Amendment 0002 - Pike Island Hydraulic Systems Replacement.pdf

PDF 367 KB Posted

Attached to
Hydraulic System Replacement, Pike Island Locks and Dam
Solicitation number
W911WN23B8005
Issued by

About this file

This amendment modifies a solicitation for a hydraulic system replacement project at Pike Island Locks and Dam. The modification adds signage requirements to comply with the Bipartisan Infrastructure Law, revises technical specifications for demolition work, and adds drawings.

The amendment requires the awarded contractor to design and display signage at the worksite per the attached Bipartisan Infrastructure Law template. It revises the demolition specification section to remove a structural survey requirement. Additionally, drawing revisions include updating notes to specify the correct manufacturer on a plan sheet and adding a new drawing sheet to the set. The bid receipt deadline of December 15, 2022 at 11:00 AM EST is unchanged by this amendment.

View the file

Other files

File Type Posted
Bid Results List Bid Opening - Pike Island Hydraulic System Replacement.pdf PDF
Attendance Register Bid Opening - Pike Island Hydraulic System Replacement.pdf PDF
Attachment 12 - S-403_0002.pdf PDF
Attachment 06 - SF1442 Solicitation - Pike Island Hydraulic System Replacement.pdf PDF
Attachment 05 - LRP Security Information Sheet - CUI (May 22)1.xlsx XLSX spreadsheet
Attachment 11 - Drawing Sheet E-501_0002.pdf PDF
Attachment 10 - BIL Sign Sample and Emblem File Amendment 0002.pdf PDF
Attachment 08 - Tech Section 01 50 10.00 08 Amendment 0002.pdf PDF
Attachment 04 - Wage Determination WV20220073 20220225.pdf PDF
Attachment 05 - BIL Sign Sample and Emblem File Amendment 0002.pdf PDF
Attachment 02 - Contract Drawings - Pike Island Hydraulic System Replacement.pdf PDF
Attachment 03 - Reference Drawings - Pike Island Hydraulic System Replacement.pdf PDF
Attachment 07 - Drawing Sheet G-002_0002.pdf PDF
Attachment 06 - Drawing Sheet E-501_0002.pdf PDF
Attachment 09 - Tech Section 02 41 00.00 08 Amendment 0002.pdf PDF
Amendment 0001 - Pike Island Hydraulic Systems Replacement.pdf PDF
Attachment 01 - Technical Specifications - Pike Island Hydraulic System Upgrade.pdf PDF
Sign-In Sheet 20221130 Virtual Site Visit 23B8005_Redacted.pdf PDF
Agenda 20221130 Virtual Pre-Bid Site Visit 23B8005.pdf PDF
Contracting Discussion Pre-Bid SIte Visit 23B8005.pdf PDF
Sign-In Sheet Pre-Bid Site Visit 23B8005_Redacted.pdf PDF
Dept of Labor Resources 23B8005.pdf PDF
Agenda Pre-Bid Site Visit 23B8005.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Hydraulic System Replacement, Ohio River, Pike Island Locks and Dam

The purpose of this amendment is to: 1) Add Section 01 50 10.00 08, revise Section 02 41 00.00 08, and add the BIL Sign Sample and Emblem file to the Technical Specifications and 2) Revise Draw ing Sheet E-501 and add Draw ing Sheet G-002.

The hour and date specified for receipt of bids remains unchanged, 11:00 AM EST on 15 December 2022.

Details are specified in the Summary of Changes of this Amendment.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 12-Dec-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911WN23B8005

X 9B. DATED (SEE ITEM 11)

15-Nov-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-Dec-2022

CODE

U.S. ARMY ENGINEER DISTRICT, PITTSBURGH

ATTN CELRP-CT

W S MOORHEAD FEDERAL BUILDING

1000 LIBERTY AVENUE ROOM 2203

PITTSBURGH PA 15222-4186

W911WN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911WN23B8005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0002

Reference: Technical Specifications, Pike Island Locks and Dam, Hydraulic System Replacement, Certified Final October 2022 (Attachment 1 to the Solicitation)

The following Section is being added and is attached to this amendment, 01 50 10.00 08 PROJECT AND SAFETY SIGNS

The following Section is being revised and is attached to this amendment, 02 41 00.00 08 DEMOLITION

Paragraph 1.8.2 Structural Survey Consultant has been deleted in its entirety.

The following is being added as an Attachment to the Specifications and is attached to this amendment, Bipartisan Infrastructure Law (BIL) BIL Sign and Emblem Template (3 pages)

To be in compliance with the BIL, the attached template requirement for signage displayed shall be designed and displayed by the awarded contractor at the work site.

Reference: Contract Drawings, Pike Island Locks and Dam, Hydraulic System Replacement, Certified Final June 2022 (Attachment 2 to the Solicitation)

The following sheet has been revised and is attached to this amendment, Sheet E-501 Updated General Note #2 with the correct manufacturer.

The following sheet is being added and is attached to this amendment, Sheet G-002 shown in the Contract Drawing Index of Sheet of Sheet S-403 is being added to the Plan Set.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .