W91236-18-B-0018_Amendment_0002.pdf

PDF 163 KB Posted

Attached to
Aviation Maintenance Instructional Building, Fort Eustis, VA Federal contract opportunity
Solicitation number
W91236-18-B-0018
Issued by
Department of the Army Corps of Engineers Engineering District Norfolk

About this file

Amendment 0002

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Aviation Maintenance Instructional Building, Fort Eustis, VA

THE PROPOSAL DUE DATE OF 31 JULY 2018 AT 2:00P.M.(EST) REMAINS UNCHANGED

SEE CONTINUATION PAGE AND ATTACHED REVISED SPECS AND DRAWINGS.

Contracting POC: Joy Wright, email: joy.m.w right@usace.army.mil, phone: 757-201-71451.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 17

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 26-Jul-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123618B0018

X 9B. DATED (SEE ITEM 11)

22-Jun-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

26-Jul-2018

CODE

USA ENGINEER DISTRICT, NORFOLK

803 FRONT STREET

NORFOLK VA 23510-1096

W91236 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9123618B0018

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

SPECIFICATION CHANGES

SPECIFICATION SECTION 07 42 63 – Revise Paragraph 1.8 WARRANTY. Revise warranty period from 20 years to 2 years.

SPECIFICATION SECTION 07 61 14.00 20 – Add Paragraph 2.9 SNOW GUARDS.

SPECIFICATION SECTION 08 34 16.10 – Delete paragraphs 2.1.7.3 VERTICAL FLOATING HEAD TOP GUIDE ROLLERS, 2.3.1.1 INDIVIDUALLY OPERATED DOORS, AND 2.3.1.2 FLOATING GROUP DOORS

SPECIFICATION SECTION 09 90 00 – Revise Paragraph 3.13.2 INTERIOR PAINT TABLES, DIVISION 5:

INTERIOR METAL, FERROUS AND NON‐FERROUS PAINT TABLE – Revised DIVISION 5 Paragraph A.

SPECIFICATION SECTION 09 90 00 – Revise Paragraph 3.13.2 INTERIOR PAINT TABLES, DIVISION 9:

INTERIOR PLASTER, GYPSUM BOARD, TEXTURED SURFACES PAINT TABLE – Added paragraph C.

DRAWING CHANGES

SHEET CD‐904 – Revised note 6 reference from CD‐107 and CD‐108 to CD‐907 and CD‐908

SHEET S‐003 – Revised MASONRY CONSTRUCTION NOTE 10.

SHEET A‐501 – Revised Detail 2 – TYPICAL STACKED METAL PANEL DETAIL

SHEET A‐631 – Revised Detail 2 – HANGAR DOOR JAMB DETAIL

SHEET I‐002 – Revised Finish Schedule

SHEET I‐503 – Revised Interior and Exterior Signage Schedule

ProjNet Bidder Inquiries and Government Responses:

1. Bidder Inquiry ID 7573981:

Sheet EP701 - Please confirm feeders for Panelboards PP1 & PP3 are correct as indicated on Power riser. 5 sets of 4 #500kCMIL Response to Bidder Inquiry 7573981:

Yes, based on the transformer secondary.

2. Bidder Inquiry ID 7573982:

Sheet EP604 – Please confirm feeder breaker for panel PP3E in panel PP3 is correct. Panel PP3E is shown as a 100A MLO panel on sheet EP605.

Response to Bidder Inquiry ID 7573982:

The feeder breaker for panel PP3E should be 100 A. Conduit and wire sizes should be 3-#3, 1-#3, 1-#8, in 1 1/4" conduit. Revised drawing will be provided via amendment.

3. Bidder Inquiry ID 7573985:

Sheet EP604 – Please confirm feeder breaker for panel PP3E in panel PP3 is correct. Panel PP3E is shown as a 100A MLO panel on sheet EP605.

Response to Bidder Inquiry ID 7573985:

The feeder breaker for panel PP3E should be 100 A. Conduit and wire sizes should be 3-#3, 1-#3, 1-#8, in 1 1/4" conduit. Revised drawing will be provided via amendment.

4. Bidder Inquiry ID 7573986:

Sheet EP701 – No spec found for the Surge Protection Device being fed from switchboard SB. Please provide rating information.

Response to Bidder Inquiry ID 7573986:

See spec section 26 20 00 (part 2.28).

5. Bidder Inquiry ID 7574685:

Sheet EP402: Please identify the Special Purpose Receptacles for Key Notes 1, 2, and 3.

Response to Bidder Inquiry ID 7574685:

The Special Purpose Receptacles are designated for a particular type of military helicopter.

6. Bidder Inquiry ID 7574802:

S-003 Masonry Note 4 - Normal Weight (Moisture Controlled) All CMU is either interior or has an air barrier applied to the exterior. Is the moisture controlled required?

Response to Bidder Inquiry ID 7574802:

Type I moisture controlled cmu is required for all exterior cmu walls. Units should be protected against picking up moisture while in storage on site.

7. Bidder Inquiry ID 7574803:

S-003 Note 10 - Where is the High Strength CMU required?

Response to Bidder Inquiry ID 7574803:

Note 10 pertains to all cmu typical.

8. Bidder Inquiry ID 7574804:

If Lightweight CMU meets the compressive strength requirements are they acceptable?

Response to Bidder Inquiry ID 7574804:

Normal weight cmu is to be used. Lightweight cmu is not acceptable.

9. Bidder Inquiry ID 7574806:

Spec 042000 2.5.1 Type M Mortar is typically only used in the foundation. Is type S acceptable everywhere else?

Response to Bidder Inquiry ID 7574806:

Per specification 04 20 00 paragraph 2.5.1 type M mortar is to be used unless otherwise specified. Type M mortar is to be used at all foundation, exterior and shear wall locations. Type S mortar may be used at interior non-load bearing and non-shear wall locations.

10. Bidder Inquiry ID 7574810:

Please clarify the grouting requirements? Are all exterior walls to be fully grouted or just grouted at rebar? Are all interior walls (load bearing and non-load bearing) to be fully grouted or just grouted at rebar?

Response to Bidder Inquiry ID 7574810:

Grouting information is indicated on the plans, details and wall sections.

11. Bidder Inquiry ID 7574831:

On sheet A-501 detail 3 shows 3" Rigid Insulation in between the CMU block. On sheet A-631 detail 2 shows 3" Spray Foam Insulation between the brick and CMU block. Please clarify which is required. If both are can you provide where one starts and one stops? Can you provide a cut of what the transition from one to the other looks like?

Response to Bidder Inquiry ID 7574831:

Only Rigid Insulation is required in this wall assembly. For Detail 2/A-631, the 3" Spray Foam Insulation is supposed to be Rigid Insulation. Revised drawing will be provided via amendment.

12. Bidder Inquiry ID 7574843:

Please confirm that dowels are required at each CJ every 12".

Response to Bidder Inquiry ID 7574843:

Confirmed dowels required at 12"

13. Bidder Inquiry ID 7574859:

On sheet A-501 detail 3 - the concrete footing shows R-15 Rigid Insulation @ 2' from Edge of Footing. I do not see this anywhere else on the drawings. Please confirm if Rigid Insulation is required at the underside of the slab on grade.

Response to Bidder Inquiry ID 7574859:

Detail 3/A501 is the typical base detail; rigid insulation and vapor barrier shall be continuous 2'-0" from footing around the entire building perimeter, including the bid options.

Detail 3/A501 is intended to be a typical enlarged section detail; wall sections at 1/2" do not show this information.

Provide continuous rigid insulation and vapor barrier as indicated in detail 3/A-501 2'-0" from face of foundation typical around entire building perimeter including all bid options.

14. Bidder Inquiry ID 7574869:

A-512 Detail 1 shows a Hardwood Cap on the knee wall @ the Lobby Area. Please give guidance on how you want the contractors to attach the hardwood cap.

Response to Bidder Inquiry ID 7574869:

Provide pre-drilled holes into the cap for screw, then apply wood filler once cap is screwed down.

15. Bidder Inquiry ID 7574875:

Please confirm Stainless Steel Snow Guards are required for this project. If so, where and what is the spacing?

Response to Bidder Inquiry ID 7574875:

See sheet A-508, and see amended specification 07 61 14.00 20 para 2.9 for clarity.

2.9 Snow Guards

General: Prefabricated, noncorrosive units designed to be installed without penetrating sheet metal roofing;

complete with predrilled holes, clamps, or hooks for anchoring. Seam-Mounted, Bar-Type Snow Guards: Rail- or fence-type assembly consisting of stainless-steel rods, bars, or pipe held in place by stainless-steel clamps attached to vertical ribs of standing-seam sheet metal roofing.

a. Stainless-Steel finish.

Revised Specification to be provided via amendment.

16. Bidder Inquiry ID 7574882:

Please confirm FF&E is not required for this contract.

Response to Bidder Inquiry ID 7574882:

Concur.

17. Bidder Inquiry ID 7574934:

The signage shown in the drawings does not comply with the 2010 ADA standard. Many of them are too small to provide the required space for the tactile text specified along with corresponding braille. The restroom signs also do provide the minimum space required for the graphic. Please provide updated details complying with ADA standards or advise as to how we should proceed.

Response to Bidder Inquiry ID 7574934:

The UFC was updated during the design process to reflect the referenced ADA standard. A revised sheet will be provided with the correct signage types.

18. Bidder Inquiry ID 7575667:

The finish legend on Sheet I-901 lists Laminating Technologies as the basis of design for the toilet partitions. Spec section 10 21 13 does not list approved manufacturers Response to Bidder Inquiry ID 7575667:

Other manufacturers with products that meet the technical requirements and salient features will be considered.

19. Bidder Inquiry ID 7575668:

The finish legend on Sheet I-901 lists Laminating Technologies as the basis of design for the toilet partitions. Spec section 10 21 13 does not list approved manufacturers. Is an equal product acceptable by another manufacturer?

Response to Bidder Inquiry ID 7575668:

Yes.

20. Bidder Inquiry ID 7575671:

Specification section 08 34 16.10 Steel Sliding Hangar Doors; paragraphs 2.1.7.2 and 2.1.7.3. Please clarify requirement for Top Guide Rollers. Are Fixed Pancake type (para 2.1.7.2) or Vertical Floating Head type (para 2.1.7.3) rollers required?

Response to Bidder Inquiry ID 7575671:

Use 2.1.7.2 Fixed Pancake Top Guide Rollers. Revised specification to be provided via amendment.

21. Bidder Inquiry ID 7575677:

Specification section 08 34 16.10 Steel Sliding Hangar Doors; paragraphs 2.3.1 Hangar Door Types, Hangar Doors shall be biparting. Subsequent paragraphs 2.3.1.1, Individually Operated Doors, 2.3.1.2 Floating Group Doors,

2.3.1.3 Anchored Group Doors describe different hangar door operation types. Please clarify which operation type is required.

Response to Bidder Inquiry ID 7575677:

Use 2.3.1.3 Anchor Group Doors. Revised specification to be provided via amendment.

22. Bidder Inquiry ID 7575678:

Specification section 08 34 16.10 Steel Sliding Hangar Doors; paragraph 3.1.1 Cleaning. Please confirm SSPC SP 6/NACE No. 3 is required for fabricated hangar door metal surfaces.

Response to Bidder Inquiry ID 7575678:

Confirmed.

23. Bidder Inquiry ID 7577148:

We are asking contracting offices for consideration to add FAR 52.208-9 for SKILCRAFT door hardware in your current and future acquisition as it now applies to construction and renovation "flow down" situations per US AbilityOne Commission Procurement List Notice of Addition #20150054 (9 Feb 2016).

The architect's specification is the difference. Architecturally Specified Products ARE called out as an "ingredient" in construction and renovation products. PL #20150054 of 9 Feb 2016 added 90 door hardware products compliant to ANSI and BHMA certification IRT FAR 8.005 and 36.202.

SKILCRAFT Door Hardware products are architecturally compliant in specification DIVISION 08 OPENINGS, SECTION 08 71 00 DOOR HARDWARE; ANSI/BHMA A156.2 Cylindrical Locks, ANSI/BHMA A156.3 Exit Devices, ANSI/BHMA A156.4 Door Closers, ANSI/BHMA A156.13 Mortise Locks. SKILCRAFT locksets ARE Small and Large Format IC compatible.

FAR 52.208-9 for mandatory and specific sourcing does not require a separate CLIN because the product is architecturally specified for construction and renovation requirements. The product is going to the job site by the same project incorporation as all other materials specified by the architect.

Recommended text. "The following items have been identified to be obtained from a mandatory AbilityOne source in compliance with FAR clause 52.208-9, Contractor Use of Mandatory Sources of Supply or Services:

DIVISION 08 – OPENINGS, 08 71 00 DOOR HARDWARE; SKILCRAFT Brand Exit Devices, Door Controls – Closers, Mortise Locks & Latches. Pricing and availability may be obtained from SKILCRAFT PDQ at 1-855-NIB- SPEC (1-855-642-7732) or SKILCRAFT.ASP@VISIONCORPS.NET.

Additional items may be available from the mandatory source. AbilityOne's procurement products list can be searched at: www.abilityone.com Response to Bidder Inquiry ID 7577148:

The Contracting Officer will NOT include the recommended text above in the solicitation.

Contractors should propose based on project specifications.

24. Bidder Inquiry ID 7577169:

Specifications 07 42 63 - 3.3 is asking for continuous full height panels, as most of the panels would be 50' in length and 2.1. Panel Materials 2.1.1 e. 1. require Standard Flush Panels with Reveal Joints, 2. Smooth, Flat Surface Texture, the length maximum for this panel is 32' the only way to get the 50' is to go to a Mesa profiled panel and it would require a manufacturer approval due to the panel length and thickness. Please clarify.

Response to Bidder Inquiry ID 7577169:

Refer to revised detail 2/A-501 for horizontal panel joint detail and height (@ 36'8" AFF). Provide continuous horizontal panel joint per provided detail at North, East and West sides of the building (not required at South side of hangar since metal panels stop above two story roof typ.) This should be the only horizontal panel joint and shall allow for one continuous full height panel above and below the joint. Revised drawing will be provided via amendment.

25. Bidder Inquiry ID 7577172:

1.8 Warranty requires a 20 yr. Manufacturers no-dollar limit warranty and no Insulated Metal Panel manufacturer currently offers this type of warranty, the only 20 yr. warranty offered is a Weather-tight warranty.

Response to Bidder Inquiry ID 7577172:

Change 20 year no-dollar limit warranty to 2 years. This will be changed in the specification. Revised specification to be provided via amendment.

26. Bidder Inquiry ID 7577361:

On the finish schedule Porcelain Tile it call for 20x20 tile. In the spec it calls for nominal tile size 12x24. Please clarify which is correct.

Also on A-404 it looks like the tile is either 10x20 or 12x24. Please clarify. If it is suppose to be 20x20 we will have to cut the tile to get to 10x20 which will add significant cost.

Response to Bidder Inquiry ID 7577361:

The expectation is to have the full size tile with as few cuts as possible. The design is based on the FY14 install of 12x24 tile. This tile has been provided as a design basis as the manufacturer has since discontinued the product. The GC will need to submit an "or equal" for the shop drawings. For the review, the color and technical specs will weigh more than the size of the tile.

27. Bidder Inquiry ID 7577364:

Drawing Sheet EP402: Please identify the Special Purpose Receptacles for Key Notes 1, 2, and 3.

Surge Suppression Specification is not included in bid documents. Please identify Surge Characteristics.

Response to Bidder Inquiry ID 7577364:

See response to Inquiry ID: 7574685. For surge suppression, see spec section 26 20 00 (part 2.28).

28. Bidder Inquiry ID 7578173:

Note #6 states: "SEE SHEET CD106 AND CD107 FOR RECORD DRAWINGS. (BLDG. 2116)." These drawings are not found, please clarify.

Response to Bidder Inquiry ID 7578173:

Sheets should be referenced as CD907 and CD908 for BLDG 2116. Sheets will be amended.

29. Bidder Inquiry ID 7578203:

At Bldg 2783 the demolition plans shows the removal of the curb and asphalt to the edge of Harrison Loop, is the curb and gutter along the road to be replaced?

Response to Bidder Inquiry ID 7578203:

The curb and gutter will not be replaced along Harrison Loop in the vicinity of the Bldg 2783 curb and asphalt demolition.

30. Bidder Inquiry ID 7578276:

Spec 99000 only calls for Scuffmaster on gypsum substrates. "Armour" in stairs and wet areas. "Scrubtough" in all other areas. Finish Legend I-002 description for PNT2 agrees with this gypsum spec. Some gypsum walls are scheduled to receive PNT3, which is described as "Waterbased Epoxy" on I-002. What product should be used on the gypsum walls specified to receive PNT3 waterbased epoxy, in absence of an epoxy spec for gypsum.

Response to Bidder Inquiry ID 7578276:

Finish Legend on sheet I-002 will be revised to eliminate reference to "waterbased epoxy". GWB to receive PNT3 shall be considered "new wall board not otherwise specified" and use the High Performance Architectural Water Based Polyurethane from the paint table in the specifications.

31. Bidder Inquiry ID 7578280:

Spec section 99000 for interior steel says to use "Armour" for all metal, not otherwise specified. Armor is a paint that has a splatter coat, similar to a knockdown or orange peel texture. Exposed ceilings (for instance room 135 High Bay) call for PNT3. Finish Legend describes PNT3 as "Water Based Epoxy Paint". There is no spec in 99000 for water based epoxy paint on steel. Please advise on what product to apply to exposed ceilings with PNT3.

Response to Bidder Inquiry ID 7578280:

Finish Legend on sheet I-002 will be revised to eliminate reference to "waterbased epoxy". Paint table for exposed metals and ceilings not otherwise specified has been changed to a high performance architectural latex;

"scuffmaster" paint is not required for ceilings and exposed structure.

32. Bidder Inquiry ID 7578282:

Note 3 on I-003 calls for the ceiling and walls in this room to be water based polyurethane (which points to the scuffmaster product). The walls in High Bay 135 are called for PNT3, and also have remark 3 and 4. Please advise on the coating for the exposed wall structure above the acoustical panels, as well as for the walls below the acoustic panels.

Response to Bidder Inquiry ID 7578282:

Finish Legend on sheet I-002 will be revised to eliminate reference to "waterbased epoxy". Specifications for interior metals not otherwise specified has been changed to a high performance architectural latex. Exposed wall surfaces/structure and ceilings/roof deck above the acoustic panels in the high bay scheduled to receive PNT3 shall use the High Performance Architectural Latex. CMU walls in high bay shall have epoxy paint per interior CMU paint table.

33. Bidder Inquiry ID 7578287:

Note on I-003 calls for Stair Ceilings to receive PNT2. We are to price these exposed ceilings to receive the "Armor" coating. Please confirm.

Response to Bidder Inquiry ID 7578287:

Refer to revised specification; ceilings shall receive high performance architectural latex paint.

34. Bidder Inquiry ID 7578290:

Please confirm that all door frames, handrails, stair components, columns, etc. are to receive the "Armour" product.

Response to Bidder Inquiry ID 7578290:

Specifications have been changed to call for a high performance architectural latex paint for all miscellaneous interior metals.

35. Bidder Inquiry ID 7578298:

Most of the exposed ceilings call for PNT1, which is NOT described as Scuffmaster on the finish legend. Are all of these PNT1 exposed ceilings to be figured as Scuffmaster Armor (since that is the only product that appears in the steel spec)?

Response to Bidder Inquiry ID 7578298:

Exposed ceilings scheduled to receive PNT1 shall use the High Performance Architectural Latex. Specifications have been changed to include this in the paint tables.

36. Bidder Inquiry ID 7578424:

DRYWALL

a. Spec 99000 only calls for Scuffmaster on gypsum substrates. "Armour" in stairs and wet areas. "Scrubtough" in all other areas.

b. Finish Legend I-002 description for PNT2 agrees with this gypsum spec.

c. Some gypsum walls are scheduled to receive PNT3, which is described as "Waterbased Epoxy" on I-002.

d. What product should be used on the gypsum walls specified to receive PNT3 waterbased epoxy, in absence of an epoxy spec for gypsum.

e. In some areas (ie. vestibule 100)- the finish schedule calls for walls to be PNT3 (water based epoxy), however Finish Schedule Remark 3 calls for the walls to be waterbased polyurethane (which points to the scuffmaster products). What product should be used for PNT3 Walls that also have Remark 3?

Response to Bidder Inquiry ID 7578424:

Finish Legend on sheet I-002 will be revised to eliminate reference to "waterbased epoxy". GWB wall surfaces scheduled to receive PNT3 shall use the High Performance Architectural Water Based Polyurethane from the paint table in the specifications.

37. Bidder Inquiry ID 7578428:

STEEL

a. 99000 for interior steel says to use "Armour" for all metal, not otherwise specified. Armor is a paint that has a splatter coat, similar to a knockdown or orange peel texture.

b. Exposed ceilings (for instance room 135 High Bay) call for PNT3.

i. Finish Legend describes PNT3 as "Water Based Epoxy Paint". There is no spec in 99000 for water based epoxy paint on steel. Please advise on what product to apply to exposed ceilings with PNT3.

ii. Note 3 on I-003 calls for the ceiling and walls in this room to be water based polyurethane (which points to the scuffmaster product).

iii. The walls in High Bay 135 are called for PNT3, and also have remark 3 and 4. Please advise on the coating for the exposed wall structure above the acoustical panels, as well as for the walls below the acoustic panels.

c. Note on I-003 calls for Stair Ceilings to receive PNT2. We will price these exposed ceilings to receive the "Armor" coating, which seems unusual. Please confirm.

d. Please confirm that all door frames, handrails, stair components, columns, etc. are to receive the "Armour" product.

e. Most of the exposed ceilings call for PNT1, which is NOT described as Scuffmaster on the finish legend.

i. Are all of these PNT1 exposed ceilings to be figured as Scuffmaster Armor (since that is the only product that appears in the steel spec)?

Response to Bidder Inquiry ID 7578428:

Finish Legend on sheet I-002 will be revised to eliminate reference to "waterbased epoxy". Exposed wall surfaces scheduled to receive PNT1 or PNT3 shall use the High Performance Architectural Water Based Polyurethane from the paint table in the specifications. Ceilings and metals shall use the High Performance Architectural Latex paint system which has been added to the paint tables.

38. Bidder Inquiry ID 7578518:

Spec Section 12 21 00 Paragraph 3.2- Please confirm windows in the administrative area overlooking the high bay training area do NOT receive blinds.

Response to Bidder Inquiry ID 7578518:

Specification is missing some important punctuation. Windows in admin areas overlooking the high bay training DO require blinds.

39. Bidder Inquiry ID 7579257:

Reference roofing specifications related to roofing membrane. The specs call for an 80 mil system fully adhered.

Would the government consider allowing the contractor to install "a mechanical attachment system"? This would allow the same roof membrane but instead of gluing it, it can be mechanically fastened along with installing 2-way air vents. We are told this solution would meet all of the performance requirements without all the adhesives; thus eliminating flammable products. This project would still be provided the same warranty as a fully adhered system.

Response to Bidder Inquiry ID 7579257:

Provide fully adhered roofing membrane as specified.

40. Bidder Inquiry ID 7579259:

Specification 122100 section 3.2

a. Do windows in the administrative area overlooking the high bay training area receive blinds?

b. Do exterior windows on the first floor receive blinds?

Response to Bidder Inquiry ID 7579259:

a. Yes, they windows overlooking the high bay training areas do require blinds.

b. No, the first floor windows do not face require blinds.

41. Bidder Inquiry ID 7579262:

Solicitation reads "Offers providing less than 180 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected." However, paragraph 52.214-15 PERIOD FOR ACCEPTANCE OF BIDS states " In compliance with the solicitation, the bidder agrees, if this bid is accepted within 60 calendar days from the date specified in the solicitation for receipt of bids, to furnish any or all items upon which prices are bid at the price set opposite each item, delivered at the designated point(s), within the time specified in the Schedule."

Please advise the time of acceptance for proposals.

Response to Bidder Inquiry ID 7579262:

The correct time of acceptance for proposals is 180 calendar days. This will be corrected via amendment.

42. Bidder Inquiry ID 7579811:

Amendment 1 on the SF30 states "The Proposal Due Date is Extended to 31 July 2018 at 2:00PM (EST).

Amendment 1 Section 00 10 00 - states "The required response date/time has changed from 24-Jul-2018 02:00 PM to 31-Jul-2018 12:00 AM. Please confirm the new correct bid time.

Response to Bidder Inquiry ID 7579811:

The correct bid time is 31 July 2018 at 2:00PM (EST). This will be corrected via amendment.

43. Bidder Inquiry ID 7579815:

The roof details on page A-002 are showing a 1/2" Roof Board + Underlayment per MFR and a 5/8" Gyp. Board Thermal Barrier.

Please confirm that the gyp board and cover board is required at all roof types for this project.

Response to Bidder Inquiry ID 7579815:

Yes, bid as indicated.

44. Bidder Inquiry ID 7579844:

On S-003 Note 10 - An open ended block (ie an open ended bond beam) will fail before testing of 3000 PSI on a net area can be achieved. Please clarify requirements for testing of the 3000 PSI Grout.

Response to Bidder Inquiry ID 7579844:

Delete requirement for open ended block.

45. Bidder Inquiry ID 7579984:

a. Spec 99000 only calls for Scuffmaster on gypsum substrates. "Armour" in stairs and wet areas. "Scrubtough" in all other areas.

b. Finish Legend I-002 description for PNT2 agrees with this gypsum spec.

c. Some gypsum walls are scheduled to receive PNT3, which is described as "Waterbased Epoxy" on I-002.

d. What product should be used on the gypsum walls specified to receive PNT3 waterbased epoxy, in absence of an epoxy spec for gypsum.

e. In some areas (ie. vestibule 100)- the finish schedule calls for walls to be PNT3 (water based epoxy), however Finish Schedule Remark 3 calls for the walls to be waterbased polyurethane (which points to the scuffmaster products). What product should be used for PNT3 Walls that also have Remark 3?

Response to Bidder Inquiry ID 7579984:

GWB walls specified to receive PNT3 shall use the waterbased polyurethane; reference to waterbased epoxy on I- 002 will be deleted.

46. Bidder Inquiry ID 7579986:

a. 99000 for interior steel says to use "Armour" for all metal, not otherwise specified. Armor is a paint that has a splatter coat, similar to a knockdown or orange peel texture.

b. Exposed ceilings (for instance room 135 High Bay) call for PNT3.

i. Finish Legend describes PNT3 as "Water Based Epoxy Paint". There is no spec in 99000 for water based epoxy paint on steel. Please advise on what product to apply to exposed ceilings with PNT3.

ii. Note 3 on I-003 calls for the ceiling and walls in this room to be water based polyurethane (which points to the scuffmaster product).

iii. The walls in High Bay 135 are called for PNT3, and also have remark 3 and 4. Please advise on the coating for the exposed wall structure above the acoustical panels, as well as for the walls below the acoustic panels.

c. Note on I-003 calls for Stair Ceilings to receive PNT2. We will price these exposed ceilings to receive the "Armor" coating, which seems unusual. Please confirm.

d. Please confirm that all door frames, handrails, stair components, columns, etc. are to receive the "Armour" product.

e. Most of the exposed ceilings call for PNT1, which is NOT described as Scuffmaster on the finish legend.

i. Are all of these PNT1 exposed ceilings to be figured as Scuffmaster Armor (since that is the only product that appears in the steel spec)?

Response to Bidder Inquiry ID 7579986:

Refer to revised paint tables. Ceilings and interior metals will have high performance architectural latex.

47. Bidder Inquiry ID 7580553:

What is the maintenance period required for the plants and trees at the bioretention basin?

Response to Bidder Inquiry ID 7580553:

Maintenance requirements are included on Drawing sheet CG507, SEQUESNCE OF CONSTRUCTION FOR BIORETENSION BASINS, Step 10.

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 31-Jul-2018 12:00 AM to 31-Jul-2018 02:00 PM.

SECTION 00 21 00 - INSTRUCTIONS

The following have been modified:

A. PROJECT DESCRIPTION

The project includes high bays with space for applied instruction classrooms. A supporting tool/equipment storage and issue space, as well as laboratories, instructor work and counseling areas, and appropriate supporting space to enable automated instruction, and aircraft part and equipment mock-up demonstration space. A ground support equipment storage facility and paved apron hardstand for aircraft support equipment storage and movement is also required.

Unique aspects of the project include the following:

1. Four high bay training areas, approximately 89 feet x 189 feet x 40 feet clear height

2. Steel framed construction

3. Heavy hot rolled long span steel roof trusses

4. Bolted truss gusset construction

5. Custom bolted connections

6. Multiple overhead crane systems, 3 - ton minimum per crane

7. Deep foundations

8. Multiple construction crane critical lifts.

B. PROJECT DURATION

Work shall be complete within 600 calendar days from receipt of the Notice to Proceed (NTP).

C. BIDDER QUESTIONS AND COMMENTS

All questions and/or comments should reach the above referenced Contracting Office via ProjNet no later than 14 July 2018, in order that they may be given consideration or actions taken prior to receipt of offers.

Technical inquiries and questions relating to bid procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.projnet.org/projnet. To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue. From this page you may view all bidder inquiries or add inquiry. Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.

The Solicitation Number is : W91236-18-B-0018 The Bidder Inquiry Key is: 2JX82X-T58J7K

The Bidder Inquiry System will be unavailable for new inquires 7 days prior to bid opening in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary. Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

D. BID SUBMISSION

1. Hand-carried Bids/Offers must be delivered to the Contract Specialist or Contracting Officer located at the US Army Corps of Engineers Norfolk District:

803 FRONT STREET

Norfolk, VA 23510-1011 Attn: Contracting Office Joy Wright

Not Later than 2:00 PM EST on Tuesday, 31 July 2018. Bids/Offers will only be accepted by contracting personnel.

Guards are not authorized to accept Bids/Offers on behalf of the Government.

Norfolk District has a security gate located on Fort Norfolk on Front Street and requires all occupants of the vehicle to have a valid driver’s license for entry. Parking is limited. Firearms are not permitted on the installation. Offerors are cautioned to allow sufficient time for travelling over the causeway or ferry. Neither will constitute Government-caused delay.

2. Mail:

Bids shall specify the following information:

YOUR FIRM’S NAME

FIRM POINT OF CONTACT (POC) NAME

FIRM POC E-MAIL ADDRESS

FIRM POC PHONE NUMBER

http://www.projnet.org/projnet

Bids shall be submitted to the below address not later than 2:00 PM EST on Thursday, 14 June 2018.

One (1) ORIGINAL AND One (1) ELECTRONIC (DISC) COPY SHALL BE SUBMITTED BY EACH

OFFEROR.

Attn: Contracting Office Joy Wright USACE Norfolk District

803 FRONT STREET

Norfolk, VA 23510-1011

E. BID GUARANTEE

A Bid Guarantee will be required for this solicitation. The penal sum of the bond for the task order will be required as stated in provision 52.228-1, Bid Guarantee. Scanned copy submission of the bid bond is required.

F. BID EVALUATION AND AWARD

The Government will evaluate bids in response to this solicitation based upon the Total Evaluated Price without discussions and will award a contract to the responsible bidder whose bid, conforming to the solicitation, will be most advantageous to the Government considering only price and the price-related factors specified elsewhere in the solicitation. The Government may reject any or all bids and/or waive informalities or minor irregularities in bids received.

The Government will evaluate offers for award purposes by adding the total price for all optional items to the total price for the basic requirement.

G. AWARD TO RESPONSIBLE OFFEROR

1. DEFINITIVE RESPONSIBILITY CRITERIA

In accordance with FAR 9.104-1, the Contracting Officer will determine responsibility based on the standards defined therein. In addition, the Contracting Officer's responsibility determination also will based on the following Definitive Responsibility Criteria:

1. Whether the low bidder has demonstrated experience on three projects in which lifts of pre-positioned, pre-assembled hardware weighing 30 - 50 tons have been performed using multiple cranes working in unison.

2. Whether the low bidder has demonstrated experience on three projects in which heavy hot-rolled truss sections utilizing large gusset plate connections and high strength pre tensioned bolts.

3. Whether the low bidder has demonstrated experience on three projects in which deep pile foundations were utilized, piles driven deep into the ground and footings for the structural members of the building placed on top of the driven piles.

After bid opening, the apparent low bidder only will be required to submit documentation demonstrating past project experience responsive to the Definitive Responsibility Criteria within 3 days of the bid opening. The prime contractor may submit its past projects as a prime contractor in which the pertinent scope described in the Criteria was a part of the contract even if it was not self-performed by the prime. In addition, the prime contractor may submit projects in which it performed the pertinent scope as a subcontractor.

Finally, the contractor may submit projects of an intended subcontractor, provided that the prime clearly explains what portion of this contract will be performed by the subcontractor AND a letter of commitment signed by the subcontractor is submitted in the Responsibility submissions. A draft letter of commitment is included as an attachment.

H. RESPONSIVENESS OF BIDS (FAR 14.301)

1. To be considered for award, a bid must comply in all material respects with the invitation for bids. Such compliance enables bidders to stand on an equal footing and maintain the integrity of the sealed bidding system.

2. Bids should be filled out, executed, and submitted in accordance with the instructions in the invitation. If a bidder uses its own bid form or a letter to submit a bid, the bid may be considered only if --

3. The bidder accepts all the terms and conditions of the invitation; and

4. Award on the bid would result in a binding contract with terms and conditions that do not vary from the terms and conditions of the invitation.

5 In order for the bidder to be considered responsive the unit price must be filled in and must not past two decimal places.

I. CONTRACTOR PERFORMANCE AND BANKING INFORMATION

1. The below information will be requested of the apparent low offeror. This information is not required to be responsive to the invitation for bid. To efficiently and expeditious award the resultant contract, it is HIGHLY recommended that offerors provide the below information with their offer. If offerors wish to shield this information from public view at the bid opening, the information may be placed in an envelope with the following legend:

PRE-AWARD SURVEY INFORMATION

SOLICITATION NO. W91236-18-B-0018

<YOUR FIRM’S NAME>

a) BANK: Branch/Location Point-of-Contact Telephone Number/Fax Number/Email Address Please contact the bank in advance so they will release the necessary information regarding average balances in your operating accounts, lines of credit and credit history.

b) For DRC “1” - Three Projects in which lifts of pre-positioned, preassembled structural steel weighing 30 - 50 tons have been performed using multiple cranes working in unison:

Project Title/Contract Number Customer Point-of-Contact Telephone Number/Fax Number/ Email address $Value %Complete/Scheduled Completion Date

c) For DRC “2” - Three Projects in which heavy hot-rolled truss sections utilizing large gusset plate connections and high strength pre tensioned bolts:

Project Title/Contract Number Customer Point-of-Contact Telephone Number/Fax Number/ Email address $Value %Complete/Scheduled Completion Date

d) For DRC “3” - Three Projects in which deep pile foundations were utilized:

Project Title/Contract Number Customer Point-of-Contact Telephone Number/Fax Number/ Email address $Value %Complete/Scheduled Completion Date

e) Please do not provide avoluminous listing of your firm’s contracting history.

J. INSPECTION OF THE SITE

Prospective bidders are invited to visit the site of the work in order to acquaint themselves as to site conditions and other problems incident to the prosecution of the work. Arrangements for inspection of the site shall be made through the Office the Area Engineer identified in the clause 52.236-27, entitled "SITE VISIT

(CONSTRUCTION)."

K. EVIDENCE OF AUTHORITY TO SIGN OFFERS

Evidence of the authority of individuals signing offers to submit firm offers on behalf of the offeror is required except where the offer is signed, and shows that it is so signed, by: the President, Vice-President, or Secretary of an incorporated offeror; a partner in the case of a partnership; or the owner in the case of a sole proprietorship. Failure to submit with the offer satisfactory evidence of the authority of all other persons may be cause for rejection of the offer as invalid or nonresponsive.

L. PREAWARD SAFETY CONFERENCE

1. Where an apparent low bidder, in performance of contracts during the previous three-year period, incurred one or more accidents, or where, in the opinion of the Contracting Officer, there is any question regarding this compliance with any safety or accident prevention requirement, such bidder, on request of the Contracting Officer prior to any award under this solicitation, shall attend a conference with representatives of the Contracting Officer to discuss any such accidents or non-compliance, the reason for their occurrence, and measures which will be taken to preclude any recurrence thereof.

2. Information elicited at this conference will be used by the Contracting Officer, in conjunction with other information obtained in a preaward survey, in determining the bidder's responsibility.

3. The items discussed, the preventive measures considered, and any conclusions reached in this conference shall be recorded in minutes of the meeting, which shall be authenticated by the signatures of representatives of the bidder and the Contracting Officer, and any procedures noted therein as agreed upon shall become an obligation of the bidder, along with all other safety and accident prevention requirements of the contract, if award is made to him.

M. INCURRING COSTS

The Government is not liable for any costs incurred by the offeror submitting an offer in response to this solicitation.

N. AGENTS

Offers signed by an Agent must be made in the name of the Principal and must be accompanied by evidence of said Agent’s authority to act on behalf of its Principal.

O. UNBALANCED BIDS

Any offer which is materially unbalanced as to prices for the Base Items and the Optional Items may be rejected as non-responsive or otherwise not considered for award. An unbalanced offer is one which is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.

P. UNAUTHORIZED INSTRUCTIONS FROM GOVERNMENT OR OTHER PERSONNEL

The contractor shall not accept instructions issued by any person, employed by the U.S. Government or otherwise, other than the Contracting Officer or the Authorized Representative of the Contracting Officer acting within the limits of his/her authority as defined in the Designation of Authority letter. A copy of the Designation of Authority letter will be furnished to the contractor at time of contract award.

Q. TIMBER VALUATION

The contractor shall be responsible for tree clearing and removal in accordance with the plans and specifications, see Section 31 11 00 Clearing and Grubbing Part 3.2 Clearing.

Within 30 days after a Notice to Proceed is given to the contractor, said contractor shall submit a certified check payable in the amount of $1,198.95 to " FAO, USAED Norfolk" for fair market value of timber designated for tree removal on the site. Payment mailed to U.S. Army Corps of Engineers, Norfolk District, Attn: Real Estate Timber Sales, Fort Norfolk, 803 Front Street, Norfolk, VA 23510-1011. The contractor shall have (designated amount of time) from the Notice to Proceed to remove said timber. Ownership of timber transfers upon cutting. Title to the timber sold hereunder shall vest in the Purchaser as and when the Purchaser cuts the timber. The risk of loss shall pass to the Purchaser upon vesting of title. All trees not cut will remain property of the Government.

The check shall be payable to:

"FAO, USAED Norfolk"

R. AT/OPSEC

1. AT Level I Training. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable and annually thereafter. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 05 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: http://jko.jten.mil

2. Access and General Protection/Security Policy and Procedures. Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements {FAR clause 52.204-9 or NAF Clause BI.142, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, Should the Force Protection Condition {FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

3. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), http://jko.jten.mil/ applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

4. iWATCH Training. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 05 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award.

52.214-15 PERIOD FOR ACCEPTANCE OF BIDS (APR 1984)

In compliance with the solicitation, the bidder agrees, if this bid is accepted within 180 calendar days from the date specified in the solicitation for receipt of bids, to furnish any or all items upon which prices are bid at the price set opposite each item, delivered at the designated point(s), within the time specified in the Schedule.