Attachment 09 - Tech Section 02 41 00.00 08 Amendment 0002.pdf

PDF 48 KB Posted

Attached to
Hydraulic System Replacement, Pike Island Locks and Dam
Solicitation number
W911WN23B8005
Issued by

About this file

This section specification outlines demolition requirements for a hydraulic system replacement project at Pike Island Locks and Dam. The project includes removing the existing central hydraulic system located in the middle wall Operations Building, including all motors, pumps, reservoirs, filters and associated piping. It also requires demolishing and removing all existing central hydraulic oil lines on the river, middle and land walls, including lines for pressure and return to each miter gate and culvert valve cylinder. The specification provides demolition procedures and safety requirements for removing concrete, drilling, cutting and debris removal. It addresses protection of existing structures, disposal of removed materials and environmental controls.

View the file

Other files

File Type Posted
Bid Results List Bid Opening - Pike Island Hydraulic System Replacement.pdf PDF
Attendance Register Bid Opening - Pike Island Hydraulic System Replacement.pdf PDF
Attachment 12 - S-403_0002.pdf PDF
Attachment 06 - SF1442 Solicitation - Pike Island Hydraulic System Replacement.pdf PDF
Attachment 05 - LRP Security Information Sheet - CUI (May 22)1.xlsx XLSX spreadsheet
Attachment 11 - Drawing Sheet E-501_0002.pdf PDF
Attachment 10 - BIL Sign Sample and Emblem File Amendment 0002.pdf PDF
Attachment 08 - Tech Section 01 50 10.00 08 Amendment 0002.pdf PDF
Attachment 04 - Wage Determination WV20220073 20220225.pdf PDF
Attachment 05 - BIL Sign Sample and Emblem File Amendment 0002.pdf PDF
Amendment 0002 - Pike Island Hydraulic Systems Replacement.pdf PDF
Attachment 02 - Contract Drawings - Pike Island Hydraulic System Replacement.pdf PDF
Attachment 03 - Reference Drawings - Pike Island Hydraulic System Replacement.pdf PDF
Attachment 07 - Drawing Sheet G-002_0002.pdf PDF
Attachment 06 - Drawing Sheet E-501_0002.pdf PDF
Amendment 0001 - Pike Island Hydraulic Systems Replacement.pdf PDF
Attachment 01 - Technical Specifications - Pike Island Hydraulic System Upgrade.pdf PDF
Sign-In Sheet 20221130 Virtual Site Visit 23B8005_Redacted.pdf PDF
Agenda 20221130 Virtual Pre-Bid Site Visit 23B8005.pdf PDF
Contracting Discussion Pre-Bid SIte Visit 23B8005.pdf PDF
Sign-In Sheet Pre-Bid Site Visit 23B8005_Redacted.pdf PDF
Dept of Labor Resources 23B8005.pdf PDF
Agenda Pre-Bid Site Visit 23B8005.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pike Island-Hydraulic System Replacement

SECTION TABLE OF CONTENTS

DIVISION 02 - EXISTING CONDITIONS

SECTION 02 41 00.00 08

DEMOLITION

PART 1 GENERAL

1.1 REFERENCES

1.2 PROJECT DESCRIPTION

1.2.1 Demolition Plan

1.2.2 General Requirements

1.3 ITEMS TO REMAIN IN PLACE

1.3.1 Existing Construction Limits and Protection

1.3.2 Utility Service

1.3.3 Facilities

1.4 BURNING

1.5 SUBMITTALS

1.6 QUALITY ASSURANCE

1.6.1 Dust and Debris Control

1.6.2 Waste Management and Disposal

1.7 PROTECTION

1.7.1 Protection of Personnel

1.8 PERSONNEL QUALIFICATIONS

1.8.1 Concrete Removal Worker Qualifications

1.9 DUST CONTROL

1.10 PROTECTION

1.10.1 Protection of Personnel

1.10.2 Protection of Buildings

1.10.3 Protection of Existing Property

1.10.4 Environmental Protection

1.11 RELOCATIONS

1.12 EXISTING CONDITIONS

PART 2 PRODUCTS

PART 3 EXECUTION

3.1 REMOVAL OF MISCELLANEOUS CONCRETE

3.1.1 Equipment

3.1.1.1 Hand-Held Breaker

3.1.1.2 Drilling Equipment

3.1.1.3 Rotary Saws

3.1.2 General

3.1.2.1 Perimeter Saw Cut

3.1.2.2 Preliminary Surface Cleaning

3.1.2.3 Shallow Repairs

3.1.3 Cutting

3.1.3.1 General

3.1.3.2 Diamond-Blade Cutting

3.1.3.3 Diamond-Wire Cutting

SECTION 02 41 00.00 08 Page 1 100% CERTIFIED FINAL (HTC) – W911WN23B8005 Amendment 0002

3.1.3.4 Stitch Drilling

3.1.3.5 Drilling

3.1.4 Impacting

3.1.4.1 Hand-Held Breaker

3.2 DEMOLITION OF HYDRAULIC LINES

3.3 REMOVAL OF DEBRIS IN TRENCHES

3.4 EXISTING FACILITIES TO BE REMOVED

3.4.1 Utilities and Related Equipment

3.4.1.1 General Requirements

3.4.1.2 Disconnecting Existing Utilities

3.4.2 Concrete

3.4.3 Patching

3.4.4 Mechanical Equipment and Fixtures

3.4.4.1 Piping

3.5 DISPOSITION OF MATERIAL

3.5.1 Title to Materials

3.5.2 Salvaged Materials and Equipment

3.5.3 Unsalvageable and Non-Recyclable Material

3.6 CLEANUP

3.7 DISPOSAL OF REMOVED MATERIALS

3.7.1 Regulation of Removed Materials

3.7.2 Removal from Government Property

-- End of Section Table of Contents --

SECTION 02 41 00.00 08 Page 2

SECTION 02 41 00.00 08

DEMOLITION

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

CONCRETE SAWING AND DRILLING ASSOCIATION (CSDA)

CSDA-W-104 (June 1, 1998; R 2007) Track Mounted Wall Sawing

AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)

ASSE/SAFE A10.6 (2006) Safety Requirements for Demolition Operations

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

1.2 PROJECT DESCRIPTION

1.2.1 Demolition Plan

Prepare a Demolition Plan and submit proposed demolition, salvage, and removal procedures for approval before work is started. Include in the plan procedures for careful removal and disposition of materials specified to be salvaged, coordination with other work in progress a detailed description of methods and equipment to be used for each operation and of the sequence of operations. Provide procedures for safe conduct of the work in accordance with EM 385-1-1 . Plan shall be approved by Contracting Officer prior to work beginning. In addition to the demolition plan, the contractor must mark all items to be removed from service and those to remain. Once completed, a walkthrough is required with the government prior to the start of demolition.

1.2.2 General Requirements

Prior to staring work mark all items to be demolished and all items to remain. Perform a walkthrough of the work area with the Contracting Officer or their designated representative to ensure the items are marked appropriately. Do not begin demolition until authorization is received from the Contracting Officer. Remove rubbish and debris from within the cable, pipe and combination trenches; do not allow accumulations. The work includes demolition, salvage of identified items and materials, and removal of resulting rubbish and debris. Remove rubbish and debris from Government property daily, unless otherwise directed. Store materials that cannot be removed daily in areas specified by the Contracting Officer. In the interest of occupational safety and health, perform the work in

SECTION 02 41 00.00 08 Page 3 accordance with EM 385-1-1 , Section 23, Demolition, and other applicable Sections.

1.3 ITEMS TO REMAIN IN PLACE

Take necessary precautions to avoid damage to existing items to remain in place, to be reused, or to remain the property of the Government. Repair or replace damaged items as approved by the Contracting Officer.

Coordinate the work of this section with all other work indicated.

Construct and maintain shoring, bracing, and supports as required. Ensure that structural elements are not overloaded. Increase structural supports or add new supports as may be required as a result of any cutting, removal, deconstruction, or demolition work performed under this contract.

Do not overload structural elements. Repairs, reinforcement, or structural replacement require approval by the Contracting Officer prior to performing such work.

1.3.1 Existing Construction Limits and Protection

Do not disturb existing construction beyond the extent indicated or necessary for installation of new construction. Provide protective measures to control accumulation and migration of dust and dirt in all work areas. Remove dust, dirt, and debris from work areas daily.

1.3.2 Utility Service

Maintain existing utilities indicated to stay in service and protect against damage during demolition and deconstruction operations.

1.3.3 Facilities

Protect electrical and mechanical services and utilities. Where removal of existing concrete is specified or indicated, provide approved barricades, temporary covering of exposed areas, and temporary services or connections for electrical and mechanical utilities.

1.4 BURNING

The use of burning at the project site for the disposal of refuse and debris will not be permitted.

1.5 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Demolition Plan; G , RO Existing Conditions

1.6 QUALITY ASSURANCE

Comply with federal, state, and local hauling and disposal regulations.

In addition to the requirements of Section 00 70 00 CONDITIONS OF THE CONTRACT, FAR 52.236-13 Accident Prevention, conform to the safety

SECTION 02 41 00.00 08 Page 4 requirements contained in ASSE/SAFE A10.6 . Comply with the Environmental Protection Agency requirements specified.

1.6.1 Dust and Debris Control

Prevent the spread of dust and debris and avoid the creation of a nuisance or hazard in the surrounding area. Do not use water if it results in hazardous or objectionable conditions such as, but not limited to, ice, flooding, or pollution.

1.6.2 Waste Management and Disposal

Prepare a water control plan to describe methods and equipment to be used for controlling, collection, treatment and disposal of wastewater from drilling, sawing and other concrete removal operations at least 60 days prior to performance of any operations that produce wastewater. The plan shall include copies of required permits or other evidence of compliance with applicable Federal, State and local laws and regulations. Unless otherwise specified, do not permit concrete and other debris to drop into the river. Collect concrete and/or debris and retain near to its point of removal. Submit the demolition plan describing the method of debris control and removal, and the procedures proposed for the accomplishment of the demolition and removal work. The procedures shall provide for safe conduct of the work, including procedures and methods to provide necessary supports, lateral bracing and shoring when required, careful removal and disposition of materials specified to be salvaged, protection of property which is to remain undisturbed, coordination with other work in progress, and timely disconnection of utility services. The procedures shall include a detailed description of the methods and equipment to be used for each operation, and the sequence of operations in accordance with EM 385-1-1 .

Where applicable, the plan shall include drilling patterns and means of controlling crack propagation. The work plan shall also include an access plan for personnel; and method of controlling, collecting, and removing debris. The method of debris control and removal shall be approved by the Contracting Officer. Dispose of debris in accordance with Section 01 74 19.00 08 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT. Remove all concrete which falls into the river at no additional cost to the Government. Do not permit waste water from surface preparation, cleaning, drilling and cutting operations to directly enter the river. Collect wastewater and treat in accordance with Section 01 57 19.00 08 TEMPORARY

ENVIRONMENTAL CONTROLS.

1.7 PROTECTION

1.7.1 Protection of Personnel

Before, during and after the demolition continuously evaluate the condition of the structure being demolished and take immediate action to protect all personnel working in and around the project site.

1.8 PERSONNEL QUALIFICATIONS

1.8.1 Concrete Removal Worker Qualifications

Each worker engaged in the use of specialized removal or application equipment, including saw operators shall have satisfactorily completed an instruction program in the operation of the equipment. Each worker engaged in the operation of specialized equipment for the contract work shall have a minimum of three years of experience in the operation of the equipment.

SECTION 02 41 00.00 08 Page 5

1.8.2 Structural Survey Consultant

The Contractor shall obtain the services of an independent consultant, subject to approval by the Contracting Officer, to inspect the structural integrity of the adjacent existing dam and new lock structures.

1.9 DUST CONTROL

The amount of dust resulting from demolition shall be controlled to prevent the spread of dust to occupied portions of the construction site and to avoid creation of a nuisance in the surrounding area. Use of water will not be permitted when it will result in, or create, hazardous or objectionable conditions such as ice, flooding and pollution.

1.10 PROTECTION

1.10.1 Protection of Personnel

During the demolition work the Contractor shall continuously evaluate the condition of the structure being demolished and take immediate action to protect all personnel working in and around the demolition site.

1.10.2 Protection of Buildings

Floors, roofs, walls, columns, and other structural components that are designed and constructed to stand without lateral support or shoring, and are determined to be in stable condition, shall remain standing without additional bracing, shoring, or lateral support until demolished, unless directed otherwise by the Contracting Officer. The Contractor shall ensure that no elements determined to be unstable are left unsupported and shall be responsible for placing and securing bracing, shoring, or lateral supports as may be required as a result of any cutting, removal, or demolition work performed under this contract.

1.10.3 Protection of Existing Property

The Contractor shall take all necessary precautions to insure against damage to facilities to remain in place or to remain the property of the Government, including personal property, vehicles, and adjacent properties, and any damage to such work caused by the Contractor's operations, including but not limited to that caused by projectiles, air blast, or ground vibration, shall be repaired or replaced as approved by the Contracting Officer at no additional cost to the Government. The results of the structural surveys will be used to determine damage. The Contractor shall coordinate the work of this section with all other work and shall construct and maintain shoring, bracing, and supports as required. The Contractor shall ensure that structural elements are not overloaded and shall be responsible for increasing structural supports or adding new supports as may be required as a result of any cutting, removal, or demolition work performed under this contract.

1.10.4 Environmental Protection

The work shall comply with the requirements of Section 01 57 19.00 08

TEMPORARY ENVIRONMENTAL CONTROLS.

SECTION 02 41 00.00 08 Page 6

1.11 RELOCATIONS

Perform the removal and reinstallation of relocated items as indicated with workmen skilled in the trades involved. Repair or replace items to be relocated which are damaged by the Contractor with new undamaged items as approved by the Contracting Officer.

1.12 EXISTING CONDITIONS

Before beginning any demolition work, survey the site and examine the drawings and specifications to determine the extent of the work. Record existing conditions in the presence of the Contracting Officer showing the condition of structures and other facilities adjacent to areas of alteration or removal. Photographs sized 4 inch will be acceptable as a record of existing conditions. Include in the record the location and extent of existing cracks and other damage and description of surface conditions that exist prior to starting work. It is the Contractor's responsibility to verify and document all required outages which will be required during the course of work, and to note these outages on the record document. Submit survey results.

PART 2 PRODUCTS

NOT APPLICABLE

PART 3 EXECUTION

3.1 REMOVAL OF MISCELLANEOUS CONCRETE

Demolish portions of existing utility trench cap and parts of the tops of lock walls as indicated on contract drawings. The existing cap consists of precast concrete panels or ad hoc plate sections cut to fit openings.

Remove entire sections when demolishing, leaving partial cap sections is not acceptable. Removal of concrete for modification of the Land Wall, Middle Wall, and River Wall for installation of the hydraulic upgrades, and other minor removal shall be in accordance with the following:

3.1.1 Equipment

Assemble at the site of the work sufficient equipment that is dependable, appropriate and adequate to accomplish the work specified. Deliver the equipment a sufficient time before the start of repairs to permit thorough inspection, calibration of weighing and measuring devices, adjustment of parts, and the making of any repairs that may be required. Machines, tools, and equipment used in the performance of the work shall be approved before the work is started and shall be maintained in satisfactory condition at all times. Maintain the equipment in good working condition.

Provide dust suppression on equipment as needed to comply with Section

01 57 19.00 08 TEMPORARY ENVIRONMENTAL CONTROLS.

3.1.1.1 Hand-Held Breaker

Use 30 pound breaker for removal of concrete above reinforcing steel. Use 15 pound chipping hammer to remove concrete around reinforcing steel.

3.1.1.2 Drilling Equipment

Use percussion or rotary drilling equipment of a type suitable for the depth, diameter and material to be drilled. Use only rotary drilling

SECTION 02 41 00.00 08 Page 7 equipment where vibration from percussion drilling could damage the concrete to remain or adjacent structures. Use equipment capable of maintaining the required alignment.

3.1.1.3 Rotary Saws

Use self-propelled concrete or rock saw with tungsten-carbide tipped blade of sufficient size for the required cut. For vertical cuts, use wall mounted unit or unit mounted on appropriate support equipment. Hand held equipment may be used for perimeter saw cut at removal limits.

3.1.2 General

Prepare a demolition plan describing the methods and equipment to be used to remove existing concrete. Remove the existing concrete in the area to be repaired or modified to the minimum depth indicated with an allowable tolerance of 1 inch and to such additional depth where necessary to expose a surface of sound, unweathered concrete that is uncontaminated by oils, greases, or deicing salts or solutions. The actual depth of removal shall be subject to approval by the Contracting Officer. Remove concrete with care to avoid damage to adjacent structures and concrete that is not to be repaired under this contract and embedded metal that is not to be removed. Repair any such damage at no additional cost to the Government.

Mark on the surface the limits of concrete removal for approval by the Contracting Officer prior to any removal. When encountering miscellaneous metals during demolition efforts, do not remove metal and other embedded items exposed during the concrete removal operations without authorization of the Contracting Officer. Unless otherwise indicated, continue removal using appropriate equipment to remove unsound concrete and to eliminate any offsets in the area to be repaired which would cause an abrupt change in thickness of the repair and to remove protrusions between holes.

Variations in the final prepared surface shall not exceed the nominal maximum size aggregate of the repair material, except for relatively thin repairs in which case the variation shall not exceed 25 percent of the repair thickness. Any removal beyond the limits shown on the drawings shall be approved by the Contracting Officer prior to performing the additional removal. All equipment and removal methods shall comply with applicable sections of EM 385-1-1 .

3.1.2.1 Perimeter Saw Cut

Make a perpendicular saw cut at least 2 inches deep, but no deeper than the reinforcing steel, to delineate the perimeter of the repair area and avoid feather edges. The perimeter saw cut shall have no angles less than 90 degrees. Exercised care not to cut through existing steel reinforcement or embedded metal that is not to be removed. Omit saw-cutting where prohibited by existing metal or other items which are not to be removed. Perform sawing in accordance with CSDA-W-104, except as specified herein. Edges of repaired areas which are not mechanically anchored shall be dove-tailed. Where concrete is being removed from a vertical face by mechanical presplitting, or expansive agents, sawcut the bottom limit of the removal area to the full depth of the removal.

3.1.2.2 Preliminary Surface Cleaning

Clean concrete surfaces that are contaminated with oil, grease or dirt prior to beginning concrete removal in the area. Use detergents, proprietary cleaners formulated for removal of contaminants from concrete, or steam cleaning in accordance with the manufacturer's written

SECTION 02 41 00.00 08 Page 8 instructions. Do not use solvents for removal of oil or grease. All traces of cleaning agents and contaminants shall be removed from the surface.

3.1.2.3 Shallow Repairs

For shallow repairs that do not require reinforcing steel, remove the existing concrete to a minimum depth of 2 inches below the finished surface and to such additional depth where necessary to expose a surface of sound, unweathered concrete that is uncontaminated by oils, greases, or deicing salts or solutions. Remove all loose and deteriorated concrete from the spalled areas indicated.

3.1.3 Cutting

3.1.3.1 General

Use cutting to remove segments of concrete intact or to define the limits of removal by other methods.

3.1.3.2 Diamond-Blade Cutting

Use diamond-blade cutting for cutting through relatively thin sections and defining limits of removal to be performed by other methods. Perform diamond blade cutting using equipment of the correct type and power and with appropriate blade composition for the material being cut. Use a track system for maintaining the alignment of the saw for vertical cuts or where multiple cuts are required for deep cuts. Provide supports as required to support the concrete to be removed. Core drill corners of removal area or use corner saw to avoid overcutting.

3.1.3.3 Diamond-Wire Cutting

Perform diamond wire cutting using equipment of the correct type and power using continuous loop cable with appropriate diamond beads for the material being cut. Core drill holes at corners of removal section to the accuracy required for the wire cutting. Provide supports as required to support the concrete to be removed.

3.1.3.4 Stitch Drilling

Drill overlapping holes of appropriate size along the removal line.

Unless otherwise indicated, drill holes using rotary-percussion or core drilling equipment. Utilize guides as required to maintain alignment.

Provide supports as required to support the concrete to be removed.

3.1.3.5 Drilling

Where necessary, drill through the top of the Middle Wall down to the Gallery using the minimum diameter needed to accommodate the installation of new utilities. Care should be made to avoid reinforcing steel. Unless otherwise indicated, drill holes using rotary-percussion or core drilling equipment.

3.1.4 Impacting

Removal of concrete may be accomplished by use of impact-type power tools. Take adequate precautions to prevent impact equipment from vibrating on reinforcing steel. All demolition equipment shall be subject

SECTION 02 41 00.00 08 Page 9 to approval of the Contracting Officer.

3.1.4.1 Hand-Held Breaker

Use hand-held breakers or chipping hammers for removal of concrete in small or restricted areas, where the energy to be applied is limited to prevent damage to adjacent concrete, structures or facilities which are not to be removed, and to complete removal where other methods have been used.

3.2 DEMOLITION OF HYDRAULIC LINES

Refer to Section 01 35 00.00 08 SPECIAL PROCEDURES, paragraph SEQUENCE OF WORK prior to start of demolition of hydraulic piping. Remove the hydraulic piping on the Middle Wall, River Wall and Land Wall as shown on Drawings Nos. MD101 through MD105. Access to the lines in the Middle Wall is from vertical entry shafts leading to open galleries as shown on the reference drawing. The hydraulic lines on the River Wall and Land Wall are located in a trench at the top of the wall. The hydraulic lines at the miter gates are placed in recesses on the exterior of the lock walls and are accessible from the applicable wall.

The Contractor shall be required to drain and dispose of all hydraulic oil from the hydraulic equipment and remove all hydraulic oil in the hydraulic lines. Cleaning of the lines will not be required. Removal of hydraulic oil shall be in accordance with the applicable provisions of Section 02 81 00.00 08 REMOVAL OF REGULATED AND HAZARDOUS WASTES. In the access galleries, remove the hydraulic piping up to the point to where they are embedded in the concrete lock walls. Cap the ends of the hydraulic piping in the existing.

All piping shall be removed to the extent indicated and disposed of in accordance with Section 01 74 19.00 08 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT. Any piping or conduits which are encased in concrete may remain in the concrete.

3.3 REMOVAL OF DEBRIS IN TRENCHES

Remove the dirt and debris in the River Wall and Land Wall trenches. The debris may be contaminated with hydraulic fluids or other materials and must be disposed in accordance with Section 01 74 19.00 08 CONSTRUCTION

AND DEMOLITION WASTE MANAGEMENT.

3.4 EXISTING FACILITIES TO BE REMOVED

Dismantled and removed materials are to be separated, set aside, and prepared as specified, and stored or delivered to a collection point for reuse, remanufacture, recycling, or other disposal, as specified.

Materials shall be designated for reuse onsite whenever possible.

3.4.1 Utilities and Related Equipment

3.4.1.1 General Requirements

Do not interrupt existing utilities except when authorized in writing by the Contracting Officer. Do not begin demolition or deconstruction work until all utility disconnections have been made. Shut off and cap utilities as indicated.

SECTION 02 41 00.00 08 Page 10

3.4.1.2 Disconnecting Existing Utilities

Remove existing utilities as indicated and terminate in a manner conforming to the nationally recognized code covering the specific utility and approved by the Contracting Officer. When utility lines are encountered but are not indicated on the drawings, notify the Contracting Officer prior to further work in that area.

3.4.2 Concrete

Saw concrete along straight lines to a depth of a minimum 2 inch. Make each cut in walls perpendicular to the face and in alignment with the cut in the opposite face. Break out the remainder of the concrete provided that the broken area is concealed in the finished work, and the remaining concrete is sound. At locations where the broken face cannot be concealed, grind smooth or saw cut entirely through the concrete.

3.4.3 Patching

Where removals leave holes and damaged surfaces exposed in the finished work, patch and repair these holes and damaged surfaces to match adjacent finished surfaces, using on-site materials when available. Where new work is to be applied to existing surfaces, perform removals and patching in a manner to produce surfaces suitable for receiving new work. Finished surfaces of patched area shall be flush with the adjacent existing surface and shall match the existing adjacent surface as closely as possible as to texture and finish. Patching shall be as specified and indicated, and shall include:

a. Concrete and Masonry: Completely fill holes and depressions, left as a result of removals in existing masonry walls to remain, with an approved masonry patching material, applied in accordance with the manufacturer's printed instructions.

3.4.4 Mechanical Equipment and Fixtures

Disconnect mechanical hardware at the nearest connection to existing services to remain, unless otherwise noted. Disconnect mechanical equipment and fixtures at fittings. Remove service valves attached to the unit. Do not remove equipment until approved.

3.4.4.1 Piping

Disconnect piping at unions, flanges and valves, and fittings as required to reduce the pipe into straight lengths for practical storage. Store salvaged piping according to size and type. If the piping that remains can become pressurized due to upstream valve failure, end caps, blind flanges, or other types of plugs or fittings with a pressure gage and bleed valve shall be attached to the open end of the pipe to ensure positive leak control. Carefully dismantle piping that previously contained oil, or other dangerous fluids with precautions taken to prevent injury to persons and property. Classify piping not designated for salvage, or not reusable, as scrap metal.

3.5 DISPOSITION OF MATERIAL

3.5.1 Title to Materials

Except for materials or equipment scheduled for salvage, all materials and

SECTION 02 41 00.00 08 Page 11 equipment removed and not reused or salvaged, shall become the property of the Contractor and shall be removed from Government property. Title to materials resulting from demolition and deconstruction, and materials and equipment to be removed, is vested in the Contractor upon approval by the Contracting Officer of the Contractor's demolition, deconstruction, and removal procedures, and authorization by the Contracting Officer to begin demolition and deconstruction. The Government will not be responsible for the condition or loss of, or damage to, such property after contract award. Showing for sale or selling materials and equipment on site is prohibited.

3.5.2 Salvaged Materials and Equipment

Remove materials and equipment that are indicated and specified to be removed by the Contractor and that are to remain the property of the Government, and deliver to a storage site, as directed by the Contracting Officer.

a. Salvage items and material to the maximum extent possible.

b. Store all materials salvaged for the Contractor as approved by the Contracting Officer and remove from Government property before completion of the contract. On site sales of salvaged material is prohibited.

Items to be salvaged include:

Checkered plate covers over combination trench and cable and pipe trench are to be removed by the Contractor and remain on site at a location directed by the Contracting Officer.

3.5.3 Unsalvageable and Non-Recyclable Material

Dispose of unsalvageable and non-recyclable noncombustible material off the site at a properly permitted solid waste disposal facility which is permitted to accept the particular material being disposed.

3.6 CLEANUP

Remove debris and rubbish from basement and similar excavations. Remove and transport the debris in a manner that prevents spillage on streets or adjacent areas. Apply local regulations regarding hauling and disposal.

3.7 DISPOSAL OF REMOVED MATERIALS

3.7.1 Regulation of Removed Materials

Dispose of debris, rubbish, scrap, and other nonsalvageable materials resulting from removal operations with all applicable federal, state and local regulations as contractually specified. Storage of removed materials on the project site is prohibited.

3.7.2 Removal from Government Property

Transport waste materials removed from demolished and deconstructed structures, except waste soil, from Government property for legal disposal in accordance with Section 01 74 19.00 08 CONSTRUCTION AND DEMOLITION

WASTE MANAGEMENT.

SECTION 02 41 00.00 08 Page 12

-- End of Section --

SECTION 02 41 00.00 08 Page 13

02 41 00.00 08 - DEMOLITION
02 41 00.00 08 - DEMOLITION
PART 1 GENERAL
1.1 REFERENCES
1.2 PROJECT DESCRIPTION
1.2.1 Demolition Plan
1.2.2 General Requirements
1.3 ITEMS TO REMAIN IN PLACE
1.3.1 Existing Construction Limits and Protection
1.3.2 Utility Service
1.3.3 Facilities
1.4 BURNING
1.5 SUBMITTALS
1.6 QUALITY ASSURANCE
1.6.1 Dust and Debris Control
1.6.2 Waste Management and Disposal
1.7 PROTECTION
1.7.1 Protection of Personnel
1.8 PERSONNEL QUALIFICATIONS
1.8.1 Concrete Removal Worker Qualifications
1.9 DUST CONTROL
1.10 PROTECTION
1.10.1 Protection of Personnel
1.10.2 Protection of Buildings
1.10.3 Protection of Existing Property
1.10.4 Environmental Protection
1.11 RELOCATIONS
1.12 EXISTING CONDITIONS
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 REMOVAL OF MISCELLANEOUS CONCRETE
3.1.1 Equipment
3.1.1.1 Hand-Held Breaker
3.1.1.2 Drilling Equipment
3.1.1.3 Rotary Saws
3.1.2 General
3.1.2.1 Perimeter Saw Cut
3.1.2.2 Preliminary Surface Cleaning
3.1.2.3 Shallow Repairs
3.1.3 Cutting
3.1.3.1 General
3.1.3.2 Diamond-Blade Cutting
3.1.3.3 Diamond-Wire Cutting
3.1.3.4 Stitch Drilling
3.1.3.5 Drilling
3.1.4 Impacting
3.1.4.1 Hand-Held Breaker
3.2 DEMOLITION OF HYDRAULIC LINES
3.3 REMOVAL OF DEBRIS IN TRENCHES
3.4 EXISTING FACILITIES TO BE REMOVED
3.4.1 Utilities and Related Equipment
3.4.1.1 General Requirements
3.4.1.2 Disconnecting Existing Utilities
3.4.2 Concrete
3.4.3 Patching
3.4.4 Mechanical Equipment and Fixtures
3.4.4.1 Piping
3.5 DISPOSITION OF MATERIAL
3.5.1 Title to Materials
3.5.2 Salvaged Materials and Equipment
3.5.3 Unsalvageable and Non-Recyclable Material
3.6 CLEANUP
3.7 DISPOSAL OF REMOVED MATERIALS
3.7.1 Regulation of Removed Materials
3.7.2 Removal from Government Property

File details come from the government source that posted it. Updated .