W911SA21B2007 Attachment 2 - TE-5 Construction.xlsx
XLSX spreadsheet 42 KB Posted
- Solicitation number
- W911SA21B2007
About this file
This document contains a construction cost estimate template and instructions for its completion, as well as details of a federal contract opportunity for interior and exterior renovation work at multiple buildings located at Fort Hunter Liggett, California.
The construction cost estimate template includes three sheets to itemize material, labor, and other direct costs by line item for evaluation. Instructions specify providing unit descriptions and quantities, material and labor unit rates and totals, and other direct costs. The contract opportunity involves renovating five buildings and bathroom upgrades, with a period of performance through September 2022. The Army Materiel Command plans to issue a firm fixed-price invitation for bids under full and open competition valued between $1 million and $5 million in July 2021. Interested parties can add themselves to the vendor list but will not receive direct notifications.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet 1
| OMB No. 0704-0193 | |||
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |||
| *Please seen Note below when adding rows or Divisions on this sheet | MS Excel V5.0 1994 | ||
| CONTRACTOR | ADDRESS |
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |
| ERROR:#VALUE! | ||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION |
| MATERIAL COST | LABOR COST | |||||||||
| UNIT | OTHER | |||||||||
| LINE | ITEM | OF | QTY | MNHRS | AVERAGE | DIRECT | LINE | |||
| NO. | MEA | UNIT | TOTAL | RATE | TOTAL | COSTS | TOTAL | |||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| General Requirement | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Site Construction | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Concrete | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Masonry | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Metals | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| SUM | S H E E T T O T A L | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
NOTE: Do not exceed two decimal places. You may relabel divisions as needed, but if more divisions or rows are needed, bidders may add them, but are cautioned that formulas may need to be adjusted to calculate costs correctly.
To minimize format issues when adding line items to existing divisions on sheet, you can select single or multiple rows within that division, copy and right click copied rows to select Insert Copy Cells.
SOLICITATION NUMBER ______________
&"Arial,Bold"FOR OFFICIAL USE ONLY
Sheet 2
| OMB No. 0704-0193 | ||||||||||
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| *Please seen Note below when adding rows or Divisions on this sheet | MS Excel V5.0 1994 | |||||||||
| CONTRACTOR | ADDRESS | |||||||||
| 0 | 0 | |||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| 0 | ERROR:#VALUE! | |||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| 0 | 0 | 0 | ||||||||
| MATERIAL COST | LABOR COST | |||||||||
| UNIT | OTHER | |||||||||
| LINE | ITEM | OF | QTY | MNHRS | AVERAGE | DIRECT | LINE | |||
| NO. | MEA | UNIT | TOTAL | RATE | TOTAL | COSTS | TOTAL | |||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| Woods and Plactics | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Thermal and Moisture Protection | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Doors and Windows | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Finishes | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Specialities | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| SUM | S H E E T T O T A L | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
NOTE: Do not exceed two decimal places. You may relabel divisions as needed, but if more divisions or rows are needed, bidders may add them, but are cautioned that formulas may need to be adjusted to calculate costs correctly.
To minimize format issues when adding line items to existing divisions on sheet, you can select single or multiple rows within that division, copy and right click copied rows to select Insert Copy Cells.
&"Arial,Bold"FOR OFFICIAL USE ONLY
Sheet 3
| OMB No. 0704-0193 | ||||||||||
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| *Please seen Note below when adding rows or Divisions on this sheet | MS Excel V5.0 1994 | |||||||||
| CONTRACTOR | ADDRESS | |||||||||
| 0 | 0 | |||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| 0 | ERROR:#VALUE! | |||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| 0 | 0 | 0 | ||||||||
| MATERIAL COST | LABOR COST | |||||||||
| UNIT | OTHER | |||||||||
| LINE | ITEM | OF | QTY | MNHRS | AVERAGE | DIRECT | LINE | |||
| NO. | MEA | UNIT | TOTAL | RATE | TOTAL | COSTS | TOTAL | |||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Furnishings | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Special Construction | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Conveying Systems | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Mechanical/Plumbing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Electrical | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| SUM | S H E E T T O T A L | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
NOTE: Do not exceed two decimal places. You may relabel divisions as needed, but if more divisions or rows are needed, bidders may add them, but are cautioned that formulas may need to be adjusted to calculate costs correctly.
To minimize format issues when adding line items to existing divisions on sheet, you can select single or multiple rows within that division, copy and right click copied rows to select Insert Copy Cells.
&"Arial,Bold"FOR OFFICIAL USE ONLY
Sub-Total
| OMB No. 0704-0193 | ||||||||||
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| MS Excel V5.0 1994 | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| 0 | 0 | |||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| 0 | ERROR:#VALUE! | |||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| 0 | 0 | 0 | ||||||||
| MATERIAL COST | LABOR COST | |||||||||
| UNIT | OTHER | |||||||||
| LINE | ITEM | OF | QTY | MNHRS | AVERAGE | DIRECT | LINE | |||
| NO. | MEA | UNIT | TOTAL | RATE | TOTAL | COSTS | TOTAL | |||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| SHEET 1 | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| SHEET 2 | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| SHEET 3 | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
SUM S H E E T T O T A L LS $ - 0 $ - 0 $ - 0 $ - 0
SOLICITATION NUMBER _________________
&"Arial,Bold"FOR OFFICIAL USE ONLY
REVERSESIDE
| INSTRUCTION FOR COMPLETING THE CONSTRUCTION COST ESTIMATE |
| Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to |
| permit itemizing of all direct costs. |
| Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards -- SY, cubic yards -CY, square |
| feet-SF, linear feet-LF, board feet-BF, each-EA, pound -LB). |
| Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be fur- |
| nished by the Government, Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will |
| be issued. Otherwise, the contractor is responsible for determining quantity estimates. |
Col 4 and 5 Material Costs. Enter unit material cost (Col 4) to be supplied. The total cost (col 5) is automatically calculated (Col 3 * Col 4).
| Col 6, 7 and 8 Labor Costs. In Col 6 edit the existing equation by entering manhours per unit * Col 2. In Col 7, enter the average wage rate |
| for the discipline involved. Col 8 is automatically calculated (Col 6 * Col 7). |
| Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract |
| and of significant dollar value. |
Col 10 Line Total. Col 10 is automatically calculated.
NOTE: In addition to other totals entered on various pages, the grand total of column 10, plus OH & P will be shown on the last page as follows.
TOTAL MATERIAL COSTS $ - 0
TOTAL LABOR COSTS $ - 0
TOTAL OTHER DIRECT COSTS $ - 0
TOTAL DIRECT COSTS $ - 0
LABOR BURDEN _________% ERROR:#VALUE!
OVERHEAD _________% ERROR:#VALUE!
PROFIT _________% ERROR:#VALUE!
BID BOND _________% ERROR:#VALUE!
TOTAL PRICE ERROR:#VALUE!
DATE NAME
| TITLE | BY | ||
| (Signature) | |||
| INSTRUCTIONS TO ESTIMATORS |
| 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and |
| estimated costs (and attached supporting information) suitable for detailed review and analysis. |
| 2. In addition to the specific information required by this form, incorporate in and submit with this |
| form any additional data, supporting schedules, or substantioation which are reasonably required for the conduct of an appropriate review |
| analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of |
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from known data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, it is critical the estimator's "estimating process" is documented.
SOLICITATION NUMBER _______________