W911XK20B0006 0002.pdf

PDF 254 KB Posted

Attached to
Howards Bay Remedial Dredging Federal contract opportunity
Solicitation number
W911XK20B0006
Issued by
Department of the Army Corps of Engineers Engineering District Detroit

About this file

This solicitation is for remedial dredging services for Howards Bay in Wisconsin. The U.S. Army Corps of Engineers Detroit District seeks a firm to dredge approximately 52,000 cubic yards of material from the Federal Navigation Channel and place it in a Government Furnished Disposal Facility. The work also includes environmental dredging to remove around 80,000 cubic yards of contaminated sediment and debris from Howards Bay and dispose of it in the Wisconsin Point Landfill. Additional required services are dewatering and stabilizing contaminated dredged material, confirmation sampling, air and turbidity monitoring, collecting and treating return water, capping and grading the Wisconsin Point Landfill, and placing 13,400 tons of residual cover material. The contractor will have around 240 calendar days to complete the work. The estimated cost of construction is between $10-25 million. The NAICS code is 562910 and the small business size standard is 750 employees. This will be a firm-fixed price contract set aside for small business.

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W911XK20B0006

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

FY20 How ards Bay Remedial Dredging.

This amendment is issued to:

1. Changed the Bid Open Date from June 30, 2020 to July 14, 2020 2:00 p.m. Eastern Time.

2. Revised Bid Schedule Line Item 0007 Residual Cover Quantity change from 6,700 to 13,400.

3. Revision to Specification Section: 01 22 00.00 10, Paragraph 1.3.3.1; Section 01 45 00.00 10, Paragraph 3.4.3; Section 01 57 19, Paragraph 1.7.9.3.2; Section 01 57 1, Paragraph 1.7.9.3; Section 01 57 19, Paragraph 1.7.9.3.3.1; Section 35 20 23.43, Paragraph 1.1; and Section 35 20 23.53, Pargraph 1.5.3.

4. Specification - Revision to Note No. 5 on Draw ing Sheet CN105.

5. Add Wage Determination - State of Wisconsin.

Reference Changes on the follow ing pages. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 33

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Jul-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911XK20B0006

X 9B. DATED (SEE ITEM 11)

28-May-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Jul-2020

CODE

U.S.ARMY ENGINEER DISTRICT, DETROIT

477 MICHIGAN AVENUE, 7TH FLOOR

DETROIT MI 48226-4523

W911XK 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0002

1. Bid Open date changed from June 30, 2020 2:00 pm to July 14, 2020 2:00 pm Eastern Time.

2. Revision to Bid Schedule Line Item 0007 Residual Cover - Quantity change from 6,700 to 13,400.

3. Revision to the following Sections of the Specification:

Revised the language under Section: 01 22 00.00 10, Paragraph 1.3.3.1; and replace with - This item shall include all work as specified in SECTION 35 20 23.43 STRATEGIC NAVIGATION DREDGING. The Contract unit price per cubic yard of dredging shall include the cost of removal, conveyance and disposal of all materials as shown on the drawings and as specified herein, except original materials, ledge rock, boulders, cobbles, rock fragments, wrecks, scrap materials, snags, stumps, piles, debris or other material which cannot be removed or buried below the required depth by the plant specified in the accepted bid, or the equivalent of such plant, without blasting or special apparatus. The unit price shall also include the cost of all work required to be performed for the use of the disposal area. Nothing in this paragraph shall be construed as prohibiting the removal of excepted material by special means at the prices agreed and approved in accordance with applicable provisions of the contract. Costs shall also include those associated with placement of dredge material at the placement site as specified in SECTION 35 20 23.43 STRATEGIC NAVIGATION DREDGING.

This item shall also include work as specified in SECTION 35 20 23.13 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM SCOW – MONITORING PROFILE. The contract unit price per cubic yard for "Required SND Dredging with Placement at Erie Pier," shall constitute full compensation for labor, equipment, tools, and incidentals necessary to operate and maintain the system as specified herein for the duration of the SND dredging operations.

Revised the language under Section 01 45 00.00 10, Paragraph 3.4.3 and replaced with - In addition to CQC personnel specified elsewhere in the contract, provide as part of the CQC organization specialized personnel to assist the CQC System Manager for the following areas: Civil and Environmental. These individuals or specialized technical companies are employees of the prime or subcontractor and must be responsible to the CQC System Manager; must be physically present at the construction site during work on the specialized personnel’s areas of responsibility; must have the necessary education and/or experience in accordance with the experience matrix listed herein. These individuals can perform other duties but need to be allowed sufficient time to perform the specialized personnel's assigned quality control duties as described in the Quality Control Plan. A single person can cover more than one area provided that the single person is qualified to perform quality control activities in each designated area and that workload allows.

Experience Matrix Qualifications Area Civil

Graduate Civil Engineer or Construction Manager with 2 years’ experience in the type of work being performed on this project or technician with 5 yrs. related experience

Environmental

Graduate Environmental Engineer with 3 years’ experience or Construction Manager with 2 years’ experience in the type of work being performed on this project or technician with 5 years related experience

Revised the language under Section 01 57 19, Paragraph 1.7.9.3.2 and replaced with - Perform real-time airborne particulate monitoring at the Frasier property continuously during sediment handling activities, including sediment and blending agent handling activities. Perform air monitoring at perimeter of work area at two downwind locations and one upwind location. Upwind and downwind locations shall be determined daily through observations at the site or available meteorological data and located to allow coverage of potential receptors and typical shifts in the wind direction. If wind direction shifts greater than +/- 60° compass change from the original wind direction during the workday, the monitoring stations shall be relocated so that the upwind and downwind locations are maintained. Monitoring location changes shall be documented in a field logbook

Revised the language under Section 01 57 19, Paragraph 1.7.9.3.3 and replaced with - Perimeter air monitoring shall be performed using real-time particulate and air quality monitoring system; or hand-held, direct-reading survey instruments; or both. The meters selected for use during monitoring activities shall be capable of calculating and recording 15-minute running average concentrations for comparison against action levels. Flammable vapor monitoring shall be conducted at each monitoring location using a photoionization detector (PID) with an 11.7 eV bulb or an equivalent systems capable of being safely operated under expected site conditions and capable of detecting flammable vapors including large hydrocarbons/VOC at a sufficient level for the specified monitoring application. Particulate monitoring shall be conducted at each monitoring location using instrumentation equipped with electronic data-logging capabilities such as a PDR1000 (from Thermo Electron Corporation) or equivalent. At least one spare flammable vapor monitoring device and particulate monitor shall be available for use in the event of equipment failure.

Revised the language under Section 01 57 19. Paragraph 1.7.9.3.3.1 and replaced with - All air monitoring equipment shall be maintained and calibrated in accordance with specific manufacturers’ procedures.

Preventive maintenance and repairs shall be conducted in accordance with the respective manufacturers’ procedures. All direct-reading instrumentation calibrations shall be conducted under the approximate environmental conditions in which the instrument will be used. Instruments must be calibrated before and after use, noting the reading(s) and any adjustments that are necessary. All air monitoring equipment calibration, including the standard used for calibration, must be documented on a calibration log. When applicable, only manufacturer-trained and/or authorized personnel shall be allowed to perform instrument repairs.

Revised the language under Section 35 20 23.43, Paragraph 1.1. and replaced with - The contract unit price per cubic yard for dredging and excavation includes the cost of removal, conveyance, and disposal of all materials meeting the requirements of paragraph "CHARACTER OF MATERIALS" within the limits as shown on the drawings and as specified herein, except original materials, ledgerock, boulders, wrecks, scrap materials, snags, stumps, driftwood, piles, debris or other material which cannot be removed by the plant specified in the accepted bid, or the equivalent of such plant, without special apparatus. The unit price must also include the cost of all work required to be performed for the use of the Government-furnished disposal facility and include all work as specified in SECTION 35 20 23.13 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM SCOW – MONITORING PROFILE. The Contractor may elect to remove excepted material by special means at prices agreed and approved in accordance with applicable provisions of the contract.

Revised the – language under Section 35 20 23.53, Paragraph 1.5.3.and replaced with - The sequence of environmental dredging performed under this section shall be coordinated through the Contracting Officer and shall be as follows, unless otherwise approved by the Contracting Officer:

a. Hughitt Ave. Slip

b. Cummings Ave. Slip

c. Fraser Slip

d. Frog Pond area (Unit FP-1 and FP-2)

e. OC-1 through OC-5 followed by FC-1 and FC-2

f. OC-6 through OC-8 followed by FC-3 through FC-4

g. OC-9, followed by FC-5 and FC-6

h. OC-11 and OC-12, followed by FC-9

i. OC-14, followed by FC-12 and FC-13

j. OC-16 and OC -17, followed by FC-17, FC-16, FC-15, and FC-14

Coordinate sequencing with Duluth Superior Concrete, CHS Inc., and Fraser Shipyards, Inc. shipping schedules (as applicable). Environmental dredging, sampling and cover placement in a DMU shall be completed in the same season in which it was started. Environmental dredging performed under this section may be performed simultaneously as the navigational dredging under SECTION 35 20 23.43 STRATEGIC NAVIGATIONAL DREDGING provided that navigation dredging is not performed in the same area as environmental dredging, simultaneous dredging is approved by the Contracting Officer and updated environmental dredge prisms have been provided (Contractor shall allow up to 14 calendar days between completion of navigational dredging survey and issuance of updated dredge prisms).

3. Specification Section 01 57 19 – TEMPORARY ENVIRONMENTAL CONTROLS

REPLACE:

Paragraph numbering of the following paragraphs:

1.7.9.3.1 Perimeter Air Monitoring Action Levels

1.7.9.3.2 Perimeter Air Monitoring Locations

1.7.9.3.3 Monitoring Instruments

1.7.9.3.3.1 Instrument Calibration and Maintenance

1.7.9.3.4 Staffing

1.7.9.3.5 Documentation and Reporting

WITH:

The following revised paragraph numbering:

1.7.9.4.1 Perimeter Air Monitoring Action Levels

1.7.9.4.2 Perimeter Air Monitoring Locations

1.7.9.4.3 Monitoring Instruments

1.7.9.4.3.1 Instrument Calibration and Maintenance

1.7.9.4.4 Staffing

1.7.9.4.5 Documentation and Reporting

4. Specification – Revision to Note No. 5 on Drawing Sheet CN105. Replaced with - The Cummings Slip staging area is surrounded by existing berms that must not be modified. The area may be used for staging equipment and materials.

5. Add Wage Determination - State of Wisconsin. Reference Changes on the following pages. All other terms and conditions remain unchanged.

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 30-Jun-2020 02:00 PM to 14-Jul-2020 02:00 PM.

The following have been modified:

BID SCHEDULE

HOWARDS BAY SND AND GLLA DREDGING

ITEMS SUPPLIES/SERVIES QUANTITY UNIT UNIT PRICE TOTAL

0001 General Conditions 1 JOB $_________ $__________________

0002 Mobilization & Demobilization 1 JOB $_________ $__________________

0003 Required SND Dredging with Placement at Erie Pier

0003AA First 22,500 CY 22,500 CY $_________ $__________________

0003AB Over 22,500 CY 30,000 CY $_________ $__________________

0004 Environmental Dredging-

0004AA First 65,000 CY 65,000 CY $_________ $__________________

0004AB Over 65,000 CY 10,000 CY $_________ $__________________

0005 Post Removal Sampling 1 JOB $_________ $__________________

0006 Environmental Redredging 6,200 CY $_________ $__________________

0007 Residual Cover 13,400 TON $_________ $__________________

0008 Site Preparation – Dewatering Area 1 JOB $_________ $__________________

0009 Enhanced Natural Recovery 2,000 TON $_________ $__________________

0010 Road Repair and Landfill 1 JOB $_________ $__________________ Redevelopment

0011 Wisconsin Point Landfill 1 JOB $_________ $__________________ Placement Area Preparation

0012 Transportation of Environmental 86,750 CY $_________ $__________________ Dredge Material to Wisconsin Point Landfill

0013 Disposal of Environmental Dredge 86,750 CY $_________ $__________________ Material at Wisconsin Point Landfill

0014 Erie Pier Material Placement 15,330 CY $_________ $__________________

0015 Topsoil and Seeding 1 JOB $_________ $__________________

0016 Erie Pier Regrading 10 AC $_________ $__________________

0017 Water Treatment 7 MO $_________ $__________________

0018 Sediment Dewatering/Solidification 10,400 TON $_________ $__________________

0019 Sediment Trucking to TSD Facility 11,300 TON $_________ $__________________

0020 Sediment Disposal at TSD Facility 11,300 TON $_________ $__________________

0021 Debris Trucking to TSD Facility 1,930 TON $_________ $__________________

0022 Debris Disposal at TSD Facility 1,930 TON $_________ $__________________

0023 Air Monitoring 7 MO $_________ $__________________

0024 Turbidity Monitoring 29 WK $_________ $__________________

TOTAL AMOUNT OF BID $_________________________

CY = CUBIC YARD

AC = ACRES

MO = MONTH

WK = WEEK

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following have been added by full text:

WAGE DETERMINATION WI-15

"General Decision Number:

WI20200015 06/12/2020 Superseded General Decision Number: WI20190015 State:

Wisconsin Constructio n Type:

Heavy Counties: Wisconsin Statewide.

HEAVY CONSTRUCTION PROJECTS (Excluding Tunnel, Sewer, and Water Lines).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate).

The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

BOILERMAKER

Boilermaker.................$ 35.65 29.89 Small Boiler Repair (under 25,000 lbs/hr)..............$ 26.91 16.00

BRWI0001-002 06/03/2019

CRAWFORD, JACKSON, JUNEAU, LA CROSSE,

MONROE, TREMPEALEAU, AND VERNON COUNTIES

Rates Fringes

BRICKLAYER.......................$ 33.80 24.28

BRWI0002-002 06/01/2019

ASHLAND, BAYFIELD, DOUGLAS, AND IRON COUNTIES

BRICKLAYER.......................$ 39.94 23.30

BRWI0002-005 06/01/2019

ADAMS, ASHLAND, BARRON, BROWN, BURNETT, CALUMET, CHIPPEWA,

CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE, FOND DU LAC,

FOREST, GREEN LAKE, IRON, JEFFERSON, KEWAUNEE, LANGLADE,

LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE,

MENOMINEE, OCONTO, ONEIDA, OUTAGAMIE, POLK, PORTAGE, RUSK, ST

CROIX, SAUK, SHAWANO, SHEBOYGAN, TAYLOR, VILAS, WALWORTH,

WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD COUNTIES

CEMENT MASON/CONCRETE FINISHER...$ 35.51 23.37

BRWI0003-002 06/03/2019

BROWN, DOOR, FLORENCE, KEWAUNEE, MARINETTE, AND OCONTO COUNTIES

BRICKLAYER.......................$ 34.18 23.90

Modification Number Publication Date

0 01/03/2020

1 01/24/2020

2 02/28/2020

3 03/06/2020

4 06/05/2020

BOIL0107-001 01/01/2017

06/12/2020

Rates

Fringes

BRWI0004-002 06/01/2019

KENOSHA, RACINE, AND WALWORTH COUNTIES

BRICKLAYER.......................$ 38.43 25.10

BRWI0006-002 06/01/2019

ADAMS, CLARK, FOREST, LANGLADE, LINCOLN, MARATHON, MENOMINEE,

ONEIDA, PORTAGE, PRICE, TAYLOR, VILAS AND WOOD COUNTIES

BRICKLAYER.......................$ 35.06 23.02

BRWI0007-002 06/03/2019

GREEN, LAFAYETTE, AND ROCK COUNTIES

BRICKLAYER.......................$ 35.57 24.22

BRWI0008-002 06/01/2019

MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES

BRICKLAYER.......................$ 38.93 24.22

BRWI0009-001 06/03/2019

GREEN LAKE, MARQUETTE, OUTAGAMIE, SHAWANO, WAUPACA,

WASHARA, AND WINNEBAGO COUNTIES

BRWI0011-002 06/03/2019

CALUMET, FOND DU LAC, MANITOWOC, AND SHEBOYGAN COUNTIES

BRWI0013-002 06/03/2019

DANE, GRANT, IOWA, AND RICHLAND COUNTIES

BRICKLAYER.......................$ 35.56 24.23

BRWI0019-002 06/03/2019

BARRON, BUFFALO, BURNETT, CHIPPEWA, DUNN, EAU CLAIRE, PEPIN,

PIERCE, POLK, RUSK, ST. CROIX, SAWYER AND WASHBURN COUNTIES

BRICKLAYER.......................$ 33.40 24.68

BRWI0021-002 06/03/2019 DODGE

AND JEFFERSON COUNTIES

BRICKLAYER

35.75

24.02

BRWI0034-002 06/03/2019 COLUMBIA

AND SAUK COUNTIES

BRICKLAYER

35.56 24.23

CARP0087-001 05/01/2016

BURNETT (W. of Hwy 48), PIERCE (W. of Hwy 29), POLK (W. of Hwys 35, 48 & 65), AND ST. CROIX (W. of Hwy 65) COUNTIES

Carpenter & Piledrivermen........$ 36.85 18.39

CARP0252-002 06/01/2016

ADAMS, BARRON, BAYFIELD (Eastern 2/3), BROWN, BUFFALO, BURNETT (E. of Hwy 48), CALUMET, CHIPPEWA, CLARK, COLUMBIA, CRAWFORD, DANE, DODGE, DOOR, DUNN, EAU CLAIRE, FLORENCE (except area bordering Michigan State Line), FOND DU LAC, FOREST, GRANT, GREEN, GREEN LAKE, IOWA, IRON, JACKSON, JEFFERSON, JUNEAU, KEWAUNEE, LA

CROSSE, LAFAYETTE, LANGLADE, LINCOLN, MANITOWOC, MARATHON,

MARINETTE (except N.E. corner), MARQUETTE, MENOMINEE, MONROE, OCONTO, ONEIDA, OUTAGAMIE, PEPIN, PIERCE (E. of Hwys 29 & 65), POLK (E.

of Hwys 35, 48 & 65), PORTAGE, PRICE, RICHLAND, ROCK, RUSK, SAUK, SAWYER, SHAWANO, SHEBOYGAN, ST CROIX (E. of Hwy 65), TAYLOR, TREMPEALEAU, VERNON, VILAS, WALWORTH, WASHBURN, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD COUNTIES

CARPENTER

CARPENTER...................$ 33.56 18.00

MILLWRIGHT..................$ 35.08 18.35

PILEDRIVER..................$ 34.12 18.00

CARP0252-010 06/01/2016

ASHLAND COUNTY

Carpenters

Carpenter...................$ 33.56 18.00 Millwright..................$ 35.08 18.35 Pile Driver.................$ 34.12 18.00

CARP0264-003 06/01/2016

KENOSHA, MILWAUKEE, OZAUKEE, RACINE, WAUKESHA, AND WASHINGTON

COUNTIES

CARPENTER........................$ 35.78 22.11

CARP0361-004 05/01/2018

BAYFIELD (West of Hwy 63) AND DOUGLAS COUNTIES

CARPENTER........................$ 36.15 20.43

CARP2337-001 06/01/2016

ZONE A: MILWAUKEE, OZAUKEE, WAUKESHA AND WASHINGTON

ZONE B: KENOSHA & RACINE

PILEDRIVERMAN

Zone A......................$ 31.03 22.69 Zone B......................$ 31.03 22.69

CARP2337-003 06/01/2019

MILLWRIGHT

Zone A......................$ 33.58 21.53 Zone B......................$ 33.58 21.53

ZONE DEFINITIONS

ZONE A: MILWAUKEE, OZAUKEE, WAUKESHA AND WASHINGTON

COUNTIES ZONE B: KENOSHA & RACINE COUNTIES

ELEC0014-002 06/03/2019

ASHLAND, BARRON, BAYFIELD, BUFFALO, BURNETT, CHIPPEWA, CLARK

(except Maryville, Colby, Unity, Sherman, Fremont, Lynn & Sherwood), CRAWFORD, DUNN, EAU CLAIRE, GRANT, IRON, JACKSON, LA CROSSE, MONROE, PEPIN, PIERCE, POLK, PRICE, RICHLAND, RUSK, ST CROIX, SAWYER, TAYLOR, TREMPEALEAU, VERNON, AND WASHBURN COUNTIES

Electricians:....................$ 35.59 20.87

ELEC0014-007 06/03/2019

REMAINING COUNTIES

Teledata System Installer

Installer/Technician........$ 27.25 14.34

Low voltage construction, installation, maintenance and removal of teledata facilities (voice, data, and video) including outside plant, telephone and data inside wire, interconnect, terminal equipment, central offices, PABX, fiber optic cable and equipment, micro waves, V-SAT, bypass, CATV, WAN (wide area networks), LAN (local area networks), and ISDN (integrated systems digital network).

ELEC0127-002 06/01/2020

KENOSHA COUNTY

Electricians:....................$ 41.62 30%+12.70 ELEC0158-002 06/03/2019 BROWN, DOOR, KEWAUNEE, MANITOWOC (except Schleswig), MARINETTE(Wausuakee and area South thereof), OCONTO, MENOMINEE (East of a ine 6 miles West of the West boundary of Oconto County), SHAWANO (Except Area North of Townships of Aniwa and Hutchins) COUNTIES

Electricians:....................$ 33.52 29.75%+10.26 ELEC0159-003 06/01/2019 COLUMBIA, DANE, DODGE (Area West of Hwy 26, except Chester and Emmet Townships), GREEN, LAKE (except Townships of Berlin, Seneca, and St. Marie), IOWA, MARQUETTE (except Townships of Neshkoka, Crystal Lake, Newton, and Springfield), and SAUK COUNTIES

Electricians:....................$ 40.30 22.24

ELEC0219-004 06/01/2016

FLORENCE COUNTY (Townships of Aurora, Commonwealth, Fern, Florence and Homestead) AND MARINETTE COUNTY (Township of Niagara)

Electricians:

Electrical contracts over

$180,000....................$ 32.38 18.63 Electrical contracts under $180,000....................$ 30.18 18.42

ELEC0242-005 05/16/2018

DOUGLAS COUNTY

Electricians:....................$ 36.85 26.17

ELEC0388-002 06/03/2019

ADAMS, CLARK (Colby, Freemont, Lynn, Mayville, Sherman, Sherwood, Unity), FOREST, JUNEAU, LANGLADE, LINCOLN, MARATHON, MARINETTE (Beecher, Dunbar, Goodman & Pembine), MENOMINEE (Area West of a line 6 miles West of the West boundary of Oconto County), ONEIDA, PORTAGE, SHAWANO (Aniwa and Hutchins), VILAS AND WOOD COUNTIES

Electricians:....................$ 33.56 26%+11.01

ELEC0430-002 01/01/2020

RACINE COUNTY (Except Burlington Township)

Electricians:....................$ 40.30 22.19

ELEC0494-005 06/01/2019

Electricians:....................$ 41.03 25.11

ELEC0494-006 01/01/2020

CALUMET (Township of New Holstein), DODGE (East of Hwy 26 including Chester Township), FOND DU LAC, MANITOWOC (Schleswig), and

SHEBOYGAN COUNTIES

Electricians:....................$ 34.99 22.31

ELEC0494-013 06/01/2019

DODGE (East of Hwy 26 including Chester Twp, excluding Emmet Twp), FOND DU LAC (Except Waupuin), MILWAUKEE, OZAUKEE, MANITOWOC (Schleswig), WASHINGTON, AND WAUKESHA COUNTIES

Sound & Communications

Installer...................$ 20.53 18.13 Technician..................$ 30.18 19.58

Installation, testing, maintenance, operation and servicing of all sound, intercom, telephone interconnect, closed circuit TV systems, radio systems, background music systems, language laboratories, electronic carillion, antenna distribution systems, clock and program systems and low-voltage systems such as visual nurse call, audio/visual nurse call systems, doctors entrance register systems.

Includes all wire and cable carrying audio, visual, data, light and radio frequency signals. Includes the installation of conduit, wiremold, or raceways in existing structures that have been occupied for six months or more where required for the protection of the wire or cable, but does not mean a complete conduit or raceway system. work covered does not include the installation of conduit, wiremold or any raceways in any new construction, or the installation of power supply outlets by means of which external electric power is supplied to any of the foregoing equipment or products

ELEC0577-003 06/01/2019

CALUMET (except Township of New Holstein), GREEN LAKE (N. part including Townships of Berlin, St Marie, and Seneca), MARQUETTE (N. part including Townships of Crystal Lake, Neshkoro, Newton, and Springfield), OUTAGAMIE, WAUPACA, WAUSHARA, AND WINNEBAGO COUNTIES

Electricians:....................$ 33.15 28.50%+10.00

* ELEC0890-003 06/01/2020

DODGE (Emmet Township only), GREEN, JEFFERSON, LAFAYETTE, RACINE (Burlington Township), ROCK AND WALWORTH COUNTIES

Electricians $ 37.41 25.95%+11.11

ELEC0953-001 06/02/2019

Line Construction:

(1) Lineman. $

47.53

21.43

(2) Heavy Equipment Operator $

42.78

19.80

(3) Equipment Operator $ 38.02 18.40

(4) Heavy Groundman Driver..$ 33.27 16.88

(5) Light Groundman Driver..$ 30.89 16.11

(6) Groundsman $ 26.14 14.60

ENGI0139-001 06/01/2020

KENOSHA, MILWAUKEE, OZAUKEE, RACINE, WASHINGTON, AND WAUKESHA

Power Equipment Operator

Group 1.....................$ 47.66 23.15 Group 2.....................$ 47.16 23.15 Group 3.....................$ 46.66 23.15 Group 4.....................$ 45.97 23.15 Group 5.....................$ 42.39 23.15 Group 6.....................$ 37.24 23.15

HAZARDOUS WASTE PREMIUMS:

EPA Level ""A"" Protection: $3.00 per hour EPA Level ""B"" Protection: $2.00 per hour EPA Level ""C"" Protection: $1.00 per hour

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Cranes, Tower Cranes, Pedestal Tower Cranes and Derricks with or w/o attachments with a lifting capacity of over 100 tons; or Cranes, Tower Cranes, Pedestal Tower Cranes and Derricks with boom, leads, and/or jib lengths measuring 176 feet or longer; Self-Erecting Tower Cranes over 4000 lbs lifting capacity; All Cranes with Boom Dollies; Boring Machines (directional); Master Mechanic.

$0.50 additional per hour per 100 tons or 100 ft of boom over 200 ft or lifting capacity of crane over 200 tons to a maximum of 300 tons or 300 ft. Thereafter an increase of $0.01 per ft or ton, whichever is greater.

GROUP 2: Cranes, Tower Cranes, Pedestal Tower Cranes and Derricks with or without attachments with a lifting capacity of 100 tons or less; or Cranes, Tower Cranes Portable Tower Cranes, Pedestal Tower Cranes and Derricks with boom, leadsand/or jib lengths measuring 175 feet or less; Backhoes (excavators) 130,000 lbs and over; Caisson Rigs; Pile Drivers; Boring Machines (vertical or horizontal), Versi-Lift, Tri-Lift, Gantry 20,000 lbs & over.

GROUP 3: Backhoe (excavator) under 130,000 lbs;Self-erecting Tower Crane 4000 lbs & under lifting capacity;Traveling

Crane (bridge type); Skid Rigs; Dredge Operator; Mechanic; Concrete Paver (over 27E); Concrete Spreader and Distributor; Forklift/ Telehandler (machinery-moving / steel erection); Hydro Blaster, 10,000 psi and over

GROUP 4: Material Hoists; Stack Hoists; Hydraulic Backhoe (tractor or truck mounted); Hydraulic Crane, 5 tons or under (tractor or truck mounted); Hoist (tuggers 5 tons & over); Hydro-Excavators/Daylighters; Concrete Pumps Rotec type Conveyors; Tractor/Bulldozer/End Loader (over 40 hp); Motor Patrol; Scraper Operator; Sideboom; Straddle Carrier; Welder; Bituminous Plant and Paver Operator;

Roller over 5 tons; Rail Leveling Machine (Railroad); Tie Placer; Tie Extractor; Tie Tamper; Stone Leveler; Rotary Drill Operator and Blaster; Percussion Drill Operator;

Air Track Drill and/or Hammers; Gantrys (under 20,000 lbs); Tencher (wheel type or chain type having 8 inch or larger bucket); Milling Machine; Off-Road Material Haulers.

GROUP 5: Backfiller; Concrete Auto Breaker (large); Concrete Finishing Machines (road type); Rubber Tired Roller;

Concrete Batch Hopper; Concrete Conveyor Systems; Grout Pumps; Concrete Mixers (14S or over); Screw Type Pumps and Gypsum Pumps; Tractor, Bulldozer, End Loader (under 40 hp); Trencher (chain type, bucket under 8 inch); Industrial Locomotives; Rollers under 5 tons; Stump Grinder/Chipper (Large); Timber Equipment; Firemen (pile drivers and derricks); Personnel Hoist, Telehandler over 8000 lbs; Robotic Tool Carrier with or without attachments

GROUP 6: Tampers - Compactors (riding type); Assistant Engineer; A-Frames and Winch Trucks; Concrete Auto Breaker; Hydrohammers (small); Brooms and Sweepers; Hoist (tuggers under 5 tons); Boats (Tug, Safety, Work Barges, Launch);

Shouldering Machine Operator; Prestress Machines; Screed Operator; Stone Crushers and Screening Plants; Screed Operators (milling machine), Farm or Industrial Tractor Mounted Equipment; Post Hole Digger; Fireman (asphalt plants); Air Compressors over 400 CFM; Generators, over 150 KW; Augers (vertical and horizontal); Air, Electric, Hydraulic Jacks (slipform); Skid Steer Loaders (with or without attachments); Boiler Operators (temporary heat); Refrigeration Plant/Freeze Machines; Power Pack Vibratory/Ultra Sound Drivers and Extractors; Welding Machines; Heaters (mechanical); Pumps; Winches (small electric); Oiler and Greaser;

Rotary Drill Tender; Conveyor; Forklifts/Telehandler 8000 lbs & under; Elevators:

Automatic Hoists; Pumps (well points); Combination Small Equipment Operators

ENGI0139-003 06/03/2019 REMAINING COUNTIES

Power Equipment Operator

Group 1.....................$ 41.52 22.45 Group 2.....................$ 40.27 22.45 Group 3.....................$ 38.97 22.45

Group 4.....................$ 38.44 22.45 Group 5.....................$ 36.37 22.45 Group 6.....................$ 34.84 22.45

HAZARDOUS WASTE PREMIUMS:

EPA Level ""A"" Protection: $3.00 per hour EPA Level ""B"" Protection: $2.00 per hour EPA Level ""C"" Protection: $1.00 per hour

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Cranes, Tower Cranes and Derricks with or without attachments with a lifting capacity of over 100 tons; Cranes, Tower Cranes, and Derricks with boom, leads and/or jib lengths 176 ft or longer.

GROUP 2: Backhoes (Excavators) weighing 130,00 lbs and over;

Cranes, Tower Cranes and Derricks with or without attachments with a lifting capacity of 100 tons or less; Cranes, Tower Cranes, and Derricks with boom, leads, and/or jib lengths 175 ft or less; Caisson Rigs; Pile Driver

GROUP 3: Backhoes (Excavators) weighing under 130,000 lbs; Travelling Crane (bridge type); Milling Machine; Concrete Paver over 27 E; Concrete Spreader and Distributor; Concrete Laser Screed; Concrete Grinder and Planing Machine; Slipform Curb and Gutter Machine; Boring Machine (Directional); Dredge Operator; Skid Rigs; over 46 meter Concrete Pump.

GROUP 4: Hydraulic Backhoe (tractor or truck mounted); Hydraulic Crane, 10 tons or less; Tractor, Bulldozer, or End Loader (over 40 hp); Motor Patrol; Scraper Operator; Bituminous Plant and Paver Operator; Screed-Milling Machine; Roller over 5 tons; Concrete pumps 46 meter and under; Grout Pumps; Rotec type machine;

Hydro Blaster, 10,000 psi and over; Rotary Drill Operator; Percussion Drilling Machine; Air Track Drill with or without integral hammer; Blaster; Boring Machine (vertical or horizontal); Side Boom; Trencher, wheel type or chain type having 8 inch or larger bucket; Rail Leveling Machine (Railroad); Tie Placer; Tie Extractor; Tie Tamper; Stone Leveler; Straddle Carrier; Material Hoists; Stack Hoist; Man Hoists;

Mechanic and Welder; Off Road Material Haulers.

GROUP 5: Tractor, Bulldozer, or Endloader (under 40 hp); Tampers -Compactors, riding type; Stump Chipper, large; Roller, Rubber Tire; Backfiller; Trencher, chain type (bucket under 8 inch); Concrete Auto Breaker, large; Concrete Finishing Machine (road type); Concrete Batch Hopper; Concrete Conveyor Systems; Concrete Mixers, 14S or over; Pumps, Screw Type and Gypsum); Hydrohammers, small;

Brooms and Sweeeprs; Lift Slab Machine; Roller under 5 tons; Industrial Locomotives; Fireman (Pile Drivers and Derricks); Pumps (well points); Hoists, automatic; A-Frames and Winch Trucks; Hoists (tuggers); Boats (Tug, Safety, Work Barges and Launches); Assistant Engineer

GROUP 6: Shouldering Machine Operator; Farm or Industrial Tractor mounted equipment; Post Hole Digger; Auger (vertical and horizontal); Skid Steer Loader with or without attachments; Robotic Tool Carrier with or without attachments;

Power Pack Vibratory/Ultra Sound Driver and Extractor; Fireman (Asphalt Plants);

Screed Operator; Stone Crushers and Screening Plants; Air, Electric, Hydraulic Jacks (Slip Form); Prestress Machines; Air Compressor, 400 CFM or over; Refrigeration Plant/Freese Machine; Boiler Operators (temporary heat); Forklifts; Welding Machines;

Generators; Pumps over 3""; Heaters, Mechanical; Combination small equipment operator; Winches, small electric; Oiler; Greaser; Rotary Drill Tender;

Conveyor; Elevator Operator

IRON0008-002 06/01/2019

BROWN, CALUMET, DOOR, FOND DU LAC, KEWAUNEE, MANITOWOC,

MARINETTE, OCONTO, OUTAGAMI, SHAWANO, SHEBOYGAN, AND

WINNEBAGO COUNTIES:

IRONWORKER.......................$ 35.07 27.62

Paid Holidays: New Year's Day, Memorial Day, July 4th, Labor Day, Thanksgiving Day & Christmas Day.

IRON0008-003 06/01/2019

KENOSHA, MILWAUKEE, OZAUKEE, RACINE, WALWORTH (N.E. 2/3),

WASHINGTON, AND WAUKESHA COUNTIES

IRONWORKER.......................$ 37.12 27.87

Paid Holidays: New Year's Day, Memorial Day, July 4th, Labor Day, Thanksgiving Day & Christmas Day.

IRON0383-001 06/01/2019

ADAMS, COLUMBIA, CRAWFORD, DANE, DODGE, FLORENCE, FOREST,

GRANT, GREENE, (Excluding S.E. tip), GREEN LAKE, IOWA, JEFFERSON, JUNEAU, LA CROSSE, LAFAYETTE, LANGLADE, MARATHON, MARQUETTE, MENOMINEE, MONROE, PORTAGE, RICHLAND, ROCK (Northern area, vicinity of Edgerton and Milton), SAUK, VERNON, WAUPACA, WAUSHARA, AND WOOD COUNTIES

IRONWORKER.......................$ 35.50 26.57

IRON0512-008 06/03/2019

BARRON, BUFFALO, CHIPPEWA, CLARK, DUNN, EAU CLAIRE, JACKSON,

PEPIN, PIERCE, POLK, RUSK, ST CROIX, TAYLOR, AND TREMPEALEAU

IRONWORKER.......................$ 37.60 29.40

IRON0512-021 06/03/2019

ASHLAND, BAYFIELD, BURNETT, DOUGLAS, IRON, LINCOLN, ONEIDA, PRICE,

SAWYER, VILAS AND WASHBURN COUNTIES

IRONWORKER.......................$ 33.19 29.40

LABO0113-002 06/03/2019 MILWAUKEE

AND WAUKESHA COUNTIES

LABORER

Group 1.....................$ 29.02 21.92 Group 2.....................$ 29.17 21.92 Group 3.....................$ 29.37 21.92 Group 4.....................$ 29.52 21.92 Group 5.....................$ 29.67 21.92 Group 6.....................$ 25.51 21.92

LABORERS CLASSIFICATIONS

GROUP 1: General Laborer; Tree Trimmer; Conduit Layer; Demolition and Wrecking Laborer; Guard Rail, Fence, and Bridge Builder; Landscaper; Multiplate Culvert Assembler; Stone Handler; Bituminous Worker (Shoveler, Loader, and Utility Man); Batch Truck Dumper or Cement Handler; Bituminous Worker (Dumper, Ironer, Smoother, and Tamper); Concrete Handler

GROUP 2: Air Tool Operator; Joint Sawer and Filler (Pavement); Vibrator or Tamper Operator (Mechanical Hand Operated); Chain Saw Operator; Demolition Burning Torch Laborer

GROUP 3: Bituminous Worker (Raker and Luteman); Formsetter (Curb, Sidewalk, and Pavement); Strike Off Man

GROUP 4: Line and Grade Specialist GROUP 5:

Blaster and Powderman GROUP 6: Flagperson; traffic control person

LABO0113-003 06/03/2019 OZAUKEE AND WASHINGTON COUNTIES

Group 1.....................$ 28.27 21.92 Group 2.....................$ 28.37 21.92 Group 3.....................$ 28.42 21.92 Group 4.....................$ 28.62 21.92 Group 5.....................$ 28.47 21.92 Group 6.....................$ 25.36 21.92

LABORERS CLASSIFICATIONS

GROUP 1: General Laborer; Tree Trimmer; Conduit Layer; Demolition and Wrecking Laborer; Guard Rail, Fence, and Bridge Builder; Landscaper; Multiplate Culvert Assembler; Stone Handler; Bituminous Worker (Shoveler, Loader, and Utility Man); Batch Truck Dumper or Cement Handler; Bituminous Worker (Dumper, Ironer, Smoother, and Tamper); Concrete Handler

Tamper Operator (Mechanical Hand Operated);

Blaster; powderman GROUP 6: Flagperson and Traffic Control Person

LABO0113-011 06/03/2019 KENOSHA AND RACINE COUNTIES

Group 1.....................$ 28.08 21.92 Group 2.....................$ 28.23 21.92 Group 3.....................$ 28.43 21.92 Group 4.....................$ 28.40 21.92 Group 5.....................$ 28.73 21.92 Group 6.....................$ 25.22 21.92

LABORERS CLASSIFICATIONS:

GROUP 1: General laborer; Tree Trimmer; Conduit Layer; Demolition and

Culvert Assembler; Stone Handler; Bituminous Worker (Shoveler, Loader, and Utility Man); Batch Truck Dumper or Cement Handler; Bituminous worker

Blaster and Powderman GROUP 6: Flagman; traffic control person

LABO0140-002 06/03/2019

ADAMS, ASHLAND, BARRON, BAYFIELD, BROWN, BUFFALO, BURNETT,

CALUMET, CHIPPEWA, CLARK, COLUMBIA, CRAWFORD, DODGE, DOOR,

DOUGLAS, DUNN, EAU CLAIRE, FLORENCE, FOND DU LAC, FOREST, GRANT,

GREEN, GREEN LAKE, IRON, JACKSON, JUNEAU, IOWA, JEFFERSON,

KEWAUNEE, LA CROSSE, LAFAYETTE, LANGLADE, LINCOLN, MANITOWOC,

MARATHON, MARINETTE, MARQUETTE, MENOMINEE, MONROE, OCONTO,

ONEIDA, OUTAGAMIE, PEPIN, PIERCE, POLK, PORTAGE, PRICE, RICHLAND,

ROCK, RUSK, SAUK, SAWYER, SHAWANO, SHEBOYGAN, ST. CROIX, TAYLOR,

TREMPEALEAU, VERNON, VILLAS, WALWORTH, WASHBURN,

WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD COUNTIES

Group 1.....................$ 32.84 17.54 Group 2.....................$ 32.94 17.54 Group 3.....................$ 32.99 17.54 Group 4.....................$ 33.19 17.54 Group 5.....................$ 33.04 17.54 Group 6.....................$ 29.47 17.54

LABORER CLASSIFICATIONS

Culvert Assembler; Stone Handler; Bitminous Worker (Shoveler, Loader, and Utility Man); Batch Truck Dumper or Cement Handler; Bituminous Worker (Dumper, Ironer, Smoother and Tamper); Concrete Handler

Tamper Operator (Mechanical Hand Operated); Chain Saw Operator, Demolition

GROUP 3: Bituminous Worker (Raker and Luteman); Formsetter (Curb, Sidewalk and

GROUP 4: Line and Grade Secialist GROUP 5:

Blaster; powderman GROUP 6: Flagperson; Traffic Control

LABO0464-003 06/03/2019 DANE COUNTY

Group 1.....................$ 33.12 17.54 Group 2.....................$ 33.22 17.54 Group 3.....................$ 33.27 17.54 Group 4.....................$ 33.47 17.54 Group 5.....................$ 33.32 17.54 Group 6.....................$ 29.47 17.54

LABORERS CLASSIFICATIONS:

Culvert Assembler; Stone Handler; Bituminous Worker (Shoveler, Loader, and Utility Man); Batch Truck Dumper or Cement Handler; Bituminious Worker

Burning Torch

Laborer

Blaster; Powderman GROUP 6: Flagperson and Traffic Control Person

PAIN0106-008 05/01/2017

ASHLAND, BAYFIELD, BURNETT, AND DOUGLAS COUNTIES

Painters:

New:

Brush, Roller..............$ 30.33 17.27 Spray, Sandblast, Steel....$ 30.93 17.27

Repaint:

Brush, Roller..............$ 28.83 17.27 Spray, Sandblast, Steel....$ 29.43 17.27

PAIN0108-002 06/01/2019

RACINE COUNTY

Brush, Roller...............$ 36.08 20.36 Spray & Sandblast...........$ 37.08 20.36

PAIN0259-002 05/01/2008

BARRON, CHIPPEWA, DUNN, EAU CLAIRE, PEPIN, PIERCE, POLK, RUSK,

SAWYER, ST. CROIX, AND WASHBURN COUNTIES

PAINTER..........................$ 24.11 12.15

PAIN0259-004 05/01/2015

BUFFALO, CRAWFORD, JACKSON, LA CROSSE, MONROE, TREMPEALEAU,

AND VERNON COUNTIES

PAINTER..........................$ 22.03 12.45

PAIN0781-002 06/01/2019

JEFFERSON, MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES

Bridge......................$ 33.30 23.86 Brush.......................$ 32.95 23.86

Spray & Sandblast...........$ 33.70 23.86

PAIN0802-002 06/01/2019

COLUMBIA, DANE, DODGE, GRANT, GREEN, IOWA, LAFAYETTE, RICHLAND,

ROCK, AND SAUK COUNTIES

PAINTER

Brush.......................$ 30.93 18.44

PREMIUM PAY:

Structural Steel, Spray, Bridges = $1.00 additional per hour.

PAIN0802-003 06/01/2019

ADAMS, BROWN, CALUMET, CLARK, DOOR, FOND DU LAC, FOREST, GREEN

LAKE, IRON, JUNEAU, KEWAUNEE, LANGLADE, LINCOLN, MANITOWOC,

MARATHON, MARINETTE, MARQUETTE, MENOMINEE, OCONTO, ONEIDA,

OUTAGAMIE, PORTAGE, PRICE, SHAWANO, SHEBOYGAN, TAYLOR, VILAS,

WAUSHARA, WAUPACA, WINNEBAGO, AND WOOD COUNTIES

PAINTER..........................$ 30.93 18.58

PAIN0934-001 06/01/2017 KENOSHA

AND WALWORTH COUNTIES

Brush.......................$ 33.74 18.95 Spray.......................$ 34.74 18.95 Structural Steel............$ 33.89 18.95

PAIN1011-002 06/02/2019

FLORENCE COUNTY

Painters:........................$ 25.76 13.33

PLAS0599-010 06/01/2017

CEMENT MASON/CONCRETE FINISHER

Area 1......................$ 39.46 17.17 Area 2 (BAC)................$ 35.07 19.75 Area 3......................$ 35.61 19.40 Area 4......................$ 34.70 20.51 Area 5......................$ 36.27 18.73 Area 6......................$ 32.02 22.99

AREA DESCRIPTIONS

AREA 1: BAYFIELD, DOUGLAS, PRICE, SAWYER, AND WASHBURN

AREA 2: ADAMS, ASHLAND, BARRON, BROWN, BURNETT, CALUMET,

CHIPPEWA, CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE,

FOND DU LAC, FOREST, GREEN LAKE, IRON, JEFFERSON, KEWAUNEE,

LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE,

MARQUETTE, MENOMINEE, OCONTO, ONEIDA, OUTAGAMIE, POLK,

PORTAGE, RUSK, ST CROIX, SAUK, SHAWANO, SHEBOYGAN, TAYLOR,

VILAS, WALWORTH, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD

AREA 3: BUFFALO, CRAWFORD, EAU CLAIRE, JACKSON, JUNEAU, LA

CROSSE MONROE, PEPIN, PIERCE, RICHLAND, TREMPEALEAU, AND

VERNON COUNTIES

AREA 4: MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES

AREA 5: DANE, GRANT, GREEN, IOWA, LAFAYETTE, AND ROCK

AREA 6: KENOSHA AND RACINE COUNTIES

PLUM0011-003 05/07/2018

ASHLAND, BAYFIELD, BURNETT, DOUGLAS, IRON, SAWYER, AND

WASHBURN COUNTIES

PLUMBER..........................$ 40.63 20.72

PLUM0075-002 06/01/2016

PLUMBER..........................$ 40.27 21.47

PLUM0075-004 06/01/2016

DODGE (Watertown), GREEN, JEFFERSON, LAFAYETTE, AND ROCK COUNTIES

PLUMBER..........................$ 40.52 21.47

PLUM0075-009 06/01/2016

COLUMBIA, DANE, IOWA, MARQUETTE, RICHLAND AND SAUK COUNTIES

PLUMBER..........................$ 38.82 20.12

PLUM0111-007 05/28/2018

MARINETTE COUNTY (Niagara only)

PLUMBER/PIPEFITTER...............$ 33.33 24.48

PLUM0118-002 06/01/2019

KENOSHA, RACINE, AND WALWORTH COUNTIES

Plumber and Steamfitter..........$ 42.95 23.60

PLUM0400-003 06/04/2018

ADAMS,BROWN, CALUMET, DODGE (except Watertown), DOOR, FOND DU LAC, GREEN LAKE,KEWAUNEE, MANITOWOC, MARINETTE (except Niagara), MENOMINEE, OCONTO, OUTAGAMIE, SHAWANO, SHEBOYGAN, WAUPACA, WAUSHARA, AND WINNEBAGO COUNTIES

PLUMBER/PIPEFITTER...............$ 36.74 19.06

PLUM0434-002 06/03/2018

BARON, BUFFALO, CHIPPEWA, CLARK, CRAWFORD, DUNN, EAU CLAIRE,

FLORENCE, FOREST, GRANT, JACKSON, JUNEAU, LA CROSSE, LANGLADE,

LINCOLN, MARATHON, MONROE, ONEIDA, PEPIN, PIERCE, POLK, PORTAGE,

PRICE, RUSK, ST. CROIX, TAYLOR, TREMPEALEAU, VERNON, VILAS, AND

WOOD COUNTIES

PIPEFITTER.......................$ 40.15 18.57

PLUM0601-003 06/03/2019

DODGE (Watertown), GREEN, JEFFERSON, LAFAYETTE, MILWAUKEE, OZAUKEE, ROCK, WASHINGTON AND WAUKESHA COUNTIES

PIPEFITTER.......................$ 46.89 25.29

PLUM0601-009 06/04/2017

COLUMBIA, DANE, IOWA, MARQUETTE, RICHLAND AND SAUK COUNTIES

PIPEFITTER.......................$ 47.08 20.89

TEAM0039-002 06/01/2019

TRUCK DRIVER

1 & 2 Axle Trucks...........$ 29.57 22.03 3 or more axles; Euclids or Dumptor, Articulated Truck, Mechanic.............$ 29.72 22.03

SUWI2011-001 11/16/2011

Rates Fringes WELL

DRILLER.....................$ 16.52

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2014.

PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate. Survey Rate Identifiers Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

a. an existing published wage determination

b. a survey underlying a wage determination

c. a Wage and Hour Division letter setting forth a position on a wage determination matter

d. a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .