Appendix_5_-Environmental_requirements_Paving.pdf

PDF 2 MB Posted

Attached to
Base-wide Underground Water Distribution and base-wide roadway paving and repair at work site.
Solicitation number
W91238-18-R-0002
Issued by

About this file

Appendix 5 Environmental Req Paving

View the file

Other files

File Type Posted
DIVISION_1_TO_33_TECHNICAL_SPECIFICATIONSrev1.pdf PDF
Atch_1_REVSOW_7_MAR_18.pdf PDF
Appendix_5A_Environmental_Requirements_waterpipe_v2.pdf PDF
Amendment_0002_W91238-18-R-0002.pdf PDF
Wage_Determination_dated_2_Mar_2018.pdf PDF
Appendix_19A_-_Concrete_Pavement_Detail.pdf PDF
Appendix_25_As_Built_Whse_29_Soil_Boring.pdf PDF
Appendix_31__Land_Location_Control_2014.pdf PDF
Appendix_32__Map_Test_of_Excav_Soil.pdf PDF
Appendix_11-_Updated_Water_Lines_Replacement_ALL.pdf PDF
Appendix_29_Geotechnical_Invest_WH_58.pdf PDF
Appendix_11A-_Updated_Water_Line_Phasing_Plan_revised.pdf PDF
Appendix_26__As_Built_Whse28Sht_8_Soil_Logs.pdf PDF
Appendix_11B_Updated_Water_Lines_Replmt_Pave_Rep.pdf PDF
Atch_1_REVSOW_15_FEB_18.pdf PDF
Appendix_28_Boring_logs_Whse_57.pdf PDF
Appendix_30_Boring_Logs_WH_59.pdf PDF
Appendix_27_Boring_Logs_Whse_56.pdf PDF
Appendix_14__UFC_3_230_01_Water_Storage_Trans.pdf PDF
Amendment_0001_.pdf PDF
Atch_3_REV_Wage_Determ.pdf PDF
W9123818R0002_Site_Visit_Log_Sheet.pdf PDF
Atch_3_WDetermination.pdf PDF
Atch_6_Appendixes_zip_file.pdf PDF
Atch_1_SOW_.pdf PDF
SF1442_Solicitation.pdf PDF
Appendix_24_-_Construction_and_Demolition_Debris_Worksheet.xlsx XLSX spreadsheet
Atch_2_Supplemental_Req.pdf PDF
Appendix_4_-DesignRoadFlexibleCBR_2.xls XLS spreadsheet
Appendix_10A_-Domestic_Water_Valve_Depths_DLA_tracy.xlsx XLSX spreadsheet
Appendix_5A_Environmental_requirements_Water_Pipeline.pdf PDF
Atch_4_Spec_Div_1_thru__33_Tech_Spec.pdf PDF
Att_5_Base_Access_Req.xlsx XLSX spreadsheet
Appendix_4_-Paving_Design_Calculations.xls XLS spreadsheet
Synopsis_Tracy18R0002_.doc DOC document
Synopsis_(Presolicitation).doc DOC document
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NEPA Required

Project Title:

REC/SCS EA EIS None

Additional Project Requirements

EMS Inspection HM inventory update

Air Emissions Permits

Haz Waste Site Specific Training

Est. Completion Time and Notes

Project Location Sharpe Tracy

Storm water permits

Meetings and Coordination

Site Visit Requested Prior to Construction Site Visit Requested During Construction

Contractually required Environmental Protection Plan? Review Specific Environmental Requirements with Contractor?

Additional Environmental Requirements/ comments:

Project #

Prepared by: Phone:Date:

ENVIRONMENTAL REQUIREMENTS

General Conformity Calculations

Section 106/NHPA Land Use Controls notification

This page to be completed and returned by the Environmental Department

Environmental Checklist Page 4 of 4 21 Mar 2013

Hazardous Waste Disposal

NEPA Required Additional Project Requirements Project Location Meetings and Coordination ..\My Pictures\dlalogo.jpg

ENVIRONMENTAL REQUIREMENTS

This page to be completed and returned by the Environmental Department Environmental Checklist Page 4 of 4 21 Mar 2013 8.2.1.4029.1.523496.503679

TextField1: FY 13 Pavement Repairs
TextField1: P.2013.01525
CheckBox5: 0
CheckBox5: 0
CheckBox5: 0
CheckBox5: 1
CheckBox5: 0
CheckBox5: 0
CheckBox5: 0
CheckBox5: 0
CheckBox5: 0
CheckBox5: 1
CheckBox5: 0
CheckBox5: 1
CheckBox5: 0
CheckBox5: 0
CheckBox5: 0
CheckBox5: 1
CheckBox5: 0
CheckBox5: 0
CheckBox5: 0
CheckBox5: 0
CheckBox5: 1
CheckBox5: 0
TextField12:
TextField11: 1. SJVAPCD Notification and/or Dust Control Plan may be required: San Joaquin Valley Air Pollution Control District Construction Notification Form required for sites 1-5 acres (provides 48 hour notice to Air District). A Dust Control Plan is required for any construction site exceeding 5 acres of disturbed surface area or exceeding 2,500 cubic yards per day of moved, deposited, or relocated bulk materials on at least three days of the project. Fugitive dust control and road dirt control are required. Fugitive dust exceeding 20% opacity cannot travel past the fence line. A water truck should be used to control dust at site. Visible road dirt cannot be tracked outside the depot and should be controlled on depot with sweeper/vacuum truck.

Environmental Office must be provided a copy of any contractor correspondence with the SJVAPCD.

2. NEPA is exempt, no documentation is required.

3. General conformity Record of Non Applicability (RONA) is attached.

4. A storm water permit is required.

5. Wastes with total lead greater than 350ppm disposed of in California must be disposed of at a Class 1 hazardous waste landfill, or at other landfills that have specific permits to accept these wastes.

If total lead is greater than 1000ppm it is considered hazardous waste, therefore hazardous waste manifesting and a registered hazardous waste transporter is required. See attached striping study.

6. The following LUC Areas will be disturbed:

1. Eastern Soils Depot LUC - minor repairs

2. DSERTS 6 (SWMU 6) - major repairs

3. Areas 1 & 2 LUCs - Reconstruction

4. SWMU 24 LUC - minor repairs

5. Area 1/ B237 LUC - minor repairs

6. DSERTS 72 LUC - minor repairs Because both Minor and Major repairs can turn into Reconstruct projects where soil would be disturbed, each of the sites listed above need to be flagged and the Contractor should be prepared to use appropriate PPE per the LUC requirements for each site. If the projects stay as either Minor or Major repairs, soil will not be disturbed and no need for PPE for the contaminants at the LUC sites. However, the Perimeter Road of Areas 1 and 2 (our Areas 2 and 3) are slated for Reconstruction; therefore PPE will be needed at these two sites. Soil from these areas must be tested for known contaminants prior to either relocation on the depot or disposal.

TextField4: Environmental office
TextField3: 24081
DateTimeField1: 2013-09-11