W911SA21B2007 Attachment 2 - TE-5 Construction.xlsx

XLSX spreadsheet 42 KB Posted

Attached to
Interior & Exterior Renovation of Various Buildings at Fort Hunter Liggett, CA
Solicitation number
W911SA21B2007
Issued by

About this file

This document contains a construction cost estimate template and instructions for its completion, as well as details of a federal contract opportunity for interior and exterior renovation work at multiple buildings located at Fort Hunter Liggett, California.

The construction cost estimate template includes three sheets to itemize material, labor, and other direct costs by line item for evaluation. Instructions specify providing unit descriptions and quantities, material and labor unit rates and totals, and other direct costs. The contract opportunity involves renovating five buildings and bathroom upgrades, with a period of performance through September 2022. The Army Materiel Command plans to issue a firm fixed-price invitation for bids under full and open competition valued between $1 million and $5 million in July 2021. Interested parties can add themselves to the vendor list but will not receive direct notifications.

View the file

Other files

File Type Posted
W911SA21B2007 Abstract Page 2.pdf PDF
W911SA21B2007 Abstract Page 3.pdf PDF
W911SA21B2007 Signed Abstract Page 1.pdf PDF
W911SA21B2007 Complete Abstract.pdf PDF
W911SA21B2007 Attachment 18 Picture Flooring.jpeg JPEG file
W911SA21B2007 Amendment 0002.docx DOCX document
W911SA21B2007 Attachment 17 Picture Flooring.jpeg JPEG file
W911SA21B2007 Attachment 15 Picture Flooring.jpeg JPEG file
W911SA21B2007 Attachment 13 Picture Flooring.jpeg JPEG file
W911SA21B2007 Attachment 16 Picture Flooring.jpeg JPEG file
W911SA21B2007 Attachment 14 Picture Flooring.jpeg JPEG file
W911SA21B2007 Attachment 8 Wage Determination 22 July 2021.pdf PDF
W911SA21B2007 Attachment 11 Picture Sidewalk Repairs.pdf PDF
W911SA21B2007 Attachment 12 Bldg 301 Asbestos Survey.pdf PDF
W911SA21B2007 Amendment 0001.docx DOCX document
W911SA21B2007 Attachment 2 SOW Updated 23 July 2021.docx DOCX document
W911SA21B2007 Site Visit Sign In Sheet.pdf PDF
W911SA21B2007 Attachment 5 Bldg 301C Floor Plan.pdf PDF
W911SA21B2007 Attachment 1 AT OPSEC.pdf PDF
W911SA21B2007 Attachment 4 Bldg 301B Floor Plan.pdf PDF
W911SA21B2007 Attachment 8 Wage Determination.pdf PDF
W911SA21B2007 Attachment 6 Bldg 301J Floor Plan.pdf PDF
W911SA21B2007 Attachment 2 SOW.pdf PDF
W911SA21B2007 Attachment 3 Bldg 301 Plans.pdf PDF
W911SA21B2007 Attachment 9 SF 24 Sample.pdf PDF
W911SA21B2007 Solicitation.docx DOCX document
W911SA21B2007 Attachment 7 Bldg 296 Floor Plan.pdf PDF
W911SA21B2007 Attachment 10 FHL Form 7.pdf PDF
W911SA21B2007 Attachment 5 - Bldg. 301 Main.pdf PDF
W911SA21B2007 Attachment 7 - Fort Hunter Liggett 301C Floor 01.pdf PDF
W911SA21B2007 Attachment 4 - SOW -Reno 301 Complex.pdf PDF
W911SA21B2007 Attachment 6 - Fort Hunter Liggett 301B Floor 01.pdf PDF
W911SA21B2007 Attachment 3 - COVID-19 Site Visit Information.docx DOCX document
W911SA21B2007 Attachment 8 - Fort Hunter Liggett 301J Floor 01.pdf PDF
W911SA21B2007 Attachment 1 - Wage Determinations.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet 1

OMB No. 0704-0193
CONSTRUCTION COST ESTIMATE BREAKDOWN
*Please seen Note below when adding rows or Divisions on this sheetMS Excel V5.0 1994
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
ERROR:#VALUE!
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
MATERIAL COSTLABOR COST
UNITOTHER
LINEITEMOFQTYMNHRSAVERAGEDIRECTLINE
NO.MEAUNITTOTALRATETOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
General Requirement- 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Site Construction$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Concrete$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Masonry$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Metals$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SUMS H E E T T O T A LLS$ - 0$ - 0$ - 0$ - 0

NOTE: Do not exceed two decimal places. You may relabel divisions as needed, but if more divisions or rows are needed, bidders may add them, but are cautioned that formulas may need to be adjusted to calculate costs correctly.

To minimize format issues when adding line items to existing divisions on sheet, you can select single or multiple rows within that division, copy and right click copied rows to select Insert Copy Cells.

SOLICITATION NUMBER ______________

&"Arial,Bold"FOR OFFICIAL USE ONLY

Sheet 2

OMB No. 0704-0193
CONSTRUCTION COST ESTIMATE BREAKDOWN
*Please seen Note below when adding rows or Divisions on this sheetMS Excel V5.0 1994
CONTRACTORADDRESS
00
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
0ERROR:#VALUE!
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
000
MATERIAL COSTLABOR COST
UNITOTHER
LINEITEMOFQTYMNHRSAVERAGEDIRECTLINE
NO.MEAUNITTOTALRATETOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
Woods and Plactics$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Thermal and Moisture Protection$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Doors and Windows$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Finishes$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Specialities$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SUMS H E E T T O T A LLS$ - 0$ - 0$ - 0$ - 0

NOTE: Do not exceed two decimal places. You may relabel divisions as needed, but if more divisions or rows are needed, bidders may add them, but are cautioned that formulas may need to be adjusted to calculate costs correctly.

To minimize format issues when adding line items to existing divisions on sheet, you can select single or multiple rows within that division, copy and right click copied rows to select Insert Copy Cells.

&"Arial,Bold"FOR OFFICIAL USE ONLY

Sheet 3

OMB No. 0704-0193
CONSTRUCTION COST ESTIMATE BREAKDOWN
*Please seen Note below when adding rows or Divisions on this sheetMS Excel V5.0 1994
CONTRACTORADDRESS
00
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
0ERROR:#VALUE!
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
000
MATERIAL COSTLABOR COST
UNITOTHER
LINEITEMOFQTYMNHRSAVERAGEDIRECTLINE
NO.MEAUNITTOTALRATETOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
Equipment$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Furnishings$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Special Construction$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Conveying Systems$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Mechanical/Plumbing$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Electrical$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SUMS H E E T T O T A LLS$ - 0$ - 0$ - 0$ - 0

NOTE: Do not exceed two decimal places. You may relabel divisions as needed, but if more divisions or rows are needed, bidders may add them, but are cautioned that formulas may need to be adjusted to calculate costs correctly.

To minimize format issues when adding line items to existing divisions on sheet, you can select single or multiple rows within that division, copy and right click copied rows to select Insert Copy Cells.

&"Arial,Bold"FOR OFFICIAL USE ONLY

Sub-Total

OMB No. 0704-0193
CONSTRUCTION COST ESTIMATE BREAKDOWN
MS Excel V5.0 1994
CONTRACTORADDRESS
00
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
0ERROR:#VALUE!
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
000
MATERIAL COSTLABOR COST
UNITOTHER
LINEITEMOFQTYMNHRSAVERAGEDIRECTLINE
NO.MEAUNITTOTALRATETOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
SHEET 1LS$ - 0$ - 0$ - 0$ - 0
SHEET 2LS$ - 0$ - 0$ - 0$ - 0
SHEET 3LS$ - 0$ - 0$ - 0$ - 0

SUM S H E E T T O T A L LS $ - 0 $ - 0 $ - 0 $ - 0

SOLICITATION NUMBER _________________

&"Arial,Bold"FOR OFFICIAL USE ONLY

REVERSESIDE

INSTRUCTION FOR COMPLETING THE CONSTRUCTION COST ESTIMATE
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to
permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards -- SY, cubic yards -CY, square
feet-SF, linear feet-LF, board feet-BF, each-EA, pound -LB).
Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be fur-
nished by the Government, Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will
be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit material cost (Col 4) to be supplied. The total cost (col 5) is automatically calculated (Col 3 * Col 4).

Col 6, 7 and 8 Labor Costs. In Col 6 edit the existing equation by entering manhours per unit * Col 2. In Col 7, enter the average wage rate
for the discipline involved. Col 8 is automatically calculated (Col 6 * Col 7).
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract
and of significant dollar value.

Col 10 Line Total. Col 10 is automatically calculated.

NOTE: In addition to other totals entered on various pages, the grand total of column 10, plus OH & P will be shown on the last page as follows.

TOTAL MATERIAL COSTS $ - 0

TOTAL LABOR COSTS $ - 0

TOTAL OTHER DIRECT COSTS $ - 0

TOTAL DIRECT COSTS $ - 0

LABOR BURDEN _________% ERROR:#VALUE!

OVERHEAD _________% ERROR:#VALUE!

PROFIT _________% ERROR:#VALUE!

BID BOND _________% ERROR:#VALUE!

TOTAL PRICE ERROR:#VALUE!

DATE NAME

TITLEBY
(Signature)
INSTRUCTIONS TO ESTIMATORS
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and
estimated costs (and attached supporting information) suitable for detailed review and analysis.
2. In addition to the specific information required by this form, incorporate in and submit with this
form any additional data, supporting schedules, or substantioation which are reasonably required for the conduct of an appropriate review
analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from known data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, it is critical the estimator's "estimating process" is documented.

SOLICITATION NUMBER _______________

&"Arial,Bold"FOR OFFICIAL USE ONLY

File details come from the government source that posted it. Updated .