EEAAD_CDRL_A001_COTS_Manual_signed.pdf
PDF 233 KB Posted
- Solicitation number
- W911QY-19-R-0007-EEAAD
About this file
This Contract Data Requirements List (CDRL) outlines the requirements for five submissions of a Commercial Off-the-Shelf (COTS) manual and supplemental information for an Enhanced Electronic Automatic Activation Device (EEAAD). The Army Contracting Command Aberdeen Proving Ground is the requiring agency. The first submission is due 45 days after contract award, with subsequent submissions due 45 days prior to logistics demonstration, operational testing, and 10 days after operational testing. A final reproducible copy is due 30 days after verification conference. Each submission will be reviewed for acceptance within 15 to 20 days. If rejected, corrections have 15 to 20 days for resubmission. This CDRL involves 10 total submissions to the Army Materiel Command and Army Contracting Command Aberdeen Proving Ground.
Exhibit A CDRL A001 - COTS Manual
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP _ _ TM _ _ OTHER _X__
D. SYSTEM/ITEM
Enhanced Electronic Automatic Activation Device (EEAAD)
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
COTS Manual with Supplemental Information (1st, 2nd, 3rd, 4th, and FRC) for the EEAAD Submissions
3. SUBTITLE
COTS Manual for the Enhanced Electronic Automatic Activation Device (EEAAD)
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80759A/DI-CMAN-80792A
5. CONTRACT REFERENCE
MIL-PRF-32216A
6. REQUIRING OFFICE
AMSTA-LCS-E
7. DD 250 REQ
DD
9. DIST
STATEMENT
A
10. FREQUENCY
5 T
12. DATE OF 1ST SUBMISSION
See Block 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
23 January 2019
13. DATE OF SUBSEQUENT
SUBMISSION See Block 16 Draft Final
Reg Repro
16. REMARKS
The FIRST SUBMISSION of the COTS manual and any supplemental information shall be due 45 calendar days after contract award. The Government will determine acceptance or rejection of the submission within 15 calendar days of receipt. If rejected, Contractor shall have 15 calendar days to correct any errors and resubmit to the Government. If accepted, Contractor will receive Government’s review comments within 15 calendar days after start of validation.
The SECOND SUBMISSION of the COTS manual and any supplemental information is due 45 calendar days prior to the Logistics Demonstration (Log Demo). The Government will determine acceptance or rejection of the submission within 15 calendar days of receipt. If rejected, Contractor shall have 15 calendar days to correct any errors and resubmit to the Government. If accepted, Contractor will receive Government’s review comments within 15 calendar days of the conclusion of Log Demo.
The THIRD SUBMISSION of the COTS manual and any supplemental information shall be due 45 calendar days prior to Operational Testing (OT). The Government will determine acceptance or rejection of the submission within 20 calendar days of receipt. If rejected, Contractor shall have 20 calendar days to correct any errors and resubmit to the Government. If accepted, Contractor will receive Government’s review comments within 20 calendar days.
The FOURTH SUBMISSION of the COTS manual and any supplemental information shall be due 10 calendar days after the completion of OT. The Government will determine acceptance or rejection of the submission within 15 calendar days of receipt. If rejected, Contractor shall have 15 days to correct any errors and resubmit to the Government. If accepted, Contractor will receive Government’s review comments within 30 calendar days.
The Verification Conference shall take place 45 days after Government's acceptance of the fourth submission.
A FINAL REPRODUCIBLE COPY (FRC) is due 30 days after Contractor's receipt of Government's master mark-up of COTS manual and any supplemental information resulting from the Verification Conference. The Government will review and determine acceptance or rejection of the submission within 20 days of receipt. If rejected, Contractor shall have 20 days to correct any errors and resubmit to the Government.
The First, Second, Third, Fourth, and FRC submissions may be delivered to the Government representative electronically. Each submission shall be sent with a letter of transmittal and will be considered a draft until accepted by the Government.
AMSTA-LCS-E
1st Submission 1 1
2nd Submission 1 1
3rd Submission 1 1
4th Submission 1 1
FRC 1 1
SFAE-SDR-SCIE
1st Submission 1
2nd Submission 1
3rd Submission 1
4th Submission 1
FRC 1 1
15. TOTAL --------- 10 6
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1 Pages
17. PRICE
GROUP
18. ESTIMATED
TOTAL PRICE
| 2019-01-24T12:11:01-0500 | |
| LONGLEY.DEBRA.ANNE.1398400026 |
| 2019-01-25T05:54:36-0500 | |
| LEON.DONNA.LEI.1057014586 |
File details come from the government source that posted it. Updated .