A.01.13 A-501.pdf
PDF 234 KB Posted
- Attached to
- DLA Warehouse 11 Renovation Federal contract opportunity
- Solicitation number
- W9123620B0017
About this file
This document package includes construction drawings and specifications for renovations to Building 11 at the Defense Supply Center Richmond in Richmond, Virginia. The project involves replacing a translucent backup panel and broken clerestory windows at Bay L, installing a new membrane roof assembly over wood decking, replacing metal gutters and downspouts, and performing miscellaneous construction details. The related federal contract opportunity is a sealed bid solicitation issued by the Department of the Army Corps of Engineers Norfolk District for the specified renovations. Electronic bid submissions are due in accordance with solicitation number W9123620B0017. The solicitation provides the opportunity for contractors to repair and renovate Building 11 to replace aging building components and upgrade the building envelope.
View the file
Other files for this federal contract opportunity
Show all 50
DLA Warehouse 11 Renovation has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GL GL
KALWALL TRANSLUCENT BACK UP PANEL
AT BAY L CLERESTORY ONLY. CLEAN
EXISTING / NEW GLASS INTERIOR SURFACE
PRIOR TO INSTALLATION OF KALWALL
EXISTING WALL
FLASHING
CLERESTORY WINDOW,
REPLACE BROKEN
PANEL IN KIND
BLOCKING AS REQUIRED
KALWALL TRANSLUCENT BACK UP
PANEL AT BAY L CLERESTORY
ONLY. CLEAN EXISTING / NEW
GLASS INTERIOR SURFACE PRIOR
TO INSTALLATION OF KALWALL
EXISTING WALL
SILL FLASHING
CLERESTORY WINDOW,
REPLACE BROKEN PANEL IN
KIND
BLOCKING AS REQUIRED
NEW MEMBRANE ROOF ON COVER
BOARD OVER INSULATION
WOOD PLANK ROOF DECK, REPLACE
IN KIND, AS SHOWN ON STRUCTURAL
EXISTING STRUCTURE
EXISTING WALL
FLASHING
CLERESTORY WINDOW, REPLACE
BROKEN PANEL IN KIND
CLERESTORY WINDOW, REPLACE
BROKEN PANEL IN KIND
METAL EXTENDER AS REQUIRED
NEW ROOF MEMRANE
FLASHING ADHERED TO
SUBSTRATE
NEW THRU-WALL METAL
COUNTERFLASHING EMBEDDED
IN SEALANT
VAPOR RETARDER
INSULATION
STRUCTURAL DECK
COVERBOARD
M
IN
M
IN
PIPE
SEALANT
STAINLESS STEEL WORM GEAR CLAMP
FIELD FORMED FLASHING MEMBRANE
WITH ADHESIVE
FIELD FORMED FLASHING MEMBRANE
SINGLE-PLY ROOFING MEMBRANE
COVER BOARD ON RIGID INSULATION
M
IN
EXISTING ROOF DECKING
INSULATION
TREATED WOOD NAILERS TO
MATCH HEIGHT OF INSULATION
AND COVER BOARD
ROOFING MEMBRANE
NEW METAL GUTTER.
MATCH EXISTING
METAL FASTENER 4 IN. O.C.,
STAGGERED USING 1-INCH
GALVANIZED ANNULAR RING
NAILS OR OTHER ACCEPTABLE
FASTENER
STRUCTURAL DECK
VAPOR RETARDER
FLASHING STRIP
COVERBOARD1
G
TOP OF ROOF
33' - 6"
F V
A-501
A-501
RUBBER WALKBOARD
PAVER ADHERED TO
ROOF MEMBRANE
PROVIDE NEW GUTTER
NEW DOWNSPOUT
BEYOND
SEALANT AND
BACKER ROD
ALUMINUM
FRAME
GLAZING PANEL
EMBED FLASHING
IN SEALANT
SILL FLASHING
SEALANT AND
BACKER ROD
ALUMINUM
FRAME
GLAZING PANEL
CORNER BEAD
3-5/8 METAL STUDS,
SECURELY ANCHOR TO
STRUCTURE AS REQUIRED
ACOUSTICAL
CEILING TILE
BOTTOM OF CEILING
REFER TO RCP
BOTTOM OF SOFFIT
REFER TO RCP
5/8" GYP. BD.
BOTTOM OF CEILING
REFER TO RCP
GUARDRAIL POST
ANCHOR
BASE PLATE
FACE OF BLDG
FACE OF CANOPY
NEW 1/2" BIRD NETTING TO
MATCH EXISTING NETTING
NEW VELCRO TYPE
MAINTENANCE ACCESS
OPENINGS FOR SPRINKLER
AND ELECTRICAL SYSTEMS,
TYP BETWEEN ALL GRID
SPACES
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
N O
R F
O L K
D
IS
T R
IC
T
F
R O
N T
S T
R E
E T
N O
R F
O L K
V
IR
G
IN
IA
J
O N
E S
F R
A N
K L
IN
R D
S U
IT
E
R A
L E
IG
H
N
C
-3
(9
-6
(9
-7
F
A X
L
IC
E N
S E
F
-0
F
IL
E N
A M
E
C A
T E
G O
R Y
C O
D E
N
A O
F
IL
E N
O
W -2
-B
-0
W -1
-F
-0
D S
A L T
S M
A N
FOR OFFICIAL USE ONLY
FOR CONSTRUCTION
A-501
M
IS
C E
L L A
N E
O U
S D
E T
A
IL
S
D E
F E
N S
E S
U P
P L Y
C E
N T
E R
R
IC
H M
O N
D R
IC
H
M O
N D
V A
R M
O R
S O
N
T S
H O
U S
E
P Z
O O
K
M
A R
C H
R E
N O
V A
T
IO
N S
T O
B U
IL
D
IN
G
D
D R
V
P R
O J E
C T
N U
M B
E R
P
.0
.0
A -5
.D
W G
3" = 1'-0"A-501
3 TYPICAL HEAD KALWALL DETAIL
3" = 1'-0"A-501
4 TYPICAL SILL KALWALL DETAIL
1/2" = 1'-0"A-501
5 ROOF DECK REPAIR
3" = 1'-0"A-501
12 FLASHING AT CLERESTORY WINDOW
3" = 1'-0"A-501
6 FLASHING AT PIPE PENETRATIONS
3" = 1'-0"A-501
9 FLASHING AT GUTTER
3/4" = 1'-0"A-501
11 TYPICAL WALL SECTION AT KALWALL
3" = 1'-0"A-501
10 TYPICAL WINDOW SILL DETAIL
3" = 1'-0"A-501
7 TYPICAL HEAD DETAIL AT WINDOW
3" = 1'-0"A-501
8 ACT CEILING TO GYP CEILING
1 1/2" = 1'-0"A-501
1 GUARDRAIL POST DETAIL
1/4" = 1'-0"A-501
2 CANOPY SOFFIT ACCESS PLAN
A
M E
N D
M E
N T
A P
R
File details come from the government source that posted it. Updated .