01_22_00.00_10_amendment_0002_20may2016.pdf

PDF 15 KB Posted

Attached to
FY16 POE LOCK EMBEDDED GATE ANCHORAGE REPLACMENT
Solicitation number
W911XK-16-R-0003
Issued by

About this file

01 22 00.00 10 amendment 0002

View the file

Other files

File Type Posted
W911XK-16-R-0003-0004_FY16_Poe_Gate_Embedded_Anchorages.pdf PDF
35_50_56_AMENDMENT_0003_2_JUNE_2016.pdf PDF
W911XK-16-R-0003-0003_FY16_Poe_Gate_Embedded_Anchorages.pdf PDF
01_35_13_AMENDMENT_0003_2_JUNE_2016.pdf PDF
Revised_Exhibit_B-_Key_Personnel_Information_ _Consent_Form_.pdf PDF
Revised_Exhibit_A--Performance_Relevancy.pdf PDF
Revised_EXHIBIT_E-_Small_Business_Participation_Plan_(Form).pdf PDF
31_00_00_amendment_0002_20may2016.pdf PDF
01_45_00.10_10_amendment_0002_20may2016.pdf PDF
Amendment_0002_shts.pdf PDF
SLYF16_C-101_18_May_2016.pdf PDF
32_13_13.06_amendment_0002_20may2016.pdf PDF
32_11_16_amendment_0002_20may2016.pdf PDF
W911XK-16-R-0003-0002.pdf PDF
Site_Visit_Sign-in_Sheet--W911XK-16-R-0003_.pdf PDF
FY16_Poe_Lock_Embedded_Anchorage_Replacement_Pre-Proposal_Meeting_Presentation.pdf PDF
W911XK-16-R-0003-0001_FY16_Poe_Gate_Embedded_Anchorage_Replacement.pdf PDF
Poe_MG_Anchorage_Replace_RTA_Specs.pdf PDF
Reference_Drawings_Ready_to_Advertise.pdf PDF
EXHIBIT_E-_Small_Business_Participation_Plan_(Form).pdf PDF
Exhibit_A--Performance_Relevancy.pdf PDF
W911XK-16-R-0003_FY16_Poe_Gate_Embedded_Anchorage_Replacement.pdf PDF
Exhibit_C_-_Past_Performance_Reference_Questionnaire_revised_17_March_2016.pdf PDF
EXHIBIT_D_-_Requirements_of_the_Small_Business_Subcontracting_Plan.pdf PDF
Exhibit_B-_Key_Personnel_Information_ _Consent_Form_.pdf PDF
Poe_MG_Anchorage_Replace_RTA_Plans.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 22 00.00 10

PRICE AND PAYMENT PROCEDURES (AMENDMENT 0002 20 MAY 2016)

PART 1 GENERAL

1.1 SINGLE JOB PAYMENT ITEMS

1.2 UNIT PRICE PAYMENT ITEMS

1.3 BIDDING SCHEDULE

PART 2 PRODUCTS

PART 3 EXECUTION

3.1 CONTRACT COST BREAKDOWN

-- End of Section Table of Contents --

SECTION 01 22 00.00 10 Page 1

SECTION 01 22 00.00 10

PRICE AND PAYMENT PROCEDURES (AMENDMENT 0002 20 MAY 2016)

PART 1 GENERAL

1.1 SINGLE JOB PAYMENT ITEMS

Payment items for the work of this contract for which contract job payments will be made are listed in the BIDDING SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, are included in the listed job item most closely associated with the work involved. The job price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

1.2 UNIT PRICE PAYMENT ITEMS

Payment items for the work of this contract on which the contract unit price payments will be made are listed in the BIDDING SCHEDULE and described below. The unit price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.

1.3 BIDDING SCHEDULE

1.3.1 BONDS. Payment for costs associated with bonds and insurance will be made at the contract job price for "Bonds", as defined in Section 00700.

1.3.2 FABRICATE EMBEDDED ANCHORAGES. Payment for all costs associated with fabricating embedded anchorages, to include but not be limited to, the new anchorage frames, pin plates, anchor rods, anchor rod washers and nuts, pins, bushings, shims, keeper plates, painting, and items incidental thereto, will be made at the contract job price for bid items "Fabricate Embedded Anchorages for Gate 1" and "Fabricate Embedded Anchorages for Gate 3" and optional bid item "Fabricate Embedded Anchorage for Gate 2", as specified herein and as shown on the drawings. No payment will be made until fabricated items have been delivered onsite.

1.3.3 INSTALL EMBEDDED ANCHORAGES. Payment for all costs associated with installing embedded anchorages, including gaskets, seat angle fabrication and installation, concrete, grout, centralizers, shoring and stabilizing gate leaves, removal and reinstallation of linkage assembly, electrical materials and work, and items incidental thereto, will be made at the contract job price for base bid items "Install Embedded Anchorages at Gate 1" and "Install Embedded Anchorages at Gate 3" and optional bid item "Install Embedded Anchorage at Gate 2", as specified herein and as shown on the drawings.

SECTION 01 22 00.00 10 Page 2

1.3.4 ANCHOR DEMONSTRATION TEST. Payment shall constitute full compensation for furnishing all plant, labor, materials, and equipment to perform the anchor demonstration test, which will be made at the contract job price for base bid item "Anchor Demonstration Test", as specified herein and as shown on the drawings.

1.3.5 AGGREGATE ACCESS ROUTE. Payment for all costs associated with constructing the aggregate access route, to include but not limited to, excavation and disposal, aggregate material and placement, and items incidental thereto, will be made at the contract job price for base bid item "Aggregate Access Route", as specified herein and as shown on the drawings.

1.3.6 PAVEMENT ON ACCESS ROUTE. Payment for all costs associated with paving the access route, to include but not limited to, concrete work, aggregate material and placement, and items incidental thereto, will be made at the contract job price for base bid item "Pavement on Access Route", as specified herein and as shown on the drawings.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

3.1 CONTRACT COST BREAKDOWN

The Contractor must furnish within 30 days after the date of Notice to Proceed, and prior to the submission of its first partial payment estimate, a breakdown of its single job pay item or items which will be reviewed by the Contracting Officer as to propriety of distribution of the total cost to the various accounts. Any unbalanced items as between early and late payment items or other discrepancies will be revised by the Contracting Officer to agree with a reasonable cost of the work included in the various items. This contract cost breakdown will then be utilized as the basis for progress payments to the Contractor.

-- End of Section --