Attachment_0001_-_Foundation_Drawings.pdf

PDF 2 MB Posted

Attached to
Install an Existing Large Horizontal Boring Mill at Red River Army Depot
Solicitation number
W911RQ-18-R-0295
Issued by

About this file

Attachment 0001 -- Foundation and Equipment Drawings

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

,9 in m m (B O R

IN

G S P

IN

D

LE

D

IA

M E

TE

R

,9 in m m

,9 in m m

,7 in m m -X a x is t ra v e l

47,24in 1200mm-ram travel

108,24in

2749,33mm

86,61in 2200mm (Z+W travels)

,9 in m

-Y a x is t ra v e l m m

,1 in

,9 in m m

86,61in 2200mm (Z +W axes travels)

TO COOLANT TANK

FROM COOLANT PIT

Poz.

Designed by Approved by - date kg

H

G

F

E

D

C

B

A

J

K

L

M

N

P

Q

R

A

B

C

D

E

F

G

H

J

K

L

M

N

P

Q

1110987654321 13 14 15 16 17 18 19 20 21 22 23 24

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

1/4

SCALE

SHEET

Date

706M.000.000.0

Filename

Material-

LAYOUT BP150

EDITION

Checked by

02.09.2011

HEAVY TOOLS

PIT

AUTOMATIC TOOL CHANGER HAND

ELECTRICAL CABINET

PIT CONTOUR

ram front

RACK

PIT CONTOUR

PIT CONTOUR

ACCESSORIES RACK

LEFT POSITION

LEFT SIDE FLOOR TABLE

BORING SPINDLE IN MAX

PIT CONTOUR

MAIN SPINDLE AXIS IN MAX

front position ram front surface

RIGHT POSITION AXIS

boring sindle in max back position pillar

(existing at cusomer site) pit contour ram front in max pit contour

(existing at customer site) pillar

PUMP

STAIRS

STAIRS

(2000 liters) coolant collection pit bed end

X axis telescopic

RECIRCULATION

COOLANT TANK

covers covers

CHIP CONTAINER

CHIP CONVAYOR

X axis telescopic

PLATFORM

TOOLS MAGAZINE

MAIN SPINDLE

LOADING TOOLS MAGAZINE

COOLING UNIT

AND HEAVY TOOLS RACK

PIT

FIXING CHEMICHAL COMPOSITE

main spindle axis in max

OPERATOR PLATFORM

ACCESSORIES

down position surface

CHIP CONVEYOR

FLOOR LEVEL

EXTERNAL-INTERNAL TOOL

ANCHORING SCREWS WITH

ELECTRICAL CABLES DUCT

31,50in

,0 in

800mm

35,43in 900mm

,0 in

,3

-p it l e n g h t

,4 m m

,0 in

,2 m m

5003,80mm 197,00in

-pit width

-f lo o r ta b le l e n g h t

,7 m m

,3 in

,9 m m

,4

,6 in -R A M m m

3657,60mm 144,00in

142,50mm

5,61in

,6 m m

,9 in

,0 in

32,00in 812,80mm

,7 m m

,8 in

,8 in

,4 m m

,2 in

,9

1300mm

51,18in

800mm 31,50in m m

,8

,2 m m

,0

,4 m m

,8

,4 m m

,8 in

-floor table width

,8 in

B

B

A

A

RECIRCULATION PUMP

SCALE 1 : 15

SECTION A-A

HEAVY TOOLS AXIS

ELECTRICAL CABINET

M 30

355,60mm

-holes diameter(will drill in correspondence with the holes of beds) 1,38in 35mm

14,00in a p ro x

59,09in

,9

5003,80mm 197,00in

,8

,4

1501mm m m

,0 in m m

,4 in

3657,60mm 144,00in

,6 in

-floor table width

-r a m m m1 ,6 in

500mm

2,83in 72mm

142,50mm 5,61in

900mm 35,43in m m

,6 in

19,69in aprox m m

,6 in

C

C

Approved by - date kg

02.09.2011

H

G

F

E

D

C

B

A

J

K

L

M

N

P

Q

R

A

B

C

D

E

F

G

H

J

K

L

M

N

P

Q

1110987654321 13 14 15 16 17 18 19 20 21 22 23 24

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

2/4

SCALE

SHEET

Date

706M.000.000.0

FilenameDesigned by

LAYOUT BP150

EDITION

Material- Poz.

Checked by

OPERATOR PLATFORM

X AXIS DRIVE

TOOL MAGAZINE

CONTROL PANEL

SECTION B-B

SCALE 1 : 18

"X" AXIS TELESCOPIC COVERS

"X" AXIS TELESCOPIC COVERS

CHIP CONVEYOR

CHIP CONTAINER

BED

COLUMN SADDLE

EXTERNAL-INTERNAL TOOL COOLANT TANK

19,69in

9,84in

9,84in

250mm

1473,03mm 57,99in

102,36in

2600mm

16154,40mm 636,00in

-PIT COVEYOR LENGHT12344,40mm 486,00in

250mm

1574,80mm 62,00in m m

,6

500mm

,4 in

NOTE : IS NOT REPRESENTED "Y" AXIS COVERS

SECTION C-C

SCALE 1 : 15

cnc milling head ram protection plate

FLOOR LEVEL

a p ro x

,8 in m m

-floor table lenght 342,31in

8694,74mm

,8 in m m -p it c h

Designed by Approved by - date kg

H

G

F

E

D

C

B

A

J

K

L

M

N

P

Q

R

A

B

C

D

E

F

G

H

J

K

L

M

N

P

Q

1110987654321 13 14 15 16 17 18 19 20 21 22 23 24

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

3/4

SCALE

SHEET

Date

706M.000.000.0

Filename

LAYOUT BP150

Poz.

EDITION

Checked by

Material-

02.09.2011

X AXIS TELESCOPIC COVERS

HEAVY TOOLS RACK

ACCESSORIES RACK

FLOOR TABLE

Y AXIS DRIFE

CHIP CONVEYOR

CHIP CONTAINER X AXIS TELESCOPIC COVERS

BED ASSEMBLY

recirculation pump

EDITION

Checked by

Material- Poz.

Designed by Approved by - date kg

02.09.2011

H

G

F

E

D

C

B

A

J

K

L

M

N

P

Q

R

A

B

C

D

E

F

G

H

J

K

L

M

N

P

Q

1110987654321 13 14 15 16 17 18 19 20 21 22 23 24

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

4/4LAYOUT BP150

SCALE

SHEET

DateFilename

706M.000.000.0

(FOR MAGAZINE TOOLS)

TELESCOPIC COVERS

BED ASSEMBLY

TELESCOPIC COVERS

CHIP CONVEYOR

HEAVY TOOL RACK

Y AXIS DRIVE

RAM PROTECTION PLATE

TOOL COOLANT TANK

CHIP CONTAINER

COLUMN

(EXISTING AT CUSTOMER)

HEADSTOC BALANCING

OPERATOR PLATFORM

CONTROLA PANEL

FLOOR TABLE

LOADING TOOLS PLATFORM

CNC MILLING HEAD

492,13 12500

Material- Poz.

Designed by Approved by - date

H

G

F

E

D

C

B

A

J

K

L

M

N

P

Q

R

A

B

C

D

E

F

G

H

J

K

L

M

N

P

Q

1110987654321 13 14 15 16 17 18 19 20 21 22 23 24

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

1/1

SCALE

SHEET

Date

FOUNDATION PLAN

Filename

706M.650.000.0

EDITION

Checked by

02.09.2011

1.Cut out the existing bosses( noted M1.....M16.) at the foundation level.

2.Position the beds of the new machine on foundation and trace the anchoring holes on foundation.

3.Remove the beds and drill the holes A1,A2...........B7 according to the table ( the coordinates are theoretical values)

TAG X LOC Y LOC SIZE

A1 1805,60 -2255 35 280

A2 1805,60 -1312,50 35 280

A3 1805,60 -695 35 280

A4 2305,60 -2255 35 280

A5 2305,60 -1312,50 35 280

A6 2305,60 -695 35 280

A7 2805,60 -2255 35 280

A8 2805,60 -1312,50 35 280

A9 2805,60 -695 35 280

A10 3305,60 -2255 35 280

A11 3305,60 -695 35 280

A12 3805,60 -2255 35 280

A13 3805,60 -695 35 280

A14 4305,60 -2255 35 280

A15 4305,60 -1312,50 35 280

A16 4305,60 -695 35 280

A17 4805,60 -2255 35 280

A18 4805,60 -1312,50 35 280

A19 4805,60 -695 35 280

A20 5305,60 -2255 35 280

A21 5305,60 -1312,50 35 280

A22 5305,60 -695 35 280

A23 5805,60 -2255 35 280

A24 5805,60 -1312,50 35 280

A25 5805,60 -695 35 280

A26 6305,60 -2255 35 280

A27 6305,60 -695 35 280

A28 6805,60 -695 35 280

A29 7805,60 -2255 35 280

A30 7805,60 -1312,50 35 280

A31 7805,60 -695 35 280

A32 8305,60 -2255 35 280

A33 8305,60 -1312,50 35 280

A34 8305,60 -695 35 280

A35 8805,60 -2255 35 280

A36 8805,60 -695 35 280

A37 9305,60 -2255 35 280

A38 9305,60 -695 35 280

A39 9805,60 -2255 35 280

A40 9805,60 -1312,50 35 280

A41 9805,60 -695 35 280

A42 10305,60 -2255 35 280

A43 10305,60 -1312,50 35 280

A44 10305,60 -695 35 280

A45 10805,60 -2255 35 280

A46 10805,60 -1312,50 35 280

A47 10805,60 -695 35 280

A48 11305,60 -2255 35 280

A49 11305,60 -1312,50 35 280

A50 11305,60 -695 35 280

A51 11805,60 -2255 35 280

A52 11805,60 -695 35 280

A53 12305,60 -2255 35 280

A54 12305,60 -695 35 280

A55 12805,60 -2255 35 280

A56 12805,60 -1312,50 35 280

A57 12805,60 -695 35 280

A58 13305,60 -2255 35 280

A59 13305,60 -1312,50 35 280

A60 13305,60 -695 35 280

A61 13805,60 -2255 35 280

A62 13805,60 -1312,50 35 280

A63 13805,60 -695 35 280

A64 14305,60 -2255 35 280

A65 14305,60 -1312,50 35 280

A66 14305,60 -695 35 280

B1 3555,60 -1313,64 35 280.01

B2 6730,60 -1312,50 35 280.01

B3 6705,60 -2255 35 280.01

B4 7404,10 -1312,50 35 280.01

B5 7430,60 -695 35 280.01

B6 9055,60 -1312,50 35 280.01

B7 12055,60 -1312,50 35 280.01

SECTION A-A

SCALE 1 : 20

,4

,0

,0

38,88

,6

987,43

,0

,8

SECTION B-B

SCALE 1 : 20

8,13 206,38

,2

,0

30,00

636,00

16154,40

A49

A1

A2

A3

A4

A5

A6

A7

A8

A9

A10

A11

B1

A12

A13

A14

A15

A16

A17

A18

A19

A20

A21

A22

A23

A24

A25

A26

A27

B2

B3

A28

B4

B5

A29

A30

A31

A32

A33

A34

A35

A36

M2 A37

A38

A39

A40

A41

A42

A43

A44

A45

M8

A47

A48

M15

A50

A51

A52

B7

A53

A54

A55

A56

A57

A58

A59

A60

A61

M12

A62 A65

A63

M13

A46

M16

A66

EXISTING PILLAR CONTOUR EXISTINGPILLAR CONTOUR

CUT AT FLOOR LEVELCUT AT FLOOR LEVELCUT AT FLOOR LEVEL

CUT AT FLOOR LEVEL

CUT AT FLOOR LEVEL

CUT AT FLOOR LEVEL

CUT AT FLOOR LEVEL

CUT AT FLOOR LEVEL

COLLECTION COOLANT PIT

PIT PIT

M1

A64

M14

M3 M4

M5

M6

M7

B6

M9

M10

M11

X

Y

8,00

203,20

,0

,7

207,17 5262,03

203,20

-PIT LENGHT

636,00 16154,40

204,00 5181,60

,0

342,00 8686,80

,0

145,63 3698,88

269,00 6832,60

30,00

,0

280,00

,6

,2

-P

IT

W

ID

TH

203,20

B B

A

A

2052736
cnc315
cnc315-1
cnc315-2
cnc-details
LAYOUT BP150 - Sheet1
LAYOUT BP150 - Sheet2
LAYOUT BP150 - Sheet3
LAYOUT BP150 - Sheet4
706M.650.000.0-FOUNDATION

File details come from the government source that posted it.