Attachment 08 - Tech Section 01 50 10.00 08 Amendment 0002.pdf

PDF 14 KB Posted

Attached to
Hydraulic System Replacement, Pike Island Locks and Dam
Solicitation number
W911WN23B8005
Issued by

About this file

This document provides specifications for project and safety signs required under a federal construction contract. The contract involves replacing the central hydraulic system at Pike Island Locks and Dam, including new hydraulic power units, stainless steel piping, and control systems. Six precast buildings will house the new hydraulic power units and electrical equipment. Signage must be installed within 15 days per specifications for a project identification sign and safety performance sign made of treated wood, vinyl decals on plywood, and updated daily. The contractor must furnish, install, maintain and remove all signs and complete hydraulic system demolition and replacement work while minimizing lock closures to maintain waterway traffic flow.

View the file

Other files

File Type Posted
Bid Results List Bid Opening - Pike Island Hydraulic System Replacement.pdf PDF
Attendance Register Bid Opening - Pike Island Hydraulic System Replacement.pdf PDF
Attachment 12 - S-403_0002.pdf PDF
Attachment 06 - SF1442 Solicitation - Pike Island Hydraulic System Replacement.pdf PDF
Attachment 05 - LRP Security Information Sheet - CUI (May 22)1.xlsx XLSX spreadsheet
Attachment 11 - Drawing Sheet E-501_0002.pdf PDF
Attachment 10 - BIL Sign Sample and Emblem File Amendment 0002.pdf PDF
Attachment 04 - Wage Determination WV20220073 20220225.pdf PDF
Attachment 05 - BIL Sign Sample and Emblem File Amendment 0002.pdf PDF
Amendment 0002 - Pike Island Hydraulic Systems Replacement.pdf PDF
Attachment 02 - Contract Drawings - Pike Island Hydraulic System Replacement.pdf PDF
Attachment 03 - Reference Drawings - Pike Island Hydraulic System Replacement.pdf PDF
Attachment 07 - Drawing Sheet G-002_0002.pdf PDF
Attachment 06 - Drawing Sheet E-501_0002.pdf PDF
Attachment 09 - Tech Section 02 41 00.00 08 Amendment 0002.pdf PDF
Amendment 0001 - Pike Island Hydraulic Systems Replacement.pdf PDF
Attachment 01 - Technical Specifications - Pike Island Hydraulic System Upgrade.pdf PDF
Sign-In Sheet 20221130 Virtual Site Visit 23B8005_Redacted.pdf PDF
Agenda 20221130 Virtual Pre-Bid Site Visit 23B8005.pdf PDF
Contracting Discussion Pre-Bid SIte Visit 23B8005.pdf PDF
Sign-In Sheet Pre-Bid Site Visit 23B8005_Redacted.pdf PDF
Dept of Labor Resources 23B8005.pdf PDF
Agenda Pre-Bid Site Visit 23B8005.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pike Island-Hydraulic System Replacement

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 50 10.00 08

PROJECT AND SAFETY SIGNS

PART 1 GENERAL

1.1 SUMMARY

1.2 APPLICABLE PUBLICATIONS

1.3 PAYMENT

1.4 1.4 CONSTRUCTION PROJECT SIGNS

1.4.1 Project Identification Sign

1.4.2 Safety Performance Sign

PART 2 PRODUCTS

2.1 MATERIALS

2.1.1 Wood

2.1.2 Sign Face

2.1.3 Fasteners

PART 3 EXECUTION

3.1 INSTALLATION

3.2 MAINTENANCE

-- End of Section Table of Contents --

SECTION 01 50 10.00 08 Page 1 100% CERTIFIED FINAL (HTC) – W911WN23B8005 Amendment 0002

SECTION 01 50 10.00 08

PROJECT AND SAFETY SIGNS

PART 1 GENERAL

1.1 SUMMARY

The work covered by this Section consists of fabricating, erecting and maintaining the Project Identification and Safety Performance signs. The signs shall be installed within 15 calendar days after Notice to Proceed and shall be maintained in good condition throughout the construction period. All items will remain the property of the Contractor and shall be removed at the end of the contract.

1.2 APPLICABLE PUBLICATIONS

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EP 310-1-6a (2006) Sign Standards Manual, Volume 1

1.3 PAYMENT

No separate or direct payment will be made for the items listed in this Section, and such work will be considered as a subsidiary obligation of the Contractor.

1.4 1.4 CONSTRUCTION PROJECT SIGNS

Construction project signs shall be coordinated with the Contracting Officer or designated representative. The signs shall include one Project Identification Sign and one Safety Performance Sign. The layout of all signs shall be in accordance with the standards specified in EP 310-1-6a , (Part 16 attached), the attached Project and Safety Sign Standards, and the requirements specified herein. Relevant portions of the manual are attached.

1.4.1 Project Identification Sign

One project identification sign constructed in accordance with EP 310-1-6a , Section 16., except the layout of the sign shall be as shown on the attached sample Bipartisan Infrastructure Law (BIL) Project Sign Requirements. The following information shall be used for the Project Identification Sign:

Corps relationship to project:

Design and Construction Supervised by:

Division/District

Pittsburgh District

One to three line title to describe work

SECTION 01 50 10.00 08 Page 2

Pike Island Hydraulic System Replacement

One to two line identification of project or name of sponsoring department:

One to five line identification of prime contractors - this information is optional.

1.4.2 Safety Performance Sign

One safety performance sign constructed in accordance with EP 310-1-6a , Section 16. The project title shall be as specified in paragraph Project Identification Sign.

PART 2 PRODUCTS

2.1 MATERIALS

2.1.1 Wood

Wood material for the posts shall be preservative treated, structural grade Douglas Fir or No. 1 Southern Pine, or better. All other wood members shall be of well seasoned, kiln dried, clear redwood, bald cypress, red cedar, Douglas fir, spruce, tulip poplar, or white pine. The lumber materials shall be free of splits, wane, and loose knots or pitch pockets. All members of the sign shall be fastened with screws or bolts of type, size, number, and spacing to provide rigid construction and neat appearance. If the vertical supports system does not rigidly support the sign due to local soil conditions and/or wind loading additional bracing of the sign supports shall be provided. This additional bracing shall be composed of 2" x 4" bracing bolted to the inside face of each 4" x 4" support post and firmly anchored to the ground behind the sign. This additional bracing is not required to be treated lumber. Two-inch x four-inch struts shall be installed between the 4" x 4" support posts to reinforce the top and bottom edges of the sign panels.

2.1.2 Sign Face

The sign faces shall be electronically printed on white non-reflective vinyl decals four mils thick. The sign face decals shall be mounted on panels of 3/4" thick high density overlay exterior plywood with single-sided vinyl facing. The entire circumference of the sign panels will be sealed and protected with white vinyl trim cap. A protective overlaminate film shall be applied over the sign face decals capable of minimizing the deteriorating effects of ultraviolet radiation and providing additional protection against weathering and application of graffiti. The BIL symbol is shown on the attached BIL Emblem Guide.

2.1.3 Fasteners

All bolts shall be 0.375" diameter and 4" long Allen head bolts, threaded to match T-nuts.

SECTION 01 50 10.00 08 Page 3

PART 3 EXECUTION

3.1 INSTALLATION

The Contractor shall affix the panels to the posts with the Allen head bolts prior to erection of the signs, including drilling counter-sunk

0.375 inch diameter holes in the posts to match the T-nut locations. The Contractor shall take all precautions necessary to protect the faces of the signs from damage during assembly and construction. The signs shall be installed upon commencement of the work under this contract. The location in which each sign is to be installed shall be cleared and leveled to facilitate the installation of, and provide easy visual contact with, the signs. Installation and positioning of the sign plate and posts shall be as indicated on EP 310-1-6a , Part 16, attached. Excavation and backfilling of the holes for posts and installation of the posts, braces, and stakes shall be such that signs are installed plumb and level.

3.2 MAINTENANCE

The Contractor shall maintain the signs in good condition and the sign site in a neat condition throughout the construction period. The safety performance record shall be updated daily.

-- End of Section --

SECTION 01 50 10.00 08 Page 4

01 50 10.00 08 - PROJECT AND SAFETY SIGNS
01 50 10.00 08 - PROJECT AND SAFETY SIGNS
PART 1 GENERAL
1.1 SUMMARY
1.2 APPLICABLE PUBLICATIONS
1.3 PAYMENT
1.4 1.4 CONSTRUCTION PROJECT SIGNS
1.4.1 Project Identification Sign
1.4.2 Safety Performance Sign
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Wood
2.1.2 Sign Face
2.1.3 Fasteners
PART 3 EXECUTION
3.1 INSTALLATION
3.2 MAINTENANCE

File details come from the government source that posted it. Updated .