Attachment 02-Asbestos-Lead Survey Bldg 2478_20120209 W911RX26BA002.pdf

PDF 4 MB Posted

Attached to
Ft. Bliss BLDG 2479 Kitchenette Installation Amendment 03
Solicitation number
W911RX-26-B-A002
Issued by

About this file

This document is an Asbestos and Lead-Based Paint Inspection Report for Building 2478 at Fort Bliss, Texas, dated February 2012, prepared by R & A Consultants, Corp. for Tepa EC, LLC.

The inspection identified asbestos-containing materials throughout the building, with the primary finding being floor tile black flooring mastic containing 2% Chrysotile asbestos in an estimated quantity of 26,700 square feet, classified as Non-Friable/Category I material per NESHAP regulations. The survey was conducted on February 2, 2012, by licensed asbestos consultant Juan R. Ayala and lead risk assessor Oscar E. Ayala in compliance with EPA NESHAP regulations (40 CFR 61(M)), Texas Asbestos Health Protection Rules (25 TAC § 295.31 to 295.73), and OSHA standards. Bulk samples of suspect materials including cove base, mastics, flooring tiles, ceiling tiles, drywall, and exterior plasters were collected and analyzed by Crisp Analytical, LLC using polarized light microscopy (PLM) with positive-stop analysis. The report includes detailed conclusions regarding material removal requirements, noting that while Category I non-friable materials may remain in place during demolition under certain conditions, the report recommends abatement of the asbestos-containing black mastic prior to demolition due to potential separation of vinyl flooring backing and cost-effectiveness considerations. The lead-based paint inspection found one positive result (3.1 mg/cm²) on a metal ladder in the center stairway on the third floor, exceeding the EPA regulatory limit of 1.0 mg/cm². Supporting documentation includes PLM laboratory analysis reports, XRF lead testing results, building drawings with sample location maps, and Texas Department of State Health Services certifications for the consulting firm and laboratory.

View the file

Other files

File Type Posted
Attachment 14-Project closeout report (2008) W911RX26BA002.pdf PDF
Attachment 13-Ltd Asbestos-Lead Survey_Bldg-2479_20080704 W911RX26BA002.pdf PDF
Solicitation Amendment 03 W911RX26BA0020003.pdf PDF
Solicitation Amendment 03 W911RX26BA0020003 SF 30.pdf PDF
Attachment 02-Asbestos-Lead Survey_Bldg-2479 W911RX26BA002.pdf PDF
Solicitation Amendment 02 W911RX26BA0020002.pdf PDF
Attachment 11-Updated Industry QA 22JUL2026 W911RX26BA002.pdf PDF
Solicitation Amendment 02 W911RX26BA0020002 SF 30.pdf PDF
Attachment 12- As Built Drawings W911RX26BA002.pdf PDF
Attachment 01-SOW B2479 Kitchenette 8A Rev2 07172026 W911RX26BA002.pdf PDF
Solicitation Amendment W911RX26BA0020001 SF 30.pdf PDF
Attachment 11-Industry QA 07152026 W911RX26BA002.pdf PDF
Solicitation Amendment W911RX26BA0020001.pdf PDF
Attachment 07-Drawing of Bldg 2479 - Kitchenette - 04232026 W911RX26BA002.pdf PDF
Attachment 04-DPW-RFI Template Blank Form V.1.2 W911RX26BA002.pdf PDF
Attachment 10-26-0345_Environmental Review_11B 10118 6P W911RX26BA002.pdf PDF
Attachment 03-ENG_FORM_4288-R W911RX26BA002.pdf PDF
Attachment 08-Material Approval Submittal_-FILLABLE W911RX26BA002.pdf PDF
Attachment 06-iWATCH Trng for Contractors 20190613 W911RX26BA002.pdf PDF
Attachment 01-SOW Rev2 06-03-26 W911RX26BA002.pdf PDF
Attachment 05-FIRE PREVENTION CONSTRUCTION GUIDE 2025 W911RX26BA002.pdf PDF
Solicitation - W911RX26BA002.pdf PDF
Attachment 09-Davis-Bacon Act WD TX20260245 W911RX26BA002.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .