W91236-18-B-0018_Amendment_0001.pdf
PDF 153 KB Posted
- Attached to
- Aviation Maintenance Instructional Building, Fort Eustis, VA Federal contract opportunity
- Solicitation number
- W91236-18-B-0018
About this file
W91236-18-B-0018 Amendment 0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B.01.02_Abstract_of_Offers_Continuation_Sheet_Page_2_W91236-18-B-0018_AMIB.pdf | ||
| B.01.02_Abstract_of_Offers_Continuation_Sheet_Page_3_W91236-18-B-0018_AMIB.pdf | ||
| B.01.02_Abstract_of_Offers_Pg._1_W91236-18-B-0018_AMIB.pdf | ||
| AMENDMENT_0002_Attachment.pdf | ||
| W91236-18-B-0018_Amendment_0002.pdf | ||
| Amendment_0001_Attachment.pdf | ||
| Site_Visit_Attendance_Sheet_18-B-0018.pdf | ||
| A.01.13_RTA_AMIB_DWGS_VOL_1.pdf | ||
| A.01.13_RTA_AMIB_DWGS_VOL_2.pdf | ||
| A.01.38_PN077779_AMIB_GEOTECHNICAL_REPORTS_VOL_4.pdf | ||
| Site_Visit_Access_Spreadsheet.xls | XLS spreadsheet | |
| LETTER_OF_COMMITMENT_FOR_SUBCONTRACTOR_sample.docx | DOCX document | |
| A.07.23_W91236-18-B-0018_Aviation_Maintenance_Instruction_Building_FINAL.pdf | ||
| A.01.38_PN077779_AMIB_SPECIFICATIONS_RTA_VOL_1.pdf | ||
| A.01.38_PN077779_AMIB_SPECIFICATIONS_RTA_VOL_3.pdf | ||
| A.01.38_PN077779_AMIB_SPECIFICATIONS_RTA_VOL_2.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Aviation Maintenance Instructional Building, Fort Eustis, VA
THE PROPOSAL DUE DATE IS EXTENDED TO 31 JULY 2018 AT 2:00P.M. (EST)
PROJNET WILL BE REOPEN UNTIL 24 JULY 2018.
SEE CONTINUATION PAGE
Contracting POC: Joy Wright, email: joy.m.w right@usace.army.mil, phone: 757-201-7145
1. CONTRACT ID CODE PAGE OF PAGES
J 1 17
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Jul-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123618B0018
X 9B. DATED (SEE ITEM 11)
22-Jun-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Jul-2018
CODE
USA ENGINEER DISTRICT, NORFOLK
803 FRONT STREET
NORFOLK VA 23510-1096
W91236 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9123618B0018
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
The purpose of this modification is to incoporate the following changes and to include the Bidder Inquiries:
SPECIFICATION CHANGES
REVISED SPECIFICATION COVER SHEET ‐ Remove FOUO footnote from the cover sheet of each specification volume.
FAR 52.236‐1 ‐ Performance of work by contractor – Change from 51% to 15%.
GEOTECHNICAL REPORT – Section 5.2 remove type V cement. Revise concrete strength. Revise minimum bending moment capacity.
SPECIFICATION SECTION 01 33 29 – Paragraph 1.5.1.2 HPSB Checklist Public Access ‐ Provide updated location of checklist.
SPECIFICATION SECTION 01 50 00 – Revise paragraph 3.2 EMPLOYEE PARKING from:
Contractor employees will park privately owned vehicles in an area designated by the Contracting Officer. This area will not necessarily be within reasonable walking distance of the construction site. The contractor shall provide transportation between the parking area and the construction site. Contractor employee parking must not interfere with existing and established parking requirements of the government installation.
To:
Contractor employees will park privately owned vehicles in an area designated by the Contracting Officer. This area will be within reasonable walking distance of the construction site. Contractor employee parking must not interfere with existing and established parking requirements of the government installation.
SPECIFICATION SECTION 07 19 00 – Add Specification Section WATER REPELLENTS.
SPECIFICATION SECTION 08 71 00 – Revise Hardware Set #23
SPECIFICATION SECTION 09 72 00 – Replace specification Section in its entirety.
SPECIFICATION SECTION 09 90 00 PAINTING – Delete paragraph 1.3.2 "SSPC QP 1 Certification”
SPECIFICATION SECTION 14 24 23 – Paragraph 2.1.1.1 C – Revise elevator rated speed to 150 fpm.
SPECIFICATION SECTION 31 62 13.20 ‐ Paragraph 2.2, revise Compressive strength from 5000 psi to 6000 psi.
SPECIFICATION SECTION 31 62 13.20 – Paragraph 2.3.1, Revise minimum bending moment capacity from 94 kip‐feet to 42 kip‐feet.
SPECIFICATION SECTION 32 31 13 – Add Paragraph 3.2.16 GROUNDING:
Ground fencing as specified.
Ground all fences crossed by overhead power lines in excess of 600 volts, and all electrical equipment attached to the fence. Ground fences on each side of all gates, at each corner, at the closest approach to each building located within 50 feet of the fence, and where the fence alignment changes more than 15 degrees. Grounding locations cannot exceed 650 feet. Bond each gate panel with a flexible bond strap to its gate post. Ground fences crossed by power lines of 600 volts or more at or near the point of crossing and at distances not exceeding 150 feet on each side of crossing. Provide ground conductor consisting of No. 6 AWG solid copper wire. Provide copper-clad steel rod grounding electrodes3/4 inch by 10 foot long. Drive electrodes into the earth so that the top of the electrode is at least 6 inches below the grade. Where driving is impracticable, bury electrodes a minimum of 12 inches deep and radially from the fence, with top of the electrode not less than 2 feet or more than 8 feet from the fence. Clamp ground conductor to the fence and electrodes with bronze grounding clamps to create electrical continuity between fence posts, fence fabric, and ground rods. Total resistance of the fence to ground cannot exceed 25 ohms.
SPECIFICATION SECTION 32 92 19 – Revise paragraph 3.3.5 WATERING from:
Start watering areas seeded as required by temperature and wind conditions. Apply water at a rate sufficient to insure thorough wetting of soil to a depth of 2 inches without run off. During the germination process, seed is to be kept actively growing and not allowed to dry out.
To:
Start watering areas seeded as required by temperature and wind conditions. Apply water at a rate sufficient to insure thorough wetting of soil to a depth of 2 inches without run off. During the germination process, seed is to be kept actively growing and not allowed to dry out. The contractor shall water the grass until the grass is FIRMLY ESTABLISHED and after the grass has be cut 3 times. After this has been completed, the contractor shall coordinate with the ACOE and the COR and field verify and document that the grass is firmly established before being released from their contractual responsibilities.
DRAWING CHANGES
SHEET CD‐101 – Change note 8 reference from CD‐105 through CD‐111 to CD905 through CD911
SHEET S‐002 – Clarify minimum compressive strength of concrete for piles.
SHEET S‐003 ‐ Concrete construction note 26 Change 15 mil vapor barrier 10 mil.
SHEET S‐004 – Clarify allowable bending moment capacity for piles.
SHEET S‐105 ‐ Ref. on Sheet S‐105 changed from S‐507 to S‐575.
SHEET A‐601 – Correct Door schedule for door 127A.
SHEET A‐614 – Revise storefront schedule.
SHEET I‐003 – Revise Finish Schedule
SHEET I‐112 – Revised finish schedule.
SHEET I‐501 ‐ Revised tile pattern.
SHEET EL‐502 ‐ Revise Lighting schedule to include A5, A6, H1, H2, H3.
ProjNet Bidder Inquiries and Government Responses:
1. Bidder Inquiry ID 7541138:
The cover sheet for all specification volumes contain the footnote "Property of the United States Government ?
FOUO | For Official Use Only AS DIRECTED BY THE DTL" and "Copying, Dissemination, and Distribution to Unauthorized Individuals Prohibited AS DIRECTED BY THE DTL". Please confirm contractors are permitted to distribute RFP documents to subcontractor for pricing.
Responses to Bidder Inquiry ID 7541138:
The FOUO is a misprint. This in not a classified project. Distribution to subcontractors is permissible.
2. Bidder Inquiry ID 7541152:
Cover sheet for all 3 volumes contains a footnote indicating the sheet is FOUO. No other page is marked as FOUO.
CFR-2011-title32 requires that all pages containing FOUO information be so marked. Please confirm that no other specifications are designated FOUO.
Responses to Bidder Inquiry ID 7541152:
The FOUO is a misprint. This is not a classified project. Contractors may distribute documents to their subcontractors.
3. Bidder Inquiry ID 7541961:
FAR clause 52.236-1 Performance of work by contractor states "The contractor shall perform on site, and with its own organization, work equivalent to at least 51 percent of the total work amount of work to be performed under the contract"; this seems excessive for the type of project. Typically the percentage of work required to be performed by a general contractor on this type of project is 15 percent. Please advise if 51% is the correct intended percentage of work. If so, would the Government consider reducing this to 15%.
Responses to Bidder Inquiry ID 7541961:
The correct percentage of work is 15%. This will be corrected via amendment.
4. Bidder Inquiry ID 7553181:
Drawing S-105 Overall Crane Plan Notes. Note # 2 references drawing S-507. Drawing S-507 provides a detail for the elevator pit foundation. Please clarify.
Responses to Bidder Inquiry ID 7553181:
This is a typo. The correct sheet number is S-575 not S-507.
5. Bidder Inquiry ID 7553927:
Is there any vertical "X" bracing required along grid line "E" from finish floor up to the bottom of the box girder?
Elevations 1,2/S-413 shows vertical bracing along grid line "B" but unable to locate any elevation drawings along grid line "E" other than the "E" line of the box truss.
Responses to Bidder Inquiry ID 7553927 No. This is not possible and not required.
6. Bidder Inquiry ID 7555326:
1.On Sheet S-502 the Precast Pre-stressed Pile Reinforcing Elevation and section state the following; "Corrugated plastic pipe inserts for #7 standard hook epoxied into pipe. Pipe diameter and length as per epoxy manufacturer"
a. Can this sleeve be Galvanized corrugated pipe? (there can construct-ability issues when using plastic, they tend to bend during pouring and create issues when you install the rebar)
b. Is there a specification for the epoxy or epoxy grout to help determine the length of the pipe and bars?
Responses to Bidder Inquiry ID 7555326:
a. Industry standard pipe inserts are acceptable.
b. The bar development length and pipe insert length may be determined from the epoxy or epoxy grout (manufacturer provided) strength properties that should be equal to or exceed the pile cap concrete compressive stress.
7. Bidder Inquiry ID 7555336:
"Concrete Pile Schedule" calls for an allowable axial compressive capacity of 127 kips interacting with a 94 kip-ft moment. This loading combination is outside the capacity for a 14" Pile with 5,000 PSI concrete.
a. Are the stresses indicated on sheet S-004 indicative of "Factored (Ultimate) Stresses" or "Allowable (Service) Stresses"?
i. If these stresses are Allowable then a 14" Pile will not work. The piles size or quantity would need to change.
ii. If these stresses are Factored (Ultimate) Stresses then the piles can work with an increased PSI concrete. Would this be acceptable?
Responses to Bidder Inquiry ID 7555336:
Please make the following updates to the "Concrete Pile Schedule" on S-004:
Allowable Capacities – Bending Moment = 42 kip-ft Pile Note 2. Concrete compressive strength is to be minimum 6000 psi at 28 days. These changes should also be reflected in the geotechnical report and Specification Section 31 62 13.20
8. Bidder Inquiry ID 7555340:
Section 5.2 of the Geotechnical Report, "Table 4" indicates the piles are to have an Allowable (service) Axial Tensile Capacity of 44.1 Kips. With this in mine we have the following questions:
a. Since this is listed in the Geotechnical report and not the drawings does that mean that the piles are not required to have an Allowable Axial Tensile Capacity?
i. If tensile capacity is required and both it and the moment listed on Sheet S-004 (94 kip-ft) are allowable stresses, a 14" Pile with 5,000 PSI concrete cannot handle that load combination. The pile size or quantity would need to change.
ii. If tensile capacity is required and both it and the moment listed on Sheet S-004 (94 kip-ft) are Factored (Ultimate) Stresses then a 14" Pile can work with additional strands. Would this be acceptable?
b. If the Tensile Capacity is required, is it for all the piles? If not, which ones?
Responses to Bidder Inquiry ID 7555340:
Allowable Axial Tensile Capacity given in the Geotechnical report (Table 4) is the geotechnical capacity of the pile, not the required structural capacity. The required structural tensile capacity of the pile is minimal and implicitly met by other requirements.
Please make the following updates to the "Concrete Pile Schedule" on S-004:
Allowable Capacities – Bending Moment = 42 kip-ft
Pile Note 2. Concrete compressive strength is to be minimum 6000 psi at 28 days.
These changes should also be reflected in the geotechnical report and Specification Section 31 62 13.20.
9. Bidder Inquiry ID 7555415:
Section 5.2 of the Geotechnical Report calls for Type V cement to be used for sulfate resistance.
Type V cement is not readily available in the US. For sulfate resistance, can a Type II or II/III cement replacement with SCMs (supplementary cement materials) such as slag cement or flyash be used to provide the necessary resistance to sulfate attack as well as reduce the chloride permeability required in the project specifications (section 31 62 13.20, part 2.4.6) Responses to Bidder Inquiry ID 7555415:
The requirement for Type V cement should have been left out of the geotechnical report (para 5.2). The only requirement is "Concrete mix design must resist the corrosive nature of the soil as presented in the Geotechnical Report" and to design in accordance with ACI 211.1 or ACI 318, Chapter 4 (Section 31 62 13.20, part 2.2). Other cement types and additives are acceptable within these constraints.
10. Bidder Inquiry ID 7559744:
Spec Section 01 50 00 "Temporary Construction Facilities and Controls" Subsection 3.7.1 "Resident Engineer's Office - Please clarify if the contractor is to provide the government with an office trailer for the complete duration of the project.
Responses to Bidder Inquiry ID 7559744:
Yes, the contractor is to provide the government with an office trailer for the complete duration of the project
11. Bidder Inquiry ID 7559750:
Please consider a bid extension. This will help in increasing subcontractor participation which provides the government with more competitive pricing.
Responses to Bidder Inquiry ID 7559750:
This will be included in a forth coming admentment
12. Bidder Inquiry ID 7559760:
Spec Section 09 90 00 "Painting" Subsection 1.3.2 "SSPC QP 1 Certification" Please remove the QP 1 Certification for this project. Most qualified painting subcontractors do not have this certification because it is extremely expensive to get. If this requirement is not removed it will drastically decrease painting subcontractors competition and more than double the price.
Responses to Bidder Inquiry ID 7559760:
Section will have to be deleted by amendment.
13. Bidder Inquiry ID 7559763:
Concrete Construction Note 2: "Maintenance Bay slab on grade shall have a minimum 28 day compressive strength of 5000 PSI. Please confirm if 5000 PSI is required.
Responses to Bidder Inquiry ID 7559763:
5000 psi concrete at the maintenance bay slab is confirmed.
14. Bidder Inquiry ID 7559769:
Spec Section 01 50 00 "Temporary Construction Facilities and Controls" Subsection 3.2 "Employee Parking" states that contractor employee and subcontractor parking will not be at project site and the contractor will need to include pricing for transportation to and from construction site to parking area. Please provide a map that shows the parking area in relation to the construction area so we can plan accordingly and price accurately.
Responses to Bidder Inquiry ID 7559769:
This will be changed to ....contractor employee and subcontractor parking will be at the project site
15. Bidder Inquiry ID 7559775:
Is an AISC certified steel fabricator and erector required for this project?
Responses to Bidder Inquiry ID 7559775:
Per UFGS specification an AISC certified fabricator and erector are required. The previous AISC acronym (STD) has been superseded by BU.
16. Bidder Inquiry ID 7559778:
Spec Section 05 12 00 "Structural Steel" Subsection 2.5.2 "Shop Primer" has a zinc rich primer (SSPC Paint 20 or
29) requirement. Please confirm a zinc rich primer is required for this project.
Responses to Bidder Inquiry ID 7559778:
Zinc rich primer is required per the UFGS specification.
17. Bidder Inquiry ID 7559784:
Spec Section 05 12 00 "Structural Steel" Subsection 2.5.2.1 "Cleaning" has SSPC SP 6 required for cleaning steel.
This is an extremely expensive cleaning requirement for steel. Please confirm that this is required for this project.
Responses to Bidder Inquiry ID 7559784:
Per the UFGS, paragraph 2.6.2.1 "Cleaning" dictates "SSPC SP 6/NACE No.3, except steel exposed in spaces above ceilings, attic spaces, furred spaces, and chases that will be hidden to view in finished construction may be cleaned to SSPC SP 3 when recommended by the shop primer manufacturer. Maintain steel surfaces free from rust, dirt, oil, grease, and other contaminants through final assembly."
18. Bidder Inquiry ID 7559792:
We would like to request a bid extension of two weeks due to the size of this project.
Responses to Bidder Inquiry ID 7559792:
This will be included in a forthcoming amendment.
19. Bidder Inquiry ID 7559794:
Spec Section 01 45 00.00 10 "Quality Control" Subsection 3.4.3 "CQC Personnel" Please confirm that a Civil QC is required for this project.
Responses to Bidder Inquiry ID 7559794:
Per the 01 45 00.00 10 UFGS, Civil QC is required.
20. Bidder Inquiry ID 7559795:
Spec Section 01 45 00.00 10 "Quality Control" Subsection 3.4.3 "CQC Personnel" Please confirm that a Mechanical QC is required for this project.
Responses to Bidder Inquiry ID 7559795:
Per the 01 45 00.00 10 UFGS, Mechanical QC is required.
21. Bidder Inquiry ID 7559796:
Spec Section 01 45 00.00 10 "Quality Control" Subsection 3.4.3 "CQC Personnel" Please confirm that a Electrical QC is required for this project.
Responses to Bidder Inquiry ID 7559796:
Per the 01 45 00.00 10 UFGS, Electrical QC is required.
22. Bidder Inquiry ID 7559798:
Spec Section 01 45 00.00 10 "Quality Control" Subsection 3.4.3 "CQC Personnel" Please confirm that a Structural QC is required for this project.
Responses to Bidder Inquiry ID 7559798:
Per the 01 45 00.00 10 UFGS, Structural QC is required.
23. Bidder Inquiry ID 7559801:
Spec Section 01 45 00.00 10 "Quality Control" Subsection 3.4.3 "CQC Personnel" Please confirm that an Architectural QC is required for this project.
Responses to Bidder Inquiry ID 7559801:
Per the 01 45 00.00 10 UFGS, Architectural QC is required.
24. Bidder Inquiry ID 7559806:
Spec Section 01 45 00.00 10 "Quality Control" Subsection 3.4.3 "CQC Personnel" Please confirm that an Environmental QC is required for this project.
Responses to Bidder Inquiry ID 7559806:
Per the 01 45 00.00 10 UFGS, Environmental QC is required.
25. Bidder Inquiry ID 7559810:
Spec Section 01 45 00.00 10 "Quality Control" Subsection 3.4.3 "CQC Personnel" Please confirm that a Submittals Clerk is required for this project.
Responses to Bidder Inquiry ID 7559810:
Per the 01 45 00.00 10 UFGS, a Submittals Clerk is required.
26. Bidder Inquiry ID 7559813:\ Spec Section 01 45 00.00 10 "Quality Control" Subsection 3.4.3 "CQC Personnel" Please confirm that a Cx Agent/LEED Specialist is required for this project.
Responses to Bidder Inquiry ID 7559813:
Per the 01 45 00.00 10 UFGS, a Cx Agent/GBI Specialist is required. This project is covered under the Green Building Initiative (GBI) sustainability criteria.
27. Bidder Inquiry ID 7559823:
Spec Section 01 45 00.00 10 "Quality Control" Subsection 3.4.3 "CQC Personnel" Please confirm if the various Specialized QC Personnel are required full time for the whole project duration.
Responses to Bidder Inquiry ID 7559823:
Per the 01 45 00.00 10 UFGS, section 3.4.1 dictates: "The Contractor's CQC staff must maintain a presence at the site at all times during progress of the work..."
28. Bidder Inquiry ID 7559826:
Spec Section 01 45 00.00 10 "Quality Control" Subsection 3.4.3 "CQC Personnel" Please confirm if the various Specialized QC Personnel can be done by Third Party.
Responses to Bidder Inquiry ID 7559826:
Per the 01 45 00.00 10 UFGS, section 3.4.3 "CQC Personnel" dictates: "These individuals may be employees of the prime or subcontractor;..."
29. Bidder Inquiry ID 7560679:
If Bid Option #3 is accepted, would it be acceptable to use the area by Bldgs. 2783 & 2785 as additional construction lay-down?
Responses to Bidder Inquiry ID 7560679:
No. the laydown area for the project is as designated on the drawings.
30. Bidder Inquiry ID 7560680:
On Sheet C-002 it is showing the traffic pattern turning left off Washington onto Marshall. As of right now, that is a one way street in the opposite direction. Is it the intent of CED to allow two way traffic on that street during the construction duration?
Responses to Bidder Inquiry ID 7560680:
Note 3 on C-002 states the intent to allow the construction vehicles (ONLY) to access Marshall from Washington Boulevard. This will keep the large vehicles away from the main solider crossing at Marshall and Madison. POVs will still have to obey the one-way travel.
31. Bidder Inquiry ID 7561093:
Can you confirm what elevation my crane will be sitting at to drive the piles? The specifications do not allow us to cut off production piles so the pile caps will have to be excavated to the bottom of pile cap elevation (6'-2" below Floor elevation). I would prefer to be top of pile cap elevation (2'-8" below Floor Elevation).
Responses to Bidder Inquiry ID 7561093:
Excavate to bottom of pile cap prior to placing or driving piles" (Section 31 00 00, para 3.2.6)
32. Bidder Inquiry ID 7561115:
Please confirm that you will be hiring the inspection agency responsible for the Drive Logs during the production piles. We will include in our price the cost for the Geotechnical Consultant that will oversee the test pile activities and provide the required reports for determining pile performance and drive criteria.
Responses to Bidder Inquiry ID 7561115:
Pile driving logs are the responsibility of the contractor (Section 31 62 13.20, para 3.4.4). Correct, you also need to hire a geotechnical consultant to observe and provide required reports as specified (Section 31 62 13.20, para 1.5.4).
33. Bidder Inquiry ID 7561125:
On Sheet S-502 the Precast Pre-stressed Pile Reinforcing Elevation and section state the following "Corrugated plastic pipe inserts for #7 standard hook epoxied into pipe. Pipe diameter and length as per epoxy manufacturer"
a. Can this sleeve be Galvanized corrugated pipe? Pre-casters state that there are constructability issues when using plastic, then tend to bend during pouring and create issues when you go to stick and epoxy the bar.
b. Are they looking for an epoxy grout or just simply an epoxy for the bars? Either way, do they have a specificationfor the epoxy or epoxy grout that I can send out for pricing and to determine the length of the pipe and bars?
Responses to Bidder Inquiry ID 7561125:
a. Industry standard pipe inserts are acceptable.
b. The bar development length and pipe insert length may be determined from the epoxy or epoxy grout (manufacturer provided) strength properties that should be equal to or exceed the pile cap concrete compressive stress.
34. Bidder Inquiry ID 7561126:
Plan sheet S-004, "Concrete Pile Schedule" calls for an allowable axial compressive capacity of 127 kips interacting with a 94 kip-ft moment. After a quick analysis this loading combination is outside the capacity for a 14" Pile with 5,000 PSI concrete. Can you answer the following questions:
a. Are the stresses indicated on sheet S-004 indicative of "Factored (Ultimate) Stresses" or "Allowable (Service) Stresses"?
i. If these stresses are Allowable then a 14" Pile will not work. The piles size or quantity would need to change.
ii. If these stresses are Factored (Ultimate) Stresses then the piles can work with an increased PSI concrete. Would this be acceptable?
Responses to Bidder Inquiry ID 7561126:
Please make the following updates to the "Concrete Pile Schedule" on S-004:
Allowable Capacities – Bending Moment (kip-ft) = 42 Pile Note 2. Concrete compressive strength is to be minimum 6000 psi at 28 days These changes should also be reflected in the geotechnical report and Specification Section 31 62 13.20
35. Bidder Inquiry ID 7561131:
Section 5.2 of the Geotechnical Report, "Table 4" indicates the piles are to have an Allowable (service) Axial Tensile Capacity of 44.1 Kips. With this in mine we have the following questions:
a. Since this is listed in the Geotechnical report and not the drawings does that mean that the piles are not required to have an Allowable Axial Tensile Capacity?
i. If tensile capacity is required and both it and the moment listed on Sheet S-004 (94 kip-ft) are allowable stresses, a 14" Pile with 5,000 PSI concrete cannot handle that load combination. The pile size or quantity would need to change.
ii. If tensile capacity is required and both it and the moment listed on Sheet S-004 (94 kip-ft) are Factored (Ultimate) Stresses then a 14" Pile can work with additional strands. Would this be acceptable?
b. If the Tensile Capacity is required, is it for all the piles? If not, which ones?
Responses to Bidder Inquiry ID 7561131:
Allowable Axial Tensile Capacity given in the Geotechnical report (Table 4) is the geotechnical capacity of the pile, not the required structural capacity. The required structural tensile capacity of the pile is minimal and implicitly met by other requirements.
Please make the following updates to the "Concrete Pile Schedule" on S-004:
Allowable Capacities – Bending Moment (kip-ft) = 42 Pile Note 2. Concrete compressive strength is to be minimum 6000 psi at 28 days These changes should also be reflected in the geotechnical report and Specification Section 31 62 13.20
36. Bidder Inquiry ID 7561132:
Section 5.2 of the Geotechnical Report calls for Type V cement to be used for sulfate resistance. Type V cement is not readily available in the US. For sulfate resistance, we would like to use a Type II or II/III cement replacement with SCMs (supplementary cement materials) such as slag cement or flyash to provide the necessary resistance to sulfate attack as well as reduce the chloride permeability required in the project specifications section 31 62 13.20, part 2.4.6. Can you ask if we can use Type II or II/III with SCM's in lieu of Type V cement?
Responses to Bidder Inquiry ID 7561132:
The requirement for Type V cement should have been left out of the geotechnical report. The only requirement is "Concrete mix design must resist the corrosive nature of the soil as presented in the Geotechnical Report" and to design in accordance with ACI 211.1 or ACI 318, Chapter 4 (Section 31 62 13.20, part 2.2). Other cement types and additives are acceptable within these constraints.
37. Bidder Inquiry ID 7561771:
Demolition Note 8 refers to Drawings "CD104 through CD110" however these drawings are not found. Please provide if applicable.
Responses to Bidder Inquiry ID 7561771:
Note 8 was updated to state CD905 through CD911.
38. Bidder Inquiry ID 7561800:
Plan Note 1 states that Building 2751 and associated utilities are to be removed after construction of the new building. Are there any schedule requirements regarding the demolition of the remaining 9 buildings?
Responses to Bidder Inquiry ID 7561800:
No, this is the only building for demolition that is phased.
39. Bidder Inquiry ID 7561835:
An establishment period nor maintenance of grassing is mentioned in the specification. Will maintenance of grassing be required, if so, for what time period?
Responses to Bidder Inquiry ID 7561835:
Maintenance guidance was added to specification 32 92 19 (Seeding).
40. Bidder Inquiry ID 7561836:
A maintenance period is not stated, will maintenance be required and if so, for what duration?
Responses to Bidder Inquiry ID 7561836:
Maintenance guidance was added to specification 32 92 19 (seeding).
41. Bidder Inquiry ID:
We request a (2) week bid extension to the week of August 6th in order for large contractors to engage small businesses and not restrict their involvement and/or competition.
Responses to Bidder Inquiry ID:
An extension will be included in a forth coming admendment
42. Bidder Inquiry ID 7562460:
Is the General Contractor required to have a Virginia General Contractor License to work for the Government.
Responses to Bidder Inquiry ID 7562460:
No they do not have to be licensed in Virginia
43. Bidder Inquiry ID 7562584:
In reference to Projnet Question 7559823 the government's response was: "Per the 01 45 00.00 10 UFGS, section
3.4.1 dictates: "The Contractor's CQC staff must maintain a presence at the site at all times during progress of the work..."
This response leaves room for interpretation on the Civil and Environmental QC and when they are required to be on site. Because this project is LPTA, we want an even playing field for all GCs, and this project is too small to warrant Civil and Environmental QCs please consider removing the Civil and Environmental QC requirements.
Responses to Bidder Inquiry ID 7562584:
Previous response is correct.
44. Bidder Inquiry ID 7562693:
Specification 230923 BACNET DDC for HVAC requires "All devices must have a Certificate of Networthiness (CoN) and an Authority to Operate (ATO)on the Joint-Base Langley Eustis Local Area Network." Please confirm the Eustis Local Area Network is the Ft. Eustis Network Enterprise Center (NEC)? What documentation is required to prove CoN and ATO for the Ft. Eustis NEC? Thank you.
Responses to Bidder Inquiry ID 7562693:
The LAN is from the NEC. The 733 civil engineer division can provide all documentation regarding ATO.
Essentially, what is installed in the new building has to be covered by the ATO including security settings, components, etc.
45. Bidder Inquiry ID 7562736:
Specification 250511-1.1.2 states "Current base wide Energy Monitoring Control System (EMCS) possess an Authority to Operate (ATO) under Department of Defense Information Assurance Certification (DIACAP) with the Air Force." Please confirm the existing EMCS is the Johnson Controls Metasys ADX server? PLease confirm the new building EMCS system must be connected to and interface with the existing EMCS? Please confirm all cost associated with the interface to the existing EMCS are part of this contract and are the responsibility of the EMCS and DDC contractor?
Thank you.
Responses to Bidder Inquiry ID 7562736:
Yes to all questions.
46. Bidder Inquiry ID 7562746:
Specification 230923 states: All devices must have a Certificate of Networthiness (CoN) and an Authority to Operate (ATO) on the Joint-Base Langley Eustis Local Area Network. Is the intent of this requirement to connect the new building DDC system to the Eustis NEC LAN? Is the NEC LAN connection required under this project?
Please confirm that a valid Eustis NEC CAC card is required to access the Eustis NEC LAN? Please confirm all certifications, access and costs associated with connection and interface to the Eustis NEC LAN is the responsibility of the new building DDC contractor?
Responses to Bidder Inquiry ID 7562746:
Intent is to connect and integrate the new building to the emcs. The Telecom drawings should show a data drop to which the ddc building control unit can connect. A CAC is required for access. Building ddc vendor is responsible for integrating, programming, etc. to the emcs front end, including graphics pages, alarms, etc.
47. Bidder Inquiry ID 7562748:
Specification 230923 states: All devices must have a Certificate of Networthiness (CoN) and an Authority to Operate (ATO) on the Joint-Base Langley Eustis Local Area Network. Is the intent of this requirement to connect and interface the new building DDC system with the existing base wide Eustis EMCS which is the Johnson Controls Metasys ADX server? Please confirm all certifications, access and costs associated with connection, programming and interface to the existing Eustis EMCS is the responsibility of the new building DDC contractor? Please confirm a valid Eustis NEC CAC card is required to access, interface and program the existing Eustis EMCS?
Responses to Bidder Inquiry ID 7562748:
Yes to all.
48. Bidder Inquiry ID 7562890:
Sheet CS 101 gives stand off distances of 30' and 56'. Sheet S-002 AT/FP lists design stand off distances as 82ft.
Please clarify the stand-off distance for this project Responses to Bidder Inquiry ID 7562890:
The standoffs are to be considered as 82ft unless otherwise noted. The 30ft and 56ft setbacks noted on CS-101 are applicable where indicated.
49. Bidder Inquiry ID 7562911:
S-002 Geotechnical note 4 states slabs to be on a minimum 10 mil vapor barrier S-003 Concrete construction note 26 states slabs to be cast on 15 mil vapor barrier
Please confirm if a 10 mil vapor barrier is acceptable for the maintenance Instructional Building Slab and all interior slabs associated with this project?
Responses to Bidder Inquiry ID 7562911:
A 10 mil vapor barrier is acceptable.
50. Bidder Inquiry ID 7563103:
Please reference Specification Section 26 24 13 Paragraph 2.2.2.1 (a.) This paragraph gives us direction to provide a Stainless Steel enclosure for the new Switchboard. The panel schedule for Switchboard SB on Drawing EP601 identifies the Enclosure as Type 1. Can you please confirm if Switchboard SB's enclosure is to be constructed from Stainless Steel or if it is to be a NEMA 1 enclosure?
Responses to Bidder Inquiry ID 7563103:
Please reference Specification Section 26 24 13 Paragraph 2.2.2.1 (a.) This paragraph gives us direction to provide a Stainless Steel enclosure for the new Switchboard. The panel schedule for Switchboard SB on Drawing EP601 identifies the Enclosure as Type 1. Can you please confirm if Switchboard SB's enclosure is to be constructed from Stainless Steel or if it is to be a NEMA 1 enclosure?
51. Bidder Inquiry ID 7563109:
Please reference Specification Section 26 24 13 SWITCHBOARDS, Paragraph 2.2.4. Equipment Distribution breaker with a solid-state tripping system. And Paragraph 2.2.4.d LSIG trip units on distribution breakers. Are all branch breakers required to have LSIG electronic trip units?
Responses to Bidder Inquiry ID 7563109:
Only the main and distribution breakers.
52. Bidder Inquiry ID 7563115:
Please reference Specification Section 26 24 13 SWITCHBOARDS, Paragraph 2.2.5.3 Sub-metering. Is this the only specification for sub-metering for panelboards LP1, LP2, LP3, LP4, LP5, LP6? Are there any specific metering requirements for the sub-metering of the lighting panels?
Responses to Bidder Inquiry ID 7563115:
Provide as per ASHRAE 90.1 – IP.
53. Bidder Inquiry ID 7563125:
Please reference the Light Fixture Schedule of Drawing EL502, Light Fixture Type "K." This fixture is identified as a pole mounted light fixture. Upon initial review of the drawings no Type "K" light fixtures have been identified.
Can you please confirm that no type "K" light fixtures need to be provided?
Responses to Bidder Inquiry ID 7563125:
No
54. Bidder Inquiry ID 7563133:
Please reference Drawing ES101. Notes 5, 12, 13, 14, 15 and 18 are depicted on this drawing, however there are no Keynotes identifying any requirements. Can you please identify the requirements and identify who is responsible for the scope of work?
Responses to Bidder Inquiry ID 7563133:
The new work key notes shown are for electrical only. Electrical features to be provided by others. Contractor shall coordinate.
55. Bidder Inquiry ID 7563138:
Please reference Drawing ES101. Can you please confirm that the circuiting for all of the new light poles are to be provided and installed by others?
Responses to Bidder Inquiry ID 7563138:
Circuiting for all the new light poles will be provided and installed by DVP. Please coordinate with DVP for placement.
56. Bidder Inquiry ID 7563140:
Please reference Drawing ES101. Multiple poles and pole mounted light fixtures are identified on the drawing. The drawing does not indicated what type of light fixture, pole or pole base is to be provided. It also does not identify who is responsible for providing and installing these items. Can you please confirm that these light fixtures, poles, pole bases and their circuiting will be provided and installed by others?
Responses to Bidder Inquiry ID 7563140:
Confirmed
57. Bidder Inquiry ID 7563146:
Please reference Drawings EL902 and EL903. There are multiple poles and pole mounted light fixtures depicted on these drawings. The notes state that the lights, poles and power will be provided by DVP but that we are to coordinate with DVP for the exact locations of the light poles. Can you please confirm that the light fixtures, poles, pole bases and circuiting are to be provided and installed by others and that the scope of work for the electrical contractor is limited to coordination only?
Responses to Bidder Inquiry ID 7563146:
Confirmed
58. Bidder Inquiry ID 7563152:
Please reference the Grounding Detail of Drawings CS507 and CS508. These Grounding Details depict a ground rod and #8 AWG Copper conductor bonded to a fence post. The specifications and drawings do not seem to give any direction on how often this ground connection should occur / be installed. Will this ground connection be installed at one fence post or at all fence posts?
Responses to Bidder Inquiry ID 7563152:
Grounding section added to specification 32 31 13.
59. Bidder Inquiry ID 7563156:
Please reference Drawing EL901, light fixture types "H1," "H2," "H3," "A5," and "A6." These fixtures are not identified in the fixture schedule of drawing EL502. Can you please identify what light fixtures we are to provide?
Responses to Bidder Inquiry ID 7563156:
See sheet EL501 for types H and A.
A5 - LED, 40W, 277V, Recessed, 2'x2' Ceiling Mounted Luminaire, 4000 Nominal Lumens A6 - Same as Type A5, See Keynote 1 on EL502.
H1 - LED, 12W, 277V, Recessed, 6" Can light, 1000 Nominal Lumens H2 - Same as Type H1, See Keynote 1 on EL502.
H3 - LED, 19W, 277V, Recessed, 6" Can light, 1500 Nominal Lumens
60. Bidder Inquiry ID 7563162:
Please reference the light fixture circuiting and the switches for the High Bay Training Areas via Drawings EL112, EL121, EL122, EL123, etc. There are 8 switches shown in 2 groups of 4. Each of these switches control either row (a), (b), (c) or (e). Please note that there are 11 total circuits shown powering these fixtures (2 circuits powering row (a), (4) circuits powering row (b), (2) circuits powering row (c) and 3 circuits powering row (e).) There is no way to control this many circuits with the switches shown on EL112 without incorporating multiple lighting contactors and a control circuit for the coils. This generates the following questions:
a. Can you please provide a light fixture control scheme for the High Bay Training Areas?
b. Are the switches shown single pole or 3-way switches?
c. Is it the intent to provide multiple contactors and a control circuit for the coils controlled via the switches shown?
Responses to Bidder Inquiry ID 7563162:
a. Subscripts on switches correspond to luminaire subscripts to indicate lighting zones controlled by a particular switch.
b. 3-way switches
c. Locally controlled at switches shown.
61. Bidder Inquiry ID 7563167:
Please reference General Electrical Note #16 of Drawing E-001, the Equipment Connection Schedules of Drawing EP613 and the HVAC Schedules of the "M" series drawings. General Electrical Note #16 states that all mechanical equipment controllers (including safety switches) are Mechanical Contractor furnished, Electrical Contractor installed.
Can you please confirm that the Electrical Contractor is not providing disconnects that are listed on the Equipment Connection Schedules of Drawing EP613?
Responses to Bidder Inquiry ID 7563167:
They are mechanical contractor furnished
62. Bidder Inquiry ID 7563178:
Please reference Specification Section 26 20 00 Paragraph 3.1.12.3 Ground Bus. The first sentence states that we are to provide a copper ground bus in the electrical equipment rooms as indicated. Detail #3 of Drawing EP501 depicts a Grounding Busbar and its installation. The Power Riser Diagram of Drawing EP701 depicts a Ground Bar in the Main Electrical Room. Note #1 of the Dry-Type Transformer Schedule of Drawing EP701 states that we are to bond the transformers to building steel and electrical room ground bar. Please see the following questions in regards:
a. Will Ground Bus be required in each electrical room?
b. If Ground Bus are required in each electrical room can you please provide a grounding riser depicting the bonding conductors required?
c. If Ground Buses are not required in each electrical room will we be required to bond each of the transformers to the Ground Bus in the Main Electrical Room?
Responses to Bidder Inquiry ID 7563178:
a. Yes
b. Refer to Article 250 of the NEC. Use #3/0 AWG.
c. Ground buses are required.
63. Bidder Inquiry ID 7563182:
Please reference the Telecom Riser Diagrams of T-702, T-703, T-704, T-705 and T-706. Note #8 of T-702 states that we are to provide a telecom main ground bar and it shall be connected to the main building service ground. Note #7 of T-703 through T-706 state that we are to provide telecom ground bus bars and they shall be connected to the main building service ground. Please see the following questions in regards:
a. Will individual bonding conductors be required from each Telecom Ground Bus to the Main Electrical Room Ground Bus or will these Telecom Ground Bus be tied together with a common bonding conductor with a single connection to the Main Electrical Room Ground Bus?
b. The specifications give us a range in sizes for this Telecom Bus Bar Bonding Conductors size, can you please identify what size bonding conductor will be required for these connections?
Responses to Bidder Inquiry ID 7563182:
a TGBs to be individually connected to TMGB. There will be one (1) single connection from TMGB to the main building service ground bar.
b. Use #3/0 AWG.
64. Bidder Inquiry ID 7563383:
Regarding the removal of existing water and sanitary lines at the Option 3 bldg sites;
1. Will ODUS be responsible for the backfilling of the trenches at removed lines?
2. At Bldg 653, will ODUS be responsible for the patching of Jackson Ave after removal of the sanitary line?
3. At Bldg 801, will ODUS be responsible for the patching of the railroad track, if required?
Responses to Bidder Inquiry ID 7563383:
Yes, ODUS is responsible for all backfilling, patching and repairing where they remove lines.
65. Bidder Inquiry ID 7565012:
Section 26 24 13 SWITCHBOARDS, Paragraph2.2.2.1.a Enclosure: NEMA ICS 6 Type 1 fabricated entirely of 12 gauge ASTM A240/A240M type 304. Is this stating the switchboard is to be stainless steel? The switchboard is installed in an electrical room with panelboards and a transformer. The panelboards and transformers are NEMA 1 enclosure of standard code gauge steel. Can the switchboard be manufactured using standard code gauge steel and not 304 stainless steel?
Responses to Bidder Inquiry ID 7565012:
This is a regular NEMA 1 enclosure.
66. Bidder Inquiry ID 7565014:
Section 26 24 13 SWITCHBOARDS, Paragraph 2.2.4. Equip .... Distribution breaker with a solid-state tripping system.... And Paragraph 2.2.4.d LSIG trip units on distribution breakers. Are all branch breakers required to have LSIG electronic trip units? Seems like overkill.
Responses to Bidder Inquiry ID 7565014:
Only the main and distribution breakers.
67. Bidder Inquiry ID 7565016:
Section 26 24 13 SWITCHBOARDS, Paragraph 2.2.5.3 Submetering. Is this the only specification for submetering for panelboards LP1, LP2, LP3, LP4, LP5, LP6? Are there any specific metering requirements for the submetering of the lighting panels?
Responses to Bidder Inquiry ID 7565016:
Provide as per ASHRAE 90.1 – IP.
68. Bidder Inquiry ID 7565058:
Specification section 01 83 13.07 40 Reliability Centered Acceptance For Superstructure Performance Requirements; paragraphs 3.3.1 a. & b. Please clarify if the required PT&I testing of Alignment (laser preferred) and Thermography for structural components refers to this projects underhung bridge cranes and their components of if the requirement is for the entire building structural components.
Responses to Bidder Inquiry ID 7565058:
Refer to the NASA RCBEA guide for structural components which include, but not necessarily limited to, roofs, walls, insulation and cranes.
69. Bidder Inquiry ID 7565061:
Section 01 33 29 Sustainability Reporting. Is the Aviation Maintenance Training Facility required to be Third Party (LEED) certified? If so, who is responsible for registering the project and the accompanying fees required for this registration and certification?
Responses to Bidder Inquiry ID 7565061:
No, LEED Certification is not required.
70. Bidder Inquiry ID 7565064:
Section 01 33 29 Sustainability Reporting, paragraph 1.4.a. states refer to Attachment 1, HPSB Checklist at end of this specification section. Checklist is not included. Please provide.
Responses to Bidder Inquiry ID 7565064:
Please refer to paragraph 1.5.1.2 for link to checklist.
71. Bidder Inquiry ID 7565072:
On plan page A-314 Detail 2, cold formed framing is indicated to be spaced at 16" on center, however the Tectum panels are 2' wide. This would cause most vertical panel joints to not fall on the studs.
Would it be acceptable to install the Tectum panels horizontally or should the cold form framing be spaced at 24" on center?
Responses to Bidder Inquiry ID 7565072:
The 24" x 96" tectum panels will be install horizontally. With a 9'-0" wall, this mean (4) 24" panels and (1) 12" panel will be place on top of each other.
72. Bidder Inquiry ID 7565089:
Sheet A-601 Door Schedule- Door 127A is listed as type "FF" and no door material is listed. Please include this door detail and list material.
Responses to Bidder Inquiry ID 7565089:
Door 127A should be a type "N" wood door. Same as other double classroom doors.
73. Bidder Inquiry ID 7565090:
Sheet A-614 Detail 2 Storefront W2- Glazing shown as Type G1. Storefront Schedule lists it as IGU-1. Please confirm correct glazing type.
Responses to Bidder Inquiry ID 7565090:
Type G1 is not used in this project. G2 however is used for the interior storefront Glazing (Detail 2) on A-614.
74. Bidder Inquiry ID 7565091:
Please clarify if rubber entry mat (RB1) is required at Stair SB1. It is not noted on sheet A-411 but sheet I-112 calls it out as a finish material. Although, no hatching is shown.
Responses to Bidder Inquiry ID7565091:
Attached amendment
d. Attachment: ID_7565091.pdf
75. Bidder Inquiry ID 7565093:
Spec section 09 72 00 2.3 Corner Guards- This section calls for polycarbonate corner guards. Sheet A-612 detail 12 calls for stainless steel corner guards. Additionally, Sheet I-002 Finish Legend Note #8 calls for stainless steel edge protection. Please clarify.
Responses to Bidder Inquiry ID 7565093:
Corner guards shall be stainless steel as indicated in drawings. Correction will be made to specifications.
76. Bidder Inquiry ID 7565097:
Sheet I-003 Finish Schedule calls for the High Bay Training Area, Room 135, to have a wainscot finish of PT3 (porcelain tile). Please clarify if this is correct or a typo and should be PNT3 (paint).
Responses to Bidder Inquiry ID 7565097:
The correct finish for this area is PNT3/AWP1, this will be corrected in the finish schedule.
77. Bidder Inquiry ID 7565115:
Doors#'s 209A, 210A, 228A and 230A – are listed on the hardware schedule but on the Door schedule? Please clarify.
Responses to Bidder Inquiry ID 7565115:
Doors 209A, 210A, 228A and 230A is not in project and shall be deleted from hardware set 23.
78. Bidder Inquiry ID 7565150:
A-311, Section 1 – Please confirm that the Tectum Wall Panels extend to 9' as dimensioned and the cold formed metal framing above is exposed (i.e. you will see the metal studs and back side of sheathing.)
Responses to Bidder Inquiry ID 7565150:
The 24" x 96" tectum panels will be install horizontally. With a 9'-0" wall, this mean (4) 24" panels and (1) 12" panel will be place on top of each other.
79. Bidder Inquiry ID 7565167:
Is any type of bird protection required in the hangar bay? (ie. bird spikes, netting, electronic, etc) Responses to Bidder Inquiry ID 7565167:
Bird screening will be incorporated, refer to specifications and drawings.
80. Bidder Inquiry ID 7565177:
In lieu of the required SSPC QP-1 certification for painters that is required by 09 90 00, Can Contractor utilize a non-QP1 painter if they also engage an SSPC PCS (protective coatings specialist) to perform pre-work preparatory…