This document provides details on a federal solicitation for construction services. The U.S. Army Corps of Engineers Huntington District is seeking a contractor to perform repairs and stabilization work for the Portsmouth Local Protection Project in Portsmouth, Ohio. Services required include replacing damaged storm sewer pipes and manholes, flood pump station discharge pipes and valves, and sewer pump station pipes. Additional responsibilities involve protecting athletic fields, bypass pumping, and ensuring all work complies with applicable laws and regulations. Proposals are due through the DOD SAFE system by contacting the Contracting Officer and Contract Specialist by November 13, 2020 to receive an upload link. The solicitation number is W9123720R0008. Evaluation criteria include technical approach, experience, management approach, past performance, and small business participation plan. Award will be made to the responsible offeror whose proposal represents the best value to the government based on the evaluation factors.

View the file

Other files

File Type Posted
A.03.09 Specifications Summary of Changes Rev_02 .pdf PDF
B.04.20 Davis Bacon Wage Rates dtd 1 Jan 2021.pdf PDF
B.08.03 - W9123720R0008 - Amendment 0004.pdf PDF
A.03.09 Specifications Summary of Changes Rev_02 .pdf PDF
A.03.09 - KTR Questions - 2.pdf PDF
B.08.03 - W9123720R0008 - Amendment 0003.pdf PDF
B.08.03 - W9123720R0008 - Amendment 0003.pdf PDF
A.03.09 Appendix E - Environmental Analysis.pdf PDF
Appendix A - Geotechnical Design (Vol. 1), Part 1.pdf PDF
Appendix A - Geotechnical Design (Vol. 1), Part 3.pdf PDF
A.03.09 Appendix L - Ph I ESA report_Portsmouth LPP_final_07 Apr 2020.pdf PDF
Appendix A - Geotechnical Design (Vol. 1), Part 6.pdf PDF
Ohio River 2020 WTP monthly reports.pdf PDF
Appendix A - Geotechnical Design (Vol. 1), Part 9.pdf PDF
Appendix A - Geotechnical Design (Vol. 1), Part 7.pdf PDF
Section 00 10 00 PRice Breakout Schedule Rev_01.docx DOCX document
Video 2.MOV MOV file
WWTP effluent 2020 DMRs.pdf PDF
B.08.03 - W9123720R0008 - Amendment 0002.pdf PDF
Video 3c.mp4 MP4 file
Ohio River 2019 WTP monthly reports.pdf PDF
Video 3a.mp4 MP4 file
Appendix A - Geotechnical Design (Vol. 1), Part 2.pdf PDF
Video 1d.mp4 MP4 file
Appendix A - Geotechnical Design (Vol. 1), Part 4.pdf PDF
Video 1b.mp4 MP4 file
A.03.09 Appendix K - NPDES Application.pdf PDF
Section 00 22 00 Instructions and Conditions Rev_01.docx DOCX document
Appendix A - Geotechnical Design (Vol. 1), Part 5.pdf PDF
Section 00 73 00 Davis Bacon Wage Rates Rev_01.pdf PDF
Portsmouth Seepage Barrier - KTR Questions.docx DOCX document
Video 1a.mp4 MP4 file
A.03.09 Specifications Rev_01.pdf PDF
Section 00 22 00 Evaluation Factors Rev_01.docx DOCX document
PSBR-MASTER BASE WITH FEATURES_2020NOV21.zip ZIP file
Video 1c.mp4 MP4 file
Appendix A - Geotechnical Design (Vol. 1), Part 10.pdf PDF
Video 3b.mp4 MP4 file
Appendix A - Geotechnical Design (Vol. 1), Part 8.pdf PDF
B.08.03 W9123720R0008 Amendment 0001.pdf PDF
B.08.02 W9123720R0008.pdf PDF
B.08.02 W9123720R0008.pdf PDF
A.03.09 Specifications.pdf PDF
A.03.09 Plans.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary of changes to the specifications for W9123720R008, Amendment P00002

1. Added Section 35 41 17

2. Replaced Section 31 32 23 (multiple changes)

3. Replaced Section 31 56 00 (multiple changes)

4. Changed Section 31 00 00, 3.23.5: changed frequency of proctor testing

5. Changed Section 31 57 00, 3.5: to allow results and conclusions to be signed by a licensed engineer in any state of USA, not only Ohio.

6. Changed Section 40 05 13, 3.2 Temporary Pumping (multiple changes)

7. Added appendices A, E, K & L to specifications

8. Changed pay item "Seepage Barrier Critical Area" to "job" from "sq.ft".

9. Added blanks to "Item 37 Price Breakout" for contractor input if necessary.

10. Changed Section 31 55 00, 1.4 "Contractor shall be required to evacuate the construction platform if the river level is projected to reach within 5 feet of the surface of the construction platform within 24 hours.", from "...72 hours".

11. Changed solicitation changing all references of 10% SBE goal to 23%.

12. Changed solicitation allowing all experience for ten years, not six year, to be submitted.

13. Replaced FAR Clause 52.222-33, Notice of Requirement for Project Labor Agreements with FAR Clause 52.222-33, Alt. 1.