SF 30 Amendment 0001
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
See SF 30 Supplemental Continuation Page
The purpose of this Amendment 0001 is to hereby incorporate changes to Solicitation W91238-18-R-0002.
1. CONTRACT ID CODE PAGE OF PAGES
R 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Feb-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123818R0002
X 9B. DATED (SEE ITEM 11)
19-Jan-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 3 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Feb-2018
CODE
US ARMY CORPS OF ENGINEERS, SACRAMENTO
CONTRACTING DIVISION
1325 J STREET
SACRAMENTO CA 95814-2922
W91238 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9123818R0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
SF30 CONTINUATION PAGE
SF30 Amendment Continuation Page
Block 14. Amendment Description.
The purpose of this Amendment 0001 is to hereby incorporate changes to Solicitation W91238-
18-R-0002 for the following:
1- Updated Clause 252.225-7012 and 52.209-11. Previous listed clauses changed to include current year 2017/ 2018.
2- Changing solicitation closing date from February 20, 2018 to March 8, 2018 by 2:00PM
Pacific Standard Time.
3- Add Appendices 25 thru 32 part of solicitation which were addressed in bidder inquires.
All new appendixes will also be uploaded into FedBizOpps (FBO) website.
4- Contracting Officer assigned is changed from Mr. Daniel Czech to Ms. Leah Caldwell.
Contract Specialist, Lynette JohnBull is the Prime Point-of-Contact for all correspondence via EMAIL ADDRESS: lynette.j.johnbull@usace.army.mil
5- Special Notices: (a) Bidder Inquiry Key will be extended and will close 10 calendar day from RFP closing date, March 8, 2018, (b) Interested Vendor List in FedBizOpps (FBO) is disabled and is not available for this solicitation only, and (c) On-site walk through sign in log was uploaded as Attachment 0001 in FBO.
6- Appendices added 14, 11, 11A, and 11B addressed and uploaded to FBO.
7- CLIN 0002 Description is corrected.
8- Option 1 and 2 is removed and it’s entirety. RESERVED is annotated on solicitation line item as placeholder.
9- Revised Statement of Work. See revised attachment 1.
10- Revised Wage Determination dated, February 9, 2018. See revised attachment 3.
All other terms and conditions of this solicitation remain unchanged.
SECTION 00 01 10 - TABLE OF CONTENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 01 Scope of Work 17 07-DEC-2017
Attachment 02 Supplemental
Requirements
Attachment 03 Wage Determination 77 19-JAN-2018
Attachment 04 Division 1 thru Division
33 Tech Specs
433 08-NOV-2017
Attachment 05 Base Access Requirement 2 22-NOV-2017
Attachment 06 Appendixes 168 07-DEC-2017
Attachment 07 Design Road (Excel
Spreadsheet)
1 07-DEC-2017
Attachment 08 Appendix 10A Domestic
Water Valve Depehs
1 07-DEC-2017
Attachment 09 Appendix 24 Construction and Demolition Debris
Worksheet
2 07-DEC-2017
to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment Appendix 28 Boring Logs
Whse 57
6 14-FEB-2018
Attachment Appendix 29
Geotechnical Invest Whse
Attachment Appendix 32 Map Testing of Excavation Soil
1 14-FEB-2018
Attachment Appendix 31 Land Use
Location Control 2014
1 14-FEB-2018
Attachment Appendix 27 Boring Logs
Whse 56
4 14-FEB-2018
Attachment Appendix 26 As Built
Whse 28 Sheet 8 Soil
Boring Logs
1 14-FEB-2018
Attachment Appendix 25 As Built
Whse 29 Soil Boring
1 14-FEB-2018
Attachment Appendix 14 USFC 3 230
01 Water Storage
Transmission
39 14-FEB-2018
Attachment Appendix 11B Updated
Water Lines Replacement
& Paving Rpr
4 14-FEB-2018
Attachment Appendix 11A Updated
Water Line Phasing Plan
Revised
1 14-FEB-2018
Attachment Appendix 11 Update
Water Line Replacement
4 14-FEB-2018
Attachment Appendix 30 Boring Logs
Whse 59
12 14-FEB-2018
Attachment 01 Atch 1 Revised Statement of Work
17 16-FEB-2018
Attachment 02 Supplemental
Requirements
Attachment 03 Atch 3 Revised Wage
Determination
77 16-FEB-2018
Attachment 04 Division 1 thru Division
33 Tech Specs
433 08-NOV-2017
Attachment 05 Base Access Requirement 2 22-NOV-2017
Attachment 06 Appendixes 168 07-DEC-2017
Attachment 07 Design Road (Excel
Spreadsheet)
1 07-DEC-2017
Attachment 08 Appendix 10A Domestic
Water Valve Depehs
1 07-DEC-2017
Attachment 09 Appendix 24 Construction and Demolition Debris
Worksheet
2 07-DEC-2017
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 20-Feb-2018 11:00 AM to 08-Mar-2018 02:00 PM.
CLIN 0002
The CLIN extended description has changed from:
The Contractor shall furnish and install all labor, materials, tools, equipment, and supervision necessary for paving improvements to minor/ major repairs, reconstruction (roadways), and remove railroad track in accordance to
Statement of Work, specification, drawings, and attachments. Provide all construction services to repair pavements, storage and parking areas, identified as MINOR Repairs (45,422 SY) in accordance with all contract documents.
To:
The Contractor shall furnish and install all labor, materials, tools, equipment, and supervision necessary for paving improvements to minor/ major repairs, reconstruction (roadways) in accordance to Statement of Work, specification, drawings, and attachments. Provide all construction services to repair pavements, storage and parking areas, identified as MINOR Repairs (approx 45,422 SY) in accordance with all contract documents.
CLIN 1001
The CLIN description has changed from Option #1 to Option #1 REMOVED AND ENTIRETY.
Provide all construction services to remove concrete lined ditch, backfill, and replace with storm drain pipe in accordance with all contract documents.
REMOVED AND RESERVED as placeholder.
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
The unit of issue Job has been deleted.
The option status has changed from Option to No Status.
CLIN 1002
The CLIN description has changed from Option #2 to Option #2 REMOVED AND ENTIRETY.
Provide all construction services to remove excess soil from WH 1 site, and re-grade existing soil, including testing, compacting and hydro-seeding, in accordance with all contract documents.
REMOVED AND RESERVED as placeholder.
The pricing detail quantity has decreased by 26,000.00 from 26,000.00 to 0.00.
The unit of issue Cubic Yard has been deleted.
The option status has changed from Option to No Status.
The following Delivery Schedule item for CLIN 1001 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
540 dys. ANP 1 N/A
FOB: Destination
540 dys. ANP 0 N/A
The following Delivery Schedule item for CLIN 1002 has been changed from:
540 dys. ANP 26,000 N/A
540 dys. ANP 0 N/A
SECTION 00 45 00 - REPRESENTATIONS AND CERTIFICATIONS
The following have been added by reference:
52.209-11
The following have been deleted:
52.209-11
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following have been added by reference:
252.225-7012
The following have been deleted:
252.225-7012
(End of Summary of Changes)