UFC 4-171-05
1 January 2005
Including Change 3, 1 February 2010
UNIFIED FACILITIES CRITERIA (UFC)
ARMY RESERVE FACILITIES
APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED
UNIFIED FACILITIES CRITERIA (UFC)
DESIGN GUIDE: ARMY RESERVE FACILITIES
Any copyrighted material included in this UFC is identified at its point of use.
Use of the copyrighted material apart from this UFC must have the permission of the copyright holder.
U.S. ARMY CORPS OF ENGINEERS (Preparing Activity)
NAVAL FACILITIES ENGINEERING COMMAND
AIR FORCE CIVIL ENGINEER SUPPORT AGENCY
Record of Changes (changes are indicated by \1\ ... /1/)
Change No. Date Location
1 1 Jan 2005 Multiple criteria and editorial adjustments 2 25 Oct 2006 Multiple criteria adjustments. Multiple unmarked formatting and editorial adjustments 3 1 Feb 2010 Multiple criteria adjustment. Multiple unmarked formatting and editorial adjustments.
Note: This 1 February 2010 edition of UFC 4-171-05 is the 25 October 2006 edition of UFC 4-171-05 with multiple marked criteria adjustments and unmarked editorial adjustments. Note change marks incorporated in this edition include changes from the 1 January 2005 edition.
This UFC supersedes UFC 4-171-05, Design: Guide For Army Reserve Facilities dated 1 January 2005 and incorporates the above listed changes.
FOREWORD
The Unified Facilities Criteria (UFC) system is prescribed by MIL-STD 3007 and provides planning, design, construction, sustainment, restoration, and modernization criteria, and applies to the Military Departments, the Defense Agencies, and the DoD Field Activities in accordance with USD(AT&L) Memorandum dated 29 May 2002. UFC will be used for all DoD projects and work for other customers where appropriate.
UFC are living documents and will be periodically reviewed, updated, and made available to users as part of the Services’ responsibility for providing technical criteria for military construction. Headquarters, U.S. Army Corps of Engineers (HQUSACE), Naval Facilities Engineering Command (NAVFAC), and Air Force Civil Engineer Support Agency (AFCESA) are responsible for administration of the UFC system. Defense agencies should contact the preparing service for document interpretation and improvements. Technical content of UFC is the responsibility of the cognizant DoD working group. Recommended changes with supporting rationale should be sent to the respective service proponent office by the following electronic form: Criteria Change Request (CCR). The form is also accessible from the Internet sites listed below.
UFC are effective upon issuance and are distributed only in electronic media from the following source:
Whole Building Design Guide (WBDG) web site http://dod.wbdg.org.
Hard copies of UFC printed from electronic media should be checked against the current electronic version prior to use to ensure that they are current.
AUTHORIZED BY:
http://www.hnd.usace.army.mil/TECHINFO/UFC/052902_SignedUFCImplementationMemo.pdf https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=CCRPublicAgencySelect http://dod.wbdg.org/
Including Change 3, 1 February 2010
Contents
Page CHAPteR 1 IntRoDUCtIon AnD GeneRAL InFoRMAtIon
| 1-1 | PURPOSE | OF | THE | DESIGN | GUIDE | .....................................................1 |
| 1-2 | SCOPE | OF | THE | DESIGN | GUIDE | ..........................................................1 |
| 1-3 | ARMY | RESERVE | CADD | PLATFORM | ....................................................2 | |
| 1-4 | FORMAT | OF | THE | DESIGN | GUIDE | ........................................................3 |
| 1-5 | PROJECT | PARTICIPANT | RESPONSIBILITIES | .....................................3 | ||
| 1-6 | PURPOSE | OF | THE | ARMY | RESERVE | ...................................................5 |
| 1-7 | QUALITY | OF | DESIGN | ............................................................................6 | ||
| 1-8 | PROJECT | DELIVERY | .............................................................................7 | |||
| 1-9 | PROGRAM | SYNOPSIS | ..........................................................................7 | |||
| 1-10 | USAR | PROJECT | FUNDING | .................................................................10 | ||
| 1-11 | CONSTRUCTION | CONTRACT | AWARD | ..............................................11 |
CHAPteR 2 PLAnnInG GUIDeLInes
| 2-1 | INTRODUCTION | ..................................................................................12 | ||||||
| 2-2 | DESIGN | AND | REGULATORY | CRITERIA | AND | THEIR | APPLICATION | 12 |
| 2-3 | ENVIRONMENTAL | ...............................................................................14 | ||||||
| 2-4 | SITE | SELECTION | AND | PLANNING | .....................................................15 | |||
| 2-5 | ANTITERRORISM/FORCE | PROTECTION | (AT/FP) | .............................20 | ||||
| 2-6 | LANDSCAPE | ........................................................................................21 | ||||||
| 2-7 | BUILDINGS | ...........................................................................................22 | ||||||
| 2-8 | FIRE | PROTECTION/LIFE | SAFETY | ......................................................32 | ||||
| 2-9 | INTERIOR | DESIGN | ..............................................................................32 | |||||
| 2-10 | INFORMATION | TECHNOLOGY | ...........................................................33 | |||||
| 2-11 | SIGNAGE | ..............................................................................................34 | ||||||
| 2-12 | ACCESSIBILITY | ...................................................................................35 | ||||||
| 2-13 | SECURITY | ............................................................................................35 |
CHAPteR 3 GeneRAL DesIGn ConsIDeRAtIons
| 3-1 | INTRODUCTION | ..................................................................................36 | ||||
| 3-2 | CIVIL | AND | UTILITIES | ...........................................................................36 | ||
| 3-3 | LANDSCAPE | ARCHITECTURE | ...........................................................47 | |||
| 3-4 | FIRE | PROTECTION | / | LIFE | SAFETY | ....................................................48 |
| 3-5 | ARCHITECTURAL | ................................................................................50 | ||||
| 3-6 | INTERIOR | DESIGN | ..............................................................................55 | |||
| 3-7 | STRUCTURAL | ......................................................................................59 | ||||
| 3-8 | MECHANICAL | .......................................................................................63 | ||||
| 3-9 | PLUMBING | ...........................................................................................66 | ||||
| 3-10 | ELECTRICAL | ........................................................................................66 | ||||
| 3-11 | SPECIFICATIONS | ................................................................................76 | ||||
| 3-12 | COST | ESTIMATING | .............................................................................78 | |||
| 3-13 | ENERGY | CONSERVATION | ..................................................................79 | |||
| 3-14 | ANTITERRORISM | FORCE | PROTECTION | ..........................................80 | ||
| 3-15 | ACCESSIBILITY | ...................................................................................81 | ||||
| 3-16 | ENVIRONMENTAL | ...............................................................................81 |
Including Change 3, 1 February 2010
CHAPteR 4 InDIVIDUAL sPACe CRIteRIA
| 4-1 | GENERAL | .............................................................................................85 | ||
| 4-2 | TRAINING | CENTER | BUILDING | ...........................................................86 |
| 4-2.1 | Full-time | Offices | ....................................................................................86 | |
| 4-2.2 | Unit | Exclusive | Offices | ...........................................................................87 |
| 4-2.3 | Unit | Commons | ......................................................................................88 | |
| 4-2.4 | Recruiting/Retention | Office | ...................................................................89 | |
| 4-2.5 | Family | Support | Office | ...........................................................................90 |
| 4-2.6 | Administrative | Support | ..........................................................................91 |
| 4-2.6.1 | Ma�l | Room | .........................................................................91 |
| 4-2.6.2 | Reproduction.....................................................................92 |
| 4-2.7 Information | Technology | (IT) | Spaces | .....................................................93 | ||
| 4-2.7.1 | IT | Spaces | - | General | Information | .......................................93 |
| 4-2.7.2 | Entrance | Facility | (EF) | .......................................................94 | ||
| 4-2.7.3 | Telecommunications | Equipment | Room | (TER) | ..................95 | |
| 4-2.7.4 | Telecommunications | Room | (TR) | .......................................97 | ||
| 4-2.7.5 | IT | Work | Space | ..................................................................98 |
| 4-2.8 | Lobby | ....................................................................................................99 | ||||
| 4-2.9 | Assembly | Hall | .....................................................................................100 | |||
| 4-2.10 | Chair | and | Table | Storage | .....................................................................102 | |
| 4-2.11 | Kitchen | ................................................................................................103 | ||||
| 4-2.12 | Arms | Vault | ...........................................................................................104 | |||
| 4-2.13 | Armorer’s | Room | ..................................................................................107 | |||
| 4-2.14 | Classrooms | .........................................................................................108 | ||||
| 4-2.15 | Library | Reading | Room | ........................................................................ 111 | ||
| 4-2.16 | Library | Storage | ...................................................................................112 | |||
| 4-2.17 | Learning | Center | ..................................................................................112 | |||
| 4-2.18 | Training | Aids | Storage | ..........................................................................113 | ||
| 4-2.19 | COMSEC | Storage | ...............................................................................114 | |||
| 4-2.20 | Unit/Individual | Storage | ........................................................................115 | |||
| 4-2.21 | Staging | Area | .......................................................................................117 | |||
| 4-2.22 | Supply | Office | .......................................................................................118 | |||
| 4-2.23 | Janitorial | ..............................................................................................119 | ||||
| 4-2.24 | Flammable | Storage | .............................................................................120 | |||
| 4-2.25 | Controlled | Waste | Storage | ...................................................................120 | ||
| 4-2.26 | Facility | Maintenance | Storage | ..............................................................120 | ||
| 4-2.27 | Weapons | Simulator | .............................................................................121 | |||
| 4-2.28 | Band | Room | .........................................................................................123 | |||
| 4-2.29 | Medical | Section | ...................................................................................123 | |||
| 4-2.30 | Physical | Exam | Wing | ...........................................................................124 | ||
| 4-2.31 | Secure | Compartmented | Information | Facility | (SCIF) | ...........................124 |
| 4-2.32 | Soils | Testing | Lab | .................................................................................124 | ||
| 4-2.33 | Conference | Room | ...............................................................................124 | |||
| 4-2.34 | Drafting | Room | .....................................................................................126 | |||
| 4-2.35 | Physical | Readiness | Training | ...............................................................127 |
Contents Continued
Page
Including Change 3, 1 February 2010
| 4-2.36 | Army | Global | Command | Control | System | (AGCCS | ) | ............................128 |
| 4-2.37 | Distance | Learning | Center | ...................................................................129 | ||||
| 4-2.38 | Male | and | Female | Toilets | and | Showers | ...............................................130 | |
| 4-2.39 | Accessible | Unisex | Toilet | .....................................................................131 | ||||
| 4-2.40 | Male | and | Female | Locker | Rooms | ........................................................131 | ||
| 4-2.41 | Vending | Alcove | ...................................................................................133 | |||||
| 4-2.42 | Break | Area | ..........................................................................................133 | |||||
| 4-2.43 | Mechanical | ..........................................................................................134 | ||||||
| 4-2.44 | Electrical | .............................................................................................135 | ||||||
| 4-2.45 | Circulation | ...........................................................................................136 | ||||||
| 4-2.46 | Stairs | ...................................................................................................137 | ||||||
| 4-2.47 | SIPRNET | Cafe | ....................................................................................138 | |||||
| 4-2.48 | EOC | - | Emergency | Operations | Center | ................................................141 | ||
| 4-3 | ORGANIZATIONAL | MAINTENANCE | SHOP | ......................................142 | ||||
| 4-3.1 | Shop | Office | .........................................................................................142 | |||||
| 4-3.2 | Male | and | Female | Toilets | .....................................................................143 | |||
| 4-3.4 | Storage | Room | .....................................................................................144 | |||||
| 4-3.5 | Special | Equipment | Alcove | ..................................................................145 | ||||
| 4-3.6 | Battery | Room | ......................................................................................146 | |||||
| 4-3.7 | Flammable | Storage | .............................................................................146 | |||||
| 4-3.8 | Controlled | Waste | Storage | ...................................................................147 | ||||
| 4-3.9 | Workbays | ............................................................................................148 | ||||||
| 4-3.10 | Mechanical/Electricall | .........................................................................152 | ||||||
| 4-3.11 | Information | Technology | .......................................................................153 | |||||
| 4-3.12 | Custodial/Janitorial | ..............................................................................153 | ||||||
| 4-5 | AREA | MAINTENANCE | SUPPORT | ACTIVITY | (AMSA) | ......................154 | ||
| 4-5.1 | General | ...............................................................................................154 | ||||||
| 4-5.2 | AMSA | Workbays | .................................................................................154 | |||||
| 4-5.3 | Small | Arms | Shop | and | Vault | ................................................................155 | ||
| 4-5.4 | Supply | .................................................................................................155 | ||||||
| 4-5.5 | Electrical/Communications | Repair | ......................................................156 | |||||
| 4-5.6 | Breakroom | ..........................................................................................156 | ||||||
| 4-5.7 | Male | and | Female | Locker | Rooms | ........................................................156 | ||
| 4-5.8 | Male | and | Female | Toilets | and | Showers | ...............................................157 | |
| 4-5.9 | Battery | Room | ......................................................................................157 | |||||
| 4-6 | DIRECT | SUPPORT/GENERAL | SUPPORT | (DS/GS) | .........................158 | |||
| 4-7 | DEPLOYABLE | MEDICAL | SETS | (DEPMEDS) | ....................................159 | |||
| 4-8 | WAREHOUSE | .....................................................................................159 |
Page
Including Change 3, 1 February 2010 iv
APPenDICes
| APPENDIX | A | References | ................................................................................161 | ||||||||
| APPENDIX | B | Acronyms | and | Military | Rank | Designations................................167 | |||||
| APPENDIX | C | OMAR-Funded | Items | ................................................................173 | |||||||
| APPENDIX | D | Sample | 1390, | 1391, | AND | 5034R | - | Functional | Space | Detail | .....175 |
| APPENDIX | E | Standard | Kitchen | Plan | and | Equipment | List...............................199 | ||||
| APPENDIX | F | Toilet | Room | Fixture | Counts | .......................................................201 | |||||
| APPENDIX | G | Band | Room | ...............................................................................205 | |||||||
| APPENDIX | H | Secure | Compartmented | Information | Facilities | (SCIF) | .............207 | ||||
| APPENDIX | I | Physical | Exam | Wing | .................................................................209 | ||||||
| APPENDIX | J | Equipment | Concentration | Site | (ECS)........................................212 | ||||||
| APPENDIX | K | Roof | Systems | for | Army | Reserve | Projects | .................................214 | |||
| APPENDIX | L | Physical | Readiness | Room | Equipment | Matrix | ...........................219 | ||||
| APPENDIX | M | Sample | Projects | and | Photography | Credits | ...............................220 |
Page
Including Change 3, 1 February 2010 v
FIGURes
| Figure | T�tle | Page | ||||
| 1-1 | USARC, | Ft | Dodge, | Iowa | .........................................................................1 | |
| 1-2 | Project | Guidance | ....................................................................................2 | |||
| 1-3 | USARC, | Camp | Parks, | California | ............................................................2 | |
| 1-4 | ARRTC | VOQ, | Ft. | McCoy, | Wisconsin | ......................................................4 |
| 1-5 | Total | Systems | Design | .............................................................................6 | ||
| 1-6 | USARC, | Camp | Parks, | California | ............................................................7 | |
| 1-7 | OMS/DS-GS, | Arden | Hills, | Minnesota | .....................................................9 | |
| 2-1 | Project | Design | Development | ................................................................12 | ||
| 2-2 | USARC, | Green | Bay, | Wisconsin | ............................................................13 | |
| 2-3 | Site | Access | ...........................................................................................15 | |||
| 2-4 | Typical | Reserve | Center | Site | Plan | .........................................................15 |
| 2-5 | Typical | AMSA | Site | Plan | ........................................................................16 | |
| 2-6 | Typical | ECS | Site | Plan | ...........................................................................16 | |
| 2-7 | Landscape | Planting | ..............................................................................21 | |||
| 2-8 | ARRTC | VOQ, | Ft. | McCoy, | Wisconsin | ....................................................23 |
| 2-9 | Flexibility | for | Future | ..............................................................................23 | ||
| 2-10 | Training | Center | Adjacencies | .................................................................25 | ||
| 2-11 | USARC, | Green | Bay, | Wisconsin | ............................................................25 | |
| 2-12 | Lobby | and | Full-time | Office | ....................................................................26 | |
| 2-13 | Office/Unit | Common | Relationship | ........................................................26 | ||
| 2-14 | Multiple | Unit | Commons | ........................................................................26 | ||
| 2-15 | USARC, | Ft. | Dodge, | Iowa | ......................................................................27 | |
| 2-16 | Assembly | Hall | Adjacencies | ...................................................................27 | ||
| 2-17 | Janitorial | and | Toilets | .............................................................................28 | ||
| 2-18 | Conference | Room | ................................................................................29 | |||
| 2-19 | OMS | Schematic | Diagram | .....................................................................30 | ||
| 2-20 | Shop | Office | Views | ................................................................................31 | ||
| 2-21 | AMSA | Schematic | Diagram | ...................................................................31 | ||
| 2-22 | ARRTC | VOQ, | Ft. | McCoy, | Wisconsin | ....................................................33 |
| 2-23 | USARC, | Ft. | Knox, | Kentucky | .................................................................34 | |
| 3-1 | ARRTC | VOQ, | Ft. | McCoy, | Wisconsin | ....................................................36 |
| 3-2 | ARRTC | VOQ, | Ft. | McCoy, | Wisconsin | ....................................................37 |
| 3-3 | USARC, | Camp | Parks, | California | ..........................................................41 | |
| 3-4 | USARC, | Camp | Parks, | California | ..........................................................43 | |
| 3-5 | USARC, | Sacramento, | California | ..........................................................47 | ||
| 3-6 | AFRC, | Greenville, | North | Carolina | ........................................................50 | |
| 3-7 | ARRTC | VOQ, | Ft. | McCoy, | Wisconsin | ....................................................53 |
| 3-8 | Duffel | Bag | Cage | Layout | .......................................................................54 | |
| 3-9 | USARC, | Camp | Parks, | California | ..........................................................56 | |
| 3-10 | USARC, | Arden | Hills, | Minnesota | ...........................................................62 | |
| 3-11 | Janitor’s | Closet | .....................................................................................66 | |||
| 3-12 | USARC, | Camp | Parks, | California | ..........................................................69 | |
| 3-13 | USARC, | Arden | Hills, | Minnesota | ...........................................................79 | |
| 3-14 | USARC, | Arden | Hills, | Minnesota | ...........................................................81 |
Including Change 3, 1 February 2010 vi
| 4-1 | Single | Office | .........................................................................................87 | |||||
| 4-2 | Shared | Office | - | A | ..................................................................................87 | |||
| 4-3 | Shared | Office | - | B | ..................................................................................87 | |||
| 4-4 | Unit | Commons | ......................................................................................88 | |||||
| 4-5 | Unit | Commons | ......................................................................................88 | |||||
| 4-6 | Recruiting | / | Retention | Office | .................................................................90 | |||
| 4-7 | Ma�l | Room | ............................................................................................91 | |||||
| 4-8 | Copy | Room | ...........................................................................................93 | |||||
| 4-9 | IT | Work | Space | ......................................................................................98 | ||||
| 4-10 | Lobby | ....................................................................................................99 | ||||||
| 4-11 | Assembly | Hall | and | Kitchen | .................................................................100 | |||
| 4-12 | Chair | and | Table | Storage | .....................................................................102 | |||
| 4-13 | Armorer’s | Room | and | Arms | Vault | ........................................................105 | ||
| 4-14 | Classroom | ..........................................................................................109 | ||||||
| 4-15 | Classroom | with | Operable | Partition | .....................................................110 | |||
| 4-16 | Library | Reading | Room | ........................................................................ 111 | ||||
| 4-17 | Library | Storage | ...................................................................................112 | |||||
| 4-18 | Learning | Center | ..................................................................................112 | |||||
| 4-19 | Training | Aids | Storage | .........................................................................113 | ||||
| 4-20 | Unit | Storage | with | Supply | Office | ..........................................................116 | ||
| 4-21 | Unit | Storage | with | Staging | and | Supply | Office | ......................................117 |
| 4-22 | Janitorial | .............................................................................................119 | ||||||
| 4-23 | Facility | Maintenance | Storage | .............................................................120 | ||||
| 4-24 | Weapons | Simulator | ............................................................................121 | |||||
| 4-25 | Conference | Room | ..............................................................................125 | |||||
| 4-26 | Physical | Readiness | Training | Room | ....................................................127 | |||
| 4-27 | AGCCS | ...............................................................................................129 | ||||||
| 4-28 | Shower | Room | .....................................................................................130 | |||||
| 4-29 | Unisex | Toilet | .......................................................................................131 | |||||
| 4-30 | Locker | Room | ......................................................................................132 | |||||
| 4-31 | Vending | Alcove | ...................................................................................133 | |||||
| 4-32 | Break | Area | ..........................................................................................134 | |||||
| 4-33 | Typical | Small | SIPRNET | Cafe | .............................................................139 | |||
| 4-34 | Typical | Large | SIPRNET | Cafe | .............................................................140 | |||
| 4-35 | Shop | Office | .........................................................................................142 | |||||
| 4-36 | Unisex | Toilet | .......................................................................................143 | |||||
| 4-37 | Tools | and | Parts | Storage | Room | ..........................................................144 | ||
| 4-38 | Flammable | Storage | ............................................................................146 | |||||
| 4-39 | Controlled | Waste | Storage | ...................................................................148 | ||||
| 4-40 | Workbays | ............................................................................................150 | ||||||
| 4-41 | Small | Arms | Repair | Room | with | Arms | Vault | ..........................................155 |
| 4-42 | Electric | / | Comm. | Repair | ......................................................................156 | |||
| 4-43 | Break | Area | ..........................................................................................156 | |||||
| 4-44 | Battery | Room | and | Toilet | .....................................................................157 |
FIGURes Continued
Figure T�tle Page
Including Change 3, 1 February 2010 vii
| E-1 | Kitchen | Equipment | Plan | .....................................................................199 | |
| G-1 | Standard | Band | Room | Plan | .................................................................206 |
| I-1 | Typical | Medical | Section | Plan | ..............................................................209 |
| J-1 | Typical | ECS | Layout | ............................................................................212 |
FIGURes Continued
Figure T�tle Page
Including Change 3, 1 February 2010
CHAPteR 1
IntRoDUCtIon AnD GeneRAL InFoRMAtIon
1-1 PURPose oF tHe DesIGn GUIDe
| 1-1.1 This | Design | Guide | contains | design | criteria | and | general | requirements | to | be | |||||
| used | in | the | development | of | designs | for | new | construction | and | additions/alterations | of | ||||
| U.S. | Army | Reserve | (USAR) | facilities. | Its | purpose | is | to | serve | as | one | means | for | the | Using |
| Service | to | convey | functional | and | other | criteria | for | Military | Construction | Army | Reserve | ||||
| (MCAR) | projects | to | the | Design | Agency | charged | with | the | planning | and | design | of | a | ||
| facility. | This | Guide | is | also | intended | to | aid | in | the | formulation | of | project | documentation | for | |
| inclusion | in | military | construction | programs. |
Figure 1-1 USARC, Ft Dodge, Iowa
| 1-1.1.1 The | Using | Service | is | the | Assistant | Chief | of | Staff | for |
| Installation | Management- | Operations | Division | Reserve | (ACSIM- | ||||
| ODR). | An | ACSIM-ODR | representative, | the | Project | Officer, | is | ||
| typically | assigned | to | each | project. |
| 1-1.1.2 The | USAR | Installation | includes | the | USAR | unit(s) | that | ||
| will | utilize | the | facility | (Tenants) | and | the | USAR | Regional | Support |
| Command | (RSC), | which | supports | the | unit(s). | \3\ | /3/ |
| 1-1.1.3 The | Design | Agency | is | the | Corps | of | Engineers | (COE) | or | other | engineering | |
| command, | which | acts | as | USAR’s | agent | for | obtaining | design | and | construction | services. | |
| The | Design | Agency | may | develop | project | designs | utilizing | their | in-house | design | ||
| personnel, | or | may | contract | with | private-sector | architecture | and | engineering | firms | (A/Es) | ||
| to | provide | design | services. | The | in-house | personnel | or | private-sector | A/E | team | will | be |
| referred | to | as | “designer” | or | “design | team” | in | this | Guide. |
| 1-1.2 This | Guide | should | also | be | used | as | a | benchmark | of | acceptable | quality | for |
| USAR | Full | Facility | Restoration | (FFR), | Real | Property | Exchange | (RPX), | Minor | |||
| Maintenance | and | Repair | (MMR) | and | other | projects. | See | Paragraph | below | for | additional | |
| information | on | such | programs | and | their | funding. |
| 1-1.3 This | Guide | should | be | considered | to | provide | guidance | representing | an | 80% | ||||
| solution; | the | information | should | apply | at | least | 80% | of | the | time, | and | address | at | least |
| 80% | of | the | issues. | The | Design | Agency | should | always | obtain | Using | Service | approval | ||
| when | departing | from | the | guidance | herein. |
1-2 sCoPe oF tHe DesIGn GUIDe
| 1-2.1 This | Guide | is | applicable | to | all | new | construction | projects | for | Army | Reserve | ||
| facilities, | and | as | a | general | guide | in | the | modernization | or | restoration | of | existing | facilities. |
| Only | the | more | common | or | typical | features | associated | with | Army | Reserve | facilities | are | |
| addressed. | The | Guide | deals | primarily | with | training | center | buildings | and | vehicle | |||
| maintenance | shops, | both | of | which | directly | support | a | training | facility | or | group | of | facilities. |
Including Change 3, 1 February 2010
| 1-2.2 The | intent | of | the | Guide | is | to | provide | a | portion | of | the | general | information | and |
| guidance | required | for | the | successful | preparation | of | project | designs. | Additional | |||||
| information | and | guidance | must | be | obtained | from | the | Using | Service, | the | USAR | |||
| Installation, | the | Design | Agency, | and | designer | investigations | on | such | matters | as | project | |||
| scope, | local | codes | and | site | constraints. | Typical | project-specific | and | general | |||||
| documentation | to | be | made | available | to | the | designers | is | listed | below. | Additional | listings | ||
| of | criteria | are | in | Append�x | A. |
Design Guide
Project Documents
CriteriaCodes
User Input
Local Conditions
Site and
Building Concept
| 1-2.2.1 Project | Documents | |||||
| DD | Forms | 1390 | and | 1391 | – | project |
| authorization | documentation. | |||||||
| DD | Form | 5034R | – | Functional | Space | Worksheet | ||
| (with | notes). | (Sample | of | Forms | in | Append�x | D) | |
| Project | Scope | of | Work | for | design | team. |
| 1-2.2.2 Additional | Design | Criteria | ||
| USAR | Design | Process | and | Submittal |
Requirements.
| Design | Criteria, | Technical | Manuals, | Technical | |
| Letters, | Unified | Facilities | Criteria | (UFC), | and |
| other | design | guidance. | Unified | Facility | Guide |
Specifications (UFGS). \3\
1-3 ARMY ReseRVe CADD PLAtFoRM
| 1-3.1 TThe | Army | Reserve | CADD | platform | is | Bentley’s | MicroStation | Triforma. | A | |||
| USAR | Building | Information | Model | (BIM) | dataset | has | been | developed | utilizing | the | ||
| Triforma | workspace. | The | USAR | BIM | Dataset | is | available | upon | request | to | the | Louisville |
| District | Army | Reserve | Support | Team | to | designers | under | contract | |
| to | perform | Army | Reserve | designs. | The | USAR | BIM | dataset | is |
| coordinated | and | has | relationships | built | so | that | information | can | be |
| easily | extracted | in | the | form | of | drawings, | details, | schedules, | |
| quantity | takeoffs, | renderings, | animations, | and | other | formats | |||
| needed | during | the | design | and/or | construction | process. | The | BIM | |
| dataset | provides | the | level | of | quality | expected | by | the | Army |
| Reserve. | The | Bentley | Microstation | TriForma | platform | was | |||
| selected | by | the | Army | Reserve | and | Louisville | District | to | provide |
| consistency | and | ease | in | updating, | maintaining, | and | reviewing | the | |
| BIM | dataset. |
| 1-3.2 Along | with | the | USAR | BIM | Dataset, | the | Army | Reserve | developed | its | “USAR | |||
| Design | Process | and | Submittal | Requirements” | document | to | define | its | desired | design | ||||
| process | and | submittals | to | be | made | at | each | step | of | the | design | process. | All | Army |
| Reserve | projects | should | follow | the | “USAR | Design | Process | and | Submittal | |||||
| Requirements” | document, | unless | otherwise | directed | by | the | Using | Service | or | the | Design |
Agency.
Figure 1-2 Project Guidance
Figure 1-2 Project Guidance
Figure 1-3 USARC, Camp
Parks, California
Figure 1-3 USARC, Camp
Parks, California
Including Change 3, 1 February 2010
| 1-3.3 The | previous | Army | Reserve | CADD | platform, | Modular | Design | System | (MDS), | |||||
| was | a | unique | MicroStation-based | computer | aided | design | software | program | used | to | ||||
| complete | USAR | facility | designs. | This | program | contained | the | level | of | quality | expected | |||
| by | the | Army | Reserve. | MDS | had | the | unique | capability | to | streamline | the | design | and | |
| review | process, | offer | more | uniform | construction | quality | and | produce | a | reliable | cost | |||
| estimate | early | in | the | design | process. | However, | with | the | recent | moves | in | design | towards | |
| a | three | dimensional | modeling | approach | and | generational | changes | to | Bentley’s | |||||
| MicroStation | requiring | updates | to | the | MDS | program, | maintaining | the | program | was | cost | |||
| prohibitive | to | the | Army | Reserve, | thus | MDS | was | retired./3/ |
1-4 FoRMAt oF tHe DesIGn GUIDe
| 1-4.1 The | Design | Guide | format | is | intended | to | facilitate | the | development | of | project | ||
| requirements | and | designs | by | dealing | with | major | criteria | on | both | a | general | and | specific |
level.
| 1-4.2 Chapter | 1 | provides | general | information | about | the | Army | Reserve, | and | its | |||
| facilities | program | and | process. | Chapter | 2 | provides | information | and | guidance | on | overall | ||
| planning | of | Army | Reserve | sites | and | buildings, | with | emphasis | on | site | and | building | |
| organization, | functionality, | adjacencies | and | esthetics. | Chapter | 3 | contains | information | |||||
| and | guidance | on | systems | and | materials | applicable | to | all | Army | Reserve | facilities, | site | |
| design, | and | the | design | of | the | various | buildings | – | large-scale, | total | building | or | facility |
| issues. | Chapter | 4 | contains | specific | requirements | for | the | design | of | each | type | of | typical |
| space | in | an | Army | Reserve | facility. | Additional | information | is | included | in | the | Appendices. |
| 1-4.3 Illustrations | in | this | Guide | represent | possible | applications | of | the | criteria | and | |||
| are | not | intended | to | be | definitive. | The | Design | Agency | is | encouraged | to | be | creative |
| throughout | the | design | process. | Local | conditions, | codes | and | specific | project | ||||
| requirements | are | major | design | considerations | in | the | development | of | a | total, | integrated |
facility.
1-5 PRoJeCt PARtICIPAnt ResPonsIBILItIes
1-5.1 The Using Service (ACSIM-ODR) is responsible for the following:
1-5.1.1 Determining functional requirements from USAR criteria.
| 1-5.1.2 Approving | functional | requirements | or | Tenant | requests | that | extend | beyond | the |
| scope | of | this | Guide. |
| 1-5.1.3 Preparing | and | submitting | project | documentation | (DD | Forms | 1390 | and | 1391 | ||
| and | supporting | data) | in | accordance | with | Army | Regulation | 140-483 | (AR | 140-483), | and |
| providing | any | updates | of | these | documents | as | the | project | progresses. |
1-5.1.4 Approving concept and later designs to certify compliance with functional requirements.
Including Change 3, 1 February 2010
| 1-5.1.5 Developing | additional | information, | as | required, | such | as | telephone | needs, |
| special | electrical | requirements | and | equipment | specifications. |
1-5.2 The Design Agency is responsible for the following:
| 1-5.2.1 Preparing | a | design | that | provides | for | a | complete | and | usable | facility, | including |
| all | equipment, | fixtures | and | furnishings | except | those | specifically | designated | as |
Government-furnished.
| 1-5.2.2 Incorporating | the | functional | requirements | of | the | Using | Service | and | USAR |
| Installation | into | the | project | design. |
| 1-5.2.3 Developing | a | design | responsive | to | the | criteria | in | this | Guide | and | the | project |
| documentation, | and | preparing | all | submittals | required | by | the | USAR | Design | Process | and | |
| Submittal | Requirements, | and | the | project | Scope | of | Work. |
| 1-5.2.4 Justifying, | in | the | project | Design | Analysis, | any | issues | of | design | which | do | not |
| follow | this | Guide | and | other | project | documentation. |
| 1-5.2.5 Incorporating | the | quality | standards | for | the | overall | design | as | described | in | this |
| Guide | and | other | criteria | for | the | project. |
| 1-5.2.6 Identifying | the | applicable | codes | and | regulations, | and | ||
| ensuring | that | the | design | is | in | compliance | with | them. |
| 1-5.2.7 Preparing | cost | estimates, | and | ensuring | that | the | ||||||
| design | will | provide | a | fully | functional | facility | within | the | project | |||
| construction | cost | limit | (CCL). | Optional | bid | items | may | be | required | |||
| to | ensure | that | a | base | bid | within | the | construction | cost | limit | can | be |
| achieved. | Any | such | options | must | be | planned | such | that | the | facility | ||
| is | complete | and | usable | without | their | inclusion. |
| 1-5.2.8 Preparing | a | draft | of | DD | Form | 1354, | Transfer | and |
| Acceptance | of | Military | Real | Property. |
| 1-5.2.9 Preparing | any | surveys | and/or | geotechnical, | ||
| environmental, | sustainable | design | or | other | investigations | |
| identified | in | the | project | Scope | of | Work. |
| 1-5.2.10 Developing | design | analyses, | calculations, | and | other | information | that | supports |
| and | explains | the | project | design. |
1-5.2.11 Identifying issues that will deserve special attention during project construction.
| 1-5.2.12 Preparing | a | draft | of | specification | \2\ | Section | 00 | 80 | 00.00 | 06 | /2/ | for | the | use | of |
| the | constructing | entity, | and | reviewing | and | commenting | on | the | remainder | of | the | “front- | |||
| end” | specifications. | \2\ | Specification | section | available | at | the | USACE | Louisville | District |
Figure 1-4
ARRTC VOQ,
Ft. McCoy, Wisconsin
Figure 1-4
ARRTC VOQ,
Ft. McCoy, Wisconsin
Including Change 3, 1 February 2010
Web-S�te. /2/
| 1-5.2.13 Complete | coordination | of | A/E | discipline | interfaces, | and | checking | for | |
| architectural, | structural, | HVAC, | electrical, | plumbing | and | fire | protection | conflicts. |
| 1-5.2.14 Preparing | a | submittal | register | for | inclusion | in | the | specifications, | coordinated |
| with | the | construction | entity. |
1-5.3 The USAR Support Installation is responsible for the following:
1-5.3.1 Providing the Design Agency with as-built drawings of existing construction.
| 1-5.3.2 For | alteration | projects, | providing | a | copy | of | all | outstanding | maintenance | and |
| repair | work | orders. |
1-5.3.3 Providing a copy of the current Full Facility Assessment.
| 1-5.3.4 Providing | a | condition | survey | for | any | existing | facilities | affected | by | the | |||||
| proposed | work, | along | with | a | list | of | any | red | or | amber | conditions | noted | in | the | Installation |
| Status | Report. |
| 1-5.3.5 Reviewing | and | commenting | on | Design | Agency | submittals, | and | providing | input |
| to | the | Design | Agency | as | requested. |
1-5.3.6 Ensuring that any required real estate purchase is accomplished in a timely manner.
| 1-5.3.7 Providing | a | threat | assessment | that | identifies | the | level | of | risk | for | the | facility | to |
| be | designed. |
| 1-5.3.8 If | real | estate | was | purchased | for | the | project, | providing | a | copy | of | the | Real |
| Estate | Planning | Report | (REPR) | and | any | Engineering | Feasibility | Study | done | during | the | ||
| real | estate | acquisition. |
| 1-5.3.9 Performing | any | required | environmental | investigations, | and | preparing | any | |||
| required | environmental | documentation, | such | as | environmental | baseline | surveys | (EBS) | ||
| and/or | environmental | assessments | (EA). | The | USAR | Installation | may | contract | with | the |
| Design | Agency | or | design | team | for | performance | of | these | tasks. |
1-6 PURPose oF tHe ARMY ReseRVe
| 1-6.1 The | purpose | of | the | Army | Reserve | is | to | provide | trained | units | and | qualified |
| individual | soldiers | for | active | duty | in | time | of | need. |
| 1-6.2 The | Army | Reserve | spends | most | of | its | drill | time | in | training. | Therefore, | a |
| Reserve | Center | is | a | training | center. |
Including Change 3, 1 February 2010
| 1-6.2.1 The | individual | soldier | is | given | hands-on | training | in | the | skills | of | his/her | job | with |
| particular | emphasis | on | the | operation | and | maintenance | of | equipment. |
| 1-6.2.2 Unit | training | is | accomplished | by | progressively | larger | and | larger | elements | to |
| perform | the | mission | as | a | team. |
| 1-6.3 Every | functional | space | in | a | Reserve | Center | is | intended | to | be | primarily | a |
| training | space. | For | example: |
| 1-6.3.1 The | primary | purpose | of | a | kitchen | is | to | allow | cooks | to | train. | The | secondary |
| purpose | is | to | feed | the | troops. |
| 1-6.3.2 The | primary | purpose | of | the | organizational | maintenance | shop | (OMS) | is | to | |
| allow | the | training | of | mechanics. | The | secondary | purpose | is | to | maintain | vehicles. |
| 1-6.3.3 The | primary | purpose | of | office | space | is | to | allow | the | training | of | staff | and | clerical |
| personnel. | The | secondary | purpose | is | to | perform | administrative | functions | associated | |||||
| with | the | unit’s | mission. |
| 1-6.4 A | Reserve | Center | is | an | institutional | building | with | both | community | and | national | |||||
| significance. | The | center | is | the | home | station | for | the | local | unit | composed | of | individuals | |||
| sharing | experiences | of | personal | action | on | behalf | of | the | community, | much | in | the | same | |||
| way | as | a | volunteer | fire | department. | At | the | same | time, | as | a | Government | installation | of | ||
| the | U.S. | Army, | it | represents | the | entire | Army. | Thus | the | design | of | the | building | must | reflect | |
| the | Reservists’ | feelings | of | patriotism, | pride | and | community | participation | as | well | as | a | ||||
| sense | of | the | purpose | of | the | U.S. | Army: | to | keep | the | peace | by | maintaining | a | strong | and |
| capable | organized | military | force. |
1-7 QUALItY oF DesIGn
| 1-7.1 The | Design | Agency | must | seek | design | excellence | through | commitment | to | high | |||
| standards. | Success | in | achieving | this | objective | lies | not | in | the | repetition | of | previous | |
| design | solutions | but | in | relating | to | the | Using | Service | and | USAR | Installation | project- | |
| specific | requirements, | and | responding | to | their | unique |
needs.
| 1-7.2 The | concept | of | total | systems | design | will | be |
| emphasized | in | promoting | the | development | of | a | functional, |
| energy | efficient | and | esthetically | pleasing | building. | Design | |
| concepts | must | evolve | in | a | multidisciplinary | manner | with |
| regard | to | architectural, | civil, | structural, | electrical | and | |
| mechanical | systems. |
| 1-7.3 In | evaluating | the | cost | impact | of | design | ||
| decisions, | the | designer | will | consider | the | life | cycle | cost |
| effectiveness, | not | just | the | initial | cost. |
U.S. Army Reserve Facility
Cost Effective
Energy Efficient
Esthetically PleasingFunctional
Figure 1-5 Total Systems Design
Including Change 3, 1 February 2010
1-8 PRoJeCt DeLIVeRY
| 1-8.1 Design/Bid/Build | Delivery | Process: | The | majority | of | USAR | facility | projects | are | ||
| delivered | through | the | design/bid/build | (D/B/B) | process. | The | Design | Agency | prepares | a | |
| comprehensive | and | detailed | set | of | construction | documents; | interested | construction | |||
| contractors | use | these | documents | to | prepare | competitive | “hard” | bids | for | Government | |
| evaluation; | and | the | qualified | bidder | with | the | lowest | proposed | construction | price | is |
| awarded | the | contract | for | construction | at | the | proposed | price. |
| 1-8.1.2 Under | the | D/B/B | delivery | method | it | is | critical | that | the | Design | Agency | provides | ||
| construction | documents | that | clearly | define | all | construction | requirements, | so | that | the | ||||
| Using | Service | gets | the | benefit | of | best | possible | bids. | No | issues | should | remain | vague | or |
| be | left | in | a | state | to | be | resolved | during | construction; | this | could | result | in | differing |
| assumptions | among | bidders, | bid | protests | and | contractor | claims | for | price | increases | ||||
| during | construction. |
| 1-8.1.3 The | designer | must | also | keep | in | mind | that | bidders | are | not | required | to | visit | the | ||
| construction | site | prior | to | bidding. | The | construction | documents | must | allow | for | preparation | |||||
| of | bids | without | the | necessity | of | a | site | visit. | Any | items | identified | as | options | to | the | base |
| bid | must | likewise | be | fully | defined. | Both | the | base | bid | condition | and | the | option | condition | ||
| must | be | adequately | illustrated, | detailed | and | specified. |
| 1-8.2 Design/Build | Delivery | Process: | Some | USAR | projects | may | be | delivered | ||||
| through | a | design/build | (D/B) | process. | Under | this | delivery | method | the | Design | Agency | |
| develops | a | D/B | Request | for | Proposal | (RFP) | solicitation | package. | Interested | D/B | teams | |
| respond | with | statements | of | qualifications | as | well | as | their | proposed | construction | price. | |
| The | proposals | are | evaluated | on | price, | qualifications, | and | other | items | or | information | |
| requested | in | the | RFP. | The | highest-ranked | proposing | team | is | awarded | a | contract | to |
| complete | the | project | design | and | perform | the | construction. |
Figure 1-6 USARC, Camp
Parks, California
| 1-8.2.1 The | Using | Service, | the | USAR | Installation, | and | the | |||
| Design | Agency | must | determine | the | scope | and | content | of | the | D/B |
| RFP. | The | goal | is | to | provide | sufficient | project | information | and | |
| criteria | to | ensure | that | the | resulting | facility | will | meet | standard | |
| USAR | requirements | for | quality, | functionality, | performance | and | ||||
| esthetics. | The | facility | program | and | USAR | standards | must | be | ||
| defined, | and | specific | Tenant | requirements | identified. | |||||
| Qualifications | for | selection | must | be | described, | along | with | design | ||
| completion | requirements | and | submittals. |
| 1-8.2.2 The | D/B | RFP | may | include | conceptual | site | and | building | plans, | conceptual |
| image | sketches, | and | outline | specifications. |
1-9 PRoGRAM sYnoPsIs
| 1-9.1 A | typical | facility | consists | of | two | major | components: | the | training | center | and |
| related | maintenance | facilities. |
Including Change 3, 1 February 2010
| 1-9.2 Chapter | 4 | delineates | the | functional | and | environmental | requirements | for | most | ||||||||
| individual | spaces | within | the | training | center | and | maintenance | buildings. | Not | all | projects | ||||||
| will | include | all | of | the | spaces, | nor | are | all | of | the | possible | types | of | spaces | included | in | this |
| Design | Guide. | Specific | information | on | the | types | and | sizes | of | spaces | authorized | is | |||||
| determined | by | the | project | documentation. | The | Design | Agency | will | supplement | the | |||||||
| information | in | this | Guide | in | the | project | documentation | and | at | the | initial | design |
conference.
| 1-9.3 The | Army | Reserve | Center | or | training | center | (TC) | generally | consists | of | five | |
| main | functional | groups: | administrative, | assembly/kitchen, | weapons, | educational, | and | |||||
| storage. | Supporting | these | main | functional | groups | are | the | special | training | and | support | |
| areas. | Within | each | group | are | subordinate | functional | areas | that | contribute | to | the | |
| operation | of | the | group. | Circulation | and | structural | space | are | allocated | to | each | project |
| based | on | the | size | of | the | other | authorized | spaces. |
| 1-9.3.1 The | administrative | group | consists | of | spaces | for | offices, | recruiting/retention, |
| information | technology, | administrative | support, | and | a | lobby. |
| 1-9.3.1.1 Full-time | and | unit | exclusive | office | space | is | dedicated | space | for | full-time |
| employees | and | unit | supervisors. | These | may | be | single | or | shared | offices. |
| 1-9.3.1.2 Unit | common | office | space | is | shared | space | for | use | by | non-supervisory | unit | |
| personnel. | The | unit | common | workstations | are | available | for | use | by | the | various | Tenant |
| units | on | their | assigned | drill | weekends. |
| 1-9.3.1.3 Supporting | spaces | include | such | functions | as | the | mailroom, | administrative |
| support | rooms, | information | technology, | recruiting/retention | offices, | family | support | office, |
| and | the | lobby. |
| 1-9.3.2 The | assembly/kitchen | group | consists | of | the | assembly | hall, | table | and | chair |
| storage, | and | the | kitchen. |
| 1-9.3.2.1 The | main | element | of | the | assembly | group | is | a | multipurpose | space | for | |||
| assembly. | The | hall | serves | as | a | large | classroom, | a | practical | training | area, | a | dining | room, |
| and | as | an | area | for | drills | and | ceremonies. |
| 1-9.3.2.2 The | kitchen | serves | as | a | training | space | for | cooks, | and | is | also | used | to | prepare |
| and | serve | meals | for | drills | and | other | events. |
| 1-9.3.3 The | weapons | group | consists | of | the | arms | vault, | for | storage | of | the | Tenants’ |
| weapons, | and | the | armorer’s | room, | for | weapon | distribution/return | and | repair. |
| 1-9.3.4 The | educational | group | consists | of | classrooms, | library | reading | and | storage | |
| rooms, | learning | center, | training | aids | storage, | and | communications | security | (COMSEC) | |
| training | and | storage | rooms. | These | areas | provide | instructional | space | for | Reservists |
| during | weekend | training | periods | and | testing | areas | for | potential | unit | members. |
Including Change 3, 1 February 2010
| 1-9.3.5 The | storage | group | consists | of | unit/individual | storage | areas, | staging | area, | |||||
| supply | offices, | and | storage | spaces | for | janitorial, | facility | maintenance, | flammables | and | ||||
| controlled | waste. | The | unit/individual | storage | space | is | closely | related | to | the | assembly | |||
| group, | which | provides | a | training | space | for | use | of | the | equipment | issued | from | the | storage |
group.
| 1-9.3.6 Special | training | areas, | when | authorized, | include | such | spaces | as | physical | ||
| training, | weapons | training, | drafting | rooms, | medical | wings, | band | areas | and | photo | labs. |
| General-use | conference | rooms, | when | authorized, | are | included | as | special | training |
spaces.
| 1-9.3.7 Support | areas | are | allocated | in | proportion | to | the | number | of | soldiers, | or | the | |
| size | of | the | other | authorized | spaces | in | the | facility. | They | include | toilets, | showers, | locker |
| rooms, | vending, | breakroom, | and | space | for | mechanical, | electrical, | and | telephone |
equipment.
| 1-9.3.8 A | privately-owned | vehicle | parking | area | (POV) | is | typically | associated | with | the |
| training | center. |
| 1-9.4 Maintenance | facilities | consist | of | organizational | |||
| maintenance | shops | (OMS), | direct | support | and | general | support |
| maintenance | shops | (DS/GS), | area | maintenance | support | activity | |
| shops | (AMSA), | and | maintenance | shops | of | equipment | |
| concentration | sites | (ECS). |
| 1-9.4.1 These | facilities | may | be | collocated | with | a | training | |
| center | and | with | each | other. | When | collocated, | the | maintenance |
| workbays | will | be | shared. | Military | equipment | parking | areas | (MEP) |
| are | also | associated | with | these | facilities. |
| 1-9.4.2 OMS | and | DS/GS | Shops | are | used | primarily | to | train | Reserve | mechanics, |
| although | some | full-time | employees | may | be | assigned | to | these | facilities. |
| 1-9.4.3 AMSA | and | ECS | maintenance | facilities | have | the | same | requirements | and | will | ||||
| both | be | referred | to | as | AMSA. | These | shops | are | used | primarily | to | service | vehicles, | using |
| a | full-time | staff. | The | bulk | of | maintenance | work | is | performed | in | these | shops. |
| 1-9.4.4 An | ECS | is | a | large | storage | site | with | outdoor | parking | areas | and | enclosed | |||
| warehousing | of | military | equipment, | typically | located | at | a | larger | Government | installation. | |||||
| The | ECS | is | designed | not | only | to | store | equipment | but | also | to | efficiently | issue | and | return |
| equipment | used | in | training | exercises. | Facilities | which | may | be | associated | with | an | ECS, | if | ||
| included | in | the | project | documentation, | are | an | MEP, | fuel | dispensing | system, | loading | ||||
| ramp, | wash | platform, | indoor | equipment | storage | warehouse, | combat | vehicle | arms | vault, | |||||
| fencing, | security | lighting | and | an | AMSA. |
Figure 1-7
OMS/DS-GS,
Arden Hills, Minnesota
Figure 1-7
OMS/DS-GS,
Arden Hills, Minnesota
Including Change 3, 1 February 2010
1-9.4.5 Common OMS/AMSA/ECS Configurations
| 1-9.4.5.1 As | a | separate | location, | supporting | USAR | units | in | a | geographical | area, | a | |
| typical | AMSA | will | consist | of | an | AMSA | building | with | POV | area | and | MEP. |
| 1-9.4.5.2 When | collocated | with | an | OMS, | and | supporting | USAR | units | in | a | geographical |