W91236-10-R-0005-0008.pdf
PDF 29 KB Posted
- Attached to
- Single Award Task Order Contract (SATOC) for Design and Construction of Dining Facilities Southeast Region.
- Solicitation number
- W91236-10-R-0005
About this file
SF 30 Amendment 0008.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W91236-10-R-0005-0010.pdf | ||
| W91236-10-R-0005-0009.pdf | ||
| Davis Bacon Wage Determination at Phase 2KY7.pdf | ||
| WT DFAC AMEND 0008.ZIP | ZIP file | |
| Amendment 0007 1442.pdf | ||
| Amd 0007 Drawings.zip | ZIP file | |
| W91236-10-R-0005-0007.pdf | ||
| W91236-10-R-0005-0006.pdf | ||
| W91236-10-R-0005-0005.pdf | ||
| W91236-10-R-0005-0004.pdf | ||
| 00_11_00-BidSchedule.pdf | ||
| W91236-10-R-0005-0003.pdf | ||
| W91236-10-R-0005_ph2.pdf | ||
| Q and A Set 3 W91236-10-R-0005.pdf | ||
| W91236-10-R-0005-0002.pdf | ||
| Questions and Answers Set 2.docx | DOCX document | |
| W91236-10-R-0005-0001.PDF | ||
| Q and A Set 1 W91236-10-R-0005.pdf | ||
| W91236-10-R-0005.PDF | ||
| W91236-10-R-0005.PDF |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W22W9K93087702
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
TITLE: W91236-10-R-0005, SINGLE AWARD TASK ORDER CONTRACT (SATOC) FOR DESIGN AND CONSTRUCTION OF DINING FACILITIES IN THE SOUTHEAST REGION /DESIGN AND CONSTRUCTION OF DINING FACILITY AT FORT KNOX, KENTUCKY
Amendment is issued for follow ing items and is applicable to Phase 2 of subject procurement:
SEE CONTINUATION PAGE
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-May-2010
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91236-10-R-0005
X 9B. DATED (SEE ITEM 11)
03-Dec-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-May-2010
CODE
USA ENGINEER DISTRICT, NORFOLK
CONTRACTING OFFICE
803 FRONT STREET
NORFOLK VA 23510-1096
W91236 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W91236-10-R-0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
1) Request for Proposal, section 00 73 10; The Solicitation shall be amended as follows:
Delete the following line from paragraph 52.211-10 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK (APR 1984) in it’s entirety :
“TBD”
..and replace with the following:
“120 calendar days after Notice to Proceed (NTP) of Dining Facility Design/Build Contract.
2) Request for Proposal, section 01 10 00; The Solicitation shall be amended as follows:
Delete the following subparagraph from paragraph 6.11.2 in its entirety:
“The HVAC system shall be a closed loop, ground-coupled water source heat pump system. The system shall sink and source heat to and from a Vertical Ground-Coupled Heat Exchange System (VGCHES). The ground heat exchanger shall serve 100% of the HVAC loads and 100% of the domestic water heating requirements of the buildings in the project.”
..and replace with the following:
“The HVAC system shall be a closed loop, ground-coupled water source heat pump system. The system shall sink and source heat to and from a Vertical Ground-Coupled Heat Exchange System (VGCHES). The ground heat exchanger shall serve 100% of the Building HVAC loads (heating and cooling). For Kitchen hood make-up air, provide the maximum extent of geothermal practicable in accordance with other RFP requirements, supplementing as required with other required/ appropriate heat sources. More consideration will be given in proposals to maximize geothermal. For domestic water used for kitchen and cleaning operations (ie dish/pan washing, etc), geothermal shall provide at least 110 degree water, with other approved sources providing the remaining heating required.”
Request for Proposal, section 01 10 00; The Solicitation shall be amended as follows:
Delete paragraph 2.4 in it’s entirety and replace with the following:
“2.4 FURNITURE REQUIREMENTS. Provide furniture design for all personnel and dining area, including all dining area tables and chairs, freestanding food service tables, and office furniture. Coordinate with the Government to define requirements for furniture systems, movable furniture, storage systems, equipment, any existing items to be reused, etc. Early coordination of furniture design is required for a complete and usable facility.
The procurement and installation of furniture is NOT included in this contract.
Furniture will be provided and installed under a separate furniture vendor/installer contract. The general contractor shall accommodate that effort with allowance for entry of the furniture vendor/installer onto this project site at the appropriate time to permit completion of the furniture installation for a complete and usable facility to coincide with the Beneficial Occupancy Date (BOD) of this project. The furniture vendor/installer contract will include all electrical pre-wiring and the whips for final connection to the building electrical systems however; the general contractor shall make the final connections to the building electrical systems under this contract.
Furthermore, the general contractor shall provide all Information/Technology (IT) wiring (i.e. LAN, phone, etc.) up to and including the face plate of all freestanding and/or systems furniture desk tops as applicable, the services to install the cable and face plates in the furniture, the coordination with the furniture vendor/installer to accomplish the installation at the appropriate time, and all the final IT connections to the building systems under this contract.
The Government reserves the right to change the method for procurement of and installation of furniture to Contractor Furnished/Contractor Installed (CF/CI). CF/CI furniture will require competitive open market procurement by the Contractor using the Furniture, Fixtures and Equipment (FF&E) package.
3) Request for Proposal, section 01 10 00; The Solicitation shall be amended as follows:
Delete the following subparagraph from paragraph 6.9.2 in its entirety :
“The D/B Contractor shall provide primary medium voltage underground ducts, manholes and concrete pad with grounding for pad mounted transformers as per NOLIN - RECC’s requirements. NOLIN - RECC will provide all loop fed pad mounted transformers as required by building load calculations provided by D/B Contractor and all medium voltage cables in D/B Contractor provided and installed underground ducts.
NOLIN - RECC will provide power for the Dining Facility from an existing loop feed transformer. Contractors cost shall be included in contractor's pricing and Nolin Electric's cost will be paid direct by COE to Nolin Electric. NOLIN - RECC will provide a cost estimate for this work and shall NOT be included in the cost provided by
D/B Contractor. D/B Contractor shall coordinate all NOLIN’s electrical work with NOLIN personnel.”
..and replace with the following:
“The Barracks Facility and Infrastructure Project D/B Contractor shall provide primary medium voltage underground ducts, manholes and concrete pad with grounding for pad mounted transformers as per NOLIN - RECC’s requirements.
NOLIN - RECC will provide all loop fed pad mounted transformers as required by building load calculations provided by D/B Contractor and all medium voltage cables in Barracks Facility and Infrastructure Project D/B Contractor provided and installed underground ducts. NOLIN - RECC will provide power for the Dining Facility from an existing loop feed transformer. D/B Contractor shall coordinate all NOLIN’s electrical work with Barracks Facility and Infrastructure Project D/B Contractor and NOLIN personnel. See Appendix BB for additional information.”
4) Request for Proposal, section 01 10 00; The Solicitation shall be amended as follows:
Insert the following subparagraph before paragraph 6.9.4.1 in its entirety:
“The Barracks Facility and Infrastructure D/B Contractor will be responsible for street and parking lot lighting. See Appendix BB for further requirements. The following paragraph is provided for information only.”
5) Request for Proposal, section 01 10 00; The Solicitation shall be amended as follows:
Delete the following subparagraph from paragraph 6.4.6.7 in its entirety:
“The Dining Facility will require an Oil/Water Separator. The Dining Facility D/B Contractor shall be responsible for the design and construction of the Oil/Water Separator. The Oil/Water Separator shall be designed and sized in accordance with the Army Environmental Center Document SFIM-AEC-EQ-CR-200010, but shall not be less than 3000 gallon capacity. Oil/Water Separators located beneath pavements shall have the Oil/Water Separator components designed for the applied soil and vehicle loads.”
..and replace with the following:
“The Dining Facility will require an underground Grease Interceptor. The Dining Facility D/B Contractor shall be responsible for the design and construction of the Grease Interceptor, and all sanitary system elements between the building and the interceptor. Grease Interceptors located beneath pavements shall have the Grease Interceptor components designed for the applied soil and vehicle loads. Refer also to paragraph 3 for sizing requirements”
6) CAD Files are provided For Information Only, for the sole intent of facilitating proposal preparation. The Government makes no claim as to dimensional accuracy or fidelity to provided RFP drawings. These drawings are not incorporated in the RFP nor are they construed as meeting RFP requirements.
7) Attached “Site Drainage Plan” shall be incorporated into Appendix FF and is For
Information Only. The Government makes no claim as to dimensional accuracy.
8) Request for Proposal, section 00 22 20; The Solicitation shall be amended as follows:
Add the following subparagraph to subparagraph 5.3.1
“Preference #4 – Maximize the use of Geothermal energy sources.
The following are provided as attachments and are posted at www.fbo.gov :
1. The drawings and files mentioned above.
2. Davis Bacon General Decision Number: KY100007 05/07/2010 KY7
File details come from the government source that posted it. Updated .