AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
a. Solicitation is not extended. Bid opening is scheduled for 14 June 2018, 2:00 PM EST.
b. This amendment provides follow -up answ ers to question #3 and question #12.
c. Contract Line Iem Numbers (CLIN)s 0014, 1013, 2013, 3013 and 4014 are added to the solicitation.
1. CONTRACT ID CODE PAGE OF PAGES
1 61
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-Jun-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911SF-16-B-0006
X 9B. DATED (SEE ITEM 11)
29-Jul-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Jun-2018
CODE
MISSION & INSTALLATION CONTRACTING CMD
6650 MELOY DRIVE
BLDG 6, SUITE 250
FORT BENNING GA 31905
W911SF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911SF-16-B-0006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SUPPLIES OR SERVICES AND PRICES
CLIN 0007
The CLIN extended description has changed from:
Provide and Collect additional (30) 20 CY roll-off open top solid waste containers as ordered.
Service and transport to disposal facility. Containers shall not exceed 85% capacity. IAW para
3.4.7.4 of the PWS.
To:
Provide and Collect additional 20 CY roll-off open top solid waste containers as ordered. Service and transport to disposal facility. Containers shall not exceed 85% capacity. IAW para 3.4.7.4 of the PWS.
The pricing detail quantity has increased by 190.00 from 10.00 to 200.00.
CLIN 0008
Provide and Collect additional (15) 40 CY roll-off open top solid waste containers as ordered.
Provide and Collect additional 40 CY roll-off open top solid waste containers as ordered. Service and transport to disposal facility. Containers shall not exceed 85% capacity. IAW para 3.4.7.4 of the PWS.
The pricing detail quantity has increased by 190.00 from 10.00 to 200.00.
CLIN 0009
Provide and Collect additional (10) 35 CY compactors as ordered. Service and transport to disposal facility. Containers shall not exceed 85% capacity. IAW para 3.4.7.4 of the PWS.
Provide and Collect additional 35 CY compactors as ordered. Service and transport to disposal facility. Containers shall not exceed 85% capacity. IAW para 3.4.7.4 of the PWS.
The pricing detail quantity has increased by 70.00 from 10.00 to 80.00.
CLIN 0014
The CLIN type priced has been added.
The CLIN description has changed from CLIN NOT USED to ADDITIONAL 8CY
CONTAINERS.
Provide and Collect additonal eight CY bulk waste containers, service and transport to disposal facility. Empty containers at least once a week. Containers should not exceed 85% capacity.
IAW Para 3.4.7.4 of the PWS The pricing detail quantity 80.00 has been added.
The unit of issue Each has been added.
The FOB Destination has been added.
The PSC code S205 has been added.
The PROG code S10 has been added.
The WSC Equipment code 000 has been added.
The NAICS code 562111 has been added.
The MDAP/MAIS Code 000 has been added.
CLIN 1006
Provide and Collect additional (30) 20 CY roll-off open top solid waste containers as ordered.
and transport to disposal facility. Containers shall not exceed 85% capacity. IAW para 3.4.7.4 of the PWS.
The pricing detail quantity has increased by 238.00 from 12.00 to 250.00.
CLIN 1007
Provide and Collect additional (15) 40 CY roll-off open top solid waste containers as ordered.
and transport to disposal facility. Containers shall not exceed 85% capacity. IAW para 3.4.7.4 of the PWS.
CLIN 1008
facility. Containers shall not exceed 85% capacity. IAW para 3.4.7.4 of the PWS.
The pricing detail quantity has increased by 88.00 from 12.00 to 100.00.
CLIN 1013
The CLIN description has changed from CLIN NOT USED to ADDITIONAL 8CY
Provide and Collect additional eight CY bulk waste containers, service and transport to disposal facility. Empty containers at least once a week. Containers should not exceed 85% capacity.
IAW Para 3.4.7.4 of the PWS The pricing detail quantity 80.00 has been added.
The unit of issue Each has been added.
The FOB Destination has been added.
The PSC code S205 has been added.
The PROG code S10 has been added.
The WSC Equipment code 000 has been added.
CLIN 2006
Provide and Collect additional (30) 20 CY roll-off open top solid waste containers as ordered.
and transport to disposal facility. Containers shall not exceed 85% capacity. IAW para 3.4.7.4 of the PWS.
CLIN 2007
Provide and Collect additional (15) 40 CY roll-off open top solid waste containers as ordered.
and transport to disposal facility. Containers shall not exceed 85% capacity. IAW para 3.4.7.4 of the PWS.
CLIN 2008
facility. Containers shall not exceed 85% capacity. IAW para 3.4.7.4 of the PWS.
CLIN 2013
The CLIN description has changed from CLIN NOT USED to ADDITIONAL 8CY facility. Empty containers at least once a week. Containers should not exceed 85% capacity.
IAW Para 3.4.7.4 of the PWS The pricing detail quantity 80.00 has been added.
The unit of issue Each has been added.
The FOB Destination has been added.
The PSC code S205 has been added.
The PROG code S10 has been added.
The WSC Equipment code 000 has been added.
CLIN 3006
Provide and Collect additional (30) 20 CY roll-off open top solid waste containers as ordered.
and transport to disposal facility. Containers shall not exceed 85% capacity. IAW para 3.4.7.4 of the PWS.
CLIN 3007
Provide and Collect additional (15) 40 CY roll-off open top solid waste containers as ordered.
and transport to disposal facility. Containers shall not exceed 85% capacity. IAW para 3.4.7.4 of the PWS.
CLIN 3008
facility. Containers shall not exceed 85% capacity. IAW para 3.4.7.4 of the PWS.
CLIN 3013
The CLIN description has changed from CLIN NOT USED to ADDITIONAL 8CY facility. Empty containers at least once a week. Containers should not exceed 85% capacity.
IAW Para 3.4.7.4 of the PWS The pricing detail quantity 80.00 has been added.
The unit of issue Each has been added.
The FOB Destination has been added.
The PSC code S205 has been added.
The PROG code S10 has been added.
The WSC Equipment code 000 has been added.
CLIN 4006
Provide and Collect additional (30) 20 CY roll-off open top solid waste containers as ordered.
and transport to disposal facility. Containers shall not exceed 85% capacity. IAW para 3.4.7.4 of the PWS.
CLIN 4007
Provide and Collect additional (15) 40 CY roll-off open top solid waste containers as ordered.
and transport to disposal facility. Containers shall not exceed 85% capacity. IAW para 3.4.7.4 of the PWS.
CLIN 4008
facility. Containers shall not exceed 85% capacity. IAW para 3.4.7.4 of the PWS.
CLIN 4014
The CLIN description has changed from CLIN NOT USED to ADDITONAL 8CY
Provide and Collect additonal eight CY bulk waste containers, service and transport to disposal facility. Empty containers at least once a week. Containers should not exceed 85% capacity.
IAW Para 3.4.7.4 of the PWS The pricing detail quantity 80.00 has been added.
The unit of issue Each has been added.
The FOB Destination has been added.
The PSC code S205 has been added.
The PROG code S10 has been added.
The WSC Equipment code 000 has been added.
DELIVERIES AND PERFORMANCE
The following Delivery Schedule item for CLIN 0007 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
POP 25-JUL-2018 TO
31-MAY-2019
N/A DPW ENGINEERING DIV
CARL C. FARRAR
ENGINEERING AND SVCS BR
BLDG 6 ROOM 320
FT BENNING GA 31905
706-545-2678 FOB: Destination
W909H3
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
POP 25-JUL-2018 TO
31-MAY-2019
N/A DPW ENGINEERING DIV
CARL C. FARRAR
ENGINEERING AND SVCS BR
BLDG 6 ROOM 320
FT BENNING GA 31905
706-545-2678
The following Delivery Schedule item for CLIN 0008 has been changed from:
CAGE
POP 25-JUL-2018 TO
31-MAY-2019
N/A DPW ENGINEERING DIV
CARL C. FARRAR
ENGINEERING AND SVCS BR
BLDG 6 ROOM 320
FT BENNING GA 31905
706-545-2678
CAGE
POP 25-JUL-2018 TO
31-MAY-2019
N/A DPW ENGINEERING DIV
CARL C. FARRAR
ENGINEERING AND SVCS BR
BLDG 6 ROOM 320
FT BENNING GA 31905
706-545-2678
The following Delivery Schedule item for CLIN 0009 has been changed from:
CAGE
POP 25-JUL-2018 TO
31-MAY-2019
N/A DPW ENGINEERING DIV
CARL C. FARRAR
ENGINEERING AND SVCS BR
BLDG 6 ROOM 320
FT BENNING GA 31905
706-545-2678
CAGE
POP 25-JUL-2018 TO
31-MAY-2019
N/A DPW ENGINEERING DIV
CARL C. FARRAR
ENGINEERING AND SVCS BR
BLDG 6 ROOM 320
FT BENNING GA 31905
706-545-2678
The following Delivery Schedule for CLIN 0014 has been added:
CAGE
POP 25-JUL-2018 TO
31-MAY-2019
N/A DPW ENGINEERING DIV
CARL C. FARRAR
ENGINEERING AND SVCS BR
BLDG 6 ROOM 320
FT BENNING GA 31905
706-545-2678
The following Delivery Schedule item for CLIN 1006 has been changed from:
CAGE
POP 01-JUN-2019 TO
31-MAY-2020
N/A DPW ENGINEERING DIV
CARL C. FARRAR
ENGINEERING AND SVCS BR
BLDG 6 ROOM 320
FT BENNING GA 31905
706-545-2678
CAGE
POP 01-JUN-2019 TO
31-MAY-2020
N/A DPW ENGINEERING DIV
CARL C. FARRAR
ENGINEERING AND SVCS BR
BLDG 6 ROOM 320
FT BENNING GA 31905
706-545-2678
The following Delivery Schedule item for CLIN 1007 has been changed from:
CAGE
POP 01-JUN-2019 TO
31-MAY-2020
N/A DPW ENGINEERING DIV
CARL C. FARRAR
ENGINEERING AND SVCS BR
BLDG 6 ROOM 320
FT BENNING GA 31905
706-545-2678
CAGE
POP 01-JUN-2019 TO
31-MAY-2020
N/A DPW ENGINEERING DIV
CARL C. FARRAR
ENGINEERING AND SVCS BR
BLDG 6 ROOM 320
FT BENNING GA 31905
706-545-2678
The following Delivery Schedule item for CLIN 1008 has been changed from:
CAGE
POP 01-JUN-2019 TO
31-MAY-2020
N/A DPW ENGINEERING DIV
CARL C. FARRAR
ENGINEERING AND SVCS BR
BLDG 6 ROOM 320
FT BENNING GA 31905
706-545-2678
CAGE
POP 01-JUN-2019 TO
31-MAY-2020
N/A DPW ENGINEERING DIV
CARL C. FARRAR
ENGINEERING AND SVCS BR
BLDG 6 ROOM 320
FT BENNING GA 31905
706-545-2678
The following Delivery Schedule for CLIN 1013 has been added:
CAGE
POP 01-JUN-2019 TO
31-MAY-2020
N/A DPW ENGINEERING DIV
CARL C. FARRAR
ENGINEERING AND SVCS BR
BLDG 6 ROOM 320
FT BENNING GA 31905
706-545-2678
The following Delivery Schedule item for CLIN 2006 has been changed from:
CAGE
POP 01-JUN-2020 TO
31-MAY-2021
N/A DPW ENGINEERING DIV
CARL C. FARRAR
ENGINEERING AND SVCS BR
BLDG 6 ROOM 320
FT BENNING GA 31905
706-545-2678
CAGE
POP 01-JUN-2020 TO
31-MAY-2021
N/A DPW ENGINEERING DIV
CARL C. FARRAR
ENGINEERING AND SVCS BR
BLDG 6 ROOM 320
FT BENNING GA 31905
706-545-2678
The following Delivery Schedule item for CLIN 2007 has been changed from:
POP 01-JUN-2020 TO
31-MAY-2021
N/A DPW ENGINEERING DIV
CARL C. FARRAR
ENGINEERING AND SVCS BR
BLDG 6 ROOM 320
FT BENNING GA 31905
706-545-2678
CAGE
POP 01-JUN-2020 TO
31-MAY-2021
N/A DPW ENGINEERING DIV
CARL C. FARRAR
ENGINEERING AND SVCS BR
BLDG 6 ROOM 320
FT BENNING GA 31905
706-545-2678
The following Delivery Schedule item for CLIN 2008 has been changed from:
CAGE
POP 01-JUN-2020 TO
31-MAY-2021
N/A DPW ENGINEERING DIV
CARL C. FARRAR
ENGINEERING AND SVCS BR
BLDG 6 ROOM 320
FT BENNING GA 31905
706-545-2678
CAGE
POP 01-JUN-2020 TO
31-MAY-2021
N/A DPW ENGINEERING DIV
CARL C. FARRAR
ENGINEERING AND SVCS BR
BLDG 6 ROOM 320
FT BENNING GA 31905
706-545-2678
The following Delivery Schedule for CLIN 2013 has been added:
POP 01-JUN-2020 TO
31-MAY-2021
N/A DPW ENGINEERING DIV
CARL C. FARRAR
ENGINEERING AND SVCS BR
BLDG 6 ROOM 320
FT BENNING GA 31905
706-545-2678
The following Delivery Schedule item for CLIN 3006 has been changed from:
CAGE
POP 01-JUN-2021 TO
31-MAY-2022
N/A DPW ENGINEERING DIV
CARL C. FARRAR
ENGINEERING AND SVCS BR
BLDG 6 ROOM 320
FT BENNING GA 31905
706-545-2678
CAGE
POP 01-JUN-2021 TO
31-MAY-2022
N/A DPW ENGINEERING DIV
CARL C. FARRAR
ENGINEERING AND SVCS BR
BLDG 6 ROOM 320
FT BENNING GA 31905
706-545-2678
The following Delivery Schedule item for CLIN 3007 has been changed from:
CAGE
POP 01-JUN-2021 TO
31-MAY-2022
N/A DPW ENGINEERING DIV
CARL C. FARRAR
ENGINEERING AND SVCS BR
BLDG 6 ROOM 320
FT BENNING GA 31905
706-545-2678
POP 01-JUN-2021 TO
31-MAY-2022
N/A DPW ENGINEERING DIV
CARL C. FARRAR
ENGINEERING AND SVCS BR
BLDG 6 ROOM 320
FT BENNING GA 31905
706-545-2678
The following Delivery Schedule item for CLIN 3008 has been changed from:
CAGE
POP 01-JUN-2021 TO
31-MAY-2022
N/A DPW ENGINEERING DIV
CARL C. FARRAR
ENGINEERING AND SVCS BR
BLDG 6 ROOM 320
FT BENNING GA 31905
706-545-2678
CAGE
POP 01-JUN-2021 TO
31-MAY-2022
N/A DPW ENGINEERING DIV
CARL C. FARRAR
ENGINEERING AND SVCS BR
BLDG 6 ROOM 320
FT BENNING GA 31905
706-545-2678
The following Delivery Schedule for CLIN 3013 has been added:
CAGE
POP 01-JUN-2021 TO
31-MAY-2022
N/A DPW ENGINEERING DIV
CARL C. FARRAR
ENGINEERING AND SVCS BR
BLDG 6 ROOM 320
FT BENNING GA 31905
706-545-2678
The following Delivery Schedule item for CLIN 4006 has been changed from:
POP 01-JUN-2022 TO
31-MAY-2023
N/A DPW ENGINEERING DIV
CARL C. FARRAR
ENGINEERING AND SVCS BR
BLDG 6 ROOM 320
FT BENNING GA 31905
706-545-2678
CAGE
POP 01-JUN-2022 TO
31-MAY-2023
N/A DPW ENGINEERING DIV
CARL C. FARRAR
ENGINEERING AND SVCS BR
BLDG 6 ROOM 320
FT BENNING GA 31905
706-545-2678
The following Delivery Schedule item for CLIN 4007 has been changed from:
CAGE
POP 01-JUN-2022 TO
31-MAY-2023
N/A DPW ENGINEERING DIV
CARL C. FARRAR
ENGINEERING AND SVCS BR
BLDG 6 ROOM 320
FT BENNING GA 31905
706-545-2678
CAGE
POP 01-JUN-2022 TO
31-MAY-2023
N/A DPW ENGINEERING DIV
CARL C. FARRAR
ENGINEERING AND SVCS BR
BLDG 6 ROOM 320
FT BENNING GA 31905
706-545-2678
The following Delivery Schedule item for CLIN 4008 has been changed from:
CAGE
POP 01-JUN-2022 TO
31-MAY-2023
N/A DPW ENGINEERING DIV
CARL C. FARRAR
ENGINEERING AND SVCS BR
BLDG 6 ROOM 320
FT BENNING GA 31905
706-545-2678
CAGE
POP 01-JUN-2022 TO
31-MAY-2023
N/A DPW ENGINEERING DIV
CARL C. FARRAR
ENGINEERING AND SVCS BR
BLDG 6 ROOM 320
FT BENNING GA 31905
706-545-2678
The following Delivery Schedule for CLIN 4014 has been added:
CAGE
POP 01-JUN-2022 TO
31-MAY-2023
N/A DPW ENGINEERING DIV
CARL C. FARRAR
ENGINEERING AND SVCS BR
BLDG 6 ROOM 320
FT BENNING GA 31905
706-545-2678
INSPECTION AND ACCEPTANCE
The Acceptance/Inspection Schedule for CLIN 0014 has been changed from:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
N/A N/A N/A N/A
To:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
Destination Government Destination Government
The Acceptance/Inspection Schedule for CLIN 1013 has been changed from:
N/A N/A N/A N/A
The Acceptance/Inspection Schedule for CLIN 2013 has been changed from:
N/A N/A N/A N/A
To:
The Acceptance/Inspection Schedule for CLIN 3013 has been changed from:
N/A N/A N/A N/A
To:
The Acceptance/Inspection Schedule for CLIN 4014 has been changed from:
N/A N/A N/A N/A
To:
The following have been modified:
PERFORMANCE WORK STATEMENT
1.0 INTRODUCTION. This is a non-personal services contract to provide Solid Waste Management. The Government will not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, training, and other items and non-personal services necessary for solid waste management services at Fort Benning, Georgia. The Contractor shall perform to the standards specified in this PWS.
1.1 Background. Fort Benning, is located in the states of Georgia and Alabama neighboring Columbus Georgia and Phenix City, Alabama. Fort Benning consists of approximately 184,000 acres. The population base consists of approximately 120,000 military and Government civilian and Contractor personnel, as well as, resident family members. Refuse collection services are required on every Army Installation. This PWS outlines the current requirements at Fort Benning,. This contract provides for refuse collection services throughout Fort Benning. These areas includes, Main Post, Kelley Hill, Harmony Church, Sand Hill, and other training areas located at Fort Benning.
1.2 Objectives. This contract supports the Installation’s initiative to adopt the Net Zero hierarchy, and progressively increase the solid waste diversion rates until achieving zero landfill waste disposal. This goal is also identical to the Army’s Net Zero Waste program goal. The contractor shall work to reduce quantities of material disposed of in landfills by increasing diversion by any legal process that avoids landfill disposal. The contractor is encouraged to utilize best management practices, innovation, and partnering with the Installation and offer the most cost effective service to the government in the performance of this contract to maximize diversion.
The Contractor shall compile historical data, prepare required reports, and submit information as specified by the Contract Data Requirements Lists (CDRLs) or Deliverables presented in the contract. The Contractor shall ensure all work in support of mission requirements tendered to the Government for acceptance conform to the measurable performance standards of quality, timeliness, and quantity specified in the PWS of this contract.
1.3 Climatic Conditions. The average annual rainfall is 37 inches; with the wettest months particularly April through July. The average annual maximum and minimum temperatures are approximately 65 and 45 degrees Fahrenheit, respectively. Monthly normal temperatures ranged from a low of 23 degrees in January to a high of 86 degrees in July.
2.0 REQUIREMENTS.
2.1 General.
2.1.1 Scope. The Contractor shall furnish all supervision, labor, tools, vehicles, materials, quality control, equipment required to collect, transport divert, and dispose of all refuse materials at a off post, to include refuse, and from the locations listed in TE-3 Tabs 1 and 2. The Contractor shall not co-mingle and transport MSW refuse with off-post generated MSW refuse.
All solid waste generated (excluding regulated medical or hazardous waste) is to be collected, transported and disposed of and/or delivered in accordance with (IAW) all terms, conditions and standards of this PWS. The Contractor shall collect and transport refuse materials as specified.
The Contractor shall comply with all local, state and federal controls, regulations, and laws as applicable to the service provided. All refuse material must be weighed on trucks, recorded, and submitted to KO or designated Government representative. The Contractor shall obtain such permits, bonds, licenses, insurance or other authorizations as may be required by this PWS.
2.1.2 Description of Services. The Contractor shall empty refuse containers, compacters and roll-off a minimum of once a week or when they are at 85% capacity. The Contractor shall track container weights and number of services per week for reporting. The contractor shall perform schedule routes for pick-up and respond to calls for service when dumpsters reach full before scheduled pick up.
2.1.2.1 Non-Personal Services. The personnel rendering the services are not subject; either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees. Non-personal service contracts are authorized by the Government in accordance with FAR 37.104, under general contracting authority, and do not require specific statutory authorization.
2.1.3 General Information.
2.1.3.1 Ordering Periods. The ordering period consists of base ordering period and four optional ordering periods.
Phase-in Period 06/25/2018 - 07/24/2018 Base Ordering Period 07/25/2018 - 05/31/2019 Optional Ordering Period I 06/01/2019 - 05/31/2020 Optional Ordering Period II 06/01/2020 - 05/31/2021 Optional Ordering Period III 06/01/2021 - 05/31/2022 Optional Ordering Period IV 06/01/2022 - 05/31/2023 Phase-out Period 05/01/2023 - 05/31/2023
2.1.4 Place of Performance and Hours of Operation.
2.1.4.1 Place of Performance. The work to be performed under this contract will be performed at the locations listed in Technical Exhibit (TE) 03.
2.1.4.2 Hours of Operation. The Government's regular (normal) hours are from 7:00 AM to 6:00 PM, Monday through Saturday, except Federal Holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor is responsible for conducting business between these hours.
2.1.5 Federal Holidays. The Contractor’s performance shall not be required on the legal public holidays listed below. Holidays occurring on weekends will be observed as directed by the published Army calendar.
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day
2.1.5.1 The Contractor shall provide personnel support within two hours of notification outside the normal hours of operation as required, including holidays, to support the Directorate of Public Works (DPW) mission. Prior to performance of services outside the locally established hours of operation, the Contractor shall request and obtain, in writing, approval from the Contracting Officer (KO). The Program/Project Manager or the Alternate Project Manager shall be available after normal duty hours to serve as the central point of contact for Contractor operations. Contractor personnel shall not be scheduled for overtime work.
2.1.6 Travel/Temporary Duty. N/A
2.1.7 Emergency Services. (As required.)
2.1.7.1 The Contractor or their employees shall immediately notify their supervisor of any accident requiring emergency medical treatment. The Contractor will, in turn, notify the (KO) or Contracting Officer’s Representative (COR/ACOR) immediately, no later than two (2) hours of the incident.
2.1.7.2 Emergency medical treatment and services for Contractor personnel is the responsibility of the Contractor.
2.1.8 Contract Administration and management. N/A
2.1.8.1 Post Award Conference/Performance Evaluation Meetings. The Contractor shall attend the post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation (FAR) Subpart 42.5. The KO and COR/ACOR shall meet quarterly with the Contractor to review the Contractor's performance.
Written minutes of meetings will be recorded by the Government and signed by the Program/Project Manager and the KO or COR/ACOR and distributed within five (5) workdays after the meeting. The Contractor may request a meeting with the KO or COR/ACOR when the Contractor believes such a meeting is necessary. Written minutes of such meetings shall be recorded by the Contractor and signed by all participants involved, and distributed within five (5) workdays after the meeting. In either case, if the Contractor does not concur with any portion of the minutes, recorded by the Government or the Contractor, such non-concurrence shall be provided in writing to the KO within two (2) calendar days following receipt of the minutes.
2.1.8.2 Contract Administration. Notwithstanding the Contractor’s responsibility for total management during the performance of this contract, the administration of the contract requires maximum coordination and cooperation between the Government and the Contractor.
2.1.8.3 The following provides the roles and their respective authority during the performance of the contract:
2.1.8.3.1 Contracting Officer (KO). The KO is the only person authorized to direct changes in any of the requirements under this contract, and, notwithstanding any provisions contained elsewhere in this contract, said authority remains solely in the KO. In the event the Contractor effects any such change at the direction of any person other than the KO, the change will be considered to have been made without authority and solely at the risk of the Contractor. All contract administration will be effected by the KO. Communications pertaining to contractual administrative matters shall be addressed to the KO. No changes in or deviation from the terms and conditions shall be affected, without a written modification to the contract, executed by the KO authorizing such changes.
2.1.8.3.2 Contracting Officer’s Representative (COR). The KO shall designate task order level CORs during the term of this contract. Additional government personnel may be assigned to assist in contract oversight. IAW AR 70-13. Other surveillance personnel will be designated as ACOR, and shall be trained and appointed in accordance with DoDI 5000.72 and DFARS 201.602-2. These alternate surveillance support personnel may serve as on-site representatives of the COR in performance of actual contract surveillance, if they meet all COR training and experience requirements and are appointed by the contracting officer as Alternate CORs (ACOR). The COR/ACOR will provide assistance in identification and resolution of problems, conflicts in priority, subtask requirement definitions, and other operations type problems. The COR/ACOR will perform in accordance with the responsibilities and duties identified in the appointment letter.
2.1.8.3.2.1 COR Authority. A letter of designation issued to the COR/ACOR by the KO, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR/ACOR, especially with regard to changes in cost or price estimates or changes in delivery dates. The COR/ACOR is not authorized to change any of the terms and conditions of the resulting order.
2.1.8.3.3. The Contractor shall not in any way represent that it is a part of the U.S. Government, or that it has the authority to contract or procure supplies for the account of the United States of America.
2.1.9 Quality Control (QC). Quality Control is the responsibility of the Contractor. The Contractor shall provide and maintain a Quality Control Plan (QCP) that is acceptable to the KO.
Changes to the Contractor’s QCP shall be submitted to the KO for review and approval within five (5) business days prior to implementation.
2.1.10 COR/ACOR Functions. The COR/ACOR monitors all technical aspects of the contract and assists in contract administration. The COR/ACOR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements; monitor, document, and report Contractor's performance and notify both the KO and Contractor of any deficiencies; coordinate availability of Government-furnished property, and coordinate site entry of Contractor personnel.
2.1.10.1 The Contracting Officer Representative Tracking (CORT) (https://wawf.eb.mil/xhtml/auth/home/home.xhtml#) shall be used for nomination, tracking, documentation, and management of CORs IAW DoDI 5000.72, DFARS 201.602-2 and PGI 201.602-2.
2.1.11 Subcontract Management. N/A
2.1.12 Contractor Employees.
2.1.12.1 Key Personnel. The following personnel are considered key personnel by the Government: /Project Manager/Quality Control Manager} The Contractor shall submit resumes and an organization chart (to include contact info) for initial key personnel and replacements to the KO for approval.
2.1.12.1.1 The Contractor shall provide a Program/Project Manager (PM) who is responsible for the performance of the work. The PM or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of the contract. The name of the PM shall be provided by the Contractor to the KO. The PM or alternate shall be available between {8:00 AM to 4:30 PM}, Monday through Friday except Federal holidays or when the Government facility is closed for administrative reasons.
2.1.12.1.2 Qualification Standards. Contractor employees shall have a general knowledge of solid waste collection techniques, be familiar with military structure and operational procedures, possess the skills necessary to perform collections, and have necessary licenses to operate vehicles and equipment used for collection efforts. The Contractor shall provide objective evidence of key personnel qualifications and years of experience to the KO for review and acceptance.
2.1.12.1.3 Contractor Identification. All contract personnel shall be identified as a Contractor, i.e., badge, company logo, or uniform. All contract personnel are required to identify themselves such that they differentiate themselves from Government employees. They shall also ensure that all correspondence (documents, emails etc.) or reports produced by the Contractor are marked as Contractor products or that Contractor participation is disclosed.
2.1.12.1.4 Standards of Conduct. Contractor personnel’s conduct shall not reflect discredit upon the Government. The Contractor shall ensure that personnel present a professional appearance while working on a Government installation. The Contractor’s employees shall observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substance.
The Contractor is responsible for ensuring that any Contractor employees providing services under this contract conduct themselves and perform services in a professional, safe, and responsible manner. The Contractor shall remove, from the job site, any employee for reasons of misconduct or security. The Contractor shall ensure employee conduct complies with 41 USC 423 Procurement Integrity. The Contractor shall also ensure that no Contractor employees conduct political related activities or events on the installation.
2.1.12.1.5 Organizational Conflict of Interest (OCI). N/A
2.1.13 Business Relations. The Contractor shall successfully integrate and coordinate all activity needed to execute the requirement. The Contractor shall manage the timeliness, completeness and quality of problem identification to a degree acceptable to the Government. The Contractor shall provide corrective action plans, timely identification of issues and effective management of subcontractors. The Contractor shall assure customer satisfaction and professional and ethical behavior of all Contractor personnel.
2.1.14 Disposal Methods. The Government shall work closely with the Contractor to determine best disposal methods IAW diversion and net zero waste goals. Landfill must always be the last alternative.
2.1.15 Coordination with ECOs and Building Managers. Government will assign Building Managers(s) and/or ECOs to each building on post. These Building Managers and ECOs shall coordinate with the COR/ACOR and/or Diversion Manager on a monthly basis to work towards improving building diversion rates. This can include, but is not limited to, strategic placement of interior and exterior containers and refuse signs.
2.1.16 Container Access. The Government will ensure the contractor's vehicles have unobstructed access to containers on collection days. The Government warrants any right of way to container locations is sufficient to bear the weight of the contractor's equipment and vehicles reasonably required to perform the service.
2.2 Special Requirements. NA
2.2.1 Contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by the government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by Installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
2.2.2 All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level 1 Awareness Training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 30 calendar days after completion of training by all employees and subcontractor personnel. AT Level 1 awareness training is available at the following website: https://atlevel1.dtic.mil/at.
2.2.3 Access and General Protection/Security Policy and Procedures. Contractor and all associated subcontractor employees shall comply with applicable installation, facility, and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
2.2.4 iWATCH Training. The Contractor and all associated sub-contractors shall brief all employees on the local iWATCH program in coordination with information provided by the COR. This local developed training shall be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award.
2.2.5 OPSEC SOP/Plan. The contractor shall adhere to the Government's Operations Security (OPSEC) Standard Operating Procedure (SOP)/Plan during the entire period of performance.
2.2.6 OPSEC: In accordance with AR 530-1, all personnel shall complete Level I Operations Security (OPSEC) training which is composed of both initial and continual awareness training (annually). All newly assigned personnel, within the first 30 days of arrival in the organization, shall receive initial training to include a briefing on the organizations critical information. The end state of initial and continual awareness training is that each individual should have the requisite knowledge to safeguard critical information.
2.2.7 Physical Security. The contractor shall be responsible for safeguarding all government property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.
2.2.8 Contractor Employees Who Require Access to Government Information Systems: All contractor employees, and associated subcontractor employees, with access to a government information system must be registered in the ATCTS (Army Training Certification Tracking System) at commencement of services and must successfully complete the DoD Cyber Awareness Challenge training prior to access to the information system and then annually thereafter.
2.2.9 ‐ Information Assurance (IA)/Information Technology (IT) Certification: Per DoD 8570.01-M, DFARS 252.239.7001, and AR 25-2, contractor employees and associated subcontractor employees supporting IA/IT functions shall be appropriately certified for each category and level upon contract award. The baseline and computing environment certifications are stipulated in DoD 8570.01-M must be completed upon contract award. Upon request by the Government, the Contractor shall provide documentation supporting the IA certification status of personnel performing IA functions. Contractor personnel who do not have proper and current certifications shall be denied access to DoD information systems for the purpose of performing IA functions.
2.2.10 Conservation of Utilities. The contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities which includes turning off the water faucets or valves after using the required amount to accomplish the necessary cleaning.
2.2.11 Post-award conference or periodic progress meetings: The contractor agrees to attend any post-award conference convened by the contracting activity or contract administration office.
These procedures are identified in FAR Subpart 42.5. The Contracting Officer, COR, and other government personnel, as appropriate, may meet periodically with the contractor to review the contractor’s performance. At these meetings, the Contracting Officer will apprise the contractor of how the government views the contractor’s performance, and the contractor shall apprise the government of any problems experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
2.2.12 COR: The COR for this contract is the DPW COR and Inspector located at 6650 Meloy Drive, Fort Benning, GA 31905. The COR shall monitor all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions:
assure the contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, monitor contractor’s performance and notify both the Contracting Officer and contractor of any deficiencies; coordinate availability of government-furnished property; and provide site-entry for contractor personnel. A letter of designation will be issued to the COR, a copy of which will be sent to the contractor detailing the responsibilities and limitations of the COR. The COR is not authorized to change any of the terms and conditions of the contract.
2.2.13 Contract Manager: The contractor shall manage the contract or shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor during absences shall be designated in writing and provided to the Contracting Officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract.
2.2.14 Identification of Contractor Employees: All contract personnel attending meetings, answering government telephones, and working in other situations where their contractor status is not obvious to third parties shall be required to identify themselves as contractors to avoid creating an impression in the minds of members of the public that they are government officials.
They shall also ensure all documents or reports produced by the contractor are suitably marked as contractor products or that contractor participation is appropriately disclosed.
2.2.15 Telephone Usage: NA
2.2.16 BACKGROUND CHECK REQUIREMENTS: Contractor/Sub-Contractor employees providing services under contracts are subject to the following process:
2.2.17 Background checks will be initiated and paid for by the Government. The cost for the pre-employment screening is the responsibility of the Contractor. The Commander Designated Entity (CDE) at the Installation supports IMCOM by coordinating, submitting, tracking child related background checks, and reviewing and compiling the results to identify whether they contain derogatory information to be passed on for a suitability determination. The CDE will advise and assist CONTRACTOR and sub- CONTRACTOR employees completing all required documents required for the background check process. CDE contact information will be provided upon contract award.
2.2.18 The following is a list of the required screenings per the Army Directive 2014-23.
2.2.18.1 (a) REGULAR/RECURRING contact with children:
Definition: Contact with children more than an average of one (1) day a week for three (3) or more months OR daily for a period of one (1) month or longer.
Required screening:
1.Pre-employment screening: 1) Application, 2) Interview, 3) Reference check, 4) Statement of Previous Arrest or Charge, 5) Assessment of individual’s eligibility, qualifications, temperament and suitability for work with children, 6) Tentative offer of employment (Proponent: Contractor is responsible organization);
2. Preliminary investigation: 1) Installation Record Check (if applicable), 2) FBI Fingerprint check, and 3) Local Civilian Law Enforcement Check (Proponent:
Government/Commander Designated Entity is responsible organization);
2.2.18.2 (b) SHORT TERM/OCCASIONAL contact with children:
Definition: Contact with children that does not fall under the definition of Regular/Recurring contact.
Required screening:
1.Pre-employment screening: 1) Application, 2) Interview, 3) Reference check, 4) Statement of Previous Arrest or Charge, 5) Assessment of individual’s eligibility, qualifications, temperament and suitability for work with children, 6) Tentative offer of employment (Proponent: Contractor is responsible organization);
2. Preliminary investigation: 1) Installation Record Check (if applicable), 2) FBI Fingerprint check, and 3) Local Civilian Law Enforcement Check (Proponent:
Government/Commander Designated Entity is responsible organization);
An employee must successfully complete the required screening (1.3(b)(i) and (ii) BEFORE working under this contract
2.2.19 Additional information on the background check process can be found at:
http://www.opm.gov/investigations/background-investigations.
2.2.20 Re-verification (IRC and FBI fingerprint check) is required every 5 years.
2.3 Access and General Protection/Security Policy and Procedures. The Contractor and all associated subcontractors’ employees shall comply with applicable installation, facility, and area commander installation/facility access and local security policies and procedures (provided by a Government representative). The Contractor workforce must comply with all personal identity verification requirements as directed by DOD, Headquarters Department of the Army (HQDA), and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in Contractor security matters or processes.
2.3.1 Motor Vehicle Operators. Contractor’s personnel, whose tasks involve operation of any vehicles, shall possess a valid U.S. state driver’s license, certificates and permits, applicable for the type and class of vehicle being operated.
2.3.2 Contractor Vehicles Registration. All Contractor-owned and/or operated vehicles and trailers operating on the installation will be registered before contract start date, by making application to the Provost Marshal Vehicle Registration Section and the COR/ACOR. Evidence of vehicle ownership and vehicle liability insurance must be presented upon application of vehicle registration.
2.3.4 Access requirements: The Contractor shall provide all information required for background checks to meet installation access requirements, to be accomplished by the installation Provost Marshall Office, Director of Emergency Services, or Security Office, and
COR/ACOR.
2.3.5 Physical Security. NA
2.3.6 Key Control. NA
2.3.7 NA
2.3.8 NA
2.3.9 Lock Combinations. NA
2.3.10 Security Training. As required by the installation.
2.3.11 NA
2.3.12 Safety. The Contractor shall safeguard and maintain all government and Contractor property, as well as provide for the safety and well-being of personnel employed under this contract. The Contractor shall comply with AR 385-10, The Army Safety Program.
2.3.13 Safety Plan. The Contractor shall develop and implement a safety program for its employees. The Contractor shall submit the Safety Plan to the KO, or designated representative, for review and acceptance within ten (10) days of commencement of work. Revisions shall be submitted five (5) calendar days prior to the effective date of change.
2.3.14 Occupational Safety and Health. The Contractor shall comply with the Occupational Safety and Health Administration (OSHA) standards. The Contractor shall be responsible for ensuring adherence to all applicable Fort Benning, State of Georgia, and federal rules and regulations.
2.3.15 Special Training / Qualifications.
2.3.16 NA
2.3.17: N/A
2.3.18 Environmental Requirements.
2.3.19 Executive Order (EO) 13693, Planning for Federal Sustainability in the Next Decade.
The Contractor shall comply with tenants of the EO and when practicable, shall use:
a. products with post-consumer recycled content
b. products that are recyclable
c. low toxicity or non-toxic products
d. low-maintenance products
2.3.20 Green Procurement. Section 6002 of the Resource Conservation and Recovery Act of 1976 (RCRA) requires the use of recycled and recovered products identified in the Environmental Protection Agency’s Comprehensive Procurement Guidelines.
2.3.21 EPA Guidelines are the minimum requirement. The Contractor is encouraged to use other materials and products not listed but commonly used in industry. The Contractor shall maintain records and submit an annual report to the COR/ACOR, along with the annual certification required by FAR 52.223-9 Certification and Estimate of Percentage of Recovered Material Content for EPA Designated Items, upon completion of the base year and each option year.
2.3.22 Environmental Compliance. The Contractor shall comply with all federal, state, local and installation environmental laws, rules and plans. The Contractor shall use and store all materials, chemicals, and equipment used in the performance of services on the installation in accordance with industry standards, local, federal and state laws, and according to manufactures' recommendations. The Contractor will submit Safety Data Sheets (SDS) for approval on all materials, five (5) days before delivery of the material, to the COR/ACOR. The Contractor shall make all environmental and hazardous material records available, at the beginning of the next duty day after the Government’s request to view the records.
2.3.23 Hazardous/Spill Plan. IAW Spill Prevention Control and Countermeasure Plan, if the Contractor spills or releases any hazardous substances, i.e. substances listed in 40 CFR 302, Designation, Reportable Quantities, and Notification, the Contractor shall immediately notify the KO and COR/ACOR, followed by written notification within one (1) hour. The Contractor shall submit a hazardous/spill plan to the KO within 30 days of contract award.
3.0 PERFORMANCE REQUIREMENTS AND STANDARDS.
3.1 High Level Objective (HLO).
3.1.1 Performance Task Requirements, Standards and Acceptable Quality Levels (AQLs).
3.1.1.1 Damage. As directed by the KO, the Contractor shall repair Government property damaged by vehicles, erosion, drought or insect diseases. The Contractor shall furnish all labor, materials and equipment to perform the repair work including cultivating and applying seed, sprigging, or placing sod. All turf repair work shall be maintained to ensure successful growth.
3.1.1.1.2 Third Party Repair Damaged Areas.