Q and A Set 3 W91236-10-R-0005.pdf

PDF 8 KB Posted

Attached to
Single Award Task Order Contract (SATOC) for Design and Construction of Dining Facilities Southeast Region.
Solicitation number
W91236-10-R-0005
Issued by

About this file

Questions and Answers Set 3 for solicitation W91236-10-R-0005

View the file

Other files

File Type Posted
W91236-10-R-0005-0010.pdf PDF
W91236-10-R-0005-0009.pdf PDF
W91236-10-R-0005-0008.pdf PDF
Davis Bacon Wage Determination at Phase 2KY7.pdf PDF
WT DFAC AMEND 0008.ZIP ZIP file
Amendment 0007 1442.pdf PDF
Amd 0007 Drawings.zip ZIP file
W91236-10-R-0005-0007.pdf PDF
W91236-10-R-0005-0006.pdf PDF
W91236-10-R-0005-0005.pdf PDF
W91236-10-R-0005-0004.pdf PDF
00_11_00-BidSchedule.pdf PDF
W91236-10-R-0005-0003.pdf PDF
W91236-10-R-0005_ph2.pdf PDF
W91236-10-R-0005-0002.pdf PDF
Questions and Answers Set 2.docx DOCX document
W91236-10-R-0005-0001.PDF PDF
Q and A Set 1 W91236-10-R-0005.pdf PDF
W91236-10-R-0005.PDF PDF
W91236-10-R-0005.PDF PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers Set 3

Single Award Task Order Contract (SATOC) for Design and Construction of Dining Facilities, Southeast Region

W91236-10-R-0005

Q1. Under 7.0 TAB C, paragraph 7.1.3 - please clarify what is required for "conceptual plan is required for Phase I."

A1. Conceptual plan in this context refers to the nature of the technical approach narrative, which will be more general (i.e.

"conceptual") for phase 1, but more project specific for phase 2.

File details come from the government source that posted it. Updated .