Attachment 12 - S-403_0002.pdf

PDF 230 KB Posted

Attached to
Hydraulic System Replacement, Pike Island Locks and Dam
Solicitation number
W911WN23B8005
Issued by

About this file

This solicitation package describes a federal contract opportunity for the replacement of the hydraulic system at Pike Island Locks and Dam. The U.S. Army Corps of Engineers, Pittsburgh District, is seeking a contractor to furnish and install a new four-corner hydraulic system for the Main and Auxiliary Lock Chambers. The project includes new Hydraulic Power Units to be located in six precast buildings, installation of electrical and control systems, demolition and disposal of existing equipment, and removal of hydraulic lines. Construction must be performed with minimal lock closures and in proximity to operating locks and dams. The solicitation number is W911WN23B8005 and the opportunity was posted to the Procedures, Instructions, and Information Exchange system. Responses are due by the date specified on the federal procurement website.

View the file

Other files

File Type Posted
Bid Results List Bid Opening - Pike Island Hydraulic System Replacement.pdf PDF
Attendance Register Bid Opening - Pike Island Hydraulic System Replacement.pdf PDF
Attachment 06 - SF1442 Solicitation - Pike Island Hydraulic System Replacement.pdf PDF
Attachment 05 - LRP Security Information Sheet - CUI (May 22)1.xlsx XLSX spreadsheet
Attachment 11 - Drawing Sheet E-501_0002.pdf PDF
Attachment 10 - BIL Sign Sample and Emblem File Amendment 0002.pdf PDF
Attachment 08 - Tech Section 01 50 10.00 08 Amendment 0002.pdf PDF
Attachment 04 - Wage Determination WV20220073 20220225.pdf PDF
Attachment 05 - BIL Sign Sample and Emblem File Amendment 0002.pdf PDF
Amendment 0002 - Pike Island Hydraulic Systems Replacement.pdf PDF
Attachment 02 - Contract Drawings - Pike Island Hydraulic System Replacement.pdf PDF
Attachment 03 - Reference Drawings - Pike Island Hydraulic System Replacement.pdf PDF
Attachment 07 - Drawing Sheet G-002_0002.pdf PDF
Attachment 06 - Drawing Sheet E-501_0002.pdf PDF
Attachment 09 - Tech Section 02 41 00.00 08 Amendment 0002.pdf PDF
Amendment 0001 - Pike Island Hydraulic Systems Replacement.pdf PDF
Attachment 01 - Technical Specifications - Pike Island Hydraulic System Upgrade.pdf PDF
Sign-In Sheet 20221130 Virtual Site Visit 23B8005_Redacted.pdf PDF
Agenda 20221130 Virtual Pre-Bid Site Visit 23B8005.pdf PDF
Contracting Discussion Pre-Bid SIte Visit 23B8005.pdf PDF
Sign-In Sheet Pre-Bid Site Visit 23B8005_Redacted.pdf PDF
Dept of Labor Resources 23B8005.pdf PDF
Agenda Pre-Bid Site Visit 23B8005.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

L-17

M J

S T

A

.0

A

CABLE TRENCH

EXISTING

S T

A

.0

B M

J

L-19

L-20

CABLE TRENCH

EXISTING

S T

A

.0

B M

J

L-29

L-30

EXISTING CABLE TRENCH

MACHINERY RECESS

EXISTING VALVE

MACHINERY RECESS

EXISTING VALVE

MACHINERY RECESS

EXISTING MITER GATE

L-18

L-30

L-31

S T

A

.0

B M

J

E X

IS

T

IN

G

B U

L K

H E

A D

R E

C E

S S

EXISTING CABLE TRENCH

EXPANSION JOINT

EXPANSION JOINT

EXPANSION JOINT

EXPANSION JOINT

2'-6" 9'-3 3/16 " 2'-6"

2'-6" 2'-8 3/16 "

A1

PLAN - MITER GATE MANIFOLD RECESS

SCALE: 1/4" = 1'

A7

PLAN - VALVE MACHINERY MANIFOLD RECESS AND NEW HPU BUILDING NO. 5

SCALE: 1/4" = 1'

H1

PLAN - VALVE MACHINERY MANIFOLD RECESS

SCALE: 1/4" = 1'

/2

20'-9 11/16 "

1'-9 1/2 "

/1

2'-8 3/16 "

13'-0"

/1

21'-9 11/16 " 1'-9 1/2 "

14'-0"

H7

PLAN - NEW UTILITY ACCESS TRENCH AT NEW HPU BUILDING NO. 6

SCALE: 1/4" = 1'

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

H T

C

O H

IO

R

IV

E

R B

A S

IN

P

IK

E I

S L

A N

D L

O C

K S

A N

D D

A M

H Y

D R

A U

L

IC

S Y

S T

E M

R E

P L

A C

E M

E N

T

P

IT

T S

B U

R G

H D

IS

T

R

IC

T

L

IB

E

R T

Y A

V E

P

IT

T S

B U

R G

H P

A

W W

N B

O C

T O

B E

R

A N

S I

D

GENERAL SHEET NOTES

REPRESENT EXISTING FEATURES.

FEATURES CALLED OUT IN ITALICS AND/OR DISPLAYED IN GRAYSCALE 2.

FOR GENERAL PROJECT ABBREVIATIONS, SEE SHEET G-003.1.

S-401

A1

NORTH

PLAN

0 4' 8'2' S-401

A1

0 4' 8'2'

NORTH

PLAN

SHEET KEYNOTES

DIFFERENTIAL DISPLACEMENT BETWEEN THE MONOLITHS.

COMPRESSIBLE JOINT MATERIAL INSTALLED TO ALLOW FOR

GAPS BETWEEN SUPPORT ANGLES AT MONOLITH JOINTS SHALL HAVE A 4.

DETAIL TYPICAL BUT OPPOSITE ON OPPOSING SIDE OF TRENCH.3.

INFORMATION.

BUILDING. SEE SHEETS S-102 AND S-103 FOR ADDITIONAL

CONCRETE BASE PAD FOR PREFABRICATED PRECAST CONCRETE HPU 2.

FOR CLARITY. SEE TYPICAL SECTIONS ON SHEET S-501.

NEW ALUMINUM PLANKING TRENCH COVER NOT SHOWN IN THIS AREA 1.

LAND WALL MONOLITHS L-17 AND L-18

LAND WALL MONOLITHS L-30 AND L-31

S-401

H1

0 4' 8'2'

NORTH

PLAN

LAND WALL MONOLITHS L-29 AND L-30

AND MANIFOLD RECESS.

THAT WAS DEMOLISHED IN ORDER TO CONSTRUCT THE NEW TRENCH

ORIGINAL SECTION OF REMOVABLE CONCRETE SLAB TRENCH COVER

THIS LOCATION SHALL BE DETERMINED BY THE LOCATION OF THE FINAL

LENGTH OF SUPPORT ANGLE AND ALUMINUM PLANKING REQUIRED AT 1.

TRENCH AND GRATING NOTES

GRATING NOTE 1

SEE TRENCH AND

NO. 5

HPU BUILDING

GRATING NOTE 1

SEE TRENCH AND

PLACES

TYP 2

NO. 6

HPU BUILDING

S-401

H1

0 4' 8'2'

NORTH

PLAN

LAND WALL MONOLITHS L-19 AND L-20

GRATING NOTE 1

SEE TRENCH AND

S-403

P L

A N

S

E N

L A

R G

E D

W O

R K

A R

E A

S

S H

E E

T

O F

S T

R U

C T

U R

A L

A H

E L

F F

R

IC

H

B C

R A

T T

Y

J D

U B

O

IS

G

M E

Y E

R

D R

A W

IN

G

A D

D E

D P

E R

A M

E N

D M

E N

T

J E

N

D E

C

S-501

D7

S-501

D7

S-501

M1

S-502

A8

S-501

H7

S-501

D7

S-501

M1

S-501

A13

S-501

H7

S-502

A8

S-501

M1

S-501

A13

S-501

M1 S-501

H7

S-502

A8

S-502

A8

S-501

H7

File details come from the government source that posted it. Updated .