W911SA21B2007 Complete Abstract.pdf

PDF 320 KB Posted

Attached to
Interior & Exterior Renovation of Various Buildings at Fort Hunter Liggett, CA
Solicitation number
W911SA21B2007
Issued by

About this file

This abstract of offers document summarizes bids received for the Interior & Exterior Renovation of Various Buildings at Fort Hunter Liggett, California project. The solicitation seeks bids for renovations to buildings 301, 301b, 301c, 301j and bathroom upgrades to building 296. Four contractors submitted bids for the project, with pricing provided for multiple line items. Contractor names, bid amounts, and acknowledgement of amendments are included. The period of performance is anticipated to be from award in July 2021 until completion by September 2022. The Mission and Installation Contracting Command at Fort McCoy will award a fixed-price contract for the renovation work.

View the file

Other files

File Type Posted
W911SA21B2007 Abstract Page 2.pdf PDF
W911SA21B2007 Abstract Page 3.pdf PDF
W911SA21B2007 Signed Abstract Page 1.pdf PDF
W911SA21B2007 Attachment 18 Picture Flooring.jpeg JPEG file
W911SA21B2007 Amendment 0002.docx DOCX document
W911SA21B2007 Attachment 17 Picture Flooring.jpeg JPEG file
W911SA21B2007 Attachment 15 Picture Flooring.jpeg JPEG file
W911SA21B2007 Attachment 13 Picture Flooring.jpeg JPEG file
W911SA21B2007 Attachment 16 Picture Flooring.jpeg JPEG file
W911SA21B2007 Attachment 14 Picture Flooring.jpeg JPEG file
W911SA21B2007 Attachment 8 Wage Determination 22 July 2021.pdf PDF
W911SA21B2007 Attachment 11 Picture Sidewalk Repairs.pdf PDF
W911SA21B2007 Attachment 12 Bldg 301 Asbestos Survey.pdf PDF
W911SA21B2007 Amendment 0001.docx DOCX document
W911SA21B2007 Attachment 2 SOW Updated 23 July 2021.docx DOCX document
W911SA21B2007 Site Visit Sign In Sheet.pdf PDF
W911SA21B2007 Attachment 5 Bldg 301C Floor Plan.pdf PDF
W911SA21B2007 Attachment 1 AT OPSEC.pdf PDF
W911SA21B2007 Attachment 4 Bldg 301B Floor Plan.pdf PDF
W911SA21B2007 Attachment 8 Wage Determination.pdf PDF
W911SA21B2007 Attachment 6 Bldg 301J Floor Plan.pdf PDF
W911SA21B2007 Attachment 2 SOW.pdf PDF
W911SA21B2007 Attachment 3 Bldg 301 Plans.pdf PDF
W911SA21B2007 Attachment 9 SF 24 Sample.pdf PDF
W911SA21B2007 Solicitation.docx DOCX document
W911SA21B2007 Attachment 7 Bldg 296 Floor Plan.pdf PDF
W911SA21B2007 Attachment 10 FHL Form 7.pdf PDF
W911SA21B2007 Attachment 5 - Bldg. 301 Main.pdf PDF
W911SA21B2007 Attachment 7 - Fort Hunter Liggett 301C Floor 01.pdf PDF
W911SA21B2007 Attachment 4 - SOW -Reno 301 Complex.pdf PDF
W911SA21B2007 Attachment 6 - Fort Hunter Liggett 301B Floor 01.pdf PDF
W911SA21B2007 Attachment 3 - COVID-19 Site Visit Information.docx DOCX document
W911SA21B2007 Attachment 8 - Fort Hunter Liggett 301J Floor 01.pdf PDF
W911SA21B2007 Attachment 2 - TE-5 Construction.xlsx XLSX spreadsheet
W911SA21B2007 Attachment 1 - Wage Determinations.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSTRACT OF OFFERS - CONSTRUCTION

CONTINUATION SHEET

1. SOLICITATION NUMBER PAGE OF

PAGES

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

4. OFFERS (Continued)2. PROJECT TITLE

NO.: NO.: NO.: NO.:

A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR

B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

A.

ITEM

NO.

B.

ESTIMATED

QUANTITY

C.

UNIT D. UNIT

PRICE

E. ESTIMATED

AMOUNT

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

OPTIONAL FORM 1419A (11-88)

ABSTRACT OF OFFERS - CONSTRUCTION

CONTINUATION SHEET

1. SOLICITATION NUMBER PAGE OF

PAGES

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

4. OFFERS (Continued)2. PROJECT TITLE

NO.: NO.: NO.: NO.:

A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR

B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

A.

ITEM

NO.

B.

ESTIMATED

QUANTITY

C.

UNIT D. UNIT

PRICE

E. ESTIMATED

AMOUNT

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

OPTIONAL FORM 1419A (11-88)

W911SA21B2007 Signed Abstract
W911SA21B2007 Page 2 OF1419A
W911SA21B2007 Page 3 OF1419A
Offeror No:
1:
1 SOLICITATION NUMBER: W911SA21B2007
PAGES#1: 2
PAGES: 3
2 PROJECT TITLE: Interior & Exterior Renovation of Various Buildings at Fort Hunter Liggett, CA
A OFFEROR: Quincon Inc
A OFFEROR_2: MX Construction
A OFFEROR_3: PreCon Industries
A OFFEROR_4: RORE Inc
B BID SECURITY Type and amount: 20%
B BID SECURITY Type and amount_2: 20%
B BID SECURITY Type and amount_3: 20%
B BID SECURITY Type and amount_4: 20%
C AMENDMENTS ACKNOWLEDGED: Yes Two
C AMENDMENTS ACKNOWLEDGED_2: Yes Two
C AMENDMENTS ACKNOWLEDGED_3: Yes - Two
C AMENDMENTS ACKNOWLEDGED_4: Yes - Two
A ITEM NORow1:
B ESTIMATED QUANTITYRow1:
C UNITRow1:
D UNIT PRICERow1: 710402.00
E ESTIMATED AMOUNTRow1:
D UNIT PRICERow1_2: 693247.54
E ESTIMATED AMOUNTRow1_2:
D UNIT PRICERow1_3: 593200.00
E ESTIMATED AMOUNTRow1_3:
D UNIT PRICERow1_4: 1831100.00
E ESTIMATED AMOUNTRow1_4:
A ITEM NORow2:
B ESTIMATED QUANTITYRow2:
C UNITRow2:
D UNIT PRICERow2: 572253.00
E ESTIMATED AMOUNTRow2:
D UNIT PRICERow2_2: 592751.33
E ESTIMATED AMOUNTRow2_2:
D UNIT PRICERow2_3: 443600
E ESTIMATED AMOUNTRow2_3:
D UNIT PRICERow2_4: 800400.00
E ESTIMATED AMOUNTRow2_4:
A ITEM NORow3:
B ESTIMATED QUANTITYRow3:
C UNITRow3:
D UNIT PRICERow3: 568880.00
E ESTIMATED AMOUNTRow3:
D UNIT PRICERow3_2: 589467.20
E ESTIMATED AMOUNTRow3_2:
D UNIT PRICERow3_3: 441800.00
E ESTIMATED AMOUNTRow3_3:
D UNIT PRICERow3_4: 798200.00
E ESTIMATED AMOUNTRow3_4:
A ITEM NORow4:
B ESTIMATED QUANTITYRow4:
C UNITRow4:
D UNIT PRICERow4: 650210.00
E ESTIMATED AMOUNTRow4:
D UNIT PRICERow4_2: 550398.88
E ESTIMATED AMOUNTRow4_2:
D UNIT PRICERow4_3: 405500.00
E ESTIMATED AMOUNTRow4_3:
D UNIT PRICERow4_4: 762000.00
E ESTIMATED AMOUNTRow4_4:
A ITEM NORow5:
B ESTIMATED QUANTITYRow5:
C UNITRow5:
D UNIT PRICERow5: 158000.00
E ESTIMATED AMOUNTRow5:
D UNIT PRICERow5_2: 114507.90
E ESTIMATED AMOUNTRow5_2:
D UNIT PRICERow5_3: 90400.00
E ESTIMATED AMOUNTRow5_3:
D UNIT PRICERow5_4: 108300.00
E ESTIMATED AMOUNTRow5_4:
A ITEM NORow6:
B ESTIMATED QUANTITYRow6:
C UNITRow6:
D UNIT PRICERow6: 2659745.00
E ESTIMATED AMOUNTRow6:
D UNIT PRICERow6_2: 2540372.85
E ESTIMATED AMOUNTRow6_2:
D UNIT PRICERow6_3: 1974500.00
E ESTIMATED AMOUNTRow6_3:
D UNIT PRICERow6_4: 4300000
E ESTIMATED AMOUNTRow6_4:
A ITEM NORow7:
B ESTIMATED QUANTITYRow7:
C UNITRow7:
D UNIT PRICERow7:
E ESTIMATED AMOUNTRow7:
D UNIT PRICERow7_2:
E ESTIMATED AMOUNTRow7_2:
D UNIT PRICERow7_3:
E ESTIMATED AMOUNTRow7_3:
D UNIT PRICERow7_4:
E ESTIMATED AMOUNTRow7_4:
A ITEM NORow8:
B ESTIMATED QUANTITYRow8:
C UNITRow8:
D UNIT PRICERow8:
E ESTIMATED AMOUNTRow8:
D UNIT PRICERow8_2:
E ESTIMATED AMOUNTRow8_2:
D UNIT PRICERow8_3:
E ESTIMATED AMOUNTRow8_3:
D UNIT PRICERow8_4:
E ESTIMATED AMOUNTRow8_4:
A ITEM NORow9:
B ESTIMATED QUANTITYRow9:
C UNITRow9:
D UNIT PRICERow9:
E ESTIMATED AMOUNTRow9:
D UNIT PRICERow9_2:
E ESTIMATED AMOUNTRow9_2:
D UNIT PRICERow9_3:
E ESTIMATED AMOUNTRow9_3:
D UNIT PRICERow9_4:
E ESTIMATED AMOUNTRow9_4:
A ITEM NORow10:
B ESTIMATED QUANTITYRow10:
C UNITRow10:
D UNIT PRICERow10:
E ESTIMATED AMOUNTRow10:
D UNIT PRICERow10_2:
E ESTIMATED AMOUNTRow10_2:
D UNIT PRICERow10_3:
E ESTIMATED AMOUNTRow10_3:
D UNIT PRICERow10_4:
E ESTIMATED AMOUNTRow10_4:
A ITEM NORow11:
B ESTIMATED QUANTITYRow11:
C UNITRow11:
D UNIT PRICERow11:
E ESTIMATED AMOUNTRow11:
D UNIT PRICERow11_2:
E ESTIMATED AMOUNTRow11_2:
D UNIT PRICERow11_3:
E ESTIMATED AMOUNTRow11_3:
D UNIT PRICERow11_4:
E ESTIMATED AMOUNTRow11_4:
A ITEM NORow12:
B ESTIMATED QUANTITYRow12:
C UNITRow12:
D UNIT PRICERow12:
E ESTIMATED AMOUNTRow12:
D UNIT PRICERow12_2:
E ESTIMATED AMOUNTRow12_2:
D UNIT PRICERow12_3:
E ESTIMATED AMOUNTRow12_3:
D UNIT PRICERow12_4:
E ESTIMATED AMOUNTRow12_4:
A ITEM NORow13:
B ESTIMATED QUANTITYRow13:
C UNITRow13:
D UNIT PRICERow13:
E ESTIMATED AMOUNTRow13:
D UNIT PRICERow13_2:
E ESTIMATED AMOUNTRow13_2:
D UNIT PRICERow13_3:
E ESTIMATED AMOUNTRow13_3:
D UNIT PRICERow13_4:
E ESTIMATED AMOUNTRow13_4:
Reset Form:
EMAIL FORM:

File details come from the government source that posted it. Updated .