Appendix_5A_Environmental_requirements_Water_Pipeline.pdf
PDF 3 MB Posted
- Attached to
- Base-wide Underground Water Distribution and base-wide roadway paving and repair at work site.
- Solicitation number
- W91238-18-R-0002
About this file
Appendix 5A Environmental Req Water
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ENVIRONMENTAL CHECKLIST
Project proponent completes all sections. Please print clearly or type. Submit to Environmental Office for review.
Any questions Call: 839-4129 Environmental Chief
Section 1: General Information Project#
Project Title:
Phone:
Phone:
Phone:
Dept:
Date:
Proponent/Department:
Proj. Mgr:
Prepared by:
Section 2: Project Site Information
Planned Start Date: Planned Completion Date:
Purpose of the project (include any description of operations, functions, and activities associated with the project which will change or occur due to the project):
Sharpe TracyProject Location
Environmental Checklist Page 1 of 4 3 Dec 2012
Describe the location and area of the proposed project:
Total Acreage Developed: Acres Disturbed:
Total Length of Trench:
Excavation Area & Depth:
Trench Depth:
Acres Paved:
Describe the size and staging location of soil borrow/stock piles:
Describe where excess soil/ fill material will be disposed?:
Describe laydown areas, locations and duration of use:
Section 3: General Project Questions (Check positive responses.)
Is the project a new facility?
Has the project area been mapped, labeled, or distinguished?
Is additional future development or phases planned?
Provide additional project location data not requested elsewhere:
Section 4: Specific Project Questions (Check positive responses.)
Dewatering of a construction site?
Facility renovation or alteration?
Building demolition, renovation, or retrofit?
Installation of electrical equipment, e.g. transformers, switches or capacitors?
Equipment alteration or relocation?
Placement of new equipment?
Installation, repair or removal of fuel storage tanks?
Routine use of fuels or oils?
New fuel storage or distribution facilities?
New heating units or boilers?
Emergency generators or other stationary internal combustion engines?
New sources of air emissions (e.g. paint booths, blasting operations)?
New drinking water services?
Water for fire protection?
Generation or Disposal of domestic wastewater (e.g. rinsewater, washdowns, pressure washing, etc.)?
Concrete?
Involve Solid wastes such as:
Asphalt?
Topsoil?
Electrical equipment?
Recyclable materials (e.g. steel, cardboard, wood, etc.)?
Increase in outfall water or untreated runoff entering Storm water system?
Asbestos or Asbestos containing building materials?
Involve disturbance or use of Hazardous substances such as:
Mercury?
PCBs?
Lead Based Paint?
Other?
Cleaners or solvents?
Excavation, trenching, or disturbance of soils?
Disturbance of any threatened or endangered species (e.g. Burrowing Owl, etc.)?
Loud and/or sustained noise above 70dB?
Environmental Checklist Page 3 of 4 3 Dec 2012
Hazardous material storage required?
Involve use or storage of Hazardous materials:
Storage of HM more than 55 gal?
Will there be temporary or permanant storage of HM?
Installation or alteration of potable water backflow prevention devices?
Would this proposal cause any concerns from the neighbors (e.g. dust, noise, view)?
NEPA Required
Project Title:
REC/SCS EA EIS None
Additional Project Requirements
EMS Inspection HM inventory update
Air Emissions Permits
Haz Waste Site Specific Training
Est. Completion Time and Notes
Project Location Sharpe Tracy
Storm water permits
Meetings and Coordination
Site Visit Requested Prior to Construction Site Visit Requested During Construction
Contractually required Environmental Protection Plan? Review Specific Environmental Requirements with Contractor?
Additional Environmental Requirements/ comments:
Project #
Prepared by: Phone:Date:
ENVIRONMENTAL REQUIREMENTS
General Conformity Calculations
Section 106/NHPA Land Use Controls notification
This page to be completed and returned by the Environmental Department
Environmental Checklist Page 4 of 4 21 Mar 2013
Hazardous Waste Disposal
ENVIRONMENTAL CHECKLIST
Project proponent completes all sections. Please print clearly or type. Submit to Environmental Office for review.
Any questions Call: 839-4129 Environmental Chief Section 1: General Information Section 2: Project Site Information Purpose of the project (include any description of operations, functions, and activities associated with the project which will change or occur due to the project):
Project Location Environmental Checklist Page 1 of 4 3 Dec 2012 ..\My Pictures\dlalogo.jpg Describe the location and area of the proposed project:
Describe the size and staging location of soil borrow/stock piles:
Describe where excess soil/ fill material will be disposed?:
Describe laydown areas, locations and duration of use:
Section 3: General Project Questions (Check positive responses.)
Provide additional project location data not requested elsewhere:
Section 4: Specific Project Questions (Check positive responses.)
Involve Solid wastes such as:
Involve disturbance or use of Hazardous substances such as:
Environmental Checklist Page 3 of 4 3 Dec 2012 Involve use or storage of Hazardous materials:
NEPA Required Additional Project Requirements Project Location Meetings and Coordination ..\My Pictures\dlalogo.jpg
ENVIRONMENTAL REQUIREMENTS
This page to be completed and returned by the Environmental Department Environmental Checklist Page 4 of 4 21 Mar 2013 8.2.1.4029.1.523496.503679
| TextField1: P.2014.01055 |
| TextField1: Replace Main Water Distribution System Piping |
| TextField1: P.2014.01055 |
| TextField2: Replace Main Water Distribution System Piping |
| TextField12: |
| TextField3: 4525 |
| TextField3: DS-FJI |
| TextField3: 4525 |
| DateTimeField1: 2014-05-21 |
| DateTimeField1: November 2014 |
| DateTimeField1: Feb 28, 2016 |
| DateTimeField1: 2014-05-21 |
| TextField4: Tuan Nguyen |
| TextField4: Tuan Nguyen |
| CheckBox5: 0 |
| CheckBox5: 1 |
| CheckBox5: 0 |
| CheckBox5: 0 |
| CheckBox5: 0 |
| CheckBox5: 1 |
| CheckBox5: 0 |
| CheckBox5: 0 |
| CheckBox5: 0 |
| CheckBox5: 0 |
| CheckBox5: 0 |
| CheckBox5: 1 |
| CheckBox5: 0 |
| CheckBox5: 1 |
| CheckBox5: 1 |
| CheckBox5: 1 |
| CheckBox5: 1 |
| CheckBox5: 1 |
| CheckBox5: 0 |
| CheckBox5: 0 |
| CheckBox5: 0 |
| CheckBox5: 0 |
| CheckBox5: 1 |
| CheckBox5: 0 |
| TextField6: Repair by replacement approximately 50,000 LF of underground AC and DI pipes of the existing depot main domestic water distribution system with new PVC pipes including valves and valve boxes. |
| TextField7: 5-8' |
| TextField8: TBD |
| TextField9: Off Site |
| TextField10: Will be assigned at the Precon in needed |
| CheckBox1: 0 |
| CheckBox1: 0 |
| CheckBox1: 0 |
| CheckBox1: 1 |
| CheckBox1: 0 |
| CheckBox1: 0 |
| CheckBox1: 0 |
| CheckBox1: 0 |
| CheckBox1: 0 |
| CheckBox1: 0 |
| CheckBox1: 0 |
| CheckBox1: 0 |
| CheckBox1: 0 |
| CheckBox1: 0 |
| CheckBox1: 0 |
| CheckBox1: 0 |
| CheckBox1: 0 |
| CheckBox1: 0 |
| CheckBox1: 1 |
| CheckBox1: 1 |
| CheckBox1: 1 |
| CheckBox1: 0 |
| CheckBox1: 0 |
| CheckBox1: 0 |
| CheckBox1: 1 |
| CheckBox1: 0 |
| CheckBox1: 0 |
| CheckBox1: 0 |
| CheckBox1: 0 |
| CheckBox1: 0 |
| CheckBox1: 1 |
| CheckBox1: 0 |
| CheckBox1: 1 |
| CheckBox1: 0 |
| CheckBox1: 0 |
| CheckBox1: 0 |
| CheckBox1: 0 |
| CheckBox1: 0 |
| TextField11: 1. NEPA Categorical Exclusion 32CFR Part 651 Appendix B section II (g) (1). |
2. A storm water permit is required. Storm water Permit Registration Documents (PRDs) must be provided to the environmental office for review and submission to the State. Contractor will have to register on the State's storm water site and be linked to the pending Notice of Intent (NOI) to then complete the required application. The contractor is responsible for paying all fees to the State.
3. Some areas of this project may be located on "Land Use Control" areas. Any waste soil generated from these areas of excavation or trenching may not be relocated on site. It must be analyzed for the appropriate contaminants for that location (likely pesticides and/or metals). It must then be disposed of appropriately as it may well be hazardous waste. Consult the Master Plan Land Use Control map.
4. Contractor must adhere to the attached General Environmental Controls
TextField5: Tracy Site