Appendix_8__Specs-Intact_Submittal_Register_.txt
TXT text file 27 KB Posted
- Attached to
- Kitchen/Cafeteria Remodel at DDJC Tracy, CA Federal contract opportunity
- Solicitation number
- W91238-17-R-0062
About this file
Appendix 8 Specs-Intact Submittal Register
Text of this file
01 32 01,,,,1.3,"Project Scheduler Qualifications",01,G,, 01 32 01,,,,3.5,"Bar Chart Schedule",01, 01 32 01,,,,3.1,"Project Schedule",01,G,, 01 32 01,,,,3.5.1,"Preliminary Project Schedule",01,G,, 01 32 01,,,,3.5.2,"Initial Project Schedule",01,G,, 01 32 01,,,,3.6.1,"Data Optical Discs",01, 01 32 01,,,,3.5.3,"Periodic Schedule Update",01,G,, 01 32 01,,,,3.7.2,"Periodic Schedule Update",01,G,, 01 32 01,,,,3.9.1,"Justification of Delay",01,G,, 01 32 01,,,,3.9.3,"Time Impact Analysis",01,G,, 01 32 01,,,,3.9.4,"Forensic Schedule Analysis",01,G,, 01 32 01,,,,3.1.1,"Schedule Status Report",01,G,, 01 33 00,,,,1.9,"Submittal Register",01,G,, 01 33 29,,,,1.5.1,"Sustainability Action Plan",01,G,, 01 33 29,,,,1.5.2,"Preliminary Sustainability eNotebook",01,G,, 01 33 29,,,,1.5.2,"Final Sustainability eNotebook",11,G,, 01 33 29,,,,1.5.2,"Amended Final Sustainability eNotebook",11,G,, 01 35 26,,,,1.6,"Accident Prevention Plan (APP)",01,G,, DO 01 35 26,,,,1.6.2.15,"Health Hazard Control Plan",01,G,, 01 35 26,,,,1.6.2.16,"Emergency Action Plan",01,G,, 01 35 26,,,,1.6.2.2,"Standard Lift Plan",01,G,, 01 35 26,,,,1.6.2.3,"Critical Lift Plan",01,G,, DO 01 35 26,,,,1.7,"Activity Hazard Analysis (AHA)",01, 01 35 26,,,,1.11.3,"Monthly Exposure Reports",06, 01 35 26,,,,1.11,"Notifications and Reports",06, 01 35 26,,,,1.11.2,"Accident Investigation Reports",06,G,, DO 01 35 26,,,,1.11.4,"LHE Inspection Reports",06, 01 35 26,,,,1.11.6,"Regulatory Citations and Violations",06, 01 35 26,,,,1.5.1.4,"Crane Operators/Riggers",07, 01 35 26,,,,1.8.1,"Confined Space Entry Permit",07, 01 35 26,,,,1.8.1,"Hot Work Permit",07, 01 35 26,,,,1.11.5,"Certificate of Compliance",07, 01 35 26,,,,3.7,"Excavation Permit",07, 01 35 26,,,,1.5.1.4,"Proof of Current Qualification",07, 01 45 00,,,,3.2,"Contractor Quality Control Plan",01,G,, 01 45 00,,,,3.7.2.1,"MTC validation",01,G,, 01 45 00,,,,3.9.2,"Verification Statement",06, 01 50 00,,,,1.3,"Construction Site Plan",01,G,, RO 01 50 00,,,,3.1.12.1,"Traffic Control Plan",01,G,, RO 01 50 00,,,,3.7,"Safety Plan",01,G,, 01 50 00,,,,1.4,"Temporary Earthwork Plan",01,G,, 01 50 00,,,,3.1.12.3,"Dust Control Methods And Procedures",01,G,, 01 50 00,,,,2.4,"Backflow Preventer Tests",06, 01 50 00,,,,1.7.1,"Backflow Tester",07, 01 50 00,,,,1.7,"Backflow Preventers",07, 01 50 00,,,,1.7.2,"Backflow Prevention Training Certificate",07, 01 74 19,,,,1.6,"Waste Management Plan",01,G,, 01 74 19,,,,1.7,"Records",11, 01 78 00,,,,1.7.1,"Warranty Management Plan",03, 01 78 00,,,,1.7.5,"Warranty Tags",03, 01 78 00,,,,1.5,"Spare Parts Data",03, 01 78 00,,,,3.1.4,"working as-built drawings",06,G,, 01 78 00,,,,3.2,"final as-built record drawings",06,G,, DO 01 78 00,,,,1.7.1,"Instructions",08, 01 78 00,,,,3.9,"Operation and Maintenance Manuals",10, 01 78 00,,,,1.3.4,"Record Drawings",11,G,, DO 01 78 00,,,,2.3,"Certification of EPA Designated Items",11,G,, 01 78 00,,,,3.11,"Interim DD FORM 1354",11,G,, 01 78 00,,,,3.11,"Checklist for DD FORM 1354",11,G,, 01 78 00,,,,3.6,"Final Approved Shop Drawings",11,G,, 01 78 00,,,,3.7,"Construction Contract Specifications",11,G,, 01 78 00,,,,3.8,"As-Built Record Of Equipment And Materials",11, 02 41 00,,,,1.2.1,"Demolition Plan",01,G,, RO 02 41 00,,,,1.11,"Existing Conditions",01, 02 41 00,,,,1.7,"Notification",07,G,, RO 02 41 00,,,,3.2.3,"Receipts",11, 02 82 13,,,,1.3,"Detailed Drawings",02,G,, 02 82 13,,,,3.10.3.1,"Asbestos Waste Shipment Records",03,G,, 02 82 13,,,,2.1,"Encapsulants",03,G,, 02 82 13,,,,1.8.1,"Respiratory Protection Program",03,G,, DO 02 82 13,,,,3.10,"Cleanup and Disposal",03,G,, 02 82 13,,,,1.5.1,"Qualifications",03,G,, 02 82 13,,,,1.10,"Training Program",03, 02 82 13,,,,1.7.1,"Licenses, Permits and Notifications",03, 02 82 13,,,,3.10.3.2,"Asbestos Management Plan",03,G,, DO 02 82 13,,,,3.8,"Exposure Assessment and Air Monitoring",06, 02 82 13,,,,1.6.3,"Local Exhaust System",06, 02 82 13,,,,1.6.3,"Local Exhaust System",07, 02 82 13,,,,2.1,"Encapsulants",07,G,, 02 82 13,,,,1.8,"Medical Surveillance Requirements",07, 02 83 13,,,,1.5.2.2,"Lead Compliance Plan",01,G,, 02 83 13,,,,1.5.1.1,"Competent Person",01,G,, 02 83 13,,,,1.5.1.2,"Training Certification",01,G,, 02 83 13,,,,1.5.2.8,"Lead waste management plan",01,G,, 02 83 13,,,,3.5.2.1,"Written evidence",01,G,, 02 83 13,,,,1.5.2.4,"Medical Examinations",01,G,, 02 83 13,,,,1.5.2.3,"Sampling results",06,G,, 02 83 13,,,,1.5.2.3,"Occupational and Environmental Assessment Data Report",06,G,, 02 83 13,,,,1.5.1.3,"Testing laboratory",07, 02 83 13,,,,3.5.1.1,"Clearance Certification",07, 02 83 13,,,,3.5.2.1,"hazardous waste manifest",11, 02 83 13,,,,3.5.2.1,"turn-in documents or weight tickets",11, 02 84 16,,,,3.3.1,"Testing Results",06,G,, 02 84 16,,,,1.8.1,"Qualifications of CIH",07, 02 84 16,,,,1.8.1,"Training Certification",07, 02 84 16,,,,1.8.2,"PCB and Lamp Removal Work Plan",07,G,, 02 84 16,,,,1.8.3,"PCB and Lamp Disposal Plan",07,G,, 02 84 16,,,,3.2.4,"Certification of Decontamination",07,G,, 02 84 16,,,,3.5.2,"Transporter certification",11,G,, 02 84 16,,,,3.5.2.1,"Certificate of Disposal and/or recycling",11, 02 84 16,,,,3.5.3,"DD Form 1348-1",11, 03 30 00,,,,,"Recycled Content Products",03, 03 30 00,,,,1.3,"Portland Cement",03, 03 30 00,,,,2.1,"Portland Cement",03, 03 30 00,,,,3.2.1,"Ready-Mixed Concrete",03, 03 30 00,,,,2.12,"Vapor Barrier",03, 03 30 00,,,,2.7,"Latex Bonding Agent",03, 03 30 00,,,,1.3.7,"Floor Finish",03, 03 30 00,,,,2.10,"Floor Hardener",03, 03 30 00,,,,2.3,"Chemical Admixtures",03, 03 30 00,,,,2.8,"Epoxy Resin",03, 03 30 00,,,,2.3.5,"Surface Retarder",04, 03 30 00,,,,1.3.1,"Mixture Proportions",05,G,, PO 03 30 00,,,,3.3,"Lightweight Aggregate Concrete",05, 03 30 00,,,,3.11,"Testing and Inspection for CQC",06,G,, PO 03 30 00,,,,1.5,"Qualifications",07, 07 92 00,,,,2.1,"Sealants",03, 07 92 00,,,,2.2,"Primers",03, 07 92 00,,,,2.3,"Bond breakers",03, 07 92 00,,,,2.4,"Backstops",03, 07 92 00,,,,3.3.6,"Sealant",07, 08 11 13,,,,2.1,"Doors",02,G,, PO 08 11 13,,,,2.1,"Doors",02,G,, PO 08 11 13,,,,2.6,"Frames",02, 08 11 13,,,,2.6,"Frames",02, 08 11 13,,,,2.4,"Accessories",02, 08 11 13,,,,2.8,"Weatherstripping",02, 08 11 13,,,,2.1,"Doors",03,G,, PO 08 11 13,,,,2.6,"Frames",03, 08 11 13,,,,2.4,"Accessories",03, 08 11 13,,,,2.8,"Weatherstripping",03, 08 11 16,,,,1.5.1,"Doors, windows and frames",02,G,, PO 08 11 16,,,,1.5.2.1,"Finish sample",04, 08 11 16,,,,1.2.1,"calculations",05,G,, PO 08 11 16,,,,2.1,"Doors and frames",08, 08 33 23,,,,2.1,"Overhead Coiling Doors",02, 08 33 23,,,,1.6,"Counterbalancing Mechanism",02, 08 33 23,,,,2.3,"Counterbalancing Mechanism",02, 08 33 23,,,,1.6,"Manual Door Operators",02, 08 33 23,,,,2.4,"Manual Door Operators",02, 08 33 23,,,,2.1.3,"Bottom Bar",02, 08 33 23,,,,1.5,"Guides",02, 08 33 23,,,,2.3.1,"Mounting Brackets",02, 08 33 23,,,,2.1.7,"Overhead Drum",02, 08 33 23,,,,1.6,"Hood",02, 08 33 23,,,,1.6,"Painting",02, 08 33 23,,,,1.5,"Installation Drawings",02, 08 33 23,,,,2.1,"Overhead Coiling Doors",03, 08 33 23,,,,2.2,"Hardware",03, 08 33 23,,,,1.6,"Counterbalancing Mechanism",03, 08 33 23,,,,2.3,"Counterbalancing Mechanism",03, 08 33 23,,,,1.6,"Manual Door Operators",03, 08 33 23,,,,2.4,"Manual Door Operators",03, 08 33 23,,,,2.1,"Overhead Coiling Doors",05, 08 33 23,,,,2.2,"Hardware",05, 08 33 23,,,,1.6,"Counterbalancing Mechanism",05, 08 33 23,,,,2.3,"Counterbalancing Mechanism",05, 08 33 23,,,,1.6,"Manual Door Operators",05, 08 33 23,,,,2.4,"Manual Door Operators",05, 08 33 23,,,,1.5,"Operation and Maintenance Manuals",10, 08 33 23,,,,1.6,"Overhead Coiling Door Assemblies",10, 08 33 23,,,,1.6,"Materials",10, 08 33 23,,,,1.6,"Devices",10, 08 33 23,,,,1.6,"Procedures",10, 08 33 23,,,,1.6,"Manufacture's Brochures",10, 08 33 23,,,,1.6,"Parts Lists",10, 08 44 00,,,,1.5,"Glazed curtain wall system",02, 08 44 00,,,,1.12,"Installation Drawings",02, 08 44 00,,,,2.4.2,"Shop-Painting Aluminum",02, 08 44 00,,,,2.4.3,"Shop-Painting Steel",02, 08 44 00,,,,1.5,"Glazed curtain wall system",03, 08 44 00,,,,1.13,"Preventive Maintenance and Inspection",03, 08 44 00,,,,2.2,"Metals For Fabrication",03, 08 44 00,,,,2.3,"Nonskinning Sealing Compound",03, 08 44 00,,,,2.4.1,"Metal Accessories",03, 08 44 00,,,,2.5,"Curtain-wall Framing Members",03, 08 44 00,,,,2.6,"Aluminum Doors and Frames",03, 08 44 00,,,,2.7.1,"Curtain Wall Frame",03, 08 44 00,,,,,"Thermal Insulation Materials",03, 08 44 00,,,,2.8,"Sealants and Calkings",03, 08 44 00,,,,2.9,"Curtain-Wall Installation Materials",03, 08 44 00,,,,1.8.1,"warranties",03, 08 44 00,,,,1.8.1,"warranties",03, 08 44 00,,,,1.3,"Calculations",05, 08 44 00,,,,2.4.5,"Finish",05, 08 44 00,,,,2.4.5,"Exposed-to-View Aluminum Finish",05, 08 44 00,,,,1.5.7,"Seismic Calculations",05, 08 44 00,,,,1.5.6.3,"Standard Airblast Test",06, 08 44 00,,,,1.5,"Glazed curtain wall system",08, 08 44 00,,,,1.4.2.6,"Insulating glass",08, 08 44 00,,,,1.8,"WARRANTY",11, 08 71 00,,,,1.3,"Hardware schedule",02,G,, 08 71 00,,,,2.3.7,"Keying system",02, 08 71 00,,,,2.3,"Hardware items",03,G,, 08 71 00,,,,3.1,"Installation",08, 08 71 00,,,,1.3,"Hardware Schedule",10,G,, 08 71 00,,,,1.4,"Key Bitting",11, 08 81 00,,,,,"Installation",02, 08 81 00,,,,,"Electrified Privacy Glass",02, 08 81 00,,,,1.7.1,"Insulating Glass",03, 08 81 00,,,,2.3,"Electrified Privacy Glass Power Conditioners",03, 08 81 00,,,,1.3,"Glazing Accessories",03, 08 81 00,,,,2.3,"Electrified Privacy Glass Product Data",03, 08 81 00,,,,1.7.1,"Insulating Glass",04, 08 81 00,,,,,"Electrified Privacy Glass",04, 08 81 00,,,,2.4.2,"Glazing Compound",04, 08 81 00,,,,2.4.5,"Tape",04, 08 81 00,,,,2.4.3.1,"Sealant",04, 08 81 00,,,,1.7.1,"Insulating Glass",07, 08 81 00,,,,1.7.3,"Warranty For Electrified Privacy Glass",07, 08 81 00,,,,2.4,"Setting and sealing materials",08, 08 81 00,,,,3.2,"Glass setting",08, 08 81 00,,,,,"Electrified Privacy Glass",08, 08 81 00,,,,1.6.1,"Local/Regional Materials",11, 08 91 00,,,,1.4,"Wall louvers",02, 08 91 00,,,,1.5,"Wall louvers",02, 08 91 00,,,,2.2,"Metal Wall Louvers",03, 08 91 00,,,,1.4,"Wall louvers",04,G,, RO 08 91 00,,,,1.5,"Wall louvers",04,G,, RO 08 91 00,,,,1.5,"Door louvers",04,G,, RO 08 91 00,,,,2.3,"Door louvers",04,G,, RO 09 22 00,,,,2.1,"Metal support systems",02, 09 29 00,,,,2.1.6,"Cementitious backer units",03, 09 29 00,,,,2.1.4,"Glass Mat Water-Resistant Gypsum Tile Backing Board",03, 09 29 00,,,,2.1.3,"Water-Resistant Gypsum Backing Board",03, 09 29 00,,,,2.1.5,"Glass Mat Covered or Reinforced Gypsum Sheathing",03, 09 29 00,,,,2.1.5.1,"Glass Mat Covered or Reinforced Gypsum Sheathing Sealant",03, 09 29 00,,,,2.1.7,"Joint Treatment Materials",03, 09 29 00,,,,2.1.10,"Accessories",03, 09 29 00,,,,1.3,"Certification",03, 09 29 00,,,,2.1,"Asbestos Free Materials",07,G,, RO 09 29 00,,,,2.1,"Material Safety Data Sheets",08, 09 29 00,,,,3.8,"Waste Management",10, 09 29 00,,,,1.6.1,"Local/Regional Materials",11, 09 29 00,,,,2.1.1,"Gypsum Board",11, 09 30 00,,,,1.4,"Detail Drawings",02,G,, 09 30 00,,,,2.1,"Tile",03,G,, 09 30 00,,,,2.2,"Setting-Bed",03,G,, 09 30 00,,,,2.4,"Mortar, Grout, and Adhesive",03,G,, 09 30 00,,,,1.2.3,"Certification",03, 09 30 00,,,,2.1,"Tile",04,G,, 09 30 00,,,,2.4,"Grout",04,G,, 09 30 00,,,,2.1,"Tile",07,G,, 09 30 00,,,,2.4,"Mortar, Grout, and Adhesive",07,G,, 09 30 00,,,,1.2.2,"Local/Regional Materials",11, 09 30 00,,,,2.1,"Tile",11, 09 30 00,,,,2.2.6,"Reinforcing Wire Fabric",11, 09 30 00,,,,2.4,"Adhesives",11, 09 65 00,,,,2.6,"Resilient Flooring and Accessories",02,G,, 09 65 00,,,,2.6,"Resilient Flooring and Accessories",03,G,, 09 65 00,,,,2.2,"Adhesives",03, 09 65 00,,,,1.4,"Certification",03, 09 65 00,,,,2.6,"Resilient Flooring and Accessories",04,G,, 09 65 00,,,,3.3,"Moisture, Alkalinity and Bond Tests",06,G,, 09 65 00,,,,3.2,"Surface Preparation",08,G,, 09 65 00,,,,3.1,"Installation",08,G,, 09 65 00,,,,2.6,"Resilient Flooring and Accessories",10,G,, 09 65 00,,,,1.2.1,"Local/Regional Materials",11, 09 65 00,,,,2.6,"Resilient Flooring and Accessories",11, 09 65 00,,,,2.2,"Adhesives",11, 09 65 00,,,,3.4,"VINYL COMPOSITION TILE",11, 09 65 00,,,,2.1,"WALL BASE",11, 09 67 23.14,,,,2.3,"Flooring Systems",02,G,, DO 09 67 23.14,,,,2.4,"Sealer and Resin",03,G,, DO 09 67 23.14,,,,3.3.2,"Floor Surfacing",03,G,, DO 09 67 23.14,,,,3.2,"Mixing",03,G,, DO 09 67 23.14,,,,1.4,"Certification",03, 09 67 23.14,,,,2.3,"Flooring Systems",04,G,, RO 09 67 23.14,,,,3.4,"Testing",06,G,, DO 09 67 23.14,,,,1.3.1,"Qualifications of Installer",07,G,, RO 09 67 23.14,,,,3.3,"Application",08,G,, RO 09 67 23.14,,,,2.3,"Flooring Systems",10,G,, RO 09 67 23.14,,,,2.2.1,"Indoor Air Quality for Primer",11,S,, 09 67 23.14,,,,2.2.5,"Indoor Air Quality for Top Coating",11,S,, 09 67 23.14,,,,2.4,"Indoor Air Quality for Sealer And Resin",11,S,, 09 90 00,,,,1.9.1,"Local/Regional Materials",01, 09 90 00,,,,3.10,"Piping identification",02, 09 90 00,,,,3.10,"stencil",02, 09 90 00,,,,,"Certification",03, 09 90 00,,,,2.1,"Coating Manufacturer's Technical Data Sheets",03, 09 90 00,,,,,"Sealant",03, 09 90 00,,,,1.10,"Color",04,G,, 09 90 00,,,,1.4.2,"Textured Wall Coating System",04,G,, 09 90 00,,,,1.4.3,"Sample Textured Wall Coating System Mock-Up",04,G,, 09 90 00,,,,1.3,"Applicator's qualifications",07, 09 90 00,,,,1.4.1.2,"Qualification Testing",07,G,, 09 90 00,,,,3.3.1,"Application instructions",08, 09 90 00,,,,3.7.2,"Mixing",08, 09 90 00,,,,1.7.2,"Manufacturer's Material Safety Data Sheets",08, 09 90 00,,,,,"Coatings",10,G,, 10 14 02,,,,1.2,"Detail Drawings",02,G,, RO 10 14 02,,,,3.1,"Detail Drawings",02,G,, RO 10 14 02,,,,3.1,"Installation",03, 10 14 02,,,,1.2,"Interior Signage",04,G,, RO 10 14 02,,,,3.1,"Approved Manufacturer's Instructions",10, 10 14 02,,,,3.1.2,"Protection and Cleaning",10, 10 44 16,,,,2.2,"Wall Brackets",02, 10 44 16,,,,2.2,"Wall Brackets",03, 10 44 16,,,,3.2.1,"Replacement Parts",03, 10 44 16,,,,2.2,"Wall Brackets",04, 11 44 00,,,,2.1,"Exhaust Hoods Over Cooking Equipment",02,G,, 11 44 00,,,,2.1,"Exhaust Hoods Over Cooking Equipment",03,G,, 11 44 00,,,,3.2,"Field Test Reports",06, 11 44 00,,,,3.2,"Exhaust Hood Air-Balance Report",06, 13 48 00,,,,3.1,"Bracing",02,G,, PO
13 48 00,,,,3.4,"RESILIENT VIBRATION ISOLATION DEVICES",02,G,, PO
13 48 00,,,,1.3,"Equipment Requirements",02,G,, PO 13 48 00,,,,3.1,"Bracing",03,G,, PO 13 48 00,,,,1.3,"Equipment Requirements",03,G,, PO
13 48 00,,,,3.4,"RESILIENT VIBRATION ISOLATION DEVICES",03,G,, PO
13 48 00,,,,3.3,"Anchor Bolts",06,G,, PO
13 48 00,,,,3.4,"RESILIENT VIBRATION ISOLATION DEVICES",06,G,, PO
13 48 26,,,,3.1,"Coupling and Bracing",02, 13 48 26,,,,3.3,"Flexible Couplings or Joints",02, 13 48 26,,,,1.3,"Equipment Requirements",02, 13 48 26,,,,1.2.4,"Contractor Designed Bracing",02,G,, 13 48 26,,,,3.1,"Coupling and Bracing",03, 13 48 26,,,,1.3,"Equipment Requirements",03, 13 48 26,,,,1.2.4,"Contractor Designed Bracing",03,G,, 13 48 26,,,,2.2,"Flexible Ball Joints",07, 21 21 03,,,,1.4.3,"Installation Drawings",02,G,, DO 21 21 03,,,,1.4,"Similar Services",03, 21 21 03,,,,2.1,"Standard Products",03,G,, 21 21 03,,,,3.2,"Preliminary Tests",03,G,, 21 21 03,,,,3.3,"Final Acceptance Tests",03,G,, 21 21 03,,,,3.4,"Field Training",03, 21 21 03,,,,3.2,"Preliminary Tests",06, 21 21 03,,,,3.3,"Final Acceptance Tests",06, 21 21 03,,,,1.4.2,"Installation Technician",07,G,, 21 21 03,,,,1.4.3,"Installation Drawings",07,G,, DO 21 21 03,,,,3.4,"Operation and Maintenance Instructions",10,G,, 22 00 00,,,,3.9.1,"Plumbing System",02,G,, PO 22 00 00,,,,1.10.1,"Local/Regional Materials",03, 22 00 00,,,,1.10.2,"Environmental Data",03, 22 00 00,,,,2.1,"Materials",03, 22 00 00,,,,2.4,"Fixtures",03, 22 00 00,,,,2.4.3,"Countertop lavatories",03, 22 00 00,,,,2.4.4,"Kitchen sinks",03, 22 00 00,,,,2.4.5,"Hand sinks",03, 22 00 00,,,,3.9.1.1,"Backflow prevention assemblies",03,G,, 22 00 00,,,,1.5.1,"Welding",03, 22 00 00,,,,3.4,"Vibration-Absorbing Features",03,G,, PO 22 00 00,,,,3.9.1,"Plumbing System",03, 22 00 00,,,,3.9,"Tests, Flushing and Disinfection",06, 22 00 00,,,,3.9.1.1,"Test of Backflow Prevention Assemblies",06,G,, PO 22 00 00,,,,1.3,"Materials and Equipment",07, 22 00 00,,,,2.1.1,"Bolts",07, 22 00 00,,,,3.9.1,"Plumbing System",10,G,, PO 23 00 00,,,,1.4.5,"Detail Drawings",02,G,, 23 00 00,,,,2.9.1.1,"Metallic Flexible Duct",03, 23 00 00,,,,2.9.1.2,"Insulated Nonmetallic Flexible Duct Runouts",03, 23 00 00,,,,2.9.1.2,"Duct Connectors",03, 23 00 00,,,,2.9.2,"Duct Access Doors",03, 23 00 00,,,,2.9.3,"Manual Balancing Dampers",03, 23 00 00,,,,2.9.5.1,"Diffusers",03, 23 00 00,,,,2.9.5.2,"Registers and Grilles",03, 23 00 00,,,,2.9.6,"Louvers",03, 23 00 00,,,,2.10.1.1,"Centrifugal Fans",03, 23 00 00,,,,2.10.1.2,"In-Line Centrifugal Fans",03, 23 00 00,,,,2.10.1.3,"Ceiling Exhaust Fans",03, 23 00 00,,,,2.10.1.4,"Air Curtain Fans",03, 23 00 00,,,,,"Kitchen Exhaust Fans",03,G,, 23 00 00,,,,2.11.1.1,"Variable Volume, Single Duct Terminal Units",03,G,, 23 00 00,,,,1.4.6,"Test Procedures",03, 23 00 00,,,,1.2.1,"Diagrams",03,G,, 23 00 00,,,,3.14,"Operation and Maintenance Training",03, 23 00 00,,,,3.12,"Performance Tests",06,G,, 23 00 00,,,,3.14,"Performance Tests",06,G,, 23 00 00,,,,3.10,"Damper Acceptance Test",06,G,, 23 00 00,,,,1.4.1,"Bolts",07, 23 00 00,,,,1.4.7,"Sustainable Design Certification",07, 23 00 00,,,,3.2,"Manufacturer's Installation Instructions",08, 23 00 00,,,,3.14,"Operation and Maintenance Training",08, 23 00 00,,,,3.14,"Operation and Maintenance Manuals",10, 23 00 00,,,,2.9.3,"Manual Balancing Dampers",10,G,, 23 00 00,,,,2.10.1.1,"Centrifugal Fans",10,G,, 23 00 00,,,,2.10.1.2,"In-Line Centrifugal Fans",10,G,, 23 00 00,,,,2.10.1.3,"Ceiling Exhaust Fans",10,G,, 23 00 00,,,,2.10.1.4,"Air Curtain Fans",10,G,, 23 00 00,,,,,"Kitchen Exhaust Fans",10,G,, 23 00 00,,,,2.11.1.1,"Variable Volume, Single Duct Terminal Units",10,G,, 23 05 93,,,,1.3,"Records of Existing Conditions",01,G,, PO 23 05 93,,,,1.3.3,"Records of Existing Conditions",01,G,, PO 23 05 93,,,,1.5.3.1,"TAB Firm",01,G,, PO 23 05 93,,,,1.2,"TAB team assistants",01,G,, PO 23 05 93,,,,1.2,"TAB team engineer",01,G,, PO 23 05 93,,,,1.5.3.2,"TAB Specialist",01,G,, PO 23 05 93,,,,1.2,"TAB team field leader",01,G,, PO 23 05 93,,,,1.3.3,"TAB Schematic Drawings and Report Forms",02,G,, PO 23 05 93,,,,1.3,"Equipment and Performance Data",03,G,, PO 23 05 93,,,,1.5.3.4,"TAB Related HVAC Submittals",03,G,, PO 23 05 93,,,,1.5.2,"TAB Procedures",03,G,, PO 23 05 93,,,,1.5.2,"Calibration",03,G,, PO 23 05 93,,,,1.3.3,"Systems Readiness Check",03,G,, PO 23 05 93,,,,1.5.4,"TAB Execution",03,G,, PO 23 05 93,,,,1.5.4.3,"TAB Verification",03,G,, PO 23 05 93,,,,3.3.2,"Advance Notice of Pre-Final DALT Field Work",03,G,, PO 23 05 93,,,,,"DALT and TAB Work Execution Schedule",06,G,, 23 05 93,,,,,"DALT and TAB Procedures Summary",06,G,, 23 05 93,,,,1.3.3,"Design review report",06,G,, 23 05 93,,,,1.6.2.1,"Design review report",06,G,, 23 05 93,,,,1.6.2,"Pre-Final DALT report",06,G,, 23 05 93,,,,3.3.5,"Pre-Final DALT report",06,G,, 23 05 93,,,,1.6.2,"Final DALT report",06,G,, 23 05 93,,,,3.3.8,"Final DALT report",06,G,, 23 05 93,,,,1.5.5.2,"TAB report for Season 1",06,G,, 23 05 93,,,,1.5.5.2,"TAB report for Season 2",06,G,, 23 05 93,,,,1.5.3.1,"TAB Firm",07,G,, PO 23 05 93,,,,1.5.1,"Independent TAB Agency and Personnel Qualifications",07,G,, PO 23 05 93,,,,1.6.2,"DALT and TAB Submittal and Work Schedule",07,G,, PO 23 05 93,,,,1.3.3,"Design review report",07,G,, PO 23 05 93,,,,1.6.2.1,"Design review report",07,G,, PO 23 05 93,,,,1.6.2.2,"Pre-field DALT preliminary notification",07,G,, PO 23 05 93,,,,1.6.2.3,"Pre-field TAB engineering report",07,G,, PO 23 05 93,,,,1.6.2,"Advanced notice for Season 1 TAB field work",07,G,, PO 23 05 93,,,,1.6.2,"Prerequisite HVAC Work Check Out List For Season 1",07,G,, PO 23 05 93,,,,1.6.2,"Advanced Notice For Season 2 TAB Field Work",07,G,, PO 23 05 93,,,,1.6.2,"Prerequisite HVAC Work Check Out List For Season 2",07,G,, PO 23 07 00,,,,3.2.2.4,"Mica Plates",02,G,, PO 23 07 00,,,,2.1,"General Materials",03, 23 07 00,,,,2.1.1,"Adhesives",03, 23 07 00,,,,2.1.13,"Sealants",03, 23 07 00,,,,2.3.1,"Duct Insulation",03, 23 07 00,,,,2.3.4,"Duct Insulation Jackets",03, 23 07 00,,,,2.2,"Pipe Insulation Materials",03, 23 07 00,,,,2.1.8,"Jackets",03, 23 07 00,,,,2.1.1.3,"Thermal Insulation",04,G,, PO 23 09 00,,,,3.3,"DDC Contractor Design Drawings",02,G,, 23 09 00,,,,3.3,"Draft As-Built Drawings",02,G,, 23 09 00,,,,2.2,"Manufacturer's Product Data",03,G,, 23 09 00,,,,3.1.1,"Existing Conditions Report",06, 23 09 00,,,,3.5.2,"Start-Up Testing Report",06,G,, 23 09 00,,,,3.6.1,"PVT Procedures",06,G,, 23 09 00,,,,3.6.3,"PVT Report",06,G,, 23 09 00,,,,1.7.1,"Preconstruction Quality Control (QC) Checklist",06,G,, 23 09 00,,,,1.7.2,"Post-Construction Quality Control (QC) Checklist",06,G,, 23 09 00,,,,3.7,"Operation and Maintenance (O&M) Instructions",10,G,, 23 09 00,,,,3.8.1,"Training Documentation",10,G,, 23 09 00,,,,2.5,"Enclosure Keys",11,G,, 23 09 00,,,,3.3,"Final As-Built Drawings",11,G,, 23 09 00,,,,1.7.3,"Closeout Quality Control (QC) Checklist",11,G,, 23 11 23,,,,3.1,"Gas Piping System",02, 23 11 23,,,,1.3.1,"Welding",03, 23 11 23,,,,2.4,"Pressure regulators",03, 23 11 23,,,,3.14,"Testing",06, 23 11 23,,,,3.14.1,"Pressure Tests",06, 23 11 23,,,,3.14.2,"Test With Gas",06, 23 11 25,,,,1.5.3,"Gas Piping System",02,G,, 23 11 25,,,,2.2,"Gas Piping System",02,G,, 23 11 25,,,,3.2,"Gas Piping System",02,G,, 23 11 25,,,,1.6.1,"Pipe and Fittings",03,G,, 23 11 25,,,,1.5.3,"Gas Equipment Connectors",03,G,, 23 11 25,,,,1.5.3,"Gas Piping System",03,G,, 23 11 25,,,,2.2,"Gas Piping System",03,G,, 23 11 25,,,,3.2,"Gas Piping System",03,G,, 23 11 25,,,,2.1,"Pipe Coating Materials",03,G,, 23 11 25,,,,2.3,"Valves",03,G,, 23 11 25,,,,2.2.5,"Warning and Identification Tape",03,G,, 23 11 25,,,,3.15,"Testing",06,G,, 23 11 25,,,,3.15.1,"Pressure Tests",06,G,, 23 11 25,,,,3.15.2,"Test with Gas",06,G,, 23 11 25,,,,1.5.1,"Welders Procedures and Qualifications",07,G,, 23 11 25,,,,1.5.1,"Assigned Number, Letter, or Symbol",07,G,, 23 11 25,,,,1.5.2,"PE Pipe and Fittings",08,G,, 23 11 25,,,,2.1,"Pipe Coating Materials",08,G,, 23 11 25,,,,1.3.1,"Gas Facility System and Equipment Operation",10,G,, 23 11 25,,,,1.3.2,"Gas Facility System Maintenance",10,G,, 23 11 25,,,,1.3.3,"Gas Facility Equipment Maintenance",10,G,, 26 05 00,,,,2.1,"Material, Equipment, and Fixture Lists",01, 26 05 00,,,,2.1.1,"Conduits and Raceways",03,G,, 26 05 00,,,,2.1.3,"Wire and Cable",03,G,, 26 05 00,,,,3.2.1.9,"Splices and Connectors",03,G,, 26 05 00,,,,2.1.4,"Switches",03,G,, 26 05 00,,,,2.1.5,"Receptacles",03,G,, 26 05 00,,,,2.1.6,"Outlet Boxes, Pull Boxes and Junction Boxes",03,G,, 26 05 00,,,,2.1.8,"Circuit Breakers",03,G,, 26 05 00,,,,2.1.7,"Panelboards",03,G,, 26 05 00,,,,2.1.9,"Lighting Fixtures",03,G,, 26 05 00,,,,2.1.11,"Dry-Type Distribution Transformers",03,G,, 26 05 00,,,,3.3,"Continuity Test",06,G,, 26 05 00,,,,3.3,"Phase-Rotation Tests",06,G,, 26 05 00,,,,3.3,"Insulation Resistance Test",06,G,, 26 05 00,,,,3.1,"Manufacturer's Instructions",08, 26 05 48,,,,3.2,"Lighting Fixtures in Buildings",02, 26 05 48,,,,1.3,"Equipment Requirements",02, 26 05 48,,,,3.2,"Lighting Fixtures in Buildings",03,G,, 26 05 48,,,,1.3,"Equipment Requirements",03,G,, 26 05 48,,,,1.2.4,"Contractor Designed Bracing",03,G,, 26 20 00,,,,2.12,"Panelboards",02,G,, 26 20 00,,,,2.14,"Transformers",02,G,, 26 20 00,,,,2.26,"Wireways",02,G,, 26 20 00,,,,3.1.8.1,"Marking strips",02,G,, 26 20 00,,,,2.11,"Receptacles",03,G,, 26 20 00,,,,2.12.3,"Circuit breakers",03,G,, 26 20 00,,,,2.9,"Switches",03,G,, 26 20 00,,,,2.14,"Transformers",03,G,, 26 20 00,,,,2.13,"Enclosed circuit breakers",03,G,, 26 20 00,,,,2.16,"Motor controllers",03,G,, 26 20 00,,,,2.18.1,"Combination motor controllers",03,G,, 26 20 00,,,,2.17,"Manual motor starters",03,G,, 26 20 00,,,,2.27,"Surge protective devices",03,G,, 26 20 00,,,,3.5.2,"600-volt wiring test",06,G,, 26 20 00,,,,3.5.5,"Grounding system test",06,G,, 26 20 00,,,,3.5.3,"Transformer tests",06,G,, 26 20 00,,,,3.5.4,"Ground-fault receptacle test",06,G,, 26 20 00,,,,2.10,"Fuses",07,G,, 26 20 00,,,,2.29.1,"Transformer factory tests",09, 26 20 00,,,,1.5.1,"Electrical Systems",10,G,, 26 51 00,,,,1.5.1,"Luminaire Drawings",02,G,, 26 51 00,,,,1.5.2,"Occupancy/Vacancy Sensor Coverage Layout",02,G,, 26 51 00,,,,2.2,"Luminaires",03,G,, 26 51 00,,,,2.4,"Light Sources",03,G,, 26 51 00,,,,2.3,"Drivers",03,G,, 26 51 00,,,,1.6.1,"LED Luminaire Warranty",03,G,, 26 51 00,,,,1.5.4,"Luminaire Design Data",03,G,, 26 51 00,,,,2.5.3.2,"Vacancy Sensors",03,G,, 26 51 00,,,,2.5.2,"Dimming Controllers (Dimmers)",03,G,, 26 51 00,,,,2.5.4,"Timeswitch",03,G,, 26 51 00,,,,2.6.1,"Exit Signs",03,G,, 26 51 00,,,,2.6.2,"Emergency Lighting Unit (EBU)",03,G,, 26 51 00,,,,2.6.3,"LED Emergency Drivers",03,G,, 26 51 00,,,,2.5.3.1,"Occupancy Sensors",03,G,, 26 51 00,,,,2.5.5,"Lighting Control Panel",03,G,, 26 51 00,,,,1.5.5,"LED Luminaire - IES LM-79 Test Report",06,G,, 26 51 00,,,,1.5.6,"LED Light Source - IES LM-80 Test Report",06,G,, 26 51 00,,,,1.5.7,"LED Light Source - IES TM-21 Test Report",06,G,, 26 51 00,,,,1.5.8,"Occupancy/Vacancy Sensor Verification Tests",06,G,, 26 51 00,,,,1.5.11.3,"Energy Efficiency",06,G,, 26 51 00,,,,1.6.1.1,"Luminaire Useful Life Certificate",07,G,, 26 51 00,,,,1.5.3,"LED Driver and Dimming Switch Compatibility Certificate",07,G,, 27 10 00,,,,1.6.1.1,"Telecommunications drawings",02,G,, 27 10 00,,,,1.6.1.2,"Telecommunications Space Drawings",02,G,, 27 10 00,,,,2.3,"Telecommunications cabling",03,G,, 27 10 00,,,,2.5,"Telecommunications outlet/connector assemblies",03,G,, 27 10 00,,,,1.10.3,"Spare Parts",03,G,, 27 10 00,,,,3.5.1,"Telecommunications cabling testing",06,G,, 27 10 00,,,,1.6.2.1,"Telecommunications Contractor",07,G,, 27 10 00,,,,1.6.2.2,"Key Personnel",07,G,, 27 10 00,,,,1.6.2.3,"Manufacturer Qualifications",07,G,, 27 10 00,,,,1.6.3,"Test plan",07,G,, 27 10 00,,,,2.9.1,"Factory reel tests",09,G,, 27 10 00,,,,1.10.1,"Telecommunications cabling and pathway system",10,G,, 27 10 00,,,,1.10.2,"Record Documentation",11,G,, 28 31 76,,,,2.1.2,"Nameplates",02,G,, 28 31 76,,,,3.2.1,"Wiring Diagrams",02,G,, 28 31 76,,,,1.2.1,"System Layout",02,G,, 28 31 76,,,,2.3,"System Operation",02,G,, 28 31 76,,,,2.12,"Notification Appliances",02,G,, 28 31 76,,,,2.10,"Fire Alarm Control Unit and Mass Notification Control Unit (FMCP)",03,G,, 28 31 76,,,,2.11,"Manual Stations",03,G,, 28 31 76,,,,2.12,"Notification Appliances",03,G,, 28 31 76,,,,2.6,"Addressable Interface Devices",03,G,, 28 31 76,,,,3.7,"Field Quality Control",06, 28 31 76,,,,3.7.1,"Testing Procedures",06,G,, 28 31 76,,,,1.6.1.4,"Installer",07, 28 31 76,,,,3.7.2.2,"Formal Inspection and Tests",07, 28 31 76,,,,3.7.2.3,"Final Testing",07, 28 31 76,,,,2.3,"System Operation",09,G,, 28 31 76,,,,1.6.2.2,"Fire Alarm/Mass Notification System",09, 28 31 76,,,,3.8,"Operation and Maintenance (O&M) Instructions",10,G,, 28 31 76,,,,3.7.2.4,"As-Built Drawings",11,
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .