This is an award notice for a firm-fixed-price requirements contract for base operations support services at Fort Leonard Wood, Missouri. The contract was awarded by the Department of the Army Materiel Command Mission and Installation Contracting Command Fort Eustis. The contractor will provide services across ten functional task areas including work management, utility plants and systems operations, HVAC, electrical work, structural work, roads and grounds maintenance, environmental and entomology services, maintenance of the Maneuver Support Center of Excellence complex, sheet metal and sign shop services, and preventive maintenance. The base period of performance is from May 2019 to February 2020 with four one-year option periods. Pricing is set for labor, materials, and construction work not to exceed specified amounts for each functional area. The solicitation number is W911S7-18-R-0025 and responses were due by November 13, 2018.

W911S718R00250004 FLW DPW Conformed Copy

View the file

Other files

File Type Posted
W911S718R00250004_FLW_DPW_MOD_v2.pdf PDF
Attachment_14_FLW_DPW_Questions_and_Answers_14FEB19.pdf PDF
W911S718R00250004_FLW_DPW_MOD.pdf PDF
Attachment_16_FLW_BLDG_Square_Footage.xlsx XLSX spreadsheet
Attachment_13_Technical_Exhibits_6_Facility_List_20NOV18.xlsx XLSX spreadsheet
Attachment_12_Wage_Determination_(Construction).pdf PDF
Attachment_14_FLW_DPW_Questions_and_Answers_04FEB19.pdf PDF
Attachment_9_FLW_DPW_Pricing_and_Labor_Matrix_24JAN19.xlsx XLSX spreadsheet
Attachment_2_FLW_DPW_PRS.xlsx XLSX spreadsheet
Attachment_10_Collective_Bargaining_Agreement_(CBA-2016-8411).pdf PDF
Attachment_11_Wage_Determination_(Rev.__8_-_03JUL18).pdf PDF
Attachment_15_FLW_Site_Map.pdf PDF
Attachment_3_FLW_DPW_Technical_Exhibits.pdf PDF
Attachment_5_Partner_Consent_Letter_Sample.docx DOCX document
Attachment_7_Specific_Relevant_Contract_Reference_Sheet.docx DOCX document
Attachment_4_Past_Performance_Questionnaire_FLW_DPW.pdf PDF
Attachment_6_Client_Authorization_Letter_Sample.pdf PDF
Attachment_8_FLW_DPW_Staffing_Matrix.xlsx XLSX spreadsheet
Attachment_1_FLW_DPW_PWS_01FEB19.pdf PDF
W911S718R00250003_Solicitation_Amendment_FLW_DPW.pdf PDF
Attachment_12_Wage_Determination_(Construction).pdf PDF
Attachment_6_Client_Authorization_Letter_Sample.pdf PDF
Attachment_5_Partner_Consent_Letter_Sample.docx DOCX document
Attachment_3_FLW_DPW_Technical_Exhibits.pdf PDF
Attachment_8_FLW_DPW_Staffing_Matrix.xlsx XLSX spreadsheet
Attachment_4_Past_Performance_Questionnaire_FLW_DPW.pdf PDF
Attachment_10_Collective_Bargaining_Agreement_(CBA-2016-8411).pdf PDF
Attachment_14_FLW_DPW_Questions_and_Answers.pdf PDF
Attachment_1_FLW_DPW_PWS.pdf PDF
W911S718R00250002_FLW_DPW_Conform.pdf PDF
Attachment_13_Technical_Exhibits_6__Facility_List_20NOV18.xlsx XLSX spreadsheet
Attachment_7_Specific_Relevant_Contract_Reference_Sheet.docx DOCX document
W911S718R00250002_FLW_DPW_MOD.pdf PDF
Attachment_2_FLW_DPW_PRS.xlsx XLSX spreadsheet
Attachment_9_FLW_DPW_Pricing_and_Labor_Matrix.xlsx XLSX spreadsheet
Attachment_11_Wage_Determination_(Rev.__8_-_03JUL18).pdf PDF
W911S718R00250001_Solicitation_Amendment_FLW_DPW.pdf PDF
Attachment_4_-_Past_Performance_Questionnaire_FLW_DPW.pdf PDF
Attachment_8_Staffing_Matrix_FLW.xlsx XLSX spreadsheet
Attachment_10_-_Collective_Bargaining_Agreement.pdf PDF
Attachment_1_-_PWS_FLW_Base_Operations.doc DOC document
Attachment_6_-_Client_Authorization_Letter_Sample.pdf PDF
W911S718R0025_Solicitation_FLW_DPW.pdf PDF
Attachment_5_-_Sample_Consent_Letter.docx DOCX document
Attachment_11_-_SCA_WD_15-5094_(REV-6).pdf PDF
Attachment_9_-_Pricing_and_Labor_Matrix_Worksheet_FLW.xlsx XLSX spreadsheet
Attachment_2_-_PRS_FLW.xlsx XLSX spreadsheet
Attachment_3_-_Technical_Exhibits_FLW.doc DOC document
Attachment_7_-_Specific_Relevant_Contracts_Sheet.docx DOCX document
FLW_DPW_Pre-solicitation_Notice.docx DOCX document
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 11:00 AM local t ime 22 Feb 2019

X

A X B X C

D

EX

X G F 80 - 88

89 - 104 H 105 - 110 william.m.jaeger.civ@mail.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 110

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

W911S0 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and

See Section L 1.b.

conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

WILLIAM JAEGER 757-501-7993

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

1 - 2 3 - 53

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

54 J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

55 - 57

58 - 64 X K REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 65 - 68 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIO NS AND INSTRUCTIO NS

PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS

69 - 78

PART II - CO NTRACT CLAUSES

MICC - FORT EUSTIS

705 WASHINGTON BLVD

FORT EUSTIS VA 23604

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

29 Oct 2018

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

W911S718R0025

Section A - Solicitation/Contract Form

SUMMARY OF REQUIREMENT

Solicitation #: W911S7-18-R-0025

A.1 Description of Requirement: The Fort Leonard Wood (FLW) Department of Public Works (DPW) has a requirement for Base Operations (BASOPS) Support Services. In addition, this is a non-personal service performance-based requirement consisting of ten (10) functional task areas as described in the Performance Work Statement (PWS). A few of these services will be performed at a second location, Lake of the Ozarks Recreation Area (LORA), which is approximately 50 miles from FLW. The scope of each functional task area is provided below:

• Work Management

• Utility Plants and Systems Operations

• Heating Ventilation and Cooling Systems

• Electrical Work

• Structural Work

• Roads and Grounds, Fuel Handling & Railroads

• Environmental & Entomology

• United States Army Maneuver Support Center (MSCOE) Complex

• Sheet Metal & Sign Shop

• Building Preventive Maintenance

A.2. NAICS Code: 561210, Facilities Support Services

A.3. Size Standard: $38.5 Million

A.4. Set-Aside: 100% 8(a)

A.5 Offers shall remain valid for a minimum of 180 calendar days from the date of receipt.

A.6 All questions concerning this RFP must be submitted by 13 November 2018 to the electronic address provided in the General Instructions.

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 2 Months Phase-In Period

FFP

During the phase-in period, the Contractor shall prepare to assume full responsibility for all areas of operation in accordance with the terms and conditions of this Contract. The Contractor shall take all actions necessary for a smooth transition of the contracted operations. This period will be two (2) months in duration. The Government will make all facilities and equipment accessible to the Contractor for a maximum of two (2) months prior to the Contract start date.

During this period the Contractor's management personnel will be permitted to observe any DPW Base Operations Support Services at Fort Leonard Wood, as approved by the Contracting Officer (KO).

FOB: Destination

NET AMT

0002 10 Months Work Management

FFP

This CLIN is FFP for all Labor and Supplies associated with managing and administering this contract. Includes management, supervisory, quality control, and administrative personnel (i.e. accounting and general clerks, supply technicians, coordinators, dispatchers, etc.).

PSC CD: M1AZ

0003 10 Months Utility Plant Operations Labor

CPFF

Includes all costs for labor to perform Standard Operating Orders (SOOs), Demand Maintenance Orders (DMOs), and Operational Work Orders (OWOs);

all Preventive Maintenance Orders (PMOs) associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Section C.5.5) specifications and Technical Exhibits (TEs).

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

0004 1 Job NTE $182,700.00 Utility Plant Operations Materials

COST

Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.

0005 10 Months HVAC Operations Labor

CPFF

Heating Ventilation and Cooling Systems (HVAC). Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.3) specifications and Technical Exhibits (TEs).

0006 1 Job NTE $410,000.00 HVAC Operations Materials

COST

Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.

0007 10 Months Electrical Operations Labor

CPFF

Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.4 and C.5.7.4) specifications and Technical Exhibits (TEs).

0008 1 Job NTE $382,800.00 Electrical Operations Materials

COST

Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.

0009 10 Months Structural Operations Labor

CPFF

Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.2) specifications and Technical Exhibits (TEs).

0010 1 Job NTE $257,800.00 Structural Operations Materials

COST

Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.

0011 10 Months Roads and Grounds Operations Labor

CPFF

Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.6 and C.5.7.5) specifications and Technical Exhibits (TEs).

0012 1 Job NTE $836,000.00 Roads and Grounds Operations Materials

COST

Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.

0013 10 Months Env & Entomology Operations Labor

CPFF

Environmental (Env). Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.7.6 and C.5.7.2) specifications and Technical Exhibits (TEs).

0014 1 Job NTE $76,900.00 Env & Entomology Operations Materials

COST

Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.

0015 10 Months MSCoE Operations Labor

CPFF

United States Army Maneuver Support Center (MSCOE) Complex. Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.7.3) specifications and TEs.

0016 1 Job NTE $114,000.00 MSCoE Operations Materials

COST

Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.

0017 10 Months Sheet Metal and Signs Operations Labor

CPFF

Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.3.2)

0018 1 Job NTE $80,000.00 Sheet Metal & Signs Operations Materials

COST

Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.

0019 10 Months Preventive Maintenance (PM) Labor

CPFF

Includes all costs for labor to perform PMOs. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.2.7) specifications and Technical Exhibits (TEs).

0020 1 Job NTE $1,010,000.00 PM Materials

COST

Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.

0021 1 Job NTE $8,000,000.00 Construction

FFP

Work IAW PWS C.5.1.1.4 and as defined in PWS Section C.2 Definition and Acronyms: Construction, Level II Work (Unscheduled Task), New Work and Public Works. All projects will be Firm-Fixed Priced pror to commencment of work, NTE $150,000.00 each and approved by the Contracting Officer. The NTE price associated with this CLIN is for estimating purposes only. Acutal workload is not determined at this time.

0022 Each Contractor Manpower Reporting (CMR)

FFP

The Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS.

Reporting inputs will be for the labor executed during the period of performance during each Government FY, which runs October 1st through September 30th.

1002 12 Months OPTION Work Management

FFP

This CLIN is FFP for all Labor and Supplies associated with managing and administering this contract. Includes management, supervisory, quality control, and administrative personnel (i.e. accounting and general clerks, supply technicians, coordinators, dispatchers, etc.).

1003 12 Months OPTION Utility Plant Operations Labor

CPFF

Includes all costs for labor to perform Standard Operating Orders (SOOs), Demand Maintenance Orders (DMOs), and Operational Work Orders (OWOs);

all Preventive Maintenance Orders (PMOs) associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Section

1004 1 Job NTE $188,181.00 OPTION Utility Plant Operations Materials

COST

Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.

1005 12 Months OPTION HVAC Operations Labor

CPFF

Heating Ventilation and Cooling Systems (HVAC). Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.3) specifications and

1006 1 Job NTE $422,300.00 OPTION HVAC Operations Materials

COST

Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.

1007 12 Months OPTION Electrical Operations Labor

CPFF

Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.4

1008 1 Job NTE $394,284.00 OPTION Electrical Operations Materials

COST

Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.

1009 12 Months OPTION Structural Operations Labor

CPFF

Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.2)

1010 1 Job NTE $265,534.00 OPTION Structural Operations Materials

COST

Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.

1011 12 Months OPTION Roads and Grounds Operations Labor

CPFF

Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.6

1012 1 Job NTE $861,080.00 OPTION Roads and Grounds Operations Materials

COST

Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.

1013 12 Months OPTION Env & Entomology Operations Labor

CPFF

Environmental (Env). Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.7.6 and C.5.7.2) specifications and Technical Exhibits

1014 1 Job NTE $79,207.00 OPTION Env & Entomology Operations Materials

COST

Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.

1015 12 Months OPTION MSCoE Operations Labor

CPFF

United States Army Maneuver Support Center (MSCOE) Complex. Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.7.3) specifications

1016 1 Job NTE $117,420.00 OPTION MSCoE Operations Materials

COST

Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.

1017 12 Months OPTION Sheet Metal and Signs Operations Labor

CPFF

Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.3.2)

1018 1 Job NTE $82,400.00 OPTION Sheet Metal & Signs Operations Materials

COST

Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.

1019 12 Months OPTION Preventive Maintenance (PM) Labor

CPFF

Includes all costs for labor to perform PMOs. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.2.7) specifications and Technical Exhibits (TEs).

1020 1 Job NTE $1,040,300.00 OPTION PM Materials

COST

Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.

1021 1 Job NTE $8,000,000.00 OPTION Construction

FFP

Work IAW PWS C.5.1.1.4 and as defined in PWS Section C.2 Definition and Acronyms: Construction, Level II Work (Unscheduled Task), New Work and Public Works. All projects will be Firm-Fixed Priced pror to commencment of work, NTE $150,000.00 each and approved by the Contracting Officer. The NTE price associated with this CLIN is for estimating purposes only. Acutal workload is not determined at this time.

1022 Each OPTION Contractor Manpower Reporting (CMR)

FFP

The Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS.

Reporting inputs will be for the labor executed during the period of performance during each Government FY, which runs October 1st through September 30th.

2002 12 Months OPTION Work Management

FFP

This CLIN is FFP for all Labor and Supplies associated with managing and administering this contract. Includes management, supervisory, quality control, and administrative personnel (i.e. accounting and general clerks, supply technicians, coordinators, dispatchers, etc.).

2003 12 Months OPTION Utility Plant Operations Labor

CPFF

Includes all costs for labor to perform Standard Operating Orders (SOOs), Demand Maintenance Orders (DMOs), and Operational Work Orders (OWOs);

all Preventive Maintenance Orders (PMOs) associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Section

2004 1 Job NTE $193,826.00 OPTION Utility Plant Operations Materials

COST

Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.

2005 12 Months OPTION HVAC Operations Labor

CPFF

Heating Ventilation and Cooling Systems (HVAC). Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.3) specifications and

2006 1 Job NTE $434,969.00 OPTION HVAC Operations Materials

COST

Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.

2007 12 Months OPTION Electrical Operations Labor

CPFF

Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.4

2008 1 Job NTE $406,113.00 OPTION Electrical Operations Materials

COST

Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.

2009 12 Months OPTION Structural Operations Labor

CPFF

Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.2)

2010 1 Job NTE $273,500.00 OPTION Structural Operations Materials

COST

Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.

2011 12 Months OPTION Roads and Grounds Operations Labor

CPFF

Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.6

2012 1 Job NTE $886,912.00 OPTION Roads and Grounds Operations Materials

COST

Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.

2013 12 Months OPTION Env & Entomology Operations Labor

CPFF

Environmental (Env). Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.7.6 and C.5.7.2) specifications and Technical Exhibits

2014 1 Job NTE $81,583.00 OPTION Env & Entomology Operations Materials

COST

Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.

2015 12 Months OPTION MSCoE Operations Labor

CPFF

United States Army Maneuver Support Center (MSCOE) Complex. Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.7.3) specifications

2016 1 Job NTE $120,943.00 OPTION MSCoE Operations Materials

COST

Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.

2017 12 Months OPTION Sheet Metal and Signs Operations Labor

CPFF

Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.3.2)

2018 1 Job NTE $84,872.00 OPTION Sheet Metal & Signs Operations Materials

COST

Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.

2019 12 Months OPTION Preventive Maintenance (PM) Labor

CPFF

Includes all costs for labor to perform PMOs. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.2.7) specifications and Technical Exhibits (TEs).

2020 1 Job NTE $1,071,509.00 OPTION PM Materials

COST

Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.

2021 1 Job NTE $8,000,000.00 OPTION Construction

FFP

Work IAW PWS C.5.1.1.4 and as defined in PWS Section C.2 Definition and Acronyms: Construction, Level II Work (Unscheduled Task), New Work and Public Works. All projects will be Firm-Fixed Priced pror to commencment of work, NTE $150,000.00 each and approved by the Contracting Officer. The NTE price associated with this CLIN is for estimating purposes only. Acutal workload is not determined at this time.

2022 Each OPTION Contractor Manpower Reporting (CMR)

FFP

The Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS.

Reporting inputs will be for the labor executed during the period of performance during each Government FY, which runs October 1st through September 30th.

3002 12 Months OPTION Work Management

FFP

This CLIN is FFP for all Labor and Supplies associated with managing and administering this contract. Includes management, supervisory, quality control, and administrative personnel (i.e. accounting and general clerks, supply technicians, coordinators, dispatchers, etc.).

3003 12 Months OPTION Utility Plant Operations Labor

CPFF

Includes all costs for labor to perform Standard Operating Orders (SOOs), Demand Maintenance Orders (DMOs), and Operational Work Orders (OWOs);

all Preventive Maintenance Orders (PMOs) associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Section

3004 1 Job NTE $199,641.00 OPTION Utility Plant Operations Materials

COST

Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.

3005 12 Months OPTION HVAC Operations Labor

CPFF

Heating Ventilation and Cooling Systems (HVAC). Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.3) specifications and

3006 1 Job NTE $448,018.00 OPTION HVAC Operations Materials

COST

Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.

3007 12 Months OPTION Electrical Operations Labor

CPFF

Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.4

3008 1 Job NTE $418,296.00 OPTION Electrical Operations Materials

COST

Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.

3009 12 Months OPTION Structural Operations Labor

CPFF

Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.2)

3010 1 Job NTE $281,705.00 OPTION Structural Operations Materials

COST

Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.

3011 12 Months OPTION Roads and Grounds Operations Labor

CPFF

Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.6

3012 1 Job NTE $913,520.00 OPTION Roads and Grounds Operations Materials

COST

Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.

3013 12 Months OPTION Env & Entomology Operations Labor

CPFF

Environmental (Env). Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.7.6 and C.5.7.2) specifications and Technical Exhibits

3014 1 Job NTE $84,031.00 OPTION Env & Entomology Operations Materials

COST

Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.

3015 12 Months OPTION MSCoE Operations Labor

CPFF

United States Army Maneuver Support Center (MSCOE) Complex. Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.7.3) specifications

3016 1 Job NTE $124,571.00 OPTION MSCoE Operations Materials

COST

Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.

3017 12 Months OPTION Sheet Metal and Signs Operations Labor

CPFF

Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.3.2)

3018 1 Job NTE $87,418.00 OPTION Sheet Metal & Signs Operations Materials

COST

Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.

3019 12 Months OPTION Preventive Maintenance (PM) Labor

CPFF

Includes all costs for labor to perform PMOs. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.2.7) specifications and Technical Exhibits (TEs).

3020 1 Job NTE $1,103,654.00 OPTION PM Materials

COST

Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.

3021 1 Job NTE $8,000,000.00 OPTION Construction

FFP

Work IAW PWS C.5.1.1.4 and as defined in PWS Section C.2 Definition and Acronyms: Construction, Level II Work (Unscheduled Task), New Work and Public Works. All projects will be Firm-Fixed Priced pror to commencment of work, NTE $150,000.00 each and approved by the Contracting Officer. The NTE price associated with this CLIN is for estimating purposes only. Acutal workload is not determined at this time.

3022 Each OPTION Contractor Manpower Reporting (CMR)

FFP

The Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS.

Reporting inputs will be for the labor executed during the period of performance during each Government FY, which runs October 1st through September 30th.

4002 12 Months OPTION Work Management

FFP

This CLIN is FFP for all Labor and Supplies associated with managing and administering this contract. Includes management, supervisory, quality control, and administrative personnel (i.e. accounting and general clerks, supply technicians, coordinators, dispatchers, etc.).

4003 12 Months OPTION Utility Plant Operations Labor

CPFF

Includes all costs for labor to perform Standard Operating Orders (SOOs), Demand Maintenance Orders (DMOs), and Operational Work Orders (OWOs);

all Preventive Maintenance Orders (PMOs) associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Section

4004 1 Job NTE $205,630.00 OPTION Utility Plant Operations Materials

COST

Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.

4005 12 Months OPTION HVAC Operations Labor

CPFF

Heating Ventilation and Cooling Systems (HVAC). Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.3) specifications and

4006 1 Job NTE $461,459.00 OPTION HVAC Operations Materials

COST

Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.

4007 12 Months OPTION Electrical Operations Labor

CPFF

Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.4

4008 1 Job NTE $430,845.00 OPTION Electrical Operations Materials

COST

Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.

4009 12 Months OPTION Structural Operations Labor

CPFF

Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.2)

4010 1 Job NTE $290,156.00 OPTION Structural Operations Materials

COST

Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.

4011 12 Months OPTION Roads and Grounds Operations Labor

CPFF

Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.6

4012 1 Job NTE $940,925.00 OPTION Roads and Grounds Operations Materials

COST

Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.

4013 12 Months OPTION Env & Entomology Operations Labor

CPFF

Environmental (Env). Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under CLIN X019. All work shall be performed successfully in accordance with the terms and conditions of the contract and the PWS, (specifically including, but not limited to, Section C.5.7.6 and C.5.7.2) specifications and Technical Exhibits

4014 1 Job NTE $86,552.00 OPTION Env & Entomology Operations Materials

COST

Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205 -26. CLIN includes delivery of Contractor Acquired Property (CAP) classified as Equipment or Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. Funding will be added via SUB-CLINS.

4015 12 Months OPTION MSCoE Operations Labor

CPFF

United States Army Maneuver Support Center (MSCOE) Complex. Includes all costs for labor to perform SOOs, DMOs, and OWOs; all PMOs associated with this functional area are priced under…