Attachment_2-_CLIN_Pricing_Summary_and_Detail_HVAC_BLDG_4531.xls

XLS spreadsheet 168 KB Posted

Attached to
Dugway Proving Ground Utah HVAC Unit
Solicitation number
W911S619B0002
Issued by

About this file

Attachment 2- CLIN Pricing Summary and Detail HVAC BLDG 4531

View the file

Other files

File Type Posted
SF_1409,_W911S619B0002,_Bid_Opening,_072319.pdf PDF
Appendix-B1-4531_029_of_53_M-1_Mechanical_Floor_Plan_25_Oct_88-Reference_Only.pdf PDF
Appendix-B2-4531_029_of_53_M-1_Mechanical_Floor_Plan_25_Oct_1988-Reference_Only.pdf PDF
Solicitation_Comformed_Copy_W911S619B0002,_Bldg_4531,_DPG,_071119.pdf PDF
Amendment_Solicitation_W911S619B00020003,_Bldg_4531,_DPG,_071119.pdf PDF
Attachment_6_-_Dugway_4531_HVAC_DDC_100___2-20-13.pdf PDF
Attachment_7_-_DAIM-ZA_Memorandum.pdf PDF
Appendix-B4-B4531-DTCC-11-M101-Reference_Only.pdf PDF
Attachment_5_-Dugway_Building_4531_TAB_16373-FINAL-2-19-2014.pdf PDF
Attachment_8_-_AV_ODS-TurnInProcedures_160714.pdf PDF
Appendix-B3-4531_035_of_53_M-7_Ops_and_Engineering_Ctr,_Mechanical_-_Sections_and_Eq...Refere.pdf PDF
Appendix-B4-B4531-DTCC-11-M101.pdf PDF
Amendment_Solicitation_W911S619B00020002,_Bldg_4531,_DPG,_062619.pdf PDF
Appendix-B3-4531_035_of_53_M-7_Ops_and_Engineering_Ctr,_Mechanical_-_Sections_and_Eq....pdf PDF
Dugway_Proving_Grounds_Site_Visit_Attendees_Sign_In_Sheet.pdf PDF
Appendix-B2-4531_029_of_53_M-1_Mechanical_Floor_Plan_25_Oct_1988.pdf PDF
Appendix-B1-4531_029_of_53_M-1_Mechanical_Floor_Plan_25_Oct_88.pdf PDF
Solicitation_Comformed_Copy_W911S619B0002,_Bldg_4531,_DPG,_062619.pdf PDF
Amendment_Solicitation_W911S619B00020001,_Bldg_4531,_DPG,_060419.pdf PDF
Technical_Exhibit_1-A_Performance_Work_Statement-B4531_Repair_Roof-Top_Units_20192904.docx DOCX document
Appendix_C_Forms-_ENG_FORM_4288-R_5_of_7.pdf PDF
Appendix_C_Forms-_Contractor's_Daily_Construction_Report.pdf PDF
Attachment_1_General_Decision_UT190086_04262019__UT86.pdf PDF
Solicitation_W911S619B0002,_Bldg_4531,_DPG,_053019.pdf PDF
Appendix-B-Drawings-B4531_Repair_Roof-Top_Units_20190429.pdf PDF
Appendix-A-Performance_Requirement_Summary_B4531.pdf PDF
Appendix_C_Forms-_Eng_Form_4025-R_4_of_7.pdf PDF
Attachment_3_-_Site_Visitor_Information_Sheet.xlsx XLSX spreadsheet
Appendix_C_Forms-_Eng_Form_93_2014_3_of_7.pdf PDF
Appendix_C_Forms-_Eng_Form_4026._7_of_7.pdf PDF
Appendix_C_Forms-_dd1354.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pricing Schedule Sheet 1

ATTACHMENT 3 PRICING SCHEDULE SHEET 1
CLINDescriptionQuantityUnitUnit PriceAmount
0001Roof-Top HVAC Units Bldg. 4531. TConstruct Repair by Replacement of Roof-Top HVAC Units Bldg. 4531 (Ditto
Area) Dugway Proving Ground, Utah.he contractor shall furnish all the equipment, materials, labor, and supervision necessary to perform the work for this project in accordance with the drawings andspecifications; the contract terms and conditions incorporated by full text and reference.1JOB________________________
CLINDescriptionQuantityUnitUnit PriceAmount
0002Performance Payment Bonds. Bond premium for the monetary value of construction work in CLIN 0001. Contractor reimbursement cost will not exceed actual cost of Bond. Per FAR 28.102-2, the Contracting Officer may determine a lesser amount is adequate for the protection of the government.1JOB________________________
COMPANY NAME
SIGNATURE
PRINT NAME
NOTE: Return Sheets 1, 2, 3, 4, 5 and any supporting documentation by required
sumission date.

Sheet1

SUMARY SHEET 2 CLIN 0001

SUMMARY SHEETBLDG NO.SHEET 2CLIN 0001
B4531
PROJECT TITLE / SUBTITLE:CONTRACTORDATE
Roof-Top HVAC Units Bldg. 4531
DIRECT COST
Division 1 - General Requirements
Division 2 - Existing Conditions
Note supports entryDivision 23 - Heating Ventilation Air Conditioning
on CLIN 0001. 0002Division 26 - Electrical
- assist in
submission of
progress payments.
Also, completion
of DD 1354.
TOTAL DIRECT COST:
ADDITIVES
Overhead Rate (%)0%
Overhead Amount:
Profit Rate (%)0%
Profit Amount:
CLIN 0001TOTAL OVERHEAD & PROFIT:
BONDING
Bonding Rate (%)0%
CLIN 0001Bonding Amount:
TOTAL PRICE:

Details 3 CLIN 0001

LINE ITEM DETAIL WORKSHEETCONTRACTORSHEET 3
CLIN 0001CLIN 0001
PROJECT TITLE/SUBTITLE: Roof-Top HVAC Units Bldg. 4531DATE
LINE ITEM DESCRIPTIONQTYUNITS OF ISSUEUNIT PRICEEXTENDED PRICE
1General Requirements
1
1
1
1
2Existing Conditions
2
2
2
2
23Heating Ventilation Air Conditioning
23
23
23
23
23
23
26Electrical
26
26
26
26
26
26
26

A

&C* * * For Official Use Only * * * &LAF Form 3052 - &A&C* * * For Official Use Only * * *&RPage &P of &N &C* * * For Official Use Only * * * &LAF Form 3052 - &A&C* * * For Official Use Only * * *&RPage &P of &N &C* * * For Official Use Only * * * &LAF Form 3052 - &A&C* * * For Official Use Only * * *&RPage &P of &N

Abbriviations Unit Measure 6

RS Means Commonly Used Abbreviations. RS Means utilizes industry abbreviations. The following are a few of the most commonly used abbreviations.
B.F.Board Feet
CHundred: Centigrade
C.Y.Cubic Yard (27 Cubic Feet)
Cwt100 Pounds
DayDay (This is assumed - Dugway 10 hrs)
Ea.Each
Flr.Floor
L.F.Linear Foot
Lb.Pound
MBFThousand Board Feet
MonthMonth (This is assumed - 4 weeks)
Opng.Opening
S.F.Square Foot
SFCASquare Foot Contact Area
S.Y.Square Yard
Sq.Square; 100 Square Feet
StyStory
Surf.Surface
V.L.F.Vertical Linear Foot
WeekWeek (This is assumed - Dugway 4 day week 40 hrs)

File details come from the government source that posted it.