Historical_Data_for_Buckeye_JOC.docx

DOCX document 12 KB Posted

Attached to
Buckeye Job Order Contract (JOC)
Solicitation number
W911SA-16-B-0004
Issued by

About this file

Historical Data for Buckeye JOC

View the file

Other files

File Type Posted
W911SA-16-B-0004_Buckeye_JOC_Preliminary_Bid_Opening_Results.pdf PDF
29_Feb_2016_W911SA-16-B-0004_TE-2_Buckeye_JOC_Coefficient_Spreadsheet.xlsx XLSX spreadsheet
W911SA-16-B-0004_Solicitation_Modification_0003.docx DOCX document
29_Feb_2016_W911SA-16-B-0004_TE-2_Buckeye_JOC_Coefficient_Spreadsheet.xlsx XLSX spreadsheet
W911SA-16-B-0004_Final_Solicitation_Amendment_0002.docx DOCX document
Corrected_W911SA-16-B-0004_TE-2_Buckeye_JOC_Coefficient_Spreadsheet.xlsx XLSX spreadsheet
W911SA-16-B-0004_Conformed_Copy_of_Solicitation.docx DOCX document
W911SA-14-B-0015_Award_Notice.pdf PDF
W911SA-16-B-0004_TE-5_Wage_Rate_Requirements.xlsx XLSX spreadsheet
W911SA-16-B-0004_Solicitation_Amendment_0001.docx DOCX document
W911SA-16-B-0004_Pre-Bid_Conference_Sign_In_Sheet.pdf PDF
W911SA-16-B-0004_Pre-Bid_Conference_Slides.pptx PPTX presentation
W911SA-16-B-0004_Appendix_A_-_Pre-Bid_Conference_Registration_(F).docx DOCX document
W911SA-16-B-0004_TE-1_Scope_of_Work_-_Buckeye_JOC.doc DOC document
W911SA-16-B-0004_TE-4_Unified_Facilities_Criteria.pdf PDF
W911SA-16-B-0004_TE-2_Buckeye_JOC_Coefficient_Spreadsheet.xlsx XLSX spreadsheet
W911SA-16-B-0004_TE-5_Wage_Rate_Requirements.xlsx XLSX spreadsheet
W911SA-16-B-0004_TE-3_AT-OPSEC_Coversheet_-_Buckeye.pdf PDF
W911SA-16-B-0004_Final_Solicitation.docx DOCX document
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0001Chiller ReplacementOH024$364,435.55
0002Replace BoilersOH095$164,273.24
0003Temporary HeatOH095$24,418.58
0004Replace Three BoilersOH024$153,691.94
0005Recommended HVAC RepairsOH018$133,488.54
0006HVAC Control RepairsOH028$49,706.88
0007Repair Water LeakTrenton, OH$56,637.15
0008Pump Sewer SystemOH032$10,000.00
0009Replace Sewage PumpOH32$4,747.90
0010Seasonal Changeover HVACOH$194,292.68
0011Maintenance Shop UpdatesOH094/OH044/OH048$73,740.23
0012Emergency Chiller RepairOH051$8,706.20
0013Boiler ReplacementOH044$250,193.59
0014Replace BoilerOH033$273,167.69
Fall Seasonal ChangeoverOH018$214,002.18
0015Install Sewer LineOH032$208,870.15
Replace Boilers/ChillersOH008$394,911.01
Install Oil Water SeparatorOH032$98,064.63
0016Water Heater ReplacementOH094$14,104.74
0017Replace Failed VFDOH051$9,871.84
0018Repair HVACOH028$11,176.92

File details come from the government source that posted it. Updated .