00_11_00-BidSchedule.pdf
PDF 21 KB Posted
- Attached to
- Single Award Task Order Contract (SATOC) for Design and Construction of Dining Facilities Southeast Region.
- Solicitation number
- W91236-10-R-0005
About this file
Phase II bid schedule.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W91236-10-R-0005-0010.pdf | ||
| W91236-10-R-0005-0009.pdf | ||
| W91236-10-R-0005-0008.pdf | ||
| Davis Bacon Wage Determination at Phase 2KY7.pdf | ||
| WT DFAC AMEND 0008.ZIP | ZIP file | |
| Amendment 0007 1442.pdf | ||
| Amd 0007 Drawings.zip | ZIP file | |
| W91236-10-R-0005-0007.pdf | ||
| W91236-10-R-0005-0006.pdf | ||
| W91236-10-R-0005-0005.pdf | ||
| W91236-10-R-0005-0004.pdf | ||
| W91236-10-R-0005-0003.pdf | ||
| W91236-10-R-0005_ph2.pdf | ||
| Q and A Set 3 W91236-10-R-0005.pdf | ||
| W91236-10-R-0005-0002.pdf | ||
| Questions and Answers Set 2.docx | DOCX document | |
| W91236-10-R-0005-0001.PDF | ||
| Q and A Set 1 W91236-10-R-0005.pdf | ||
| W91236-10-R-0005.PDF | ||
| W91236-10-R-0005.PDF |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
00 11 00 - 1 of 2
CONTRACT LINE ITEM SCHEDULE
Item Unit Line Item No. Description Quantity Unit Price Amount _
1. Design of Facility 1 Job LS $________________ for PN 70180
2. Construction of Facility to the 5 foot line for PN 70180 1 Job LS $________________
3. Construction of Facility outside 5 foot line but within The Demarcation lines for
TOTAL OFFER $________________
4. Option 1. Furniture, Furnishings and Decor
5. Option 2. GFGI Equipment
TOTAL OFFER with Options $________________
Contract Duration in Calendar Days After the Notice to Proceed is Received Not to Exceed 500 Days. DAYS
E4BRCLMT
Typewritten Text
E4BRCLMT
Typewritten Text
E4BRCLMT
Typewritten Text
E4BRCLMT
Typewritten Text W91236-10-R-0005
E4BRCLMT
Typewritten Text
E4BRCLMT
Typewritten Text
E4BRCLMT
Typewritten Text
E4BRCLMT
Typewritten Text
E4BRCLMT
Typewritten Text
00 11 00 - 2 of 2
NOTES FOR CONTRACT LINE ITEM (CLIN) SCHEDULE
NOTE NO. 1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Contract Line Item (CLIN) schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.
NOTE NO. 2. Offerors must insert a price on all numbered items of the CLIN Schedule. Failure to do so may result in the offer being unacceptable
NOTE NO. 3. Not Used.
NOTE NO. 4. CONDITIONS GOVERNING EVALUATION OF OFFERS AND AWARD OF CONTRACTS:
The Government may require the delivery of the numbered line items, identified in the schedule as option items, in the quantity and at the price stated in the schedule. Subject to the availability of funds, the Contracting Officer may exercise the option by written notice to the Contractor within the time indicated below from the Notice to Proceed:
NOTE NO. 5. All the extensions of the unit prices shown will be subject to verification by the Government.
In case of variation between the unit price and the extension, the unit price will be considered to be the offer.
NOTE NO. 6. Not Used.
NOTE NO. 7. This procurement is not restricted to HUBZone Small Business Concerns. See FAR 52.219-1 regarding HUBZone Small Business Concern representation requirements.
NOTE NO. 8. CLIN 1, Design costs includes efforts related to the design of the facility, as well as any related costs for the constructor’s coordination during design (see Special Contract Requirement (SCR):
Constructor’s Role During Design). The Offeror shall distribute costs for the designer’s role during construction into the construction CLIN’s, as appropriate for those efforts, including any costs associated with as-built documentation. In general, include engineering and designer costs for efforts after the Design Complete or Issued for Construction documents in the construction CLIN’s.
NOTE NO. 9. Include all costs for coordination and accommodation of Government-Furnished, Government-Installed Equipment, as described in Section 01 10 00, in the Contract Line Items for construction of the associated facilities.
NOTE NO. 10. Not Used
NOTE NO. 11. The Offeror shall propose a total integrated contract duration in number of calendar days after the Notice to Proceed (NTP) is received by the Contractor, whether via electronic means or hard copy, whichever is the earliest method of delivery. The total number of proposed calendar days for design and construction, ready for turnover shall not exceed the number of calendar days shown above. The proposed duration shall become the required contract duration. The Government may issue the NTP via e-mail or Facsimile (FAX) or by other means. Day number 1 is the day after the date of receipt of the NTP. See also Section 00 73 00 and SCR: COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK.
NOTE NO. 12. At the option of the Government, the Government may require the Contractor to perform the work identified as Optional line item(s) (CLIN(s) 4,5) at the price(s) stated in the CLIN Schedule. The Contracting Officer may exercise one or more of the Option(s) by written notice to the Contractor within 120 calendar days after the date of the acknowledgment of the Notice to Proceed by the Contractor.
There is no separate completion period for these options and the work included therein shall be completed within the contract duration as proposed. Exercise of the Option(s) shall be evidenced on Standard Form 30, citing this CLIN Schedule note as the authority for exercising the Option. The Option shall be deemed exercised at the time the Government deposits the SF30 in the mail or, if earlier, at the time it is delivered to the Contractor.
END OF CLIN SCHEDULE