About this file

SF 30 Amendment 0001

View the file

Other files

File Type Posted
DIVISION_1_TO_33_TECHNICAL_SPECIFICATIONSrev1.pdf PDF
Atch_1_REVSOW_7_MAR_18.pdf PDF
Appendix_5A_Environmental_Requirements_waterpipe_v2.pdf PDF
Amendment_0002_W91238-18-R-0002.pdf PDF
Wage_Determination_dated_2_Mar_2018.pdf PDF
Appendix_19A_-_Concrete_Pavement_Detail.pdf PDF
Appendix_25_As_Built_Whse_29_Soil_Boring.pdf PDF
Appendix_31__Land_Location_Control_2014.pdf PDF
Appendix_32__Map_Test_of_Excav_Soil.pdf PDF
Appendix_11-_Updated_Water_Lines_Replacement_ALL.pdf PDF
Appendix_29_Geotechnical_Invest_WH_58.pdf PDF
Appendix_11A-_Updated_Water_Line_Phasing_Plan_revised.pdf PDF
Appendix_26__As_Built_Whse28Sht_8_Soil_Logs.pdf PDF
Appendix_11B_Updated_Water_Lines_Replmt_Pave_Rep.pdf PDF
Atch_1_REVSOW_15_FEB_18.pdf PDF
Appendix_28_Boring_logs_Whse_57.pdf PDF
Appendix_30_Boring_Logs_WH_59.pdf PDF
Appendix_27_Boring_Logs_Whse_56.pdf PDF
Appendix_14__UFC_3_230_01_Water_Storage_Trans.pdf PDF
Atch_3_REV_Wage_Determ.pdf PDF
W9123818R0002_Site_Visit_Log_Sheet.pdf PDF
Atch_3_WDetermination.pdf PDF
Atch_6_Appendixes_zip_file.pdf PDF
Atch_1_SOW_.pdf PDF
SF1442_Solicitation.pdf PDF
Appendix_24_-_Construction_and_Demolition_Debris_Worksheet.xlsx XLSX spreadsheet
Atch_2_Supplemental_Req.pdf PDF
Appendix_4_-DesignRoadFlexibleCBR_2.xls XLS spreadsheet
Appendix_10A_-Domestic_Water_Valve_Depths_DLA_tracy.xlsx XLSX spreadsheet
Appendix_5_-Environmental_requirements_Paving.pdf PDF
Appendix_5A_Environmental_requirements_Water_Pipeline.pdf PDF
Atch_4_Spec_Div_1_thru__33_Tech_Spec.pdf PDF
Att_5_Base_Access_Req.xlsx XLSX spreadsheet
Appendix_4_-Paving_Design_Calculations.xls XLS spreadsheet
Synopsis_Tracy18R0002_.doc DOC document
Synopsis_(Presolicitation).doc DOC document
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

See SF 30 Supplemental Continuation Page

The purpose of this Amendment 0001 is to hereby incorporate changes to Solicitation W91238-18-R-0002.

1. CONTRACT ID CODE PAGE OF PAGES

R 1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Feb-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123818R0002

X 9B. DATED (SEE ITEM 11)

19-Jan-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 3 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Feb-2018

CODE

US ARMY CORPS OF ENGINEERS, SACRAMENTO

CONTRACTING DIVISION

1325 J STREET

SACRAMENTO CA 95814-2922

W91238 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9123818R0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

SF30 CONTINUATION PAGE

SF30 Amendment Continuation Page

Block 14. Amendment Description.

The purpose of this Amendment 0001 is to hereby incorporate changes to Solicitation W91238-

18-R-0002 for the following:

1- Updated Clause 252.225-7012 and 52.209-11. Previous listed clauses changed to include current year 2017/ 2018.

2- Changing solicitation closing date from February 20, 2018 to March 8, 2018 by 2:00PM

Pacific Standard Time.

3- Add Appendices 25 thru 32 part of solicitation which were addressed in bidder inquires.

All new appendixes will also be uploaded into FedBizOpps (FBO) website.

4- Contracting Officer assigned is changed from Mr. Daniel Czech to Ms. Leah Caldwell.

Contract Specialist, Lynette JohnBull is the Prime Point-of-Contact for all correspondence via EMAIL ADDRESS: lynette.j.johnbull@usace.army.mil

5- Special Notices: (a) Bidder Inquiry Key will be extended and will close 10 calendar day from RFP closing date, March 8, 2018, (b) Interested Vendor List in FedBizOpps (FBO) is disabled and is not available for this solicitation only, and (c) On-site walk through sign in log was uploaded as Attachment 0001 in FBO.

6- Appendices added 14, 11, 11A, and 11B addressed and uploaded to FBO.

7- CLIN 0002 Description is corrected.

8- Option 1 and 2 is removed and it’s entirety. RESERVED is annotated on solicitation line item as placeholder.

9- Revised Statement of Work. See revised attachment 1.

10- Revised Wage Determination dated, February 9, 2018. See revised attachment 3.

All other terms and conditions of this solicitation remain unchanged.

SECTION 00 01 10 - TABLE OF CONTENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 01 Scope of Work 17 07-DEC-2017

Attachment 02 Supplemental

Requirements

Attachment 03 Wage Determination 77 19-JAN-2018

Attachment 04 Division 1 thru Division

33 Tech Specs

433 08-NOV-2017

Attachment 05 Base Access Requirement 2 22-NOV-2017

Attachment 06 Appendixes 168 07-DEC-2017

Attachment 07 Design Road (Excel

Spreadsheet)

1 07-DEC-2017

Attachment 08 Appendix 10A Domestic

Water Valve Depehs

1 07-DEC-2017

Attachment 09 Appendix 24 Construction and Demolition Debris

Worksheet

2 07-DEC-2017

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment Appendix 28 Boring Logs

Whse 57

6 14-FEB-2018

Attachment Appendix 29

Geotechnical Invest Whse

Attachment Appendix 32 Map Testing of Excavation Soil

1 14-FEB-2018

Attachment Appendix 31 Land Use

Location Control 2014

1 14-FEB-2018

Attachment Appendix 27 Boring Logs

Whse 56

4 14-FEB-2018

Attachment Appendix 26 As Built

Whse 28 Sheet 8 Soil

Boring Logs

1 14-FEB-2018

Attachment Appendix 25 As Built

Whse 29 Soil Boring

1 14-FEB-2018

Attachment Appendix 14 USFC 3 230

01 Water Storage

Transmission

39 14-FEB-2018

Attachment Appendix 11B Updated

Water Lines Replacement

& Paving Rpr

4 14-FEB-2018

Attachment Appendix 11A Updated

Water Line Phasing Plan

Revised

1 14-FEB-2018

Attachment Appendix 11 Update

Water Line Replacement

4 14-FEB-2018

Attachment Appendix 30 Boring Logs

Whse 59

12 14-FEB-2018

Attachment 01 Atch 1 Revised Statement of Work

17 16-FEB-2018

Attachment 02 Supplemental

Requirements

Attachment 03 Atch 3 Revised Wage

Determination

77 16-FEB-2018

Attachment 04 Division 1 thru Division

33 Tech Specs

433 08-NOV-2017

Attachment 05 Base Access Requirement 2 22-NOV-2017

Attachment 06 Appendixes 168 07-DEC-2017

Attachment 07 Design Road (Excel

Spreadsheet)

1 07-DEC-2017

Attachment 08 Appendix 10A Domestic

Water Valve Depehs

1 07-DEC-2017

Attachment 09 Appendix 24 Construction and Demolition Debris

Worksheet

2 07-DEC-2017

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 20-Feb-2018 11:00 AM to 08-Mar-2018 02:00 PM.

CLIN 0002

The CLIN extended description has changed from:

The Contractor shall furnish and install all labor, materials, tools, equipment, and supervision necessary for paving improvements to minor/ major repairs, reconstruction (roadways), and remove railroad track in accordance to

Statement of Work, specification, drawings, and attachments. Provide all construction services to repair pavements, storage and parking areas, identified as MINOR Repairs (45,422 SY) in accordance with all contract documents.

To:

The Contractor shall furnish and install all labor, materials, tools, equipment, and supervision necessary for paving improvements to minor/ major repairs, reconstruction (roadways) in accordance to Statement of Work, specification, drawings, and attachments. Provide all construction services to repair pavements, storage and parking areas, identified as MINOR Repairs (approx 45,422 SY) in accordance with all contract documents.

CLIN 1001

The CLIN description has changed from Option #1 to Option #1 REMOVED AND ENTIRETY.

Provide all construction services to remove concrete lined ditch, backfill, and replace with storm drain pipe in accordance with all contract documents.

REMOVED AND RESERVED as placeholder.

The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.

The unit of issue Job has been deleted.

The option status has changed from Option to No Status.

CLIN 1002

The CLIN description has changed from Option #2 to Option #2 REMOVED AND ENTIRETY.

Provide all construction services to remove excess soil from WH 1 site, and re-grade existing soil, including testing, compacting and hydro-seeding, in accordance with all contract documents.

REMOVED AND RESERVED as placeholder.

The pricing detail quantity has decreased by 26,000.00 from 26,000.00 to 0.00.

The unit of issue Cubic Yard has been deleted.

The option status has changed from Option to No Status.

The following Delivery Schedule item for CLIN 1001 has been changed from:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

540 dys. ANP 1 N/A

FOB: Destination

540 dys. ANP 0 N/A

The following Delivery Schedule item for CLIN 1002 has been changed from:

540 dys. ANP 26,000 N/A

540 dys. ANP 0 N/A

SECTION 00 45 00 - REPRESENTATIONS AND CERTIFICATIONS

The following have been added by reference:

52.209-11

The following have been deleted:

52.209-11

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following have been added by reference:

252.225-7012

The following have been deleted:

252.225-7012

(End of Summary of Changes)

File details come from the government source that posted it.