A.03.09 Specifications Summary of Changes Rev_02 .pdf

PDF 15 KB Posted

Attached to
Portsmouth Local Protection Project, Portsmouth, Ohio
Solicitation number
W9123720R0008
Issued by

About this file

This document provides details for a federal construction contract opportunity with the U.S. Army Corps of Engineers Huntington District. The scope of work involves repairs and stabilization of the Portsmouth Local Protection Project in Portsmouth, Ohio, including replacement of storm sewer pipes and manholes, flood pump station discharge pipes, and sewer pump station discharge pipes. Responses are due electronically through DOD SAFE by the specified deadline. The contract will be awarded based on an evaluation of technical approach, experience, management approach, past performance, and small business participation plan, with technical factors considered more important than past performance and price. The contract is a full and open competition with a NAICS code of 237310 and small business subcontracting requirement of 15% of costs excluding materials.

View the file

Other files

File Type Posted
A.03.09 Specifications Summary of Changes Rev_02 .pdf PDF
B.04.20 Davis Bacon Wage Rates dtd 1 Jan 2021.pdf PDF
B.08.03 - W9123720R0008 - Amendment 0004.pdf PDF
A.03.09 - KTR Questions - 2.pdf PDF
B.08.03 - W9123720R0008 - Amendment 0003.pdf PDF
B.08.03 - W9123720R0008 - Amendment 0003.pdf PDF
Summary of Changes in Solicitation.docx DOCX document
A.03.09 Appendix E - Environmental Analysis.pdf PDF
Appendix A - Geotechnical Design (Vol. 1), Part 1.pdf PDF
Appendix A - Geotechnical Design (Vol. 1), Part 3.pdf PDF
A.03.09 Appendix L - Ph I ESA report_Portsmouth LPP_final_07 Apr 2020.pdf PDF
Appendix A - Geotechnical Design (Vol. 1), Part 6.pdf PDF
Ohio River 2020 WTP monthly reports.pdf PDF
Appendix A - Geotechnical Design (Vol. 1), Part 9.pdf PDF
Appendix A - Geotechnical Design (Vol. 1), Part 7.pdf PDF
Section 00 10 00 PRice Breakout Schedule Rev_01.docx DOCX document
Video 2.MOV MOV file
WWTP effluent 2020 DMRs.pdf PDF
B.08.03 - W9123720R0008 - Amendment 0002.pdf PDF
Video 3c.mp4 MP4 file
Ohio River 2019 WTP monthly reports.pdf PDF
Video 3a.mp4 MP4 file
Appendix A - Geotechnical Design (Vol. 1), Part 2.pdf PDF
Video 1d.mp4 MP4 file
Appendix A - Geotechnical Design (Vol. 1), Part 4.pdf PDF
Video 1b.mp4 MP4 file
A.03.09 Appendix K - NPDES Application.pdf PDF
Section 00 22 00 Instructions and Conditions Rev_01.docx DOCX document
Appendix A - Geotechnical Design (Vol. 1), Part 5.pdf PDF
Section 00 73 00 Davis Bacon Wage Rates Rev_01.pdf PDF
Portsmouth Seepage Barrier - KTR Questions.docx DOCX document
Video 1a.mp4 MP4 file
A.03.09 Specifications Rev_01.pdf PDF
Section 00 22 00 Evaluation Factors Rev_01.docx DOCX document
PSBR-MASTER BASE WITH FEATURES_2020NOV21.zip ZIP file
Video 1c.mp4 MP4 file
Appendix A - Geotechnical Design (Vol. 1), Part 10.pdf PDF
Video 3b.mp4 MP4 file
Appendix A - Geotechnical Design (Vol. 1), Part 8.pdf PDF
B.08.03 W9123720R0008 Amendment 0001.pdf PDF
B.08.02 W9123720R0008.pdf PDF
B.08.02 W9123720R0008.pdf PDF
A.03.09 Specifications.pdf PDF
A.03.09 Plans.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment No. 0004 RFP No. W9123720R0008

SECTION 31 55 00 – WORK PLATFORM

1. Page 4, Paragraph 1.4. Under “SD-03 Product Data” add the following new submittal:

“Instrumentation Operations and Maintenance Plan; G|GS”

2. Page 6, Paragraph 3.2.2. At the end of this paragraph, add the following new sentence:

“The piezometers installed in this contract will have an automated data acquisition system installed by others.”

3. Page 8, Paragraph 3.4.1. Delete this paragraph and replace with the following:

“Payment for all costs in connection with installation of instrumentation, will be made at the contract line item price for "Instrumentation," which price shall include full compensation for furnishing all labor, materials, and equipment required to complete the work as specified in Paragraph INSTRUMENTATION above. This line item includes the installation of piezometers.

Payment for this work will not be included in any allowance made under other sections of the specifications.”

SECTION 31 56 00 - SEEPAGE BARRIER CONSTRUCTION

4. Page 8, Para. 1.4.e. Delete all instances of “350” and replace with “250.

SUMMARY OF CHANGES, dated 12 Jan 2021