This document provides details for a federal construction contract opportunity with the U.S. Army Corps of Engineers Huntington District. The solicitation seeks a contractor to perform repairs and stabilization of the Portsmouth Local Protection Project in Portsmouth, Ohio, including replacement of damaged storm sewer pipes and manholes, flood pump station discharge pipes, and sewer pump station discharge pipes. The contractor will also be responsible for protecting and restoring athletic fields, bypass pumping during construction, and ensuring all work meets contract requirements and applicable laws. The solicitation number is W9123720R0008. The contract will be awarded based on evaluation of technical approach, experience, management approach, past performance, small business participation plan, and cost/price factors. An organized site visit will be held on November 13, 2020, with proposals due through the DOD SAFE system by requesting a link from the contracting contacts provided by December 18, 2020. The NAICS code is 237310 and small businesses must perform 15% of the work.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04 EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The above referenced solicitation for Portsmouth Levee Repair is hereby AMENDED as follows: (A) Reference Section 00 10 00, price breakout schedule is revised in its entirety. (B) Reference Section 00 21 00, FAR Clause 52.222-33, Alt. I is added and FAR Clause 52.222-33 is deleted. (C) Reference Section 00 22 00; Evaluation Approach, Factor 5, Small Business minimum mandatory requirement is updated from 10% to 23%. (D) Reference Section 00 22 00 and 00 22 16, has been expanded from within six years’ experience to within ten years' experience. (E) Reference Section 00 70 00, DFAR Clause 252.236-7001, is updated to include Specifications dated, Dec 2020 Rev_01, Appendices A, E, K and L. Specifications have been replaced in their entirety with Specifications dated, Dec 2020 Rev_01. (F) Reference Section 00 73 00, Davis Bacon Wage Rates have been updated with General Decision No: OH20200001 dated, 12/18/20. (G) Questions and answer period has been extended until 30 Dec 2020. (H) Revised sections/documents are available at beta.sam.
1. CONTRACT ID CODE PAGE OF PAGES
1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA 15C. DATE SIGNED 15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer) (Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123720R0008
X 9B. DATED (SEE ITEM 11)
05-Nov-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
CODE
USACE, CONTRACTING DIVISION
KAREN SIMMONS, 502 8TH STREET
HUNTINGTON WV 25701
W91237 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODE CODE
EMAIL: TEL:
23-Dec-2020
23-Dec-2020
W9123720R0008
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The following have been added by full text:
REV PRICE BREAKOUT SCHEDULE
REV Price Breakout Schedule can be located as attachment titled, Price Breakout Schedule Rev_01. See DFARS 252.236-7001 for a complete list of attachments.
SECTION 00 21 00 - INSTRUCTIONS
52.222-33 NOTICE OF REQUIREMENT FOR PROJECT LABOR AGREEMENT (MAY 2010) ALTERNATE I
(MAY 2010)
(a) Definitions. ``Labor organization'' and ``project labor agreement,'' as used in this provision, are defined in the clause of this solicitation entitled Project Labor Agreement.
(b) The apparent successful offeror shall negotiate a project labor agreement with one or more labor organizations for the term of the resulting construction contract.
(c) Consistent with applicable law, the project labor agreement reached pursuant to this provision shall--
1) Bind the offeror and all subcontractors engaged in construction on the construction project to comply with the project labor agreement;
(2) Allow the offeror and all subcontractors to compete for contracts and subcontracts without regard to whether they are otherwise parties to collective bargaining agreements;
(3) Contain guarantees against strikes, lockouts, and similar job disruptions;
(4) Set forth effective, prompt, and mutually binding procedures for resolving labor disputes arising during the term of the project labor agreement;
(5) Provide other mechanisms for labor-management cooperation on matters of mutual interest and concern, including productivity, quality of work, safety, and health; and
(6) Fully conform to all statutes, regulations, Executive orders, and agency requirements.
(d) Any project labor agreement reached pursuant to this provision does not change the terms of this contract or provide for any price adjustment by the Government.
(e) The apparent successful offeror shall submit to the Contracting Officer a copy of the project labor agreement prior to contract award.
(End of Provision)
The following have been deleted:
52.222-33 Notice of Requirement for Project labor Agreement MAY 2010
SECTION 00 22 00 - SUPPLEMENTARY INSTRUCTIONS
EVALUATION CRITERIA
Evaluation Criteria can be located as attachment titled, Section 00 22 00 , Evaluation Factors Rev_01. See DFARS
SECTION 00 22 16 - SUPPLEMENTARY INSTRUCTIONS TO PROPOSERS
INSTRUCTIONS AND CONDTIONS
Instructions and Conditions can be located as attachment titled, Instructions and Conditions Rev_01. See DFARS
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following have been modified:
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
1, See full Index of Drawings listed on Sheet G1002 of the attached Plans.
2. Specifications dated, December 2020 Rev_01
3. Appendices A, E, K and L.
4. Section 00 10 00 Price Breadkout Schedule Rev_01
5. Section 00 22 00 Evaluation Factors Rev_01
6. Section 00 22 00 Instructions and Conditons Rev_01
7. Section 00 73 00 Davis Bacon Wage Rates Rev_01
(End of clause)
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
REV DAVIS BACON WAGE RATES
REV Davis Bacon Wage Rates can be located as attachment titled, Davis Bacon Wage Rate Rev_01. See DFARS
(End of Summary of Changes)