This is an award notice for a firm-fixed-price requirements contract for base operations support services at Fort Leonard Wood, Missouri. The contract was awarded by the Department of the Army Materiel Command Mission and Installation Contracting Command Fort Eustis. The contractor will provide services across ten functional task areas including work management, utility plants and systems operations, HVAC, electrical work, structural work, roads and grounds maintenance, environmental and entomology services, maintenance of the Maneuver Support Center of Excellence complex, sheet metal and sign shop services, and preventive maintenance. The base period of performance is from May 2019 to February 2020 with four one-year option periods. Pricing is set for labor, materials, and construction work not to exceed specified amounts for each functional area. The solicitation number is W911S7-18-R-0025 and responses were due by November 13, 2018.
W911S718R00250004 FLW DPW Conformed Copy
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 11:00 AM local t ime 22 Feb 2019
X
A X B X C
D
EX
X G F 80 - 88
89 - 104 H 105 - 110 william.m.jaeger.civ@mail.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 110
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
W911S0 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
See Section L 1.b.
conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
WILLIAM JAEGER 757-501-7993
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
1 - 2 3 - 53
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
54 J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
55 - 57
58 - 64 X K REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 65 - 68 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
69 - 78
PART II - CO NTRACT CLAUSES
MICC - FORT EUSTIS
705 WASHINGTON BLVD
FORT EUSTIS VA 23604
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
29 Oct 2018
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
W911S718R0025
Section A - Solicitation/Contract Form
SUMMARY OF REQUIREMENT
Solicitation #: W911S7-18-R-0025
A.1 Description of Requirement: The Fort Leonard Wood (FLW) Department of Public Works (DPW) has a requirement for Base Operations (BASOPS) Support Services. In addition, this is a non-personal service performance-based requirement consisting of ten (10) functional task areas as described in the Performance Work Statement (PWS). A few of these services will be performed at a second location, Lake of the Ozarks Recreation Area (LORA), which is approximately 50 miles from FLW. The scope of each functional task area is provided below:
• Work Management
• Utility Plants and Systems Operations
• Heating Ventilation and Cooling Systems
• Electrical Work
• Structural Work
• Roads and Grounds, Fuel Handling & Railroads
• Environmental & Entomology
• United States Army Maneuver Support Center (MSCOE) Complex
• Sheet Metal & Sign Shop
• Building Preventive Maintenance
A.2. NAICS Code: 561210, Facilities Support Services
A.3. Size Standard: $38.5 Million
A.4. Set-Aside: 100% 8(a)
A.5 Offers shall remain valid for a minimum of 180 calendar days from the date of receipt.
A.6 All questions concerning this RFP must be submitted by 13 November 2018 to the electronic address provided in the General Instructions.
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 2 Months Phase-In Period
FFP
During the phase-in period, the Contractor shall prepare to assume full responsibility for all areas of operation in accordance with the terms and conditions of this Contract. The Contractor shall take all actions necessary for a smooth transition of the contracted operations. This period will be two (2) months in duration. The Government will make all facilities and equipment accessible to the Contractor for a maximum of two (2) months prior to the Contract start date.
During this period the Contractor's management personnel will be permitted to observe any DPW Base Operations Support Services at Fort Leonard Wood, as approved by the Contracting Officer (KO).
FOB: Destination
NET AMT
0002 10 Months Work Management
FFP
This CLIN is FFP for all Labor and Supplies associated with managing and administering this contract. Includes management, supervisory, quality control, and administrative personnel (i.e. accounting and general clerks, supply technicians, coordinators, dispatchers, etc.).
PSC CD: M1AZ
0003 10 Months Utility Plant Operations Labor
CPFF
Includes all costs for labor to perform Standard Operating Orders (SOOs), Demand Maintenance Orders (DMOs), and Operational Work Orders (OWOs);
all Preventive Maintenance Orders (PMOs) associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Section C.5.5) specifications and Technical Exhibits (TEs).
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
0004 1 Job NTE $182,700.00 Utility Plant Operations Materials
COST
Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.
0005 10 Months HVAC Operations Labor
CPFF
Heating Ventilation and Cooling Systems (HVAC). Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.3) specifications and Technical Exhibits (TEs).
0006 1 Job NTE $410,000.00 HVAC Operations Materials
COST
Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.
0007 10 Months Electrical Operations Labor
CPFF
Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.4 and C.5.7.4) specifications and Technical Exhibits (TEs).
0008 1 Job NTE $382,800.00 Electrical Operations Materials
COST
Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.
0009 10 Months Structural Operations Labor
CPFF
Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.2) specifications and Technical Exhibits (TEs).
0010 1 Job NTE $257,800.00 Structural Operations Materials
COST
Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.
0011 10 Months Roads and Grounds Operations Labor
CPFF
Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.6 and C.5.7.5) specifications and Technical Exhibits (TEs).
0012 1 Job NTE $836,000.00 Roads and Grounds Operations Materials
COST
Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.
0013 10 Months Env & Entomology Operations Labor
CPFF
Environmental (Env). Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.7.6 and C.5.7.2) specifications and Technical Exhibits (TEs).
0014 1 Job NTE $76,900.00 Env & Entomology Operations Materials
COST
Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.
0015 10 Months MSCoE Operations Labor
CPFF
United States Army Maneuver Support Center (MSCOE) Complex. Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.7.3) specifications and TEs.
0016 1 Job NTE $114,000.00 MSCoE Operations Materials
COST
Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.
0017 10 Months Sheet Metal and Signs Operations Labor
CPFF
Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.3.2)
0018 1 Job NTE $80,000.00 Sheet Metal & Signs Operations Materials
COST
Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.
0019 10 Months Preventive Maintenance (PM) Labor
CPFF
Includes all costs for labor to perform PMOs. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.2.7) specifications and Technical Exhibits (TEs).
0020 1 Job NTE $1,010,000.00 PM Materials
COST
Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.
0021 1 Job NTE $8,000,000.00 Construction
FFP
Work IAW PWS C.5.1.1.4 and as defined in PWS Section C.2 Definition and Acronyms: Construction, Level II Work (Unscheduled Task), New Work and Public Works. All projects will be Firm-Fixed Priced pror to commencment of work, NTE $150,000.00 each and approved by the Contracting Officer. The NTE price associated with this CLIN is for estimating purposes only. Acutal workload is not determined at this time.
0022 Each Contractor Manpower Reporting (CMR)
FFP
The Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS.
Reporting inputs will be for the labor executed during the period of performance during each Government FY, which runs October 1st through September 30th.
1002 12 Months OPTION Work Management
FFP
This CLIN is FFP for all Labor and Supplies associated with managing and administering this contract. Includes management, supervisory, quality control, and administrative personnel (i.e. accounting and general clerks, supply technicians, coordinators, dispatchers, etc.).
1003 12 Months OPTION Utility Plant Operations Labor
CPFF
Includes all costs for labor to perform Standard Operating Orders (SOOs), Demand Maintenance Orders (DMOs), and Operational Work Orders (OWOs);
all Preventive Maintenance Orders (PMOs) associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Section
1004 1 Job NTE $188,181.00 OPTION Utility Plant Operations Materials
COST
Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.
1005 12 Months OPTION HVAC Operations Labor
CPFF
Heating Ventilation and Cooling Systems (HVAC). Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.3) specifications and
1006 1 Job NTE $422,300.00 OPTION HVAC Operations Materials
COST
Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.
1007 12 Months OPTION Electrical Operations Labor
CPFF
Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.4
1008 1 Job NTE $394,284.00 OPTION Electrical Operations Materials
COST
Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.
1009 12 Months OPTION Structural Operations Labor
CPFF
Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.2)
1010 1 Job NTE $265,534.00 OPTION Structural Operations Materials
COST
Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.
1011 12 Months OPTION Roads and Grounds Operations Labor
CPFF
Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.6
1012 1 Job NTE $861,080.00 OPTION Roads and Grounds Operations Materials
COST
Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.
1013 12 Months OPTION Env & Entomology Operations Labor
CPFF
Environmental (Env). Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.7.6 and C.5.7.2) specifications and Technical Exhibits
1014 1 Job NTE $79,207.00 OPTION Env & Entomology Operations Materials
COST
Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.
1015 12 Months OPTION MSCoE Operations Labor
CPFF
United States Army Maneuver Support Center (MSCOE) Complex. Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.7.3) specifications
1016 1 Job NTE $117,420.00 OPTION MSCoE Operations Materials
COST
Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.
1017 12 Months OPTION Sheet Metal and Signs Operations Labor
CPFF
Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.3.2)
1018 1 Job NTE $82,400.00 OPTION Sheet Metal & Signs Operations Materials
COST
Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.
1019 12 Months OPTION Preventive Maintenance (PM) Labor
CPFF
Includes all costs for labor to perform PMOs. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.2.7) specifications and Technical Exhibits (TEs).
1020 1 Job NTE $1,040,300.00 OPTION PM Materials
COST
Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.
1021 1 Job NTE $8,000,000.00 OPTION Construction
FFP
Work IAW PWS C.5.1.1.4 and as defined in PWS Section C.2 Definition and Acronyms: Construction, Level II Work (Unscheduled Task), New Work and Public Works. All projects will be Firm-Fixed Priced pror to commencment of work, NTE $150,000.00 each and approved by the Contracting Officer. The NTE price associated with this CLIN is for estimating purposes only. Acutal workload is not determined at this time.
1022 Each OPTION Contractor Manpower Reporting (CMR)
FFP
The Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS.
Reporting inputs will be for the labor executed during the period of performance during each Government FY, which runs October 1st through September 30th.
2002 12 Months OPTION Work Management
FFP
This CLIN is FFP for all Labor and Supplies associated with managing and administering this contract. Includes management, supervisory, quality control, and administrative personnel (i.e. accounting and general clerks, supply technicians, coordinators, dispatchers, etc.).
2003 12 Months OPTION Utility Plant Operations Labor
CPFF
Includes all costs for labor to perform Standard Operating Orders (SOOs), Demand Maintenance Orders (DMOs), and Operational Work Orders (OWOs);
all Preventive Maintenance Orders (PMOs) associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Section
2004 1 Job NTE $193,826.00 OPTION Utility Plant Operations Materials
COST
Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.
2005 12 Months OPTION HVAC Operations Labor
CPFF
Heating Ventilation and Cooling Systems (HVAC). Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.3) specifications and
2006 1 Job NTE $434,969.00 OPTION HVAC Operations Materials
COST
Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.
2007 12 Months OPTION Electrical Operations Labor
CPFF
Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.4
2008 1 Job NTE $406,113.00 OPTION Electrical Operations Materials
COST
Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.
2009 12 Months OPTION Structural Operations Labor
CPFF
Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.2)
2010 1 Job NTE $273,500.00 OPTION Structural Operations Materials
COST
Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.
2011 12 Months OPTION Roads and Grounds Operations Labor
CPFF
Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.6
2012 1 Job NTE $886,912.00 OPTION Roads and Grounds Operations Materials
COST
Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.
2013 12 Months OPTION Env & Entomology Operations Labor
CPFF
Environmental (Env). Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.7.6 and C.5.7.2) specifications and Technical Exhibits
2014 1 Job NTE $81,583.00 OPTION Env & Entomology Operations Materials
COST
Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.
2015 12 Months OPTION MSCoE Operations Labor
CPFF
United States Army Maneuver Support Center (MSCOE) Complex. Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.7.3) specifications
2016 1 Job NTE $120,943.00 OPTION MSCoE Operations Materials
COST
Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.
2017 12 Months OPTION Sheet Metal and Signs Operations Labor
CPFF
Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.3.2)
2018 1 Job NTE $84,872.00 OPTION Sheet Metal & Signs Operations Materials
COST
Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.
2019 12 Months OPTION Preventive Maintenance (PM) Labor
CPFF
Includes all costs for labor to perform PMOs. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.2.7) specifications and Technical Exhibits (TEs).
2020 1 Job NTE $1,071,509.00 OPTION PM Materials
COST
Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.
2021 1 Job NTE $8,000,000.00 OPTION Construction
FFP
Work IAW PWS C.5.1.1.4 and as defined in PWS Section C.2 Definition and Acronyms: Construction, Level II Work (Unscheduled Task), New Work and Public Works. All projects will be Firm-Fixed Priced pror to commencment of work, NTE $150,000.00 each and approved by the Contracting Officer. The NTE price associated with this CLIN is for estimating purposes only. Acutal workload is not determined at this time.
2022 Each OPTION Contractor Manpower Reporting (CMR)
FFP
The Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS.
Reporting inputs will be for the labor executed during the period of performance during each Government FY, which runs October 1st through September 30th.
3002 12 Months OPTION Work Management
FFP
This CLIN is FFP for all Labor and Supplies associated with managing and administering this contract. Includes management, supervisory, quality control, and administrative personnel (i.e. accounting and general clerks, supply technicians, coordinators, dispatchers, etc.).
3003 12 Months OPTION Utility Plant Operations Labor
CPFF
Includes all costs for labor to perform Standard Operating Orders (SOOs), Demand Maintenance Orders (DMOs), and Operational Work Orders (OWOs);
all Preventive Maintenance Orders (PMOs) associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Section
3004 1 Job NTE $199,641.00 OPTION Utility Plant Operations Materials
COST
Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.
3005 12 Months OPTION HVAC Operations Labor
CPFF
Heating Ventilation and Cooling Systems (HVAC). Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.3) specifications and
3006 1 Job NTE $448,018.00 OPTION HVAC Operations Materials
COST
Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.
3007 12 Months OPTION Electrical Operations Labor
CPFF
Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.4
3008 1 Job NTE $418,296.00 OPTION Electrical Operations Materials
COST
Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.
3009 12 Months OPTION Structural Operations Labor
CPFF
Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.2)
3010 1 Job NTE $281,705.00 OPTION Structural Operations Materials
COST
Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.
3011 12 Months OPTION Roads and Grounds Operations Labor
CPFF
Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.6
3012 1 Job NTE $913,520.00 OPTION Roads and Grounds Operations Materials
COST
Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.
3013 12 Months OPTION Env & Entomology Operations Labor
CPFF
Environmental (Env). Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.7.6 and C.5.7.2) specifications and Technical Exhibits
3014 1 Job NTE $84,031.00 OPTION Env & Entomology Operations Materials
COST
Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.
3015 12 Months OPTION MSCoE Operations Labor
CPFF
United States Army Maneuver Support Center (MSCOE) Complex. Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.7.3) specifications
3016 1 Job NTE $124,571.00 OPTION MSCoE Operations Materials
COST
Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.
3017 12 Months OPTION Sheet Metal and Signs Operations Labor
CPFF
Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.3.2)
3018 1 Job NTE $87,418.00 OPTION Sheet Metal & Signs Operations Materials
COST
Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.
3019 12 Months OPTION Preventive Maintenance (PM) Labor
CPFF
Includes all costs for labor to perform PMOs. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.2.7) specifications and Technical Exhibits (TEs).
3020 1 Job NTE $1,103,654.00 OPTION PM Materials
COST
Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.
3021 1 Job NTE $8,000,000.00 OPTION Construction
FFP
Work IAW PWS C.5.1.1.4 and as defined in PWS Section C.2 Definition and Acronyms: Construction, Level II Work (Unscheduled Task), New Work and Public Works. All projects will be Firm-Fixed Priced pror to commencment of work, NTE $150,000.00 each and approved by the Contracting Officer. The NTE price associated with this CLIN is for estimating purposes only. Acutal workload is not determined at this time.
3022 Each OPTION Contractor Manpower Reporting (CMR)
FFP
The Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS.
Reporting inputs will be for the labor executed during the period of performance during each Government FY, which runs October 1st through September 30th.
4002 12 Months OPTION Work Management
FFP
This CLIN is FFP for all Labor and Supplies associated with managing and administering this contract. Includes management, supervisory, quality control, and administrative personnel (i.e. accounting and general clerks, supply technicians, coordinators, dispatchers, etc.).
4003 12 Months OPTION Utility Plant Operations Labor
CPFF
Includes all costs for labor to perform Standard Operating Orders (SOOs), Demand Maintenance Orders (DMOs), and Operational Work Orders (OWOs);
all Preventive Maintenance Orders (PMOs) associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Section
4004 1 Job NTE $205,630.00 OPTION Utility Plant Operations Materials
COST
Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.
4005 12 Months OPTION HVAC Operations Labor
CPFF
Heating Ventilation and Cooling Systems (HVAC). Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.3) specifications and
4006 1 Job NTE $461,459.00 OPTION HVAC Operations Materials
COST
Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.
4007 12 Months OPTION Electrical Operations Labor
CPFF
Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.4
4008 1 Job NTE $430,845.00 OPTION Electrical Operations Materials
COST
Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.
4009 12 Months OPTION Structural Operations Labor
CPFF
Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.2)
4010 1 Job NTE $290,156.00 OPTION Structural Operations Materials
COST
Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.
4011 12 Months OPTION Roads and Grounds Operations Labor
CPFF
Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.6
4012 1 Job NTE $940,925.00 OPTION Roads and Grounds Operations Materials
COST
Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.
4013 12 Months OPTION Env & Entomology Operations Labor
CPFF
Environmental (Env). Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.7.6 and C.5.7.2) specifications and Technical Exhibits
4014 1 Job NTE $86,552.00 OPTION Env & Entomology Operations Materials
COST
Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.
4015 12 Months OPTION MSCoE Operations Labor
CPFF
United States Army Maneuver Support Center (MSCOE) Complex. Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under…