Q and A Set 1 W91236-10-R-0005.pdf

PDF 9 KB Posted

Attached to
Single Award Task Order Contract (SATOC) for Design and Construction of Dining Facilities Southeast Region.
Solicitation number
W91236-10-R-0005
Issued by

About this file

Set 1 - Questions and Answers pertaining to Solicitation W91236-10-R-0005.

View the file

Other files

File Type Posted
W91236-10-R-0005-0010.pdf PDF
W91236-10-R-0005-0009.pdf PDF
W91236-10-R-0005-0008.pdf PDF
Davis Bacon Wage Determination at Phase 2KY7.pdf PDF
WT DFAC AMEND 0008.ZIP ZIP file
Amendment 0007 1442.pdf PDF
Amd 0007 Drawings.zip ZIP file
W91236-10-R-0005-0007.pdf PDF
W91236-10-R-0005-0006.pdf PDF
W91236-10-R-0005-0005.pdf PDF
W91236-10-R-0005-0004.pdf PDF
00_11_00-BidSchedule.pdf PDF
W91236-10-R-0005-0003.pdf PDF
W91236-10-R-0005_ph2.pdf PDF
Q and A Set 3 W91236-10-R-0005.pdf PDF
W91236-10-R-0005-0002.pdf PDF
Questions and Answers Set 2.docx DOCX document
W91236-10-R-0005-0001.PDF PDF
W91236-10-R-0005.PDF PDF
W91236-10-R-0005.PDF PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers Set 1

Single Award Task Order Contract (SATOC) for Design and Construction of Dining Facilities, Southeast Region

W91236-10-R-0005

Q1. Section 00 21 10 Page 21 – Tab B Factor 1: Under 5.1.1.1 (a) states that all work must be new construction. Do you want all the projects featured in this tab from both the construction and design team to be all new construction projects or can there be renovation projects as well?

A1. Renovations are acceptable. See amendment 0001.

Q2. Section 00 21 00 Page 22 – Tab B Factor 1: Under 5.1.3, the first sentence refers to a “project list”. Is USACE requesting a project list as a part of Tab B? If so, what should the list contain?

A2. Remove the word "list". See amendment 0001.

Q3. Section 00 21 00 Page 23 – Tab B Factor 2: Is USACE requesting that we only provide reference information for the projects featured in Tab B Factor 1? Is Attachment 4 (questionnaire) only for reference or does USACE want it filled out and included in the binder submittal? If so, do we need to get the references to fill it out or do we only fill out the reference portion and USACE will obtain the evaluation?

A3. Attachement 4 project reference information need not be limited to those projects provided in factor 1. The offeror should provide the requested project/owner contact information in attachment 4 and include in the binder for those projects that best represent the offeror's past performance, except that the offeror need not have the questions answered by the owner in advance. USACE will conduct the telephonic interviews during the evaluations and will generally use the attachment 4 worksheets provided by the offeror.

Q4. Section 00 21 00 Page 24 – Tab C Factor 3: Under 7.1.1, the last sentence mentions “resumes” as not being included in the page count. Is USACE requesting resumes as a requirement under 7.1.2? Is there a format USACE wants us to follow or is USACE open to any format?

A4. See amendment 0001 for this solicitation.

Q5. Letter of Commitment (Attachment 5): We notice that this was included at the end of this section. However, we did not see it as a requirement under any of the tabs. Does USACE want attachment 5 filled out, and if so, where should this be included?

A5. See amendment 0001 for this solicitation.