 Remove and Dispose Abandoned Irr Pipe
(STA 1635+16)
1 JOB
4.15
Remove and Dispose of Irrigation systems (STA 1549+89 to
1557+50) 1 JOB $ $
4.16
Remove and Dispose - Abandoned 12" Steel Irrigation Line
(STA 1571+84)
1 JOB
4.17 Remove and Dispose Irrigation Line
(STA 1576+52)
1 JOB
4.18 Remove and Dispose - 2" PVC Within Levee Crest (STA 1579+50)
1 JOB
4.19 Remove and Dispose 4" Irrigation Pipe
(STA 1613+07)
1 JOB
4.20
Remove and Dispose Existing Pipe, Details Unknown
(STA 1554+44)
1 JOB
4.21 Remove and Dispose Abandoned 4" Pipe Riser (STA 1613+48)
1 JOB
4.22 Remove and Dispose Chain Posts (STA 1550+20 - 1554+20)
87 EA
4.23 Median Curb, Type 14
A* 480 LF $ $
4.24 Remove and Replace
Concrete Median* 30 LF $ $
4.25 Remove and Dispose
Stairway 5 EA $ $
4.26 Remove and Replace Concrete Walkway with Handrail
1 JOB
4.27
Remove and Replace 1.25" Galvanized Steel Electrical Conduit
(STA 1552+68)
1 JOB
4.28 Remove and Replace
Pipe Gate 3 EA $ $
4.29 Remove and Replace
Sign 2 EA $ $
4.30 Remove and Dispose
Abandoned Gate Posts 3 EA $ $
4.31 Remove and Dispose
Monitoring Well 1 JOB $ $
4.32 Levee Excavation (Levee Degrade and Cutoff Trench)*
90,802 CY
4.33 SB Cutoff Wall* 613,640 SF $ $
4.34 SCCB Cutoff Wall* 120,000 SF $ $
4.35 Levee Embankment
Fill (Soil Type 1)* 92,402 CY $ $
4.36 Class 2 Aggregate
Base* 7,800 TN $ $
4.37 Asphalt Concrete
Paving* 2,162 TN $ $
4.38 Handicap Ramp per COS Std Drawing T-71
1 EA
4.39 Curb (Type 3)* 151 LF $ $
4.40 Traffic Rated Vault
and Cover 1 EA $ $
4.41 Temporary Railing
(Type K) 1 EA $ $
4.42 Traffic Sign 14 EA $ $
4.43 Striping* 2,250 LF $ $
4.44 Garcia Bend Traffic
Markings 1 JOB $ $
4.45 Erosion Control
Seeding 1 AC $ $
CLIN 0005 - EROSION REPAIR: PL 84-99 SITE 0441-21
No.
Item Description Estimated
Quantity Unit Unit Price Total Price
5.1 Mobilization and
Demobilization 1 JOB $ $
5.2 Storm Water Pollution
Control 1 JOB $ $
5.3 Clearing and
Grubbing* 0.1 AC $ $
5.4 Stripping* 15 CY $ $
5.5 Levee Excavation And
Disposal (Offsite)* 90 CY $ $
5.6 Soil-Filled Quarry
Stone* 90 CY $ $
5.7 Erosion Control
Seeding* 0.1 AC $ $
CLIN 0006 - EROSION REPAIR: PL 84-99 SITE 0441-23
No.
Item Description Estimated
Quantity Unit Unit Price Total Price
6.1 Mobilization and
Demobilization 1 JOB $ $
6.2 Storm Water Pollution
Control 1 JOB $ $
6.3 Clearing and
Grubbing* 0.1 AC $ $
6.4 Tree Removal 1 JOB $ $
6.5 Stripping* 40 CY $ $
6.6 Quarry Stone* 1,230 TN $ $
6.7 Soil-Filled Quarry
Stone* 730 CY $ $
6.8 Coir Fabric* 190 SY $ $
6.9 Soil Fill Material* 50 CY $ $
6.10 Levee Embankment
Fill (Soil Type 2)* 10 CY $ $
6.11 Class 2 Aggregate
Base* 200 TN $ $
6.12 Erosion Control
Seeding* 0.2 AC $ $
OPTIONAL CLIN 1001 – Remove & dispose Faucet
Remove and Dispose Faucet
(STA 1611+09)
JOB $ $
OPTIONAL CLIN 1002 – Clearing & Grubbing at levee toe
Clearing and Grubbing at levee toe from STA 1610+00 to 1611+50*
0.1 AC
OPTIONAL CLIN 1003 - BERM: Seepage Berm
No.
Item Description Estimated
Quantity Unit Unit Price Total Price
1003.1 Mobilization &
Demobilization 1 JOB $ $
1003.2 Traffic Control 1 JOB $ $
1003.3 Storm Water Pollution
Control 1 JOB $ $
1003.4 Vibration Monitoring 1 JOB $ $
1003.5 Clearing and
Grubbing* 2.1 AC $ $
1003.6 Tree Stump Removal 71 EA $ $
1003.7 Stripping* 1,718 CY $ $
1003.8
Remove and Dispose - Concrete Encased Storm Drain Lines and Headwall (STA 1127+42 - 1127+61)
1 JOB
1003.9
Remove and Dispose - Abandoned Gas Main
(STA 1126+50 -
1130+20)
1 JOB
1003.10
Remove and Dispose - Existing Rails, Ties and Ballast (STA 1126+00 - 1130+50)
1 JOB
1003.11 Remove and Replace
Chain Link Fence* 740 LF $ $
1003.12 Levee Embankment
Fill (Soil Type 2)* 12,700 CY $ $
1003.13 18" Storm Drain* 660 LF $ $
1003.14 Type G2 Drainage
Inlet (STA 1128+18) 1 EA $ $
1003.15
OMPI Steel Pipe Inlet
(STA 1124+96, STA
1127+09, STA
1130+20)
3 EA
1003.16 Drainage Swale (STA
1126+89 - 1128+18)* 280 LF $ $
1003.17
16' Wide Gate (Caltrans Standard Plan A85)
(STA 1128+84)
2 EA
1003.18 Erosion Control
Seeding* 2.1 AC $ $
OPTIONAL CLIN 1004 – Tree Removal
1004 Tree Removal 71 EA $ $
CLIN 1005 - CUTOFF: SCCB Wall to -10'
No.
Item Description Estimated
Quantity Unit Unit Price Total Price
1005.1 Mobilization and
Demobilization 1 JOB $ $
1005.2 Traffic Control 1 JOB $ $
1005.3 Storm Water Pollution
Control 1 JOB $ $
1005.4 Vibration Monitoring 1 JOB $ $
1005.5 Clearing and Grubbing* 0 AC $ $
1005.6 Remove Asphalt
Concrete* 3,378 SY $ $
1005.7 Remove and Replace
Curb and Gutter* 25 LF $ $
1005.8 Remove and Replace Irrigation Utilities
(STA 1115+75)
1 JOB
1005.8.1 Remove 2" Irr Pipe* 20 LF $ $
1005.8.2 Remove Water Meter 1 EA $ $
1005.8.3 Remove Backflow
Device 1 EA $ $
1005.8.4 Remove Irrigation Box 2 EA $ $
1005.8.5 Install 2" PVC Sched 80
PVC pipe* 60 LF $ $
1005.8.7 New 2" Backflow
Preventer 1 EA $ $
1005.8.9 Connect to Ex Irr
System 1 EA $ $
1005.9 Remove and Replace 8" PVC Storm Drain Pipe
(STA 1120+00)
1 JOB
1005.10 Remove and Replace 8" PVC Storm Drain Pipe
(STA 1124+38)
1 JOB
1005.11
Expose 8" Asbestos Water line for SAFCA Removal and abandonment
(STA 1121+47)*
44 LF
1005.12
Expose 8" Asbestos Water line for SAFCA Removal
(STA 1123+95)*
22 LF
1005.13
Expose 6" Sewer Force Main for SAFCA Removal
(STA 1124+77)*
24 LF
1005.14 Place 6" DR-18 C900 PVC SSFM with 2 transition couplings*
15 LF
1005.15 Remove and Replace 1.25" Electrical Conduit
(STA 1125+15)
1 JOB
1005.16
Remove and Replace Gutter Drain (COS STD
DWG 8-42)
(STA 1124+25)
1 JOB
1005.17
20 LF DR-18 C900
PVC Pipe with 10LF 16"Ø steel casing centered on pipe for protection & 2 transition couplings.
1 EA
1005.18 SCCB Cutoff Wall* 48,023 SF $ $
1005.19 Class 2 Aggregate
Base* 294 TN $ $
1005.20 Asphalt Concrete
Paving* 960 TN $ $
1005.21 Relocate Water Main 1 JOB $ $
1005.21.1 Remove & Dispose 4"
Water Main
(STA 118+38)*
13 LF
1005.21.2 Remove & Dispose 6"
Water Main
(STA 118+49)*
13 LF
1005.21.3 Remove & Dispose 8"
Water Main
(STA 1121+47)*
13 LF
1005.21.4 Install 8" C-900 PVC
water main* 750 LF $ $
1005.21.5 Install 8"x8"x8" tee with
8" blind flange tapped 2"
1 EA
1005.21.6 install 8" x 4" x 8" tee and couplings at STA
1118+38
1 EA
1005.21.7 install 8" x 6" x 8" tee and couplings at STA
1118+49
1 EA
1005.22 3-Foot by 4-Foot by 10- Foot Trench Box 2 EA $ $
1005.23 Striping 1 JOB $ $
OPTIONAL CLIN 1006 - BERM: Thicken Berm, Drained Berm
No.
Item Description Estimated
Quantity Unit Unit Price Total Price
1006.1 Mobilization and
Demobilization 1 JOB $ $
1006.2 Traffic Control 1 JOB $ $
1006.3 Storm Water Pollution
Control 1 JOB $ $
1006.4 Vibration Monitoring 1 JOB $ $
1006.5 Clearing and Grubbing* 1.5 AC $ $
1006.6 Tree Stump Removal 1 EA $ $
1006.7 Stripping* 948 CY $ $
1006.8 Remove and Replace
Chain Link Fence* 590 LF $ $
1006.9 16' CLF Gate 1 EA $ $
1006.10 Levee Excavation And
Disposal (Offsite)* 3074 CY $ $
1006.11 Levee Embankment Fill
(Soil Type 2)* 10,368 CY $ $
1006.12 Berm Drainage Layer -
Filter Layer* 1,469 CY $ $
1006.13 6" Slotted PVC (SDR
26) Pipe* 530 LF $ $
1006.14 6" Solid PVC (SDR 26) Pipe* 50 LF $ $
1006.15 Connect 6" PVC Drain to SDMH (STA 1098+74)
1 JOB
1006.16 CIPP Lining* 484 LF $ $
1006.17 Raise Storm Drain Manhole 1 EA $ $
1006.18 Raise Collector Pipe Cleanout 1 EA $ $
1006.19 Erosion Control Seeding* 2 AC $ $
1006.20 Raise Vent Stack 1 EA $ $
GRAND TOTAL, including ALL OPTIONS $