Attachment_0001_-_Foundation_Drawings.pdf
PDF 2 MB Posted
- Solicitation number
- W911RQ-18-R-0295
About this file
Attachment 0001 -- Foundation and Equipment Drawings
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
,9 in m m (B O R
IN
G S P
IN
D
LE
D
IA
M E
TE
R
,9 in m m
,9 in m m
,7 in m m -X a x is t ra v e l
47,24in 1200mm-ram travel
108,24in
2749,33mm
86,61in 2200mm (Z+W travels)
,9 in m
-Y a x is t ra v e l m m
,1 in
,9 in m m
86,61in 2200mm (Z +W axes travels)
TO COOLANT TANK
FROM COOLANT PIT
Poz.
Designed by Approved by - date kg
H
G
F
E
D
C
B
A
J
K
L
M
N
P
Q
R
A
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
1110987654321 13 14 15 16 17 18 19 20 21 22 23 24
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
1/4
SCALE
SHEET
Date
706M.000.000.0
Filename
Material-
LAYOUT BP150
EDITION
Checked by
02.09.2011
HEAVY TOOLS
PIT
AUTOMATIC TOOL CHANGER HAND
ELECTRICAL CABINET
PIT CONTOUR
ram front
RACK
PIT CONTOUR
PIT CONTOUR
ACCESSORIES RACK
LEFT POSITION
LEFT SIDE FLOOR TABLE
BORING SPINDLE IN MAX
PIT CONTOUR
MAIN SPINDLE AXIS IN MAX
front position ram front surface
RIGHT POSITION AXIS
boring sindle in max back position pillar
(existing at cusomer site) pit contour ram front in max pit contour
(existing at customer site) pillar
PUMP
STAIRS
STAIRS
(2000 liters) coolant collection pit bed end
X axis telescopic
RECIRCULATION
COOLANT TANK
covers covers
CHIP CONTAINER
CHIP CONVAYOR
X axis telescopic
PLATFORM
TOOLS MAGAZINE
MAIN SPINDLE
LOADING TOOLS MAGAZINE
COOLING UNIT
AND HEAVY TOOLS RACK
PIT
FIXING CHEMICHAL COMPOSITE
main spindle axis in max
OPERATOR PLATFORM
ACCESSORIES
down position surface
CHIP CONVEYOR
FLOOR LEVEL
EXTERNAL-INTERNAL TOOL
ANCHORING SCREWS WITH
ELECTRICAL CABLES DUCT
31,50in
,0 in
800mm
35,43in 900mm
,0 in
,3
-p it l e n g h t
,4 m m
,0 in
,2 m m
5003,80mm 197,00in
-pit width
-f lo o r ta b le l e n g h t
,7 m m
,3 in
,9 m m
,4
,6 in -R A M m m
3657,60mm 144,00in
142,50mm
5,61in
,6 m m
,9 in
,0 in
32,00in 812,80mm
,7 m m
,8 in
,8 in
,4 m m
,2 in
,9
1300mm
51,18in
800mm 31,50in m m
,8
,2 m m
,0
,4 m m
,8
,4 m m
,8 in
-floor table width
,8 in
B
B
A
A
RECIRCULATION PUMP
SCALE 1 : 15
SECTION A-A
HEAVY TOOLS AXIS
ELECTRICAL CABINET
M 30
355,60mm
-holes diameter(will drill in correspondence with the holes of beds) 1,38in 35mm
14,00in a p ro x
59,09in
,9
5003,80mm 197,00in
,8
,4
1501mm m m
,0 in m m
,4 in
3657,60mm 144,00in
,6 in
-floor table width
-r a m m m1 ,6 in
500mm
2,83in 72mm
142,50mm 5,61in
900mm 35,43in m m
,6 in
19,69in aprox m m
,6 in
C
C
Approved by - date kg
02.09.2011
H
G
F
E
D
C
B
A
J
K
L
M
N
P
Q
R
A
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
1110987654321 13 14 15 16 17 18 19 20 21 22 23 24
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
2/4
SCALE
SHEET
Date
706M.000.000.0
FilenameDesigned by
LAYOUT BP150
EDITION
Material- Poz.
Checked by
OPERATOR PLATFORM
X AXIS DRIVE
TOOL MAGAZINE
CONTROL PANEL
SECTION B-B
SCALE 1 : 18
"X" AXIS TELESCOPIC COVERS
"X" AXIS TELESCOPIC COVERS
CHIP CONVEYOR
CHIP CONTAINER
BED
COLUMN SADDLE
EXTERNAL-INTERNAL TOOL COOLANT TANK
19,69in
9,84in
9,84in
250mm
1473,03mm 57,99in
102,36in
2600mm
16154,40mm 636,00in
-PIT COVEYOR LENGHT12344,40mm 486,00in
250mm
1574,80mm 62,00in m m
,6
500mm
,4 in
NOTE : IS NOT REPRESENTED "Y" AXIS COVERS
SECTION C-C
SCALE 1 : 15
cnc milling head ram protection plate
FLOOR LEVEL
a p ro x
,8 in m m
-floor table lenght 342,31in
8694,74mm
,8 in m m -p it c h
Designed by Approved by - date kg
H
G
F
E
D
C
B
A
J
K
L
M
N
P
Q
R
A
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
1110987654321 13 14 15 16 17 18 19 20 21 22 23 24
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
3/4
SCALE
SHEET
Date
706M.000.000.0
Filename
LAYOUT BP150
Poz.
EDITION
Checked by
Material-
02.09.2011
X AXIS TELESCOPIC COVERS
HEAVY TOOLS RACK
ACCESSORIES RACK
FLOOR TABLE
Y AXIS DRIFE
CHIP CONVEYOR
CHIP CONTAINER X AXIS TELESCOPIC COVERS
BED ASSEMBLY
recirculation pump
EDITION
Checked by
Material- Poz.
Designed by Approved by - date kg
02.09.2011
H
G
F
E
D
C
B
A
J
K
L
M
N
P
Q
R
A
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
1110987654321 13 14 15 16 17 18 19 20 21 22 23 24
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
4/4LAYOUT BP150
SCALE
SHEET
DateFilename
706M.000.000.0
(FOR MAGAZINE TOOLS)
TELESCOPIC COVERS
BED ASSEMBLY
TELESCOPIC COVERS
CHIP CONVEYOR
HEAVY TOOL RACK
Y AXIS DRIVE
RAM PROTECTION PLATE
TOOL COOLANT TANK
CHIP CONTAINER
COLUMN
(EXISTING AT CUSTOMER)
HEADSTOC BALANCING
OPERATOR PLATFORM
CONTROLA PANEL
FLOOR TABLE
LOADING TOOLS PLATFORM
CNC MILLING HEAD
492,13 12500
Material- Poz.
Designed by Approved by - date
H
G
F
E
D
C
B
A
J
K
L
M
N
P
Q
R
A
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
1110987654321 13 14 15 16 17 18 19 20 21 22 23 24
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
1/1
SCALE
SHEET
Date
FOUNDATION PLAN
Filename
706M.650.000.0
EDITION
Checked by
02.09.2011
1.Cut out the existing bosses( noted M1.....M16.) at the foundation level.
2.Position the beds of the new machine on foundation and trace the anchoring holes on foundation.
3.Remove the beds and drill the holes A1,A2...........B7 according to the table ( the coordinates are theoretical values)
TAG X LOC Y LOC SIZE
A1 1805,60 -2255 35 280
A2 1805,60 -1312,50 35 280
A3 1805,60 -695 35 280
A4 2305,60 -2255 35 280
A5 2305,60 -1312,50 35 280
A6 2305,60 -695 35 280
A7 2805,60 -2255 35 280
A8 2805,60 -1312,50 35 280
A9 2805,60 -695 35 280
A10 3305,60 -2255 35 280
A11 3305,60 -695 35 280
A12 3805,60 -2255 35 280
A13 3805,60 -695 35 280
A14 4305,60 -2255 35 280
A15 4305,60 -1312,50 35 280
A16 4305,60 -695 35 280
A17 4805,60 -2255 35 280
A18 4805,60 -1312,50 35 280
A19 4805,60 -695 35 280
A20 5305,60 -2255 35 280
A21 5305,60 -1312,50 35 280
A22 5305,60 -695 35 280
A23 5805,60 -2255 35 280
A24 5805,60 -1312,50 35 280
A25 5805,60 -695 35 280
A26 6305,60 -2255 35 280
A27 6305,60 -695 35 280
A28 6805,60 -695 35 280
A29 7805,60 -2255 35 280
A30 7805,60 -1312,50 35 280
A31 7805,60 -695 35 280
A32 8305,60 -2255 35 280
A33 8305,60 -1312,50 35 280
A34 8305,60 -695 35 280
A35 8805,60 -2255 35 280
A36 8805,60 -695 35 280
A37 9305,60 -2255 35 280
A38 9305,60 -695 35 280
A39 9805,60 -2255 35 280
A40 9805,60 -1312,50 35 280
A41 9805,60 -695 35 280
A42 10305,60 -2255 35 280
A43 10305,60 -1312,50 35 280
A44 10305,60 -695 35 280
A45 10805,60 -2255 35 280
A46 10805,60 -1312,50 35 280
A47 10805,60 -695 35 280
A48 11305,60 -2255 35 280
A49 11305,60 -1312,50 35 280
A50 11305,60 -695 35 280
A51 11805,60 -2255 35 280
A52 11805,60 -695 35 280
A53 12305,60 -2255 35 280
A54 12305,60 -695 35 280
A55 12805,60 -2255 35 280
A56 12805,60 -1312,50 35 280
A57 12805,60 -695 35 280
A58 13305,60 -2255 35 280
A59 13305,60 -1312,50 35 280
A60 13305,60 -695 35 280
A61 13805,60 -2255 35 280
A62 13805,60 -1312,50 35 280
A63 13805,60 -695 35 280
A64 14305,60 -2255 35 280
A65 14305,60 -1312,50 35 280
A66 14305,60 -695 35 280
B1 3555,60 -1313,64 35 280.01
B2 6730,60 -1312,50 35 280.01
B3 6705,60 -2255 35 280.01
B4 7404,10 -1312,50 35 280.01
B5 7430,60 -695 35 280.01
B6 9055,60 -1312,50 35 280.01
B7 12055,60 -1312,50 35 280.01
SECTION A-A
SCALE 1 : 20
,4
,0
,0
38,88
,6
987,43
,0
,8
SECTION B-B
SCALE 1 : 20
8,13 206,38
,2
,0
30,00
636,00
16154,40
A49
A1
A2
A3
A4
A5
A6
A7
A8
A9
A10
A11
B1
A12
A13
A14
A15
A16
A17
A18
A19
A20
A21
A22
A23
A24
A25
A26
A27
B2
B3
A28
B4
B5
A29
A30
A31
A32
A33
A34
A35
A36
M2 A37
A38
A39
A40
A41
A42
A43
A44
A45
M8
A47
A48
M15
A50
A51
A52
B7
A53
A54
A55
A56
A57
A58
A59
A60
A61
M12
A62 A65
A63
M13
A46
M16
A66
EXISTING PILLAR CONTOUR EXISTINGPILLAR CONTOUR
CUT AT FLOOR LEVELCUT AT FLOOR LEVELCUT AT FLOOR LEVEL
CUT AT FLOOR LEVEL
CUT AT FLOOR LEVEL
CUT AT FLOOR LEVEL
CUT AT FLOOR LEVEL
CUT AT FLOOR LEVEL
COLLECTION COOLANT PIT
PIT PIT
M1
A64
M14
M3 M4
M5
M6
M7
B6
M9
M10
M11
X
Y
8,00
203,20
,0
,7
207,17 5262,03
203,20
-PIT LENGHT
636,00 16154,40
204,00 5181,60
,0
342,00 8686,80
,0
145,63 3698,88
269,00 6832,60
30,00
,0
280,00
,6
,2
-P
IT
W
ID
TH
203,20
B B
A
A
| 2052736 |
| cnc315 |
| cnc315-1 |
| cnc315-2 |
| cnc-details |
| LAYOUT BP150 - Sheet1 |
| LAYOUT BP150 - Sheet2 |
| LAYOUT BP150 - Sheet3 |
| LAYOUT BP150 - Sheet4 |
| 706M.650.000.0-FOUNDATION |
File details come from the government source that posted it.