Amendment 0001 to Solicitation W911SA26QA217
This is Amendment 1 to a federal solicitation issued by the U.S. Army Directorate of Contracting at Fort McCoy, Wisconsin. The amendment is effective September 24, 2026, and was signed by Contracting Officer James K. Hubert on September 23, 2026. The primary purposes of this amendment are to respond to vendor questions, update SF 1149 (the price schedule in Attachment 04), and add FAR Clause 52.219-4 regarding price evaluation preferences for HUBZone Small Business Concerns. The point of contact is Leslie A. Koenig, (520) 706-2690, leslie.a.koenig2.civ@army.mil. Offerors must acknowledge receipt of this amendment prior to offer submission using one of three methods: completing and returning items 8 and 15 of the amendment, acknowledging receipt on each copy of their offer, or submitting a separate written communication referencing the solicitation and amendment numbers.
The amendment modifies CLIN 0005 by reducing the estimated quantity from 290,576 to 1 unit while maintaining a unit price of USD 1.00, resulting in a total contract amount decrease of USD 290,575.00. FAR Clause 52.219-4 is incorporated, establishing a 10 percent price evaluation preference factor for all offers except those from HUBZone small business concerns that have not waived the preference and otherwise successful offers from small business concerns. HUBZone joint ventures must ensure at least 40 percent of aggregate work is completed by HUBZone small business parties. An addendum to FAR 52.212-4 specifies post-award requirements including contracting officer/COR/contract administrator assignments (TBD at award), mandatory post-award conference attendance per DFARS 242.5, Certificate of Insurance submission within 10 calendar days of award with specified minimum coverage amounts, Contractor Performance Assessment Reports System (CPARS) evaluation protocols, and legal compliance obligations. Seven attachments are included: PWS and Deliverables, AT-OPSEC, PRS, Price Schedule CUI, Shop Locations, Wage Determination Log, and Service Ticket; a new Attachment 08 (Vendor Questions and Answers) has been added.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911SA26QA217 Attachment 04 Price Schedule.xlsx | XLSX spreadsheet | |
| W911SA26QA217 Attachment 08 Vendor Questions and Answers.docx | DOCX document | |
| W911SA26QA217 Attachment 05 Shop Locations.xlsx | XLSX spreadsheet | |
| W911SA26QA217 Attachment 01 PWS and Deliverables.docx | DOCX document | |
| W911SA26QA217 Attachment 03 PRS.docx | DOCX document | |
| W911SA26QA217 Attachment 04 Price Schedule - CUI.xlsx | XLSX spreadsheet | |
| W911SA26QA217 Attachment 02 AT OPSEC.pdf | ||
| W911SA26QA217 Attachment 06 Wage Determination Log.xlsx | XLSX spreadsheet | |
| W911SA26QA217 Attachment 07 Service Ticket.docx | DOCX document | |
| W911SA26QA217 Solicitation (f) 9-15-26.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Continuation of Supplies or Services and Prices/Costs
The following CLIN(s) / SLIN(s) / ELIN(s) were modified:
INFORMATI
ON
FROM TO AMOUNT
Estimated Quantity
290,576 1 -290,575
Unit Price USD 1.00 USD 1.00 Amount USD 290,576.00 USD 1.00 USD
-290,575.00
Contract Clauses
Additional Information/Notes
The following clauses were added:
FAR Clauses Incorporated by Full Text
52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns. (Deviation 2026-O0038)
(Feb 2026)
Notice of Price Evaluation preference for HUBZone Small Business Concerns (Feb 2026) (Deviation 2026-O0038)
(a) Evaluation preference.
(1) Offers will be evaluated by adding a factor of 10 percent to the price of all offers, except-
W911SA26QA2170001
(i) Offers from HUBZone small business concerns that have not waived the evaluation preference;
and
(ii) Otherwise successful offers from small business concerns.
(b) . A HUBZone small business concern may choose to waive the Waiver of evaluation preference evaluation preference. If the concern waives the preference, the factor will be added to its offer for evaluation purposes.
Offeror chooses to waive the evaluation preference.
(c) A HUBZone joint venture agrees that, in the performance of the contract, at least Joint venture.
40 percent of the aggregate work performed by the joint venture shall be completed by the HUBZone small business parties to the joint venture. Work performed by the HUBZone small business parties to the joint venture must be more than administrative functions.
(End of provision)
Addendum to 52.212-4, Contract Terms and Conditions - Commercial Products and Commercial Services
Miscellaneous text in this section has been modified from:
The following are incorporated into 52.212-4 as an addendum to this solicitation and resultant contract:
1. Contracting Officer's Representative (COR): TBD at the time of Award.
2. Contract Administrator: TBD at time of award.
3. Contracting Officer: TBD at time of award.
4. If you have questions pertaining to this contract after contract award (i.e. questions regarding delivery, invoice procedures, etc.), please request assistance from the COR via email. Requests for assistance shall include the contract number on the subject line of the emailed request. For additional assistance please contact the Contractor Administrator via email, please include the contract number in the subject line of the email. Requesting COR assistance from any other individuals could result in a delayed response.
5. Post Award Conference: In the event the Contracting Officer decides to conduct a Post Award Conference in accordance with DFARS 242.5, the awardee will be notified and will be required to attend. The Contracting Officer's notification will include specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors, and information regarding the items to be discussed.
6. Required insurance: Contractor shall require the insurance company to specify contract number in the Description of Operation block of the Certificate of Insurance (COI) and the below statement.
"The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective- (1) For such period as the laws of the State in which this contract is to be performed prescribe; or (2) Until 30 days after the Insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer."
The Contractor shall provide the Certificate of Insurance (COI) within ten (10) calendar days after contract award, via email to the Post Award Contracting Officer and Post Award Contract Specialist. The COI shall be updated and sent to the Post Award Team on an annual basis.
In accordance with FAR clause 52.228-5 entitled, "Insurance--Work on a Government Installation" the following minimum amounts of insurance are required.
Type of Coverage Required Minimum Coverage Amount
Workmen's Compensation As required by state laws
Employer's Liability Insurance Injury Liability $100,000 per accident
General Liability Insurance - Bodily $500,000 per occurrence
Auto Liability Insurance $200,000 per person
Bodily Injury $500,000 per occurrence
Property Damage $20,000 per occurrence
7. Contract performance:
Purpose. IAW with FAR Subpart 42.1500 contractor past performance information (PPI) is relevant information for future source selection purposes regarding a contractor's actions under previously awarded contracts. It includes, for example, the contractor's record of conforming to contract requirements and to standards of good workmanship; the contractor's record of forecasting and controlling costs; the contractor's adherence to contract schedules, including the administrative aspects of performance; the contractor's history of reasonable and cooperative behavior and commitment to customer satisfaction; and generally, the contractor's business-like concern for the interest of the customer. Contractor past performance information is one of the tools that support Army efforts to acquire best value and is used to evaluate performance risk in source selection.
The feedback provided by the government to the contractor in collecting PPI, and the knowledge that PPI will be used in future source selection decisions, should result in improved performance and a greater contractor focus on customer satisfaction.
Contractor Performance Assessment Reports System (CPARS): CPARS shall be prepared IAW AFARS Subpart 42 upon physical completion of the contract. If the period of performance will exceed 18 months, an "interim" assessment report shall be prepared at the completion of 12 months performance and annually thereafter until the contract is physically complete. An out-of-cycle or "addendum" report may be prepared if there is a need to record an extraordinary event prior to the next regularly scheduled evaluation or if it is necessary to report a meaningful occurrence during the period between physical completion of the contract and contract closeout.
Additionally, addendum reports may be prepared to record contractor's performance relative to contract closeout and other administrative requirements (e.g. final indirect cost proposals, technical data, etc.).
Completion Due Date. The government will complete the CPARS within 60 days after the end of the assessment rating period (if applicable).
Evaluators. The Contracting Officer and the Contracting Officer's Representative will jointly complete the performance assessment.
Contracts Performance Elements. The contractor's performance shall be assessed in accordance with elements and rating system set forth in AFARS Subpart 42.
Contractor Review. The Contracting Officer will furnish a copy of the CPARS to the contractor requesting that the contractor submit comments, rebutting statements, and/or additional information to the Contracting Officer within 30 calendar days of receipt. Failure to respond within the designated timeframe will be taken as agreement with the assessment.
Contract Concurrence. Where a contractor concurs with, or takes no exception to a CPARS, such report shall be considered final and releasable for use in source selection and other deliberative purposes.
Contractor Rebuttal. Where a contractor takes exception to a performance report, the Contracting Officer will review the contractor's rebuttal or comments and make appropriate changes. If the Contracting Officer makes changes, the changed rating will be reflected in the narrative. The Contracting Officer will make all reasonable efforts to reconcile the report and the contractor's comments. However, it is not necessary that they reach agreement on the report where such is clearly impracticable. The contractor's rebuttal or comments shall be made part of the CPARS.
Resolving Disagreements between the Government and the Contractor. In the event disagreements between the parties regarding the CPARS occur, the Contracting Officer will review the rebuttal and make appropriate changes. If no agreement is reached, the CPARS is forwarded to the Reviewing Official (Director of Contracting) along with the Contracting Officer's Findings and Recommendation and supporting documentation. The decision of the Reviewing Official is final.
Copies of the CPARS and the contractor's response and review comments, if any, shall be retained as part of the evaluation.
Release of Contractor Performance Evaluation Information. The evaluation will not be released to other than government personnel and the contractor whose performance is evaluated. The performance evaluation information will be input into the applicable module within Contractor Performance Assessment Reporting System (CPARS) database (or Government system in use at time of the evaluation).
Source Selection Information. Departments and agencies will electronically access the CPARS information to support future award decisions.
8. Legal compliance: The Contractor shall comply with all Federal, State, and Local Laws, codes and regulations applicable to his performance under this contract and shall be solely responsible for all costs associated with said compliance.
9. Attachments
Attachment 01 - PWS and Deliverables
Attachment 02 - AT-OPSEC
Attachment 03 - PRS
Attachment 04 - Price Schedule CUI
Attachment 05 - Shop Locations
Attachment 06 - Wage Determination Log
Attachment 07 - Service Ticket
(END OF ADDENDUM TO FAR 52.212-4)
To:
The following are incorporated into 52.212-4 as an addendum to this solicitation and resultant contract:
1. Contracting Officer's Representative (COR): TBD at the time of Award.
2. Contract Administrator: TBD at time of award.
3. Contracting Officer: TBD at time of award.
4. If you have questions pertaining to this contract after contract award (i.e. questions regarding delivery, invoice procedures, etc.), please request assistance from the COR via email. Requests for assistance shall include the contract number on the subject line of the emailed request. For additional assistance please contact the Contractor Administrator via email, please include the contract number in the subject line of the email. Requesting COR assistance from any other individuals could result in a delayed response.
5. Post Award Conference: In the event the Contracting Officer decides to conduct a Post Award Conference in accordance with DFARS 242.5, the awardee will be notified and will be required to attend. The Contracting Officer's notification will include specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors, and information regarding the items to be discussed.
6. Required insurance: Contractor shall require the insurance company to specify contract number in the Description of Operation block of the Certificate of Insurance (COI) and the below statement.
"The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective- (1) For such period as the laws of the State in which this contract is to be performed prescribe; or (2) Until 30 days after the Insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer."
The Contractor shall provide the Certificate of Insurance (COI) within ten (10) calendar days after contract award, via email to the Post Award Contracting Officer and Post Award Contract Specialist. The COI shall be updated and sent to the Post Award Team on an annual basis.
In accordance with FAR clause 52.228-5 entitled, "Insurance--Work on a Government Installation" the following minimum amounts of insurance are required.
Type of Coverage Required Minimum Coverage Amount
Workmen's Compensation As required by state laws
Employer's Liability Insurance Injury Liability $100,000 per accident
General Liability Insurance - Bodily $500,000 per occurrence
Auto Liability Insurance $200,000 per person
Bodily Injury $500,000 per occurrence
Property Damage $20,000 per occurrence
7. Contract performance:
Purpose. IAW with FAR Subpart 42.1500 contractor past performance information (PPI) is relevant information for future source selection purposes regarding a contractor's actions under previously awarded contracts. It includes, for example, the contractor's record of conforming to contract requirements and to standards of good workmanship; the contractor's record of forecasting and controlling costs; the contractor's adherence to contract schedules, including the administrative aspects of performance; the contractor's history of reasonable and cooperative behavior and commitment to customer satisfaction; and generally, the contractor's business-like concern for the interest of the customer. Contractor past performance information is one of the tools that support Army efforts to acquire best value and is used to evaluate performance risk in source selection.
The feedback provided by the government to the contractor in collecting PPI, and the knowledge that PPI will be used in future source selection decisions, should result in improved performance and a greater contractor focus on customer satisfaction.
Contractor Performance Assessment Reports System (CPARS): CPARS shall be prepared IAW AFARS Subpart 42 upon physical completion of the contract. If the period of performance will exceed 18 months, an "interim" assessment report shall be prepared at the completion of 12 months performance and annually thereafter until the contract is physically complete. An out-of-cycle or "addendum" report may be prepared if there is a need to record an extraordinary event prior to the next regularly scheduled evaluation or if it is necessary to report a meaningful occurrence during the period between physical completion of the contract and contract closeout.
Additionally, addendum reports may be prepared to record contractor's performance relative to contract closeout and other administrative requirements (e.g. final indirect cost proposals, technical data, etc.).
Completion Due Date. The government will complete the CPARS within 60 days after the end of the assessment rating period (if applicable).
Evaluators. The Contracting Officer and the Contracting Officer's Representative will jointly complete the performance assessment.
Contracts Performance Elements. The contractor's performance shall be assessed in accordance with elements and rating system set forth in AFARS Subpart 42.
Contractor Review. The Contracting Officer will furnish a copy of the CPARS to the contractor requesting that the contractor submit comments, rebutting statements, and/or additional information to the Contracting Officer within 30 calendar days of receipt. Failure to respond within the designated timeframe will be taken as agreement with the assessment.
Contract Concurrence. Where a contractor concurs with, or takes no exception to a CPARS, such report shall be considered final and releasable for use in source selection and other deliberative purposes.
Contractor Rebuttal. Where a contractor takes exception to a performance report, the Contracting Officer will review the contractor's rebuttal or comments and make appropriate changes. If the Contracting Officer makes changes, the changed rating will be reflected in the narrative. The Contracting Officer will make all reasonable efforts to reconcile the report and the contractor's comments. However, it is not necessary that they reach agreement on the report where such is clearly impracticable. The contractor's rebuttal or comments shall be made part of the CPARS.
Resolving Disagreements between the Government and the Contractor. In the event disagreements between the parties regarding the CPARS occur, the Contracting Officer will review the rebuttal and make appropriate changes. If no agreement is reached, the CPARS is forwarded to the Reviewing Official (Director of Contracting) along with the Contracting Officer's Findings and Recommendation and supporting documentation. The decision of the Reviewing Official is final.
Copies of the CPARS and the contractor's response and review comments, if any, shall be retained as part of the evaluation.
Release of Contractor Performance Evaluation Information. The evaluation will not be released to other than government personnel and the contractor whose performance is evaluated. The performance evaluation information will be input into the applicable module within Contractor Performance Assessment Reporting System (CPARS) database (or Government system in use at time of the evaluation).
Source Selection Information. Departments and agencies will electronically access the CPARS information to support future award decisions.
8. Legal compliance: The Contractor shall comply with all Federal, State, and Local Laws, codes and regulations applicable to his performance under this contract and shall be solely responsible for all costs associated with said compliance.
9. Attachments
Attachment 01 - PWS and Deliverables
Attachment 02 - AT-OPSEC
Attachment 03 - PRS
Attachment 04 - Price Schedule CUI
Attachment 05 - Shop Locations
Attachment 06 - Wage Determination Log
Attachment 07 - Service Ticket
Attachment 08 - Vendor Questions and Answers
(END OF ADDENDUM TO FAR 52.212-4)
| IDCode: J |
| Page: 1 |
| Pages: 10 |
| AmendNo: 0001 |
| EffDate: 24 SEP 2026 |
| ReqNo: |
| ProjNo: |
| IssCode: W911SA |
| AdmCode: |
| IssuedBy: W6QM MICC FT MCCOY (RC) |
KO DIRECTORATE OF CONTRACTIN, BLDG 1108 SOUTH R STREET
FORT MCCOY, WI 54656-5142
UNITED STATES
LESLIE KOENIG, EMAIL: LESLIE.A.KOENIG2.CIV@ARMY.MIL TELEPHONE: 5028984841
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W911SA26QA217 |
| SolDate: 15 SEP 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: SEE CONTINUATION |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: The purpose of amendment one (1) is to respond to vendor questions, update SF 1149, Attachment 04 Price Schedule, and add Clause 52.219-4. |
THE POINT OF CONTACT FOR THIS ACTION IS LESLIE A. KOENIG, (520) 706-2690, LESLIE.A.KOENIG2.CIV@ARMY.MIL
| ContNameTitle: |
| CoNameTitle: JAMES K. HUBERT |
| ContDate: |
| CODate: 23 SEP 2026 |
| 52: |
| 219-4_cb1: Off |
File details come from the government source that posted it. Updated .