This is a Questions and Answers document related to the Agricultural Wash (AGWASH) Equipment Disinfecting Service solicitation W911YP26RA005 issued by the Utah Army National Guard.
The document addresses vendor inquiries regarding the solicitation for AGWASH equipment disinfecting services at Camp Williams, Utah. The original solicitation response deadline was 0700 AM Mountain Time on July 16, 2026, though the solicitation has been stayed with the response due date listed as To Be Determined. The service period of performance is August 24-27, 2026. This is a total small business set-aside requiring vendors to be registered in SAM.gov as small businesses under one of several acceptable NAICS codes, including 561210 (Facilities Support Services), 561710 (Exterminating and Pest Control Services), 561720 (Janitorial Services), 562910 (Remediation/Environmental Remediation Services), or 562998 (All Other Miscellaneous Waste Management Services), with corresponding small business size standards ranging from $12.5 million to $47 million in annual revenue. The requirement is subject to funding availability, and the contracting point of contact is Mr. Otha Henderson (otha.b.henderson.civ@army.mil). The actual questions and answers contained in this document file are not detailed in the provided government information, though it serves as a mechanism for potential bidders to seek clarification on solicitation requirements prior to submitting their quotes.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AG WASH Q&A
1. What are the items that will need to be washed?
ANSWER: See below list.
BOX SHIP METAL 20FT MILVAN
BOX SHIP METAL 20FT MILVAN
BOX SHIP METAL 20FT MILVAN
BOX SHIP METAL 20FT MILVAN
BOX SHIP METAL 20FT MILVAN
BOX SHIP METAL 20FT MILVAN
BOX SHIP METAL 20FT MILVAN
POWER PLANT TLR MTD
TRK CARGO LMTV W/EQP
TRK CARGO LMTV W/EQP
TRK CARGO LMTV W/EQP
TRAILER,FLAT BED
TRK UTIL HVY HMMWV
TLR CGO HIMOB 3/4-T
TLR CGO HIMOB 3/4-T
TLR CGO HIMOB 3/4-T
TLR CGO HIMOB 3/4-T
TLR CGO HIMOB 3/4-T
TLR CGO HIMOB 3/4-T
TLR CGO HIMOB 3/4-T
TLR CGO HIMOB 3/4-T
TLR CGO HIMOB 3/4-T
TLR CGO HIMOB 3/4-T
TLR CGO HIMOB 3/4-T
TLR CGO HIMOB 3/4-T
TRK UT EXP CAP
TRK UT EXP CAP
TRK UT EXP CAP
TRK UT EXP CAP
TRK UT EXP CAP
TRK UT EXP CAP
TRK UT EXP CAP
TRK UT EXP CAP
TRK UT EXP CAP
TRK UT EXP CAP
TRK UT EXP CAP
TRLR TK WTR 400 GAL
TRK AMB 4 LITTER 4X4
TRK AMB 4 LITTER 4X4
TRK AMB 4 LITTER 4X4
TRK AMB 4 LITTER 4X4
TRK AMB 4 LITTER 4X4
TRK AMB 4 LITTER 4X4
TRK AMB 4 LITTER 4X4
TRK AMB 4 LITTER 4X4
2. Should the 1% Virkon solution application cover both interior and exterior surfaces of the connex boxes, trailers, generators, and vehicles? Or is the requirement focused primarily on one or the other?
ANSWER: Only the exterior of all equipment would be washed.
3. For wastewater handling and disposal, are there any preferred disposal facilities or specific local requirements? We will of course handle all disposal, provide the manifest, and fully comply with environmental regulations.
ANSWER: The company is completely responsible for containment and disposal of waste.
4. Is there a dedicated wash rack that the vehicles will utilize with access to the undercarriage? And if the site is gravel or pavement and has a sloped angle to drain the excess water into one area?
ANSWER: No dedicated work rack. Area is pavement and it is flat with no sloped angle to drain the excess water.
5. Do you have a proposed price schedule for this solicitation?
ANSWER: No, the pricing comes from your quote.
6. Please provide photos of the conex containers that require cleaning.
ANSWER: We cannot send the photos of all the equipment. The list is in Question 1.
7. The solicitation mentions completion within four days. Is this a mandatory hard deadline, or is there any flexibility in the performance period?
ANSWER: 4 Days is the limit and can only be done between 24-27 AUGUST 2026. If it takes 2 or 3 days to sanitize the equipment, it has to be between those 4 days.