W911XK-16-R-0003-0001_FY16_Poe_Gate_Embedded_Anchorage_Replacement.pdf

PDF 22 KB Posted

Attached to
FY16 POE LOCK EMBEDDED GATE ANCHORAGE REPLACMENT
Solicitation number
W911XK-16-R-0003
Issued by

About this file

Amendment 0001

View the file

Other files

File Type Posted
W911XK-16-R-0003-0004_FY16_Poe_Gate_Embedded_Anchorages.pdf PDF
35_50_56_AMENDMENT_0003_2_JUNE_2016.pdf PDF
W911XK-16-R-0003-0003_FY16_Poe_Gate_Embedded_Anchorages.pdf PDF
01_35_13_AMENDMENT_0003_2_JUNE_2016.pdf PDF
Revised_Exhibit_B-_Key_Personnel_Information_ _Consent_Form_.pdf PDF
Revised_Exhibit_A--Performance_Relevancy.pdf PDF
Revised_EXHIBIT_E-_Small_Business_Participation_Plan_(Form).pdf PDF
01_22_00.00_10_amendment_0002_20may2016.pdf PDF
31_00_00_amendment_0002_20may2016.pdf PDF
01_45_00.10_10_amendment_0002_20may2016.pdf PDF
Amendment_0002_shts.pdf PDF
SLYF16_C-101_18_May_2016.pdf PDF
32_13_13.06_amendment_0002_20may2016.pdf PDF
32_11_16_amendment_0002_20may2016.pdf PDF
W911XK-16-R-0003-0002.pdf PDF
Site_Visit_Sign-in_Sheet--W911XK-16-R-0003_.pdf PDF
FY16_Poe_Lock_Embedded_Anchorage_Replacement_Pre-Proposal_Meeting_Presentation.pdf PDF
Poe_MG_Anchorage_Replace_RTA_Specs.pdf PDF
Reference_Drawings_Ready_to_Advertise.pdf PDF
EXHIBIT_E-_Small_Business_Participation_Plan_(Form).pdf PDF
Exhibit_A--Performance_Relevancy.pdf PDF
W911XK-16-R-0003_FY16_Poe_Gate_Embedded_Anchorage_Replacement.pdf PDF
Exhibit_C_-_Past_Performance_Reference_Questionnaire_revised_17_March_2016.pdf PDF
EXHIBIT_D_-_Requirements_of_the_Small_Business_Subcontracting_Plan.pdf PDF
Exhibit_B-_Key_Personnel_Information_ _Consent_Form_.pdf PDF
Poe_MG_Anchorage_Replace_RTA_Plans.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W56MES53289095

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

FY16 Poe Gate Embedded Anchorage Replacement

This amendment is issued to change the time of the pre-proposal conference from 12:30 pm to 1:00 pm Eastern on 17 May 2016. The pre-proposal conference and the site visit are at the same location. The formal site visit w ill immediately follow the pre-proposal Conference. Reference FAR clause 52.236-27 Alt 1 for location and details pertaining to the site visit.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 13-May-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911XK-16-R-0003

X 9B. DATED (SEE ITEM 11)

10-May-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

13-May-2016

CODE

CONTRACTING BRANCH

USACE DETROIT DISTRICT

477 MICHIGAN AVENUE, 7TH FLOOR

DETROIT MI 48226-4523

W911XK 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911XK-16-R-0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been modified:

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for-- May 17, 2016 at 1:00 pm Eastern

(c) Participants will meet at—

Soo Area Office 312 Portage Avenue Sault Ste. Marie, MI 49783-2445

Point of Contact: Brittney Bender Telephone: 906-632-3312 Email: Brittney.J.Bender@usace.army.mil

Note: The site visit will immediately follow the pre-proposal conference.

Contractors attending the site visit are required to wear the following Personal Protection Equipment: Closed steel toe shoes, long pants, shirts with sleeves, hard hats and eye protection. These items will not be provided by the Government. Attendees must give 72 hours notice with the following information so that an adequate security clearance can be obtained to be included on the site visit:

Company Name Full Legal Name (First, Middle, Last) Date of Birth Citizenship Drivers License Number with Expiration Date and State of Issue

(End of provision)

(End of Summary of Changes)

File details come from the government source that posted it. Updated .