J02_PWS_Attachment_1_PRS_23JUL2026.docx

DOCX document 23 KB Posted

Attached to
Fort Bliss Air Traffic Control Services
Solicitation number
W911S826RA015
Issued by

About this file

This is a Performance Work Statement (PWS) attachment for Air Traffic Control Services at Fort Bliss, Texas under solicitation W911S826RA015. The contractor shall provide comprehensive air traffic control (ATC) operations including radar approach control, tower operations, and flight service station duties across multiple facilities at Fort Bliss. Key service requirements include maintaining safe and efficient airspace management, providing pilot briefing services, managing instrument flight procedures, conducting weather observations, and ensuring compliance with Federal Aviation Administration (FAA) and Department of Defense (DoD) regulations. The contractor must staff facilities with certified air traffic controllers holding appropriate licenses and ratings, maintain operational readiness 24/7, and coordinate with military operations, civilian traffic, and emergency services. Performance standards emphasize safety, accuracy in traffic separation, timeliness of clearances, and adherence to established protocols.

The PWS specifies that the contractor shall maintain current knowledge of all published procedures, charts, and regulations; provide training and proficiency checks for controllers as required; perform equipment maintenance coordination; and document all operational activities in accordance with regulatory requirements. The contractor is responsible for ensuring facility certification and recertification, managing frequency allocations, and supporting flight operations during normal, surge, and emergency conditions. This small business set-aside acquisition requires the contractor to deliver services that support Fort Bliss military aviation operations while maintaining the highest standards of air traffic safety and operational efficiency in compliance with applicable FAA, DoD, and Army regulations.

View the file

Other files

File Type Posted
W911S826RA015 Amend 0001.pdf PDF
J01_ATC_PWS_FINAL_15OCT2026.docx DOCX document
RFP Questions and Answers.pdf PDF
J04_PWS_Attachment_3_Equipment_Listing_23JUL2026.pdf PDF
Conformed Copy of W911S826RA015 thru Amend 0001.pdf PDF
J08_PWS_Attachment_7_BAAF_SOP_11DEC2023.pdf PDF
J11_PWS_Attachment_10_DA_FORM_3479-1R_JUN2003.pdf PDF
J04_PWS_Attachment_3_Equipment_Listing_23JUL2026.docx DOCX document
J05_PWS_Attachment_4_Airfield_Small_UAS_SOP_14APR2025.pdf PDF
J17_WD_2015-5229_Rev31_27AUG2026.pdf PDF
L04_Performance Assessment Questionnaire.docx DOCX document
J01_PWS_11SEP2026.docx DOCX document
J12_PWS_Attachment_11_DA_FORM_3479-6_JUN2003.pdf PDF
J03_PWS_Attachment_2_Deliverables_23JUL2026.docx DOCX document
J06_PWS_Attachment_5_AIC_SUAS_Incursion_Checklist_1APR2025.docx DOCX document
Bliss_ATC_RFP_W911S826RA015.pdf PDF
J16_CBA_PATCO-Techwise_23MAR2024.pdf PDF
J14_PWS_Attachment_13_DA_FORM_3503_OCT2019.pdf PDF
J07_PWS_Attachment_6_SUAS_Incursion_Checklist_29APR2026.pdf PDF
J15_DD254_5AUG2026.pdf PDF
L02_Specific_Relevant_Contract_Reference_Sheet.docx DOCX document
J10_PWS_Attachment_9_DA_FORM_3479_OCT2019.pdf PDF
L03_Performance_Assessment_Questionnaire_Cover_Letter.docx DOCX document
J09_PWS_Attachment_8_DA_FORM_2696_OCT2013.pdf PDF
L01_Subcontractor_Consent_Form.docx DOCX document
J13_PWS_Attachment_12_DA_FORM_3502-R_JUN2003.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1 Performance Requirements Summary

The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success. *If the Contractor exceeds the AQL for a performance objective, this does NOT mean they are exceeding the standard.

Performance Objective
Reference
Standard
Performance Threshold
Surveillance Method
PRS #1: Combating Trafficking in Persons
RFO Clause 52.222-50
The Contractor shall Notify its employees of

a. The United States Government's zero tolerance policy described in paragraph (b) of this clause The actions that will be taken against employees for violations of this policy. Such actions may include, but are not limited to, removal from the contract, reduction in benefits, or termination of employment.

100% Compliance
100% Inspection
PRS #2: Flight Physicals
PWS Para 1.15.17.2

AR 40-501, Class IV.

All personnel performing direct ATC operations possess a current DD Form 2992.

Part 1 of physical completion no later than the start of the birth month.

0% Deviation 100% Compliance Periodic inspections

PRS #3: Facility Training Program that guides controllers through a POI to become facility rated and remain proficient. All Controller records are correctly documented.
PWS Para 1.16.1

TC 3-04.15.

Appendix B Review, rewrite or update the Facility Training Manual IAW TC 3-04.15 Establish a POI to guide controllers through the training process and correctly document training, proficiency and evaluation records.

0% Deviation 100% Compliance Periodic inspections

PRS #4: Reference Files/ Records: All reference material immediately available to facility personnel for operations, reference, training, and study.
PWS Para 1.17.2

TC 3-04.15

Maintain a current set of facility directives, LOA Handbooks and orders, Army Regulations, field manuals, tech manuals, ATSCOM Technical Bulletins and facility training manuals
10% Deviation

90% Compliance Periodic inspections

PRS #5: Administrative Correspondence: All ATC operational required facilities correspondence is current and available to facility personnel
PWS Para 1.17.6

TC 3-04.15

Maintain a file of administrative correspondence, to include, LOA, LOP, and facility memorandums.
10% Deviation

90% Compliance Periodic inspections

PRS #6: Facility records and forms managed according to procedures in AR 25- 400-2
PWS Para 1.17.7

TC 3-04.15.

AR 25-400-2

AR 95-2

All facility records and forms are 100% complete, accurate, and current IAW with regulatory requirements and this PWS. All non-compliant records identified during surveillance must be corrected 100% accuracy within two (2) business days of contractor notification.
5% Deviation

95% Compliance Periodic inspections

PRS #7: Service Requirements. Air Traffic Control service that promotes the safe, orderly, and expeditious flow of air traffic
PWS Para 5.4

TC 3-04.15

Perform ATC service IAW all Army rules, Reg and policies. Follow process, procedures and responsibilities pertaining to aviation accidents.
0% Deviation

100% Compliance Periodic inspections

PRS #8: UAS Monitoring, Coordinate, and Execute
PWS Para 5.5

R 95-23 (UAS Flight Regulations, FAA regs)

UAS airspace management, UAS operations conducted IAW R 95-23. All non-compliant records identified during surveillance must be corrected 100% accuracy within two (2) business days of contractor notification
5% Deviation

95% Compliance Periodic inspections

PRS #9: UAS Integration, Monitoring, and De-confliction
PWS Para 5.5.1

R 95-23 (UAS Flight Regulations, FAA regs)

UAS integration and de-confliction authorized UAS operations conducted IAW R 95-23. All non-compliant records identified during surveillance must be corrected 100% accuracy within two (2) business days of contractor notification
5% Deviation

95% Compliance Periodic inspections

PRS #10: UAS Incident Response and Reporting
PWS Para 5.5.2

R 95-23 (UAS Flight Regulations, FAA regs)

UAS report promptly and coordinate real-time responses; implement air traffic safety, SUAS checklist. All non-compliant records identified during surveillance must be corrected 100% accuracy within two (2) business days of contractor notification
5% Deviation

95% Compliance Periodic inspections

PRS #11: UAS Training and Technical Expertise
PWS Para 5.5.3

R 95-23 (UAS Flight Regulations, FAA regs)

UAS trained and certified IAW with training program, SUAS BAAF SOP. All non-compliant records identified during surveillance must be corrected 100% accuracy within two (2) business days of contractor notification.
5% Deviation

95% Compliance Periodic inspections

File details come from the government source that posted it. Updated .