Section 00 10 00 PRice Breakout Schedule Rev_01.docx

DOCX document 33 KB Posted

Attached to
Portsmouth Local Protection Project, Portsmouth, Ohio
Solicitation number
W9123720R0008
Issued by

About this file

This document contains a price breakout schedule and related federal contract opportunity notice. The price breakout schedule provides estimated quantities and unit pricing for 48 separate line items for a seepage barrier construction project. It includes items such as mobilization, site work including excavation and disposal, concrete, asphalt, fencing and piping. The schedule also includes a detailed breakdown of estimated quantities and unit pricing for site work.

The related federal contract opportunity is a pre-solicitation notice for repairs and stabilization work for the Portsmouth Local Protection Project in Portsmouth, Ohio. The work includes replacement of storm sewer pipes and manholes, flood pump station pipes and valves, and athletic field restoration with bypass pumping. The solicitation number is provided along with procurement details such as evaluation criteria, a November site visit date, and electronic submission instructions through DOD SAFE. The contracting agency is the Army Corps of Engineers Huntington District and the NAICS code is 237310 for heavy construction with a size standard of $36.5 million.

View the file

Other files

File Type Posted
A.03.09 Specifications Summary of Changes Rev_02 .pdf PDF
B.04.20 Davis Bacon Wage Rates dtd 1 Jan 2021.pdf PDF
B.08.03 - W9123720R0008 - Amendment 0004.pdf PDF
A.03.09 Specifications Summary of Changes Rev_02 .pdf PDF
A.03.09 - KTR Questions - 2.pdf PDF
B.08.03 - W9123720R0008 - Amendment 0003.pdf PDF
B.08.03 - W9123720R0008 - Amendment 0003.pdf PDF
Summary of Changes in Solicitation.docx DOCX document
A.03.09 Appendix E - Environmental Analysis.pdf PDF
Appendix A - Geotechnical Design (Vol. 1), Part 1.pdf PDF
Appendix A - Geotechnical Design (Vol. 1), Part 3.pdf PDF
A.03.09 Appendix L - Ph I ESA report_Portsmouth LPP_final_07 Apr 2020.pdf PDF
Appendix A - Geotechnical Design (Vol. 1), Part 6.pdf PDF
Ohio River 2020 WTP monthly reports.pdf PDF
Appendix A - Geotechnical Design (Vol. 1), Part 9.pdf PDF
Appendix A - Geotechnical Design (Vol. 1), Part 7.pdf PDF
Video 2.MOV MOV file
WWTP effluent 2020 DMRs.pdf PDF
B.08.03 - W9123720R0008 - Amendment 0002.pdf PDF
Video 3c.mp4 MP4 file
Ohio River 2019 WTP monthly reports.pdf PDF
Video 3a.mp4 MP4 file
Appendix A - Geotechnical Design (Vol. 1), Part 2.pdf PDF
Video 1d.mp4 MP4 file
Appendix A - Geotechnical Design (Vol. 1), Part 4.pdf PDF
Video 1b.mp4 MP4 file
A.03.09 Appendix K - NPDES Application.pdf PDF
Section 00 22 00 Instructions and Conditions Rev_01.docx DOCX document
Appendix A - Geotechnical Design (Vol. 1), Part 5.pdf PDF
Section 00 73 00 Davis Bacon Wage Rates Rev_01.pdf PDF
Portsmouth Seepage Barrier - KTR Questions.docx DOCX document
Video 1a.mp4 MP4 file
A.03.09 Specifications Rev_01.pdf PDF
Section 00 22 00 Evaluation Factors Rev_01.docx DOCX document
PSBR-MASTER BASE WITH FEATURES_2020NOV21.zip ZIP file
Video 1c.mp4 MP4 file
Appendix A - Geotechnical Design (Vol. 1), Part 10.pdf PDF
Video 3b.mp4 MP4 file
Appendix A - Geotechnical Design (Vol. 1), Part 8.pdf PDF
B.08.03 W9123720R0008 Amendment 0001.pdf PDF
B.08.02 W9123720R0008.pdf PDF
B.08.02 W9123720R0008.pdf PDF
A.03.09 Specifications.pdf PDF
A.03.09 Plans.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Breakout Schedule

ITEM NO.
DESCRIPTION
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
1
Reinbursement of Actual Cost of Performance and Payment Bonds for Bids in Excess of $250,000
1
Job
Sum (not to exceed)
$__________________
2
Mobilization and Demobilization
1
Job
Sum
$__________________
3
Formal Partnering Meeting
1
Job
Sum
$__________________
4
Contractor-Furnished Government Office
1
Job
Sum
$__________________
5
Contractor-Furnished Janitorial Service
1
Job
Sum
$__________________
6
Environmental Protection
1
Job
Sum
$__________________
7
Working "As-built" Documents (Price shall not be less than $10,000)
1
Job
Sum
$__________________
8
Final "As-built" Documents (Price shall not be less than $20,000)
1
Job
Sum
$__________________
9
Cast-in-Place Concrete
1
Job
Sum
$__________________
10
Structural Steel
1
Job
Sum
$__________________
11
Miscellaneous Metal Fabrications
1
Job
Sum
$__________________
12
Electrical Work
1
Job
Sum
$__________________
13
Off-Site Topsoil
2,785
Ton
$_________
$__________________
14
Instrumentation
1
Job
Sum
$__________________
15
Evacuation of Work Platform Due to Flooding
1
Ea.
$_________
$__________________
16
Seepage Barrier Demonstration Section
16,737
Sq. Ft.
$_________
$__________________
17
Seepage Barrier Critical Area Demonstration Section
2,682
Sq. Ft.
$_________
$__________________
18
Seepage Barrier (in Embankment or Overburden)
151,571
Sq. Ft.
$_________
$__________________
19
Seepage Barrier (in Bedrock)
10,350
Sq. Ft.
$_________
$__________________
20
Seepage Barrier Critical Area
1
Job
Sum
$__________________
21
Added Verification Drilling and Testing
1,000
Ln. Ft.
$_________
$__________________
22
Drilled Concrete Piers
1
Job
Sum
$__________________
23
Asphalt Removal
1,560
Cu. Yd.
$_________
$__________________
24
Aggregate Base Course
1,440
Ton
$_________
$__________________
25
Asphalt Concrete, Base Course
996
Ton
$_________
$__________________
26
Asphalt Concrete, Surface Course
1,861
Ton
$_________
$__________________
27
Asphalt Concrete, Intermediate Course
387
Ton
$_________
$__________________
28
Tack Coat
2,234
Gallon
$_________
$__________________
29
Prime Coat
1,792
Gallon
$_________
$__________________
30
ODOT Riprap, Type C
168
Cu. Yd.
$_________
$__________________
31
ODOT Riprap, Type D
85
Cu. Yd.
$_________
$__________________
32
Geotextile Filter
336
Sq. Yd.
$_________
$__________________
33
Geotextile Fabric
4,319
Sq. Yd.
$_________
$__________________
34
Low Strength Grout
39
Cu. Yd.
$_________
$__________________
35
Pavement Planing
1,474
Ton
$_________
$__________________
36
Patching Planed Surface
369
Ton
$_________
$__________________
37
Site Work
1
Job
Sum
$__________________
38
Chain Link Fence
1
Job
Sum
$__________________
39
Gate
1
Ea.
$_________
$__________________
40
Seeding
1
Job
Sum
$__________________
41
18-Inch HDPE
900
Ln. Ft.
$_________
$__________________
42
48-Inch Precast Concrete Manhole
4
Ea.
$_________
$__________________
43
18-Inch Headwall
1
Ea.
$_________
$__________________
44
Video Inspection of Pipe
1
Job
Sum
$__________________
45
Connections to Existing Pipe
1
Job
Sum
$__________________
46
Connections to Existing Equipment
1
Job
Sum
$__________________
47
Pipelines, Liquid Process and Piping
1
Job
Sum
$__________________
48
Temporary Bypass Pumping
1
Job
Sum
$__________________

Total (Items 1 thru 48)

The following bid schedule is a pay activity breakout of Price Breakout Schedule Item No. 37 listed above for evaluation purposes only and will not be considered as part of the contract. This should be completed, as applicable, based on the method of construction chosen. The total of this breakout should be transferred to Price Breakout Schedule Item No 37 above.

The purpose of this pay activity breakout is to quantify any price items that could vary based on the method of construction (work platform type, work platform width, earthwork, etc.). A proposal may be rejected if subline items are not adequately addressed. Based on each proposal needs, additional "blank" subline items have been provided which may or may not be used. The quantities and costs associated with these subline items must be completed and will be considered during the evaluation of the proposals, but otherwise will be used for informational purposes only.

Portsmouth Seepage Barrier

Price Breakout Schedule Item 37 - "Site Work"

ITEM NO.
DESCRIPTION
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
1
Demolition
1
Job
Sum
$__________________
2
Clearing and Grubbing
__________________
Acre
$_________
$__________________
3
Topsoil Stripping
__________________
BCY
$_________
$__________________
4
Placement of Random Import Borrow Material Necessary for Access Ramp Construction
__________________
CCY
$_________
$__________________
5
Removal and Disposal of Random Import Borrow Material Necessary for Access Ramp Construction
__________________
CY
$_________
$__________________
6
Random Import Borrow Material for Work Platform Construction
__________________
CCY
$_________
$__________________
7
Removal and Disposal of Random Import Borrow Material Necessary for Platform Construction
__________________
CY
$_________
$__________________
8
Excavation of Fine-Grained Material from Top of Levee & Stored in Suitable Location
__________________
BCY
$_________
$__________________
9
All Weather Surface for Construction Site and Access Ramps
__________________
CCY
$_________
$__________________
10
Removal and Disposal of All Weather Surface for Site and Access Ramps
__________________
CY
$_________
$__________________
11
Work Platform Surface
__________________
CCY
$_________
$__________________
12
Removal and Disposal of Work Platform Surface
__________________
CY
$_________
$__________________
13
Excavation of Fine-Grained Material from Suitable Stored Location & used for Levee Final Restoration
__________________
CCY
$_________
$__________________
14
Additional Excavation of Fine-Grained Material from Borrow Area for Levee Final Restoration
__________________
BCY
$_________
$__________________
15
Placement of Topsoil for Final Grading
__________________
CCY
$_________
$__________________
16
Slurry Disposal
__________________
CY
$_________
$__________________
17
Guidewalls for Placement of Seepage Barrier
__________________
CY
$_________
$__________________
18
Maintenance of Traffic
1
Job
Sum
$__________________
19
Surveying
__________________
Hr.
$_________
$__________________
20
Miscellaneous Items
1
Job
Sum
$__________________
21
Shoring
__________________
Sq.Ft.
$_________
$__________________
22
_____________________________________
__________________
_____
$_________
$__________________
23
_____________________________________
__________________
_____
$_________
$__________________
24
_____________________________________
__________________
_____
$_________
$__________________
25
_____________________________________
__________________
_____
$_________
$__________________
26
_____________________________________
__________________
_____
$_________
$__________________
27
_____________________________________
__________________
_____
$_________
$__________________
28
_____________________________________
__________________
_____
$_________
$__________________
29
_____________________________________
__________________
_____
$_________
$__________________
30
_____________________________________
__________________
_____
$_________
$__________________
31
_____________________________________
__________________
_____
$_________
$__________________
32
_____________________________________
__________________
_____
$_________
$__________________
33
_____________________________________
__________________
_____
$_________
$__________________
34
_____________________________________
__________________
_____
$_________
$__________________
35
_____________________________________
__________________
_____
$_________
$__________________
36
_____________________________________
__________________
_____
$_________
$__________________
37
_____________________________________
__________________
_____
$_________
$__________________
38
_____________________________________
__________________
_____
$_________
$__________________
39
_____________________________________
__________________
_____
$_________
$__________________
40
_____________________________________
__________________
_____
$_________
$__________________
Unit Abbreviation
Full Name
ACR
Acres
BCY
Bank Cubic Yards
CF
Cubic Foot
CY
Cubic Yard
EA
Each
ECY
Embankment Cubic Yards
GAL
Gallons
HR
Hours
JOB
Job
LCY
Loose Cubic Yards