Technical Exhibit 1 - Performance Requirements Summary

View the file

Other files for this federal contract opportunity

Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL EXHIBIT 1

PERFORMANCE REQUIREMENTS SUMMARY

The Contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Required Services Performance Standard Acceptable Quality Level Method of

Surveillance Periodic Maintenance (PWS para 5.1.1)

Work done in compliance with the latest codes in industry and safety standards, and AAADM guidelines.

No more than one (1) missed door during schedule periodic maintenance and emergency/over and above repair per month

Periodic Surveillance

Service Calls (PWS para 5.1.2)

Respond on-site within 8 working hours

Complete repair within 24 working hours.

One (1) hour deviation for response time per service call.

Two (2) hours deviation for completion time per service call

Periodic Surveillance

Parts & Materials (PWS para 5.5)

Item shall be new and meet or exceed quality of the original part/material.

0%. Material and parts report and invoice shall indicate the same or better quality

Periodic Surveillance

Monthly Reports (PWS para 5.6)

Submitted within 5 workdays of the following month

No more than one workday late 100% Inspection

CMR (PWS para 5.8) Shall be submitted electronically no later than 31 October of every year via the CMRA website with a follow-up confirmation email to the COR within 24 hours.

0%. Report entered correctly and timely through the CMRA website

100% Inspection