This is Standard Form 30 (Amendment 0003 to Solicitation W911RX26BA002), issued by the U.S. Army Corps of Engineers on 27 July 2026, amending the solicitation dated 25 June 2026. The amendment is not extended, meaning the receipt deadline for offers remains unchanged. Contractors must acknowledge receipt of this amendment prior to the offer deadline using one of three methods: completing items 8 and 15 and returning copies of the amendment; acknowledging receipt on each copy of the offer submitted; or sending a separate letter or electronic communication referencing the solicitation and amendment numbers. Failure to acknowledge receipt at the designated location prior to the deadline may result in offer rejection.
Amendment 3 updates the attachments to the solicitation, specifically modifying Section J (List of Attachments). Key document changes include: updating Attachment 02 (Asbestos-Lead Survey for Building 2479) with a new date of 27 July 2026; adding Attachment 13 (Limited Asbestos-Lead Survey for Building 2479, dated 20080704); and adding Attachment 14 (Project closeout report from 2008). The previous Attachment 02 (Asbestos-Lead Survey for Building 2478, dated 20120209) has been deleted. All other attachments, including the Statement of Work, RFI template, Fire Prevention Construction Guide, iWATCH training materials, drawings, material approval forms, Davis-Bacon wage determination, environmental reviews, and industry Questions and Answers, remain active with dates ranging from 25 June 2026 to 22 July 2026. The amendment was signed by Contracting Officer Travis E. Engle on behalf of the United States of America.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section J - List of Attachments
The attachments table has changed from:
Identifie r
Document Name
Document Description Reference Identifier
Date Line Item Page N umbers
Docum ent Type
Provide d Under Separat e Cover
0011 Attachment 01-
SOW B2479
Kitchenette_8A Rev2 07-17-
2026, W911RX
26BA002
Statement of Work 20 Jul 2026 Attach ment
No
0002 Attachment 02- Asbestos-Lead Survey Bldg 24 78_20120209, W911RX26BA0
Environmental Review 25 Jun 2026 Attach ment
No
0003 Attachment 03-
ENG_FORM_4
288-R, W911R
X26BA002
Form 4288-R 25 Jun 2026 Attach ment
No
0004 Attachment 04-
DPW-RFI
Template Blank Form V.
1.2, W911RX2
6BA002
RFI 25 Jun 2026 Attach ment
No
0005 Attachment 05-
FIRE
PREVENTION
CONSTRUCTI
ON GUIDE
2025, W911RX
26BA002
Fire Prevention Construction Guide
25 Jun 2026 Attach ment
No
0006 Attachment 06-iWATCH Trng for Contractors iWATCH Training for Contractors 25 Jun 2026 Attach ment
No
W911RX26BA0020003
20190613, W9
11RX26BA002
0007 Attachment 07- Drawing of Bldg 2479 - Kitchenette - 04232026, W9
11RX26BA002
Drawings 25 Jun 2026 Attach ment
No
0008 Attachment 08- Material Approval Submittal_-
FILLABLE, W9
11RX26BA002
Material Approval 25 Jun 2026 Attach ment
No
0009 Attachment 09- Davis-Bacon Act WD #
TX20260245,
W911RX26BA0
Wage Determination 25 Jun 2026 Attach ment
No
0010 Attachment 10- 26-0345_Envir onmental Review_11B 10118 6P, W91
1RX26BA002
Environmental Review 25 Jun 2026 Attach ment
No
0014 Attachment 11- Industry Q&A
(15JUL2026),
W911RX26BA0
Industry Questions and Answers 20 Jul 2026 Attach ment
No
0015 Attachment 11- Updated Industry Q&A
(22JUL2026),
W911RX26BA0
Attachment 11-Update to Industry
Q&A (22JUL2026)
22 Jul 2026 Attach ment
No
0013 Attachment 12- As-Built Drawings, W91
1RX26BA002
Drawings 20 Jul 2026 Attach ment
No
To:
Identifie r
Document Name
Document Description Reference Identifier
Date Line Item Page N umbers
Docum ent Type
Provide d Under Separat e Cover
0011 Attachment 01-
SOW B2479
Kitchenette_8A Rev2 07-17-
2026, W911RX
26BA002
Statement of Work 20 Jul 2026 Attach ment
No
0002 Attachment 02- Asbestos-Lead Survey_Bldg-
2479 W911RX
26BA002
Environmental Review 27 Jul 2026 Attach ment
No
0003 Attachment 03-
ENG_FORM_4
288-R, W911R
X26BA002
Form 4288-R 25 Jun 2026 Attach ment
No
0004 Attachment 04-
DPW-RFI
Template Blank Form V.
1.2, W911RX2
6BA002
RFI 25 Jun 2026 Attach ment
No
0005 Attachment 05-
FIRE
PREVENTION
CONSTRUCTI
ON GUIDE
2025, W911RX
26BA002
Fire Prevention Construction Guide
25 Jun 2026 Attach ment
No
0006 Attachment 06-iWATCH Trng for Contractors 20190613, W9
11RX26BA002
iWATCH Training for Contractors 25 Jun 2026 Attach ment
No
0007 Attachment 07- Drawing of Bldg 2479 - Kitchenette - 04232026, W9
11RX26BA002
Drawings 25 Jun 2026 Attach ment
No
0008 Attachment 08- Material Approval Submittal_-
FILLABLE, W9
11RX26BA002
Material Approval 25 Jun 2026 Attach ment
No
0009 Attachment 09- Davis-Bacon Act WD #
TX20260245,
Wage Determination 25 Jun 2026 Attach ment
No
W911RX26BA0
0010 Attachment 10- 26-0345_Envir onmental Review_11B 10118 6P, W91
1RX26BA002
Environmental Review 25 Jun 2026 Attach ment
No
0014 Attachment 11- Industry Q&A
(15JUL2026),
W911RX26BA0
Industry Questions and Answers 20 Jul 2026 Attach ment
No
0015 Attachment 11- Updated Industry Q&A
(22JUL2026),
W911RX26BA0
Attachment 11-Update to Industry
Q&A (22JUL2026)
22 Jul 2026 Attach ment
No
0013 Attachment 12- As-Built Drawings, W91
1RX26BA002
Drawings 20 Jul 2026 Attach ment
No
0016 Attachment 13- Ltd Asbestos- Lead Survey_Bldg-2 479_20080704
W911RX26BA0
Asbestos and Lead Survey 27 Jul 2026 Attach ment
No
0017 Attachment 14- Project closeout report (2008) W911R
X26BA002
Close out report 27 Jul 2026 Attach ment
No
The following contract documents were added:
Attachment 02-Asbestos-Lead Survey_Bldg-2479 W911RX26BA002 Attachment 13-Ltd Asbestos-Lead Survey_Bldg-2479_20080704 W911RX26BA002 Attachment 14-Project closeout report (2008) W911RX26BA002
The following contract documents were deleted:
Attachment 02-Asbestos-Lead Survey Bldg 2478_20120209,W911RX26BA002
The following contract documents Page Counts were changed:
DOCUMENT PAGE COUNTS
DOCUMENT NAME FROM TO
Attachment 02-Asbestos-Lead Survey_Bldg-2479 W911RX26BA002 none
| IDCode: J |
| Page: 1 |
| Pages: 6 |
| AmendNo: 0003 |
| EffDate: 27 JUL 2026 |
| ReqNo: |
| ProjNo: PANMCC-26-P-0000 044426 |
| IssCode: W911RX |
| AdmCode: |
| IssuedBy: W6QM MICC-FT RILEY |
KO DIRECTORATE OF CONTRACTIN, 1792 12TH STREET
FORT RILEY, KS 66442-0248
UNITED STATES
JONI WARDOSKY, EMAIL: JONI.N.WARDOSKY.CIV@ARMY.MIL TELEPHONE: 5206843849
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W911RX26BA002 |
| SolDate: 25 JUN 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: Amendment 3 includes additional attachments and updates to the Asbestos study. Updates: Attachment 02 is updated Asbestos survey for Building 2479. Attachment 13 is added as an additional asbestos survey for Building 2479 Lead Survey and Attachment 14 is added for Project closeout reporting. |
| ContNameTitle: |
| CoNameTitle: TRAVIS E. ENGLE |
| ContDate: |
| CODate: 27 JUL 2026 |
File details come from the government source that posted it. Updated .