DESCRIPTION OF PROJECT

Move DVRs from communications rooms to a designated closet at the main CQ area at Buildings 3105, 3210, 3240, 3305

WORK REQUIREMENTS

1. The Contractor shall furnish all labor, material, and equipment to move the DVRs in the communications rooms to a designated closet at the main charge of quarters (CQ) desk in buildings 3105, 3210, 3240, 3305.

2. The contractor shall move the DVR recorders to the closet at the CQ and install in a secured lockable cage with two shelves that is bolted to the wall and floor.

3. The contractor shall supply a 110 volt electrical supply at each location for the DVRs.

4. The contractor shall verify that the equipment is recording and operational after moving.

APPLICABLE SPECIFICATIONS

1. National Electrical Code

2. EIA/TIA 568-B.2-1 Category 6 Specifications

3. IEE802.3/5/12Voice,ISDN, ATM 155 and 622

4. UL listed

5. UL 1685CM

6. Support network protocol 802.3 and IETF Standards10/100 Base-T Ethernet, SUBMITTALS

1. After Award of Purchase Order:

a. Performance Schedule

b. Equipment Submittals