20240531_00_90_10b-PDF-West_Point_Boiler_Plant_Video Findings_Report.pdf

PDF 13 MB Posted

Attached to
Upgrade of Central Plant Building 604. West Point, NY
Solicitation number
W911SD-24-R-0105
Issued by

About this file

This document appears to be a report on video findings related to the West Point Boiler Plant. The report is associated with a federal contract opportunity to upgrade the Central Plant Building 604 at West Point, New York. The solicitation, with number W911SD-24-R-0105, is issued by the Department of the Army Materiel Command Mission and Installation Contracting Command Fort Eustis.

The scope of work includes the renovation of the Central Plant Building 604, which has experienced various deficiencies such as roof leaks, building envelope issues, and HVAC problems. The intent is to renovate the facility in preparation for an eventual modernization study. The work involves minor upgrades to the building envelope, renovated facility support areas, new combustion and ventilation systems for the boiler and turbine halls, exterior civil improvements, and upgrades to the building's electrical, plumbing, and structural systems.

View the file

Other files

File Type Posted
20240807_W911SD-24-R-0105-0004.pdf PDF
20240801_RFI 40-61_604.pdf PDF
20240730_RFI 30-39_604.pdf PDF
20240805_W911SD-24-R-0105-0003.pdf PDF
20240717_Interested_Offerors_List_Bldg_604.pdf PDF
20240726_RFI_13-29_604.pdf PDF
20240623_08_71_06.pdf PDF
20240726_RFI_1-12_604.pdf PDF
20240726_W911SD-24-R-0105-0002.pdf PDF
20240718_2221_WP_Central_Plant_Reno_-Sheet - A-417 -Masonry_Restoration_North_Tower_Interior.pdf PDF
20240719_W911SD-24-R-0105-0001.pdf PDF
20240719_RFI_604.pdf PDF
20240419_Revised_33_61_13.19.pdf PDF
20240403_WPCPP_Mech_Addendum_1_Drawings.pdf PDF
20231112_Central_Plant_604_100_Design_Narrative_Report_ED.pdf PDF
20240325_2221_Central_Plant_604_RTA_Specs_V4.pdf PDF
20240423_Attachment_3_Past_Performance.pdf PDF
20240325_2221_Central_Plant_604_RTA_Specs_V1.pdf PDF
20240702_W911SD-24-R-0105.pdf PDF
20240423_Attachment_2_Specific_Relevant_Contracts.pdf PDF
20240423_Attachment_1_Consent.pdf PDF
20240325_2221_Central_Plant_604_RTA_Specs_V3.pdf PDF
20240325_2221_Central_Plant_604_RTA_Specs_V2.pdf PDF
20240325_2221_Central_Plant_604_RTA_Specs_V5.pdf PDF
20240325_2221_Central_Plant_604_RTA_Specs_V6.pdf PDF
20240531_Wage_Determination_NY7.txt TXT text file
20240403_WP_CUP_Bldg_604_FA FP_Addendum_1_Stamped.pdf PDF
20240325_2221_Central_Plant_604_RTA_Drawings.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(212) 779-1378 elyse@metrogroupinc.com www.metrogroupinc.com

230 Patton Ave. West Babylon, NY 11704

May 31, 2024

SK Construction Jim Rilley

Re: Williams Road, West Point

We completed a video scan of the interior on this existing 140’ vertical chimney chamber.

The chimney is constructed of brick and mortar throughout and measures 120” in diameter.

We have reviewed the photos and have determined that throughout this chimney chamber, there are missing and deteriorated brick along with mortar missing in the joints throughout.

Damaged Brick Damaged brick and deteriorated mortar

Missing Brick Damaged Missing Mortar at Joints mailto:elyse@metrogroupinc.com

Damaged bricks Missing Mortar at Joints

Split bricks Missing bricks

Damaged lower bricks and missing mortar around entire joint

At approximately 45’ from the top of the chimney, there are four (4) rectangle penetrations that enter the chimney. In addition, there are two (2) 2” round pipe that run approximately 2’ into the chimney chamber.

Rectangular openings in the masonry Pipe protruding into the masonry chamber

The brickwork at the top of the chimney is 13” thick. The chase is 14 ½” wide with a 15” wrap.

We believe that the masonry is in need of repairs. There are frequent signs of wear and deterioration that we recommend repairing in the near future.

The breeching for Boiler #1 and Boiler #2 combine into a common 60”x96” trunk approximately 52’ from the base of the chimney wall. This trunk enters the chimney approximately 40’ from the bottom of the chimney chamber.

The breeching for Boiler #3 runs as a 44” diameter pipe. It enters the chimney approximately 30’ from the bottom of the chimney chamber.

It is our recommendation to grind out and repoint the interior mortar joints in its entirety. Access will require a supported scaffold setup to access all points of the interior masonry. We will conduct a wash down of the interior chamber prior to grinding out these joints. The inner walls will be wire brushed and sprayed with the United 375 F.S.R. chemical. The inner walls will be wire brushed and cleaned with a mild pressure water sprayer.

Upon completion of the wash down, we will cut and point with new mortar. The old mortar will be remove to a depth of ½” minimum in the joints. New mortar will be packed in the joints in multiple ‘lifts’ so that each lift is well compressed. Prior to us installing the new mortar, the existing mortar which remains in the recess of the joint will be wet to ensure it does not suck the moisture out of the new mortar.

PW Pricing: Scaffolding $45,000 / Wash Down $35,420 / Repointing work $154,850

Sincerely, Elyse Guanti EMG Industrial Chimney A Metro Group Company

THIS PAGE INTENTIONALLY LEFT BLANK