A01.07_Atch_1_Bldg_100_Kitchen_&_Bldg_16_Cafeteria_Renovation_SOW_Rev_6.7.17_v_2.docx

DOCX document 36 KB Posted

Attached to
Kitchen/Cafeteria Remodel at DDJC Tracy, CA
Solicitation number
W91238-17-R-0062
Issued by

About this file

Atch 1 Bldg 100 Kitchen & Bldg 16 Cafeteria Renovation 8-3-17

View the file

Other files

File Type Posted
Appendix_8__Specs-Intact_Submittal_Register_.txt TXT text file
Appendix_7__Specs-Intact_Master_File_.pdf PDF
Appendix_1__Renovate_Cafeteria_Buildings_100_and_16_Drawings_RTA.pdf.pdf PDF
Amendment_0003.pdf PDF
Atch_1_Bldg_100_Kitchen_&_Bldg_16_Cafeteria_Renovation_SOW_Rev_9.1.17.docx DOCX document
W91238-17-R-0062_AM_002.pdf PDF
A01.07_Solicitation_17-R-0062_AM_01.pdf PDF
Site_walk_list.pdf PDF
Appendix_1_-_Renovate_Cafeteria_Buildings_100_and_16_-_Drawings_RTA.pdf PDF
A01.07_Appendix_1__Renovate_Cafeteria_Buildings_100_and_16_Drawings_RTA.pdf PDF
A01.07_Appendix_5_-_Environmental_Checklist_for_Kitchen_at_Bldg_100.pdf PDF
A01.07_Appendix_4_-_Environmental_Checklist_for_Cafeteria_at_Bldg_16.pdf PDF
A01.07_Appendix_6_-_Asbestos_and_Lead_Survey_Results.pdf PDF
A01.07_Appendix_10__Division_23_Specifications.pdf PDF
A01.07_Appendix_3_-_Division_1_Specifications.pdf PDF
A01.07_Atch_2_Supplemental_Contract_Requirements.docx DOCX document
A01.07_Atch_3_Davis_Bacon_Wage_Determination.docx DOCX document
A01.07_Appendix_2_-_Renovate_Cafeteria_Buildings_100_and_16_Design_Analysis_RTA_.pdf PDF
A01.07_Appendix_7_Division_02_Specifications.pdf PDF
Solicitation_17-R-0062.pdf PDF
A01.07_Atch_4_Past_Performance_Worksheets.pdf PDF
A01.07_Appendix_9__Division_21_Specifications.pdf PDF
A01.07_Appendix_8_Division_11_Specification.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1 W91238-x-x-xxxx 12 April 2017 Statement of Work Renovation of Building 100 Kitchen & Building 16 Cafeteria Defense Logistics Agency (DLA), DDJC Tracy Site, Tracy, CA

1.0 General Requirements

Provide construction services to include all labor, management, supervision, tools, materials, equipment, and transportation to renovate Building 100 Kitchen and Building 16 Cafeteria.

1.1 General Description

The scope of work includes but is not limited to the following:

a. Renovate the kitchen and serving areas of Building 100 as well as the serving and dining areas of Building 16. See Appendix 1 – Renovate Cafeteria Buildings 100 and 16 Drawings RTA and Appendix 2 - Renovate Cafeteria Buildings 100 and 16 Design Analysis RTA for more specific scope of work.

b. The contractor shall verify all existing conditions and dimensions of project area prior to construction.

1.2 Submittals

Submittals are required for all material to be utilized and/or installed and shall be in compliance with the Unified Facilities Guide Specifications (UFGS) and the basic contract. All submittals shall be approved prior to commencement of work. Submittals shall include but not limited to the following:

a. For Construction:

1. Task specific: Quality Control Plan, Hazard Analysis, Safety/Health Plan, and Environmental Protection Plan.

2. Construction schedule.

3. Manufacturer’s data for all materials and equipment.

4. As-built drawings.

5. Operations and Maintenance manuals.

2.0 Task Order Description

Work requirements are as described below:

Construction shall also comply with Appendix 3 – Division 1 Specifications and all applicable requirements of this contract. All Safety Requirements shall be IAW EM 385-1-1 and UFGS 01 35 26 Governmental Safety Requirements.

Asbestos abatement shall comply with UFGS specifications 02 82 13 Asbestos Abatement. Lead abatement shall comply with 02 83 13 Lead in Construction; and disposal of ballasts and light containing PCB and Mercury shall comply with 02 84 16 Handling of Lighting Ballasts and Lamps with PCBs and Mercury. See Appendix 6 – Asbestos and Lead Survey Results and Appendix 7 – Division 02 Specifications.

For any outages, DLA shall be notified 30 days in advance.

The Contractor shall maintain a clean work area during and after completion of all work. The Contractor shall provide a point of contact and telephone number to request the required work.

Contractor shall obtain all permits required to do the work.

Contractor shall include in their schedule, 21 days of hiatus after the construction of kitchen renovation in Building 100 is complete; the separate kitchen equipment contractor will install the equipment and re-opens Building 100 kitchen to the public and before the demo of Bldg 16 Cafeteria begins.

3.0 Environmental Compliance

The Contractor shall comply with all Federal, State, and Local regulations including but not limited to the NEPA and General Conformity requirements, as well as DLA and Host installation rules and policies regarding the use, storage, transport and disposal of hazardous materials and wastes.

Hazardous work processes and hazardous materials utilized or generated in the performance of this contract shall be controlled and disposed of by the Contractor in a manner that is safe in accordance with the appropriate local, state and US Government laws and directives established for the control of those processes and materials.

The Contractor shall provide for clean-up of all hazardous and non-hazardous spills when they may occur in, around, or as a result of the Contractor’s operation. The Contractor shall also provide for transportation and disposal off the facility of all hazardous and non-hazardous waste products generated in the performance of this contract. The Contractor shall immediately notify the COR of any hazardous waste spills. See also Appendix 4 – Environmental Checklist for Cafeteria at Bldg 16 and Appendix 5 – Environmental Checklist for Kitchen at Bldg 100 for additional environmental requirements.

4.0 Security Requirements

The Contractor shall follow all DLA Transaction Services security requirements during access to the facilities. A DLA Form 1818 Visit Notification must be completed upon award of the contract listing the authorized contractors/employees requiring access to the DLA Transaction Services facility. Each employee of the contractor or subcontractor shall sign in with the receptionist, obtain a pass, and be escorted while within the DLA Transaction Services facilities. Upon completion of the work, the Contractor shall sign out and turn in all facility passes.

5.0 Codes and References

The following references 1) listed below, and 2) listed elsewhere within this RFP is mandatory. All references used shall be of the latest edition. The listed references may not be all inclusive, and it is the contractor’s responsibility to meet all codes.

International Building Code (2015) International Mechanical Code International Plumbing Code NFPA 70 National Electrical Code NFPA 70E Standard for Electrical Safety in the Workplace IEEE C2, National Electrical Safety Code IESNA HB-10 IES Lighting Handbook

UFC 3-400-10N Mechanical Engineering UFC 3-410-01FA Heating, Ventilating and Air Conditioning UFC 3-420-01 Plumbing Systems UFC 3-501-01 Electrical Engineering UFC 3-520-01 Interior Electrical Systems UFC 3-530-01 Design: Interior and Exterior Lighting and Controls UFC 3-560-01 Electrical Safety, O&M UFC 1-200-02 High Performance and Sustainable Building Requirements

Appendices Appendix 1 – Renovate Cafeteria Buildings 100 and 16 Drawings RTA Appendix 2 - Renovate Cafeteria Buildings 100 and 16 Design Analysis RTA Appendix 3 – Division 1 Specifications Appendix 4 – Environmental Checklist for Cafeteria at Bldg 16 Appendix 5 – Environmental Checklist for Kitchen at Bldg 100 Appendix 6 – Asbestos and Lead Survey Results Appendix 7 – Division 02 Specifications