W91236-10-R-0005-0007.pdf
PDF 22 KB Posted
- Attached to
- Single Award Task Order Contract (SATOC) for Design and Construction of Dining Facilities Southeast Region.
- Solicitation number
- W91236-10-R-0005
About this file
Amendment 0007
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W91236-10-R-0005-0010.pdf | ||
| W91236-10-R-0005-0009.pdf | ||
| W91236-10-R-0005-0008.pdf | ||
| Davis Bacon Wage Determination at Phase 2KY7.pdf | ||
| WT DFAC AMEND 0008.ZIP | ZIP file | |
| Amendment 0007 1442.pdf | ||
| Amd 0007 Drawings.zip | ZIP file | |
| W91236-10-R-0005-0006.pdf | ||
| W91236-10-R-0005-0005.pdf | ||
| W91236-10-R-0005-0004.pdf | ||
| 00_11_00-BidSchedule.pdf | ||
| W91236-10-R-0005-0003.pdf | ||
| W91236-10-R-0005_ph2.pdf | ||
| Q and A Set 3 W91236-10-R-0005.pdf | ||
| W91236-10-R-0005-0002.pdf | ||
| Questions and Answers Set 2.docx | DOCX document | |
| W91236-10-R-0005-0001.PDF | ||
| Q and A Set 1 W91236-10-R-0005.pdf | ||
| W91236-10-R-0005.PDF | ||
| W91236-10-R-0005.PDF |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W22W9K93087702
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
TITLE: W91236-10-R-0005, SINGLE AWARD TASK ORDER CONTRACT (SATOC) FOR DESIGN AND CONSTRUCTION OF DINING FACILITIES IN THE SOUTHEAST REGION /DESIGN AND CONSTRUCTION OF DINING FACILITY AT FORT KNOX, KENTUCKY
Amendment is issued for follow ing items and is applicable to Phase 2 of subject procurement:
SEE CONTINUATION PAGE
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-May-2010
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91236-10-R-0005
X 9B. DATED (SEE ITEM 11)
03-Dec-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-May-2010
CODE
USA ENGINEER DISTRICT, NORFOLK
CONTRACTING OFFICE
803 FRONT STREET
NORFOLK VA 23510-1096
W91236 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W91236-10-R-0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
Amendment 0007
Request for Proposal, section 01 10 10; The Solicitation shall be amended as follows:
Delete paragraph of 6.4.1.3 in its entirety and replace with the following:
“The Barracks Facility and Infrastructure Project Contractor shall provide the base building pad and proposed finish floor elevation of the Dining Facility. The final finish floor elevation shall be determined by the Dining Facility D/B Contractor and be coordinated with the Barracks Facility and Infrastructure Project D/B Contractor. The Dining Facility D/B Contractor shall be responsible for any needed additional grading within the demarcation limits to ensure compliance with the requirements for grading and drainage, including the loading dock/ramp access area and as described below.
Grading activity by the Dining Facility D/B Contractor is expected to be minimal.
The difference in grade between the finished floor elevation FFE and the final grade adjacent to the buildings shall be a minimum of 6 inches, except at personnel and overhead doors. The ground outside the buildings shall have a minimum of 5% slope away from all exterior walls for the first 10 feet and positive drainage thereafter. The Contractor’s geotechnical engineer shall identify if steeper grades are necessary based on shrink/swell soil characteristics. Design grades to meet accessibility requirements where required.”
Delete the fourth paragraph of paragraph 6.4.6.4 in its entirety and replace with the following:
“The design and construction of the stormwater system, for the most part, will not be part of this RFP. The Barracks Facility and Infrastructure Project will be responsible for grading and drainage of the WT Campus site, including the pad preparations and proposed finished floor elevation for The Battalion HQ/Company OPS Center, The Dining Facility, and the Soldier and Family Assistance Center. However, because the Dining Facility D/B Contractor will be responsible for the design and construction of a portion of the access drive to the loading dock, The Dining Facility D/B Contractor shall be responsible for some grading and drainage within the perimeters of the demarcation limits to meet the grading and drainage conditions generated by the Barracks Facility and Infrastructure D/B Contractor’s explicit site design. The Barracks Facility and Infrastructure Project D/B Contractor is responsible for providing a storm sewer tie-in point at the south of the Dining Facility near the loading dock. The purpose for the storm sewer tie-in is to provide a storm sewer outlet for the loading dock drain. The Dining Facility D/B Contractor shall be responsible for providing the storm drainage structure(s) at the loading dock/ramp
W91236-10-R-0005 access area and connecting to the storm sewer tie-in point. The D/B Contractor shall coordinate with the Barracks Facility and Infrastructure Project D/B Contractor, through the Contracting Officer, to accomplish this task.”
Delete paragraph 6.5.2.1 in its entirety and replace with the following:
“Appendices F, AA and FF are provided “For Information Only”, to establish the desired site and architectural themes for the area. Where Appendix F is referred to in this RFP, Appendices AA and FF shall also be considered interchangeably and concurrently to establish the desired site and architectural themes for the area.
These appendices identify the desired project look and feel based on Fort Knox’s Installation Architectural Theme from existing and proposed adjacent building forms;
i.e. building exterior skin, roof lines, delineation of entrances, proportions of fenestration in relation to elevations, shade and shadow effects, materials, textures, exterior color schemes and organization layout.
The overall intention is to apply a singular look and architectural theme for all facilities within the Warrior in Transition Complex and for the WT Complex to have a similar architectural theme as the adjacent Building 1110. Close coordination with the work of the other WT D/B Contractors is critical for this to occur.
Appendix FF includes a portion of the work proposed by the Barracks Facility and Infrastructure Project D/B Contractor for this project as described in this RFP and shall be used in conjunction with other portions of this RFP. The Dining Facility D/B Contractor shall use Appendix F and the adjacent building color identified when determining and selecting the desired exterior colors.
In the case of conflict between the information provided in Appendix FF and other portions of the RFP, the Dining Facility D/B Contractor shall coordinate with the Barracks Facility and Infrastructure Project D/B Contractor through the Contracting Officer as stated in other parts of this RFP.”
Request for Proposal, Appendix J; The Solicitation shall be amended as follows:
Replace Appendix J drawings C-001, C-301, C-401 and C-502 in their entirety with the attached Appendix J drawings C-001, C-301, C-401 and C-502.
Request for Proposal, Appendix FF; The Solicitation shall be amended as follows:
Add attached Appendix FF Proposed Barracks Architectural Theme and Work in its entirety.
File details come from the government source that posted it. Updated .