This document is an amendment to a solicitation for the Ord and Weitzel Gate Relocation project at Arlington National Cemetery. The project involves reconstructing the Ord and Weitzel pedestrian gate and columns near their original location, reassembling restored individual stone column elements on new niche walls with bases to form the new entryway. The amendment provides responses to contractor questions, updated technical documents, and revises specifications. The Department of the Army Corps of Engineers is the contracting agency, with a period of performance of 362 days. Attachments include project drawings and specifications, soils reports, quality control standards, and photos of the existing site.

View the file

Other files for this federal contract opportunity

Other files attached to Ord & Wietzel Gate Relocation, newest first.
File Type Posted
B.01.02 - Ord and Weitzel Bid Abstract.pdf PDF
Attachment 17 04 30 00 Mason Masonry Construction.pdf PDF
Attachment 15 - Section 32 31 13.53 Divison 32 - Exterior Improvements.pdf PDF
Attachment 9 - 00 22 13.00 20 (Supplementary Instructions to Offerors).pdf PDF
Attachment 13 Photo Sep 29 12 45 37 PM.pdf PDF
Attachment 5 - Ord and Weitzel Gate Photos .pdf PDF
Attachment 8 - 01 11 00 Summary of Work.pdf PDF
Attachment 16 - 04 30 00 Mass Masonry Wall Construction.pdf PDF
Attachment 14 - GEO Tech Doc - 12 93 00.pdf PDF
Attachment 12 - P1010931.pdf PDF
Attachment 11- Stone Mason Report.pdf PDF
Attachment 10 - P1010868.pdf PDF
Attachment 7 VB16 137G Ord and Weitzel Area Road Repair Report.pdf PDF
Attachment 6 - 31 63 16 Auger Cast Grout Piles.pdf PDF
Attachment 4 - 01 45 00.00.10 .pdf PDF
W9123621B2001 0004 Amendment Ord and Weitzel Gate Solicitation 08052021.pdf PDF
21-B-2001 Amendment 3.pdf PDF
21-B-2001 Amendment 4.pdf PDF
O and W Gate PreBid Site Survey July 14 2021.pdf PDF
W9123621B2001 0001 Amendment Ord and Weitzel Gate Solicitation.pdf PDF
Ord Weitzel Spec 04 10 00 - Amendment _001 (003).pdf PDF
RTA Submittal Specifications Arlington National Cemetery_1.pdf PDF
RTA Submittal Drawings Ord and Weitzel 2020 0612.pdf PDF
W9123621B2001 Ord and Weitzel Gate Solicitation.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to accomplish the follow ing:

1. To provide the responses to ProjNet questions.

2. Provide updated technical documents in correspondence to the ProjNet questions and responses (denoted in red text).

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 06-Aug-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9123621B2001

X 9B. DATED (SEE ITEM 11)

17-Jun-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

06-Aug-2021

CODE

USACE, NORFOLK DISTRICT OFFICE

CONTRACTING OFFICE

803 FRONT STREET

NORFOLK VA 23510-1011

W91236 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9123621B2001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0005

Amendment 0005 is issued to provide the following:

1. To provide responses to ProjNet questions.

2. To provided updated technical documents in correspondence to the ProjNet questions and responses.

All other terms and conditions remain unchanged.

Attachments:

The following attachments are incorporated into this amendment:

Attachment 16 - Section 04 30 00 Mass Masonry Wall Construction.pdf 13 pages (Amendment 5)

ProjNet Inquiries:

ID 9313773

Please provide the specification section for vehicle detection loops for the automated gate shown on drawing C101.

Government Response

Specification will be provided. See attached redline for Section 32 31 13.53. See amendment 0004 for the revised

UFGS 32 31 13.53.

ID 9324963

Can you explain this in more detail? Is this stone or asphalt, etc.

Also, details C1, A1, and A3 show compacted subgrade undercut 18" Min. - Is this 18" min. Aggregate Subbase (21A)?

Government Response

The 18" compacted subgrade shown in all of the details on C-501 shall be aggregate base or a stone structural fill with a minimum CBR of 20.

ID 9329502

Per specification section 316316, part 3.8, adjacent piles within 5 feet cannot be installed with 3 days of each other.

Adjacent piles should not be drilled near each other while the grout is in a fluid state, as there is a risk of communication between the adjacent shafts. Grout used in auger cast piles does not remain in a fluid state for long, the industry standard practice is to wait 12 hours before drilling adjacent piles.

This requirement would lead to a schedule of 7 work days to install the 14 production piles, when only 3 should be required if following industry standard practice. Can this specification requirement be changed, "No piles shall be placed within 5 feet of adjacent piles until the grout in the piles has set for 12 hours"

The "3 days" in spec 31 63 16, paragraph 3.8 is changed to "24 hours" for less than 5 feet new pile distance. A sentence shall be added: "For adjacent piling between 6 and 5 feet from a newly grouted pile, the interval must be no less than 12 hours." The Attachment 31 63 16 will be provided in Amendment 4.

ID 9329708

Confirm any unsuitable soils found during excavation must be "sifted" by ANC for artifacts on the facility prior to disposal offsite. This is relevant because the KTR will handle the spoil materials twice.

Government Response

The specifications do not require shifting and Section 01 57 19 paragraph 3.4.1 states that if archeological resources or "artifacts" are discovered the Contracting office is to be contacted and any work that could damage or destroy the resource is to be suspended.

ID 9330003

Specification section 316316, part 3.8, states the adjacent piles within 5 feet cannot be installed with 3 days of each other. The adjacent piles should not be drilled near each other while the grout is in a fluid state, as there is a risk of grout movement between the adjacent shafts, however grout used in auger cast piles does not remain in a fluid state for long, the industry standard practice is to wait 12 hours before drilling adjacent piles.

The current spec requirement would lead to a schedule of 7 days to install the 14 production piles, when only 3 should be required if following industry standard practice. Can this specification requirement be changed, "No piles shall be placed within 5 feet of adjacent piles until the grout in the piles has set for 12 hours"? Please advise.

Government Response

The "3 days" in spec 31 63 16, paragraph 3.8 is changed to "24 hours" for less than 5 feet new pile distance. A sentence shall be added: "For adjacent piling between 6 and 5 feet from a newly grouted pile, the interval must be no less than 12 hours." The attachment 31 63 16 will be provided in Amendment 4.

ID 9331285

Section 00 01 15, 1.3 Subsurface Data, states that the soils report is included as part of this solicitation. We did not see the soils report and are requesting it be provided.

Soils Reports (VB16-137G Ord & Weitzel Area Road Repair Report) will be provided in Amendment 0004.

ID 9331303

Please confirm that the Government is furnishing the services of the Historic Masonry Consultant as described in 04 30 00, 1.4.2.1 and also 04 10 00, 1.6.2.1. The prior Section states the Government is furnishing this service, but the later leaves it open for the contractor to provide. Also, if the Government is providing this Consultant/Inspector, please confirm the contractor is not to provide any additional third party masonry Special Inspectors for the scope referenced in these Specification Sections.

Government Response

Contractor shall provide Historic Masonry Consultant as described in 04 30 00, 1.4.2.1 and also 04 10 00, 1.6.2.1.

Specification section 04 30 00, 1.4.2.1 has been coordinated and revised to match the most recently revised specification section 04 10 00, 1.6.2.1. See Amendment 0005 for the revised 04 30 00 file.

ID 9331312

Please reference Section 01 45 35 for Special Inspections. Can you please clarify which special inspections require both a Special Inspector and an Associate Special Inspector. The different items that require Special Inspections appear to be the steel fabrication, install, welding, concrete construction and load bearing soils. It is difficult to understand which type of inspector is required for each scope and how often (continuous or periodic). Please clarify.

Also, if a schedule of special inspections was available that would be helpful.

Government Response

The spec section is clear on the definitions and responsibilities in paragraph 1.3. Items to be inspected are also listed in paragraph 1.2.

ID 9331326

Please clarify if the contract is 362 days as listed in the Solicitation or 555 days as listed in Section 01 11 00, 1.10.

Government Response

The period of performance is 362 days. See specification attached. The attachment 01 11 00 will be provided in Amendment 0004.

ID 9331336

Please confirm that only the bid pricing schedule in the Solicitation is required to be submitted with the bid and not the bid schedule in 00 22 13.00 20 Supplementary Instructions to Bidders.

Government Response

Bid pricing schedule in the solicitation is required to be submitted with the bid. Bid schedule in 00 22 13.00 20 Supplementary Instructions to Bidders has been revised to match the solicitation, see attachment. The Attachment 00 22 13.00 20 will be provided in Amendment 4.

ID 9331337

Please reference Section 04 10 00. In 2.2.3 it states there are 11 total historic stone pieces and then in 3.2.b is says there are 11 per column. It also states there are two broken pieces that are being replaced. Please clarify the total number of pieces being removed from storage and reused. Also please clarify when the 2 Government furnished replacement pieces will arrive to the site.

Government Response

Each column, two (2) in total consists of eleven (11) individual pieces totaling twenty-two (22) individual pieces for both columns.

ID 9331654

Please confirm the gate foundations are not considered mass concrete with dimensions at 3' thick.

"Foundation" includes footings, pile caps and grade beams.

ID 9331655

Who is responsible for relocating the Dominion Energy Ductbank shown on Sheet C-507?

Government Response

Dominion owns those lines, and any/all relocation work will be performed by Dominion. However, all responsibility for proper coordination of such work within the overall scope of the O&W project rests solely with the Contractor.

As an aside, the Contractor should ensure that they plan and allow ample time for notification and coordination with Dominion.

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following have been modified:

ATTACHMENTS

1. RTA Submittal Ord and Weitzel 2020 0612 dated June 12, 2020, 64 pages

2. RTA Submittal Specifications Arlington National Cemetery dated June 12, 2020, 1021 pages

3. Ord Weitzel Spec 04 10 00 – Amendment #001 dated 11/15 16 pages

4. Attachment 4 – 01 45 00.00.10 Quality Control, 10 pages (Amendment 4)

5. Attachment 5 – O and W Access Gate Photos, 3 pages (Amendment 4)

6. Attachment 6 - 31 63 16 (Auger Cast Grout Piles), 9 pages.pdf (Amendment 4)

7. Attachment 7 - VB16-137G Ord & Weitzel Area Road Repair Report dated Aug 16, 2016, 120 pages

(Amendment 4)

8. Attachment 8 - 01 11 00 Summary of Work,.pdf, 4 pages (Amendment 4)

9. Attachment 9 - 00 22 13.00 20 (Supplementary Instructions to Offerors).pdf, 2 pages (Amendment 4)

10. Attachment 10 - P1010868.pdf, 1 page (Amendment 4)

11. Attachment 11 – Stone Mason Report.pdf, 16 Pages (Amendment 4)

12. Attachment 12 - P1010931.pdf dated 2 August 2021, 1 page (Amendment 4)

13. Attachment 13 - Photo Sep 29, 12 45 37 PM.pdf dated 2 August 2021, 1 page (Amendment 4)

14. Attachment 14 – GEO Tech Doc 12 93 00.pdf, 10 pages (Amendment 4)

15. Attachment 15 - Section 32 31 13.53 Divison 32 Exterior Improvements.pdf dated April 2021, 20 pages

(Amendment 4)

16. Attachment 16 - Section 04 30 00 Mass Masonry Wall Construction.pdf 13 pages (Amendment 5)

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

Title File Drawing No.

17. RTA Submittal Ord and Weitzel 2020 0612 dated June 12, 2020, 64 pages

18. RTA Submittal Specifications Arlington National Cemetery dated June 12, 2020, 1021 pages

19. Ord Weitzel Spec 04 10 00 – Amendment #001 dated 11/15 16 pages

20. Attachment 4 – 01 45 00.00.10 Quality Control, 10 pages (Amendment 4)

21. Attachment 5 – O and W Access Gate Photos, 3 pages (Amendment 4)

22. Attachment 6 - 31 63 16 (Auger Cast Grout Piles), 9 pages.pdf (Amendment 4)

23. Attachment 7 - VB16-137G Ord & Weitzel Area Road Repair Report dated Aug 16, 2016, 120 pages

(Amendment 4)

24. Attachment 8 - 01 11 00 Summary of Work,.pdf, 4 pages (Amendment 4)

25. Attachment 9 - 00 22 13.00 20 (Supplementary Instructions to Offerors).pdf, 2 pages (Amendment 4)

26. Attachment 10 - P1010868.pdf, 1 page (Amendment 4)

27. Attachment 11 – Stone Mason Report.pdf, 16 Pages (Amendment 4)

28. Attachment 12 - P1010931.pdf dated 2 August 2021, 1 page (Amendment 4)

29. Attachment 13 - Photo Sep 29, 12 45 37 PM.pdf dated 2 August 2021, 1 page (Amendment 4)

30. Attachment 14 – GEO Tech Doc 12 93 00.pdf, 10 pages (Amendment 4)

31. Attachment 15 - Section 32 31 13.53 Divison 32 Exterior Improvements.pdf dated April 2021, 20 pages

(Amendment 4)

32. Attachment 16 - Section 04 30 00 Mass Masonry Wall Construction.pdf 13 pages (Amendment 5)

(End of clause)

(End of Summary of Changes)

File details come from the government source that posted it. Updated .