This amendment modifies a request for proposal for the Portsmouth Local Protection Project in Portsmouth, Ohio. The U.S. Army Corps of Engineers, Huntington District intends to procure a construction contract to repair and stabilize portions of the flood protection system, including replacing approximately 750 feet of damaged storm sewer pipe, replacing three pump station discharge pipes and valves, removing and replacing 120 feet of sewer pipes, and protecting and restoring athletic fields near the construction site. Responsibilities of the contractor include planning, administration, safety, quality control, and ensuring work is performed according to applicable laws and regulations. The solicitation will utilize a best value evaluation of technical approach, experience, management approach, past performance, and small business participation, with technical factors significantly more important than cost. The response due date is January 29, 2021. The NAICS code is 237310 and the small business participation requirement is a minimum of 15% of total cost.

View the file

Other files

File Type Posted
B.04.20 Davis Bacon Wage Rates dtd 1 Jan 2021.pdf PDF
B.08.03 - W9123720R0008 - Amendment 0004.pdf PDF
A.03.09 Specifications Summary of Changes Rev_02 .pdf PDF
A.03.09 - KTR Questions - 2.pdf PDF
B.08.03 - W9123720R0008 - Amendment 0003.pdf PDF
B.08.03 - W9123720R0008 - Amendment 0003.pdf PDF
Summary of Changes in Solicitation.docx DOCX document
A.03.09 Appendix E - Environmental Analysis.pdf PDF
Appendix A - Geotechnical Design (Vol. 1), Part 1.pdf PDF
Appendix A - Geotechnical Design (Vol. 1), Part 3.pdf PDF
A.03.09 Appendix L - Ph I ESA report_Portsmouth LPP_final_07 Apr 2020.pdf PDF
Appendix A - Geotechnical Design (Vol. 1), Part 6.pdf PDF
Ohio River 2020 WTP monthly reports.pdf PDF
Appendix A - Geotechnical Design (Vol. 1), Part 9.pdf PDF
Appendix A - Geotechnical Design (Vol. 1), Part 7.pdf PDF
Section 00 10 00 PRice Breakout Schedule Rev_01.docx DOCX document
Video 2.MOV MOV file
WWTP effluent 2020 DMRs.pdf PDF
B.08.03 - W9123720R0008 - Amendment 0002.pdf PDF
Video 3c.mp4 MP4 file
Ohio River 2019 WTP monthly reports.pdf PDF
Video 3a.mp4 MP4 file
Appendix A - Geotechnical Design (Vol. 1), Part 2.pdf PDF
Video 1d.mp4 MP4 file
Appendix A - Geotechnical Design (Vol. 1), Part 4.pdf PDF
Video 1b.mp4 MP4 file
A.03.09 Appendix K - NPDES Application.pdf PDF
Section 00 22 00 Instructions and Conditions Rev_01.docx DOCX document
Appendix A - Geotechnical Design (Vol. 1), Part 5.pdf PDF
Section 00 73 00 Davis Bacon Wage Rates Rev_01.pdf PDF
Portsmouth Seepage Barrier - KTR Questions.docx DOCX document
Video 1a.mp4 MP4 file
A.03.09 Specifications Rev_01.pdf PDF
Section 00 22 00 Evaluation Factors Rev_01.docx DOCX document
PSBR-MASTER BASE WITH FEATURES_2020NOV21.zip ZIP file
Video 1c.mp4 MP4 file
Appendix A - Geotechnical Design (Vol. 1), Part 10.pdf PDF
Video 3b.mp4 MP4 file
Appendix A - Geotechnical Design (Vol. 1), Part 8.pdf PDF
B.08.03 W9123720R0008 Amendment 0001.pdf PDF
B.08.02 W9123720R0008.pdf PDF
B.08.02 W9123720R0008.pdf PDF
A.03.09 Specifications.pdf PDF
A.03.09 Plans.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment No. 0004 RFP No. W9123720R0008

SUMMARY OF CHANGES, dated 12 Jan 2021

SECTION 31 55 00 – WORK PLATFORM

1. Page 4, Paragraph 1.4. Under “SD-03 Product Data” add the following new submittal:

“Instrumentation Operations and Maintenance Plan; G|GS”

2. Page 6, Paragraph 3.2.2. At the end of this paragraph, add the following new sentence:

“The piezometers installed in this contract will have an automated data acquisition system installed by others.”

3. Page 8, Paragraph 3.4.1. Delete this paragraph and replace with the following:

“Payment for all costs in connection with installation of instrumentation, will be made at the contract line item price for "Instrumentation," which price shall include full compensation for furnishing all labor, materials, and equipment required to complete the work as specified in Paragraph INSTRUMENTATION above. This line item includes the installation of piezometers.

Payment for this work will not be included in any allowance made under other sections of the specifications.”

SECTION 31 56 00 - SEEPAGE BARRIER CONSTRUCTION

3. Page 8, Para. 1.4.e. Replace instances of ‘350’ and ‘300’ with ‘250’, and replace instances of ‘250’ with ‘200.’