This document contains a template for a construction cost estimate breakdown to be submitted in response to a federal solicitation. The solicitation seeks to provide all parts, labor, tools, equipment, materials, transportation, and supervision necessary to perform design-build projects for the 63rd Regional District, Region 2 in Texas, in accordance with the specifications, drawings, and contract documents. The cost estimate template is comprised of three sheets to itemize material, labor, and other direct costs by line item in columns for quantity, unit of measure, unit costs, extended costs, and totals. Instructions are provided on completing the template to sufficiently detail all direct costs and document the estimator's process for the government's review and analysis during negotiations.

View the file

Other files for this federal contract opportunity

Other files attached to 63rd RD MAID-IQ Region 2, TX, newest first.
File Type Posted
W911SA20B2003 Bid Abstract.pdf PDF
W911SA20B2003 Attachment 7 Wage Determinations Revised 3-17-20.docx DOCX document
W911SA20B20030007 Solicitation Amendment 0007.docx DOCX document
W911SA20B20030006 Solicitation Amendment 0006.docx DOCX document
W911SA20B20030005 Solicitation Amendment 0005.docx DOCX document
W911SA20B2003 Attachment 4 SOW Seed Project Revised 3-9-20.docx DOCX document
W911SA20B2003 Attachment 7 Wage Determinations.docx DOCX document
W911SA20B2003 Attachment 5 Drawings Seed Project Revised 3-9-20.pdf PDF
W911SA20B20030004 Solicitation Amendment 0004.docx DOCX document
W911SA20B2003 Attachment 9 Asbestos Report Seed Project.pdf PDF
W911SA20B2003 Attachment 10 LBP Report Seed Project.pdf PDF
W911SA20B2003 Attachment 4 SOW Seed Project Revised 3-4-20.pdf PDF
W911SA20B2003 Attachment 5 Drawings Seed Project Revised 3-4-20.pdf PDF
W911SA20B20030003 Solicitation Amendment 0003.docx DOCX document
W911SA20B20030002 Solicitation Amendment 0002.docx DOCX document
W911SA20B20030001 Solicitation Amendment 0001.docx DOCX document
W911SA20B2003 Site Visit Sign In Sheet.pdf PDF
W911SA20B2003 Attachment 5 Drawings Seed Project.pdf PDF
W911SA20B2003 Attachment 1 AT OPSEC.pdf PDF
W911SA20B2003 Attachment 8 SF24.pdf PDF
W911SA20B2003 Attachment 3 SOW.docx DOCX document
W911SA20B2003 Solicitation.docx DOCX document
W911SA20B2003 Attachment 4 SOW Seed Project.docx DOCX document
W911SA20B2003 Attachment 2 AT OPSEC Seed Project.pdf PDF
W911SA20B2003 Attachment 7 Wage Determinations.xlsx XLSX spreadsheet
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet 1

OMB No. 0704-0193
CONSTRUCTION COST ESTIMATE BREAKDOWN
MS Excel V5.0 1994
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
ERROR:#VALUE!
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
MATERIAL COSTLABOR COST
UNITOTHER
LINEITEMOFQTYMNHRSAVERAGEDIRECTLINE
NO.MEAUNITTOTALRATETOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
001General Requirement- 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
002$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
003$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
004Site Construction$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
005$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
006$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
007Concrete$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
008$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
009$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
010Masonry$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
011$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
012$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
013Metals$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
014$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
015$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SUMS H E E T T O T A LLS$ - 0$ - 0$ - 0$ - 0
Note: DO NOT EXCEED two decimal places.
Note: If more rows are needed, bidders may add them, but are cautioned that formulas will need to be adjusted to calculate costs correctly

SOLICITATION NUMBER ______________

&"Arial,Bold"FOR OFFICIAL USE ONLY

Sheet 2

OMB No. 0704-0193
CONSTRUCTION COST ESTIMATE BREAKDOWN
MS Excel V5.0 1994
CONTRACTORADDRESS
00
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
0ERROR:#VALUE!
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
000
MATERIAL COSTLABOR COST
UNITOTHER
LINEITEMOFQTYMNHRSAVERAGEDIRECTLINE
NO.MEAUNITTOTALRATETOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
016Woods and Plactics$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
017$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
018$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
019Thermal and Moisture Protection$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
020$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
021$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
022Doors and Windows$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
023$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
024$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
025Finishes$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
026$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
027$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
028Specialities$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
029$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
030$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SUMS H E E T T O T A LLS$ - 0$ - 0$ - 0$ - 0

&"Arial,Bold"FOR OFFICIAL USE ONLY

Sheet 3

OMB No. 0704-0193
CONSTRUCTION COST ESTIMATE BREAKDOWN
MS Excel V5.0 1994
CONTRACTORADDRESS
00
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
0ERROR:#VALUE!
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
000
MATERIAL COSTLABOR COST
UNITOTHER
LINEITEMOFQTYMNHRSAVERAGEDIRECTLINE
NO.MEAUNITTOTALRATETOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
031Equipment$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
032$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
033$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
034Furnishings$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
035$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
036$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
037Special Construction$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
038$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
039Conveying Systems$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
040$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
041Mechanical/Plumbing$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
042$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
043$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
044Electrical$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
045$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SUMS H E E T T O T A LLS$ - 0$ - 0$ - 0$ - 0

&"Arial,Bold"FOR OFFICIAL USE ONLY

Sub-Total

OMB No. 0704-0193
CONSTRUCTION COST ESTIMATE BREAKDOWN
MS Excel V5.0 1994
CONTRACTORADDRESS
00
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
0ERROR:#VALUE!
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
000
MATERIAL COSTLABOR COST
UNITOTHER
LINEITEMOFQTYMNHRSAVERAGEDIRECTLINE
NO.MEAUNITTOTALRATETOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
SHEET 1LS$ - 0$ - 0$ - 0$ - 0
SHEET 2LS$ - 0$ - 0$ - 0$ - 0
SHEET 3LS$ - 0$ - 0$ - 0$ - 0

SUM S H E E T T O T A L LS $ - 0 $ - 0 $ - 0 $ - 0

SOLICITATION NUMBER _________________

&"Arial,Bold"FOR OFFICIAL USE ONLY

REVERSESIDE

INSTRUCTION FOR COMPLETING THE CONSTRUCTION COST ESTIMATE
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to
permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards -- SY, cubic yards -CY, square
feet-SF, linear feet-LF, board feet-BF, each-EA, pound -LB).
Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be fur-
nished by the Government, Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will
be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit material cost (Col 4) to be supplied. The total cost (col 5) is automatically calculated (Col 3 * Col 4).

Col 6, 7 and 8 Labor Costs. In Col 6 edit the existing equation by entering manhours per unit * Col 2. In Col 7, enter the average wage rate
for the discipline involved. Col 8 is automatically calculated (Col 6 * Col 7).
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract
and of significant dollar value.

Col 10 Line Total. Col 10 is automatically calculated.

NOTE: In addition to other totals entered on various pages, the grand total of column 10, plus OH & P will be shown on the last page as follows.

TOTAL MATERIAL COSTS $ - 0

TOTAL LABOR COSTS $ - 0

TOTAL OTHER DIRECT COSTS $ - 0

TOTAL DIRECT COSTS $ - 0

LABOR BURDEN _________% ERROR:#VALUE!

OVERHEAD _________% ERROR:#VALUE!

PROFIT _________% ERROR:#VALUE!

BID BOND _________% ERROR:#VALUE!

TOTAL PRICE ERROR:#VALUE!

DATE NAME

TITLEBY
(Signature)
INSTRUCTIONS TO ESTIMATORS
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and
estimated costs (and attached supporting information) suitable for detailed review and analysis.
2. In addition to the specific information required by this form, incorporate in and submit with this
form any additional data, supporting schedules, or substantioation which are reasonably required for the conduct of an appropriate review
analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from known data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, it is critical the estimator's "estimating process" is documented.