W911QX20R0006.pdf

PDF 412 KB Posted

Attached to
Technician Range Services
Solicitation number
W911QX20R0006
Issued by

About this file

This is a solicitation for experimental facilities technician support services. The Army Research Laboratory at Aberdeen Proving Ground seeks technician services to support its Weapons and Materials Research Directorate. The cost-plus-fixed-fee contract has a one-year base period of performance from May 2020 to May 2021 and four one-year options. Services include technician support, other direct costs, manpower reporting, and data deliverables. The solicitation requires compliance with Service Contract Labor Standards and includes wage determinations for Maryland counties. Responses are due by March 9, 2020.

View the file

Other files

File Type Posted
W911QX20R00060005.pdf PDF
B08 - INSTRUCTIONS TO OFFERORS 0004.pdf PDF
B08 - INSTRUCTIONS TO OFFERORS 0003.pdf PDF
W911QX20R00060003.pdf PDF
B08 - W911QX20R0006-0003 Q&Av3.XLSX XLSX spreadsheet
B08 - INSTRUCTIONS TO OFFERORS P3.pdf PDF
W911QX20R00060002.pdf PDF
B08 - INSTRUCTIONS TO OFFERORS - 0002.pdf PDF
B08 - W911QX20R0006-0002 Q&Av3.XLSX XLSX spreadsheet
Wage Determination HARF.pdf PDF
A02 - PWS-0002.pdf PDF
A03 - DD 254 DRAFT.pdf PDF
Wage Determination PG.pdf PDF
A02 - PWS.pdf PDF
W911QX20R00060001.pdf PDF
W911QX20R00060001 Q&A.xlsx XLSX spreadsheet
W911QX20R0006-0001 PPQ.pdf PDF
A03 - DD 254 SAP Addendum DRAFT - 0001.doc DOC document
B08 - INSTRUCTIONS TO OFFERORS - 0001.pdf PDF
A03 - DD 254 SAP Addendum DRAFT.doc DOC document
A03 - DD1423.pdf PDF
INSTRUCTIONS TO OFFERORS.pdf PDF
A02 - PWS.pdf PDF
WAGE DETERMINATIONS PG.pdf PDF
WAGE DETERMINATIONS HARF.pdf PDF
A03 - DD 254 Collateral Addendum DRAFT.doc DOC document
A03 - DD 254 DRAFT.pdf PDF
EVALUATION APPROACH.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 11:00 AM local time 09 Mar 2020

X

A X B X C X D

EX

X

G F 48 - 54

55 - 59 X H 60

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 60

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

W911QX 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and

NA

conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 9

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

13 - 14

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 15 - 17 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 18 - 22 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

23 - 46

PART II - CONTRACT CLAUSES

US ARMY ACC - APG / ADELPHI CONT DIV

ACC - APG / ADELPHI DIV

2800 POWDER MILL ROAD

CCAP-SCA

ADELPHI MD 20783-1138

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

08 Jan 2020

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

W911QX20R0006

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job

EXPERIMENTAL FACILITIES TECH SUPPORT

CPFF

The Contractor shall provide Experimental Facilities Technician Support Services, as described in the Performance Work Statement (PWS) attached in Section J of the solicitation.

FOB: Destination

TO BE FURNISHED UPON CONTRACT AWARDPSC CD: AD22

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

0002 1 Job OTHER DIRECT COSTS (ODC's)

COST

Other Direct Costs (ODCs) associated with the performance of Experimental Facilities Technician Support Services for the Army Research Laboratory's (ARL) Weapons and Materials Research Directorate WMRD) in accordance with Section C, Performance Work Statement (PWS). ODC's will not be subject to any type of fee (e.g. handling, materials, etc.). The contractor shall provide the Contracting Officer's Representative (COR) with proper supporting documentation upon invoicing for reimbursement. The COR will verify that the ODCs are allowable and allocable. ODCs shall only be charged against this line item upon the COR's and Contracting Officer's approval.

0003 1 Job

ACCOUNTING FOR COTRACT SERVICES

CPFF

The contractor shall provide manpower reporting for contract services - a CONTRACTOR MANPOWER REPORTING clause has been added to Section C, and contractor is required to provide data on contractor manpower (including subcontractor manpower) for performance of this contract.

0004 1 Job

DATA

CPFF

The Contractor shall furnish all data in accordance with the DD1423s (CDRLs), listed as an exhibit A.

0005 1 Job

OPTION EXPERIMENTAL FACILITIES TECH SUPPORT

CPFF

The Contractor shall provide Experimental Facilities Technician Support Services, as described in the Performance Work Statement (PWS) attached in Section J of the solicitation.

0006 1 Job OPTION OTHER DIRECT COSTS (ODC's)

COST

Other Direct Costs (ODCs) associated with the performance of Experimental Facilities Technician Support Services for the Army Research Laboratory's (ARL) Weapons and Materials Research Directorate WMRD) in accordance with Section C, Performance Work Statement (PWS). ODC's will not be subject to any type of fee (e.g. handling, materials, etc.). The contractor shall provide the Contracting Officer's Representative (COR) with proper supporting documentation upon invoicing for reimbursement. The COR will verify that the ODCs are allowable and allocable. ODCs shall only be charged against this line item upon the COR's and Contracting Officer's approval.

0007 1 Job

OPTION ACCOUNTING FOR COTRACT SERVICES

CPFF

The contractor shall provide manpower reporting for contract services - a CONTRACTOR MANPOWER REPORTING clause has been added to Section C, and contractor is required to provide data on contractor manpower (including subcontractor manpower) for performance of this contract.

0008 1 Job

OPTION DATA

CPFF

The Contractor shall furnish all data in accordance with the DD1423s (CDRLs), listed as an exhibit A.

0009 1 Job

OPTION EXPERIMENTAL FACILITIES TECH SUPPORT

CPFF

The Contractor shall provide Experimental Facilities Technician Support Services, as described in the Performance Work Statement (PWS) attached in Section J of the solicitation.

0010 1 Job OPTION OTHER DIRECT COSTS (ODC's)

COST

Other Direct Costs (ODCs) associated with the performance of Experimental Facilities Technician Support Services for the Army Research Laboratory's (ARL) Weapons and Materials Research Directorate WMRD) in accordance with Section C, Performance Work Statement (PWS). ODC's will not be subject to any type of fee (e.g. handling, materials, etc.). The contractor shall provide the Contracting Officer's Representative (COR) with proper supporting documentation upon invoicing for reimbursement. The COR will verify that the ODCs are allowable and allocable. ODCs shall only be charged against this line item upon the COR's and Contracting Officer's approval.

0011 1 Job

OPTION ACCOUNTING FOR COTRACT SERVICES

CPFF

The contractor shall provide manpower reporting for contract services - a CONTRACTOR MANPOWER REPORTING clause has been added to Section C, and contractor is required to provide data on contractor manpower (including subcontractor manpower) for performance of this contract.

0012 1 Job

OPTION DATA

CPFF

The Contractor shall furnish all data in accordance with the DD1423s (CDRLs), listed as an exhibit A.

0013 1 Job

OPTION EXPERIMENTAL FACILITIES TECH SUPPORT

CPFF

The Contractor shall provide Experimental Facilities Technician Support Services, as described in the Performance Work Statement (PWS) attached in Section J of the solicitation.

0014 1 Job OPTION OTHER DIRECT COSTS (ODC's)

COST

Other Direct Costs (ODCs) associated with the performance of Experimental Facilities Technician Support Services for the Army Research Laboratory's (ARL) Weapons and Materials Research Directorate WMRD) in accordance with Section C, Performance Work Statement (PWS). ODC's will not be subject to any type of fee (e.g. handling, materials, etc.). The contractor shall provide the Contracting Officer's Representative (COR) with proper supporting documentation upon invoicing for reimbursement. The COR will verify that the ODCs are allowable and allocable. ODCs shall only be charged against this line item upon the COR's and Contracting Officer's approval.

0015 1 Job

OPTION ACCOUNTING FOR COTRACT SERVICES

CPFF

The contractor shall provide manpower reporting for contract services - a CONTRACTOR MANPOWER REPORTING clause has been added to Section C, and contractor is required to provide data on contractor manpower (including subcontractor manpower) for performance of this contract.

0016 1 Job

OPTION DATA

CPFF

The Contractor shall furnish all data in accordance with the DD1423s (CDRLs), listed as an exhibit A.

ACC-APG POINT OF CONTACT

ACC - APG POINT OF CONTACT

The ACC - APG point of contact for this action is:

Contract Specialist: Orlando Hernandez Telephone Number: 575-678-8045 E-mail: orlando.r.hernandez.civ@mail.mil

Alternate Contract Specialist: Swati Jain Telephone Number: 301-394-0045 E-mail: swati.jain2.civ@mail.mil

Contracting Officer: Phillip Amador Telephone number: (575) 678-3523 E-mail: phillip.j.amador.civ@mail.mil

CONTRACTING OFFICER"S REP-COR

CONTRACTING OFFICER’S REPRESENTATIVE (COR)

The COR appointed to this contract is identified below. See formal letter of appointment for authorized duties/responsibilities.

COR Name: TO BE FURNISHED AT TIME OF AWARD COR Telephone: TO BE FURNISHED AT TIME OF AWARD COR Email address: TO BE FURNISHED AT TIME OF AWARD

TYPE OF CONTRACT

TYPE OF CONTRACT (Reference: 52.216-1)

This is a Cost Plus Fixed Fee (CPFF) “Completion” type of contract for Contract Line Item Numbers (CLINs) 0001, 0003 - 0005, 0007 - 0009, 0011 - 0013, and 0014-0016, and a COST type of contract for CLINs 0002, 0006, 0010, and 0013.

INCREMENTAL FUNDING

INCREMENTAL FUNDING - PERFORMANCE PERIOD

This contract is incrementally funded. The amount presently available for payment and allotted to the contract is (TBD). It is estimated that the allotted funds will cover all areas of contract performance for the period from award of contract through (TBD).

Section C - Descriptions and Specifications

PERFORMANCE WORK STATEMENT

The Performance Work Statement (PWS) is hereby included in Section C by reference. The PWS, dated 27 June 2019, is 61 pages and it is listed as an attachment in Section J.

WAGE DETERMINATION

The Wage Determinations are hereby included in Section C by reference. There are two applicable Wage Determinations, Harford and Prince George’s counties, and each are eighteen (18) pages and they are listed as an attachment in Section J.

CONTRACTOR MANPOWER REPORTING

ACCOUNTING FOR CONTRACT SERVICES REQUIREMENT – ENTERPRISE-WIDE CONTRACTOR

MANPOWER REPORTING APPLICATION (CMRA)

The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Army via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/.

Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk by clicking on “Send an email” which is located under the Help Resources ribbon on the right side of the login page.

NON-PERSONAL SERVICES

ARL/ALC/GARRISON NON-PERSONAL SERVICES (JUL 2012)

The contractor, as an independent contractor and not as an agent of the Government, shall provide the necessary resources (except those furnished by the Government) to accomplish tasks of the type set forth in the Performance Work Statement.

Contractor employees performing services under this contract shall be controlled, directed and supervised at all times by management personnel of the contractor. The contractor's management shall ensure that employees properly comply with the performance standards outlined in this Performance Work Statement and as required by the contracting officer or the contracting officer's representative (COR). Contractor employees shall perform independent of and without the supervision of any Government official. Actions of contractor employees may not be interpreted or implemented in any manner that results in any contractor employee creating or modifying Federal policy, obligating the appropriated funds of the U.S. Government, overseeing the work of Federal employees, providing direct personal services to any Federal employee or otherwise violating the prohibitions set forth in Parts

7.5 and 37.1 of the Federal Acquisition Regulation (FAR). The Government shall control access to the facility and shall perform the inspection and acceptance of completed work and tasks.

Section D - Packaging and Marking

DISTRIBUTION STATEMENT

Distribution Statement A is applicable to the contract: Approved for Public Release.

Distribution Statement F is applicable to the information generated as a result of this contract: Further dissemination only as directed by Army Research Laboratory date of determination is 5/8/2019.

The contractor shall or need to access to Export controlled items ( i.e., defense articles, defense services, technical data, software, technical information, etc., subject to the Export Administration Regulations (15 CFR Parts 730-774) or the International Traffic in Arms Regulations (22 CFR Parts 120-130)).

Section E - Inspection and Acceptance

GOVERNMENT INSPECTION & ACCEPT

GOVERNMENT INSPECTION AND ACCEPTANCE

Government Inspection and Acceptance shall be performed at the U.S. Army Research Laboratory (ARL), Aberdeen Proving Ground (APG), MD by an authorized Government Representative.

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government 0006 Destination Government Destination Government 0007 Destination Government Destination Government 0008 Destination Government Destination Government 0009 Destination Government Destination Government 0010 Destination Government Destination Government 0011 Destination Government Destination Government 0012 Destination Government Destination Government 0013 Destination Government Destination Government 0014 Destination Government Destination Government 0015 Destination Government Destination Government 0016 Destination Government Destination Government

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 06-MAY-2020 TO

05-MAY-2021

N/A US ARMY RESEARCH LABORATORY

SHIPPING & RECEIVING 321 COLLERAN

RD

ABERDEEN PROVING GROUND

ABERDEEN PROVING GROUND MD 21005

410-278-4406

W813LT

0002 POP 06-MAY-2020 TO

05-MAY-2021

N/A (SAME AS PREVIOUS LOCATION)

0003 POP 06-MAY-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

0004 POP 06-MAY-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

0005 POP 06-MAY-2021 TO

05-MAY-2022

N/A (SAME AS PREVIOUS LOCATION)

0006 POP 06-MAY-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

0007 POP 06-MAY-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

0008 POP 06-MAY-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

0009 POP 06-MAY-2022 TO

05-MAY-2023

N/A (SAME AS PREVIOUS LOCATION)

0010 POP 06-MAY-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

0011 POP 06-MAY-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

0012 POP 06-MAY-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

0013 POP 06-MAY-2023 TO

05-NOV-2023

N/A (SAME AS PREVIOUS LOCATION)

0014 POP 06-MAY-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

0015 POP 06-MAY-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

0016 POP 06-MAY-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

CLAUSES INCORPORATED BY REFERENCE

52.247-34 F.O.B. Destination NOV 1991

EXERCISE OF OPTION

EXERCISE OF OPTION (SEP 1999)

The Contracting Officer may exercise the option(s) contained at CLIN(s) 0005 - 0016 by written modification to the contract prior to contract expiration.

Section G - Contract Administration Data

CLAUSES INCORPORATED BY FULL TEXT

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)

(a) Definitions. As used in this clause—

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232- 7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items—

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

_____COST VOUCHER __________

(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

_____COST VOUCHER__________

(Contracting Officer: Insert either “Invoice 2in1” or the applicable invoice and receiving report document type(s) for fixed price line items for services.)

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial item financing, submit a commercial item financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC TO BE FURNISHED UPON CONTRACT

AWARD

Issue By DoDAAC W911QX

Admin DoDAAC** TO BE FURNISHED UPON CONTRACT

AWARD

Inspect By DoDAAC W813LT

Ship To Code W813LT

Ship From Code N/A

Mark For Code W813LT

Service Approver (DoDAAC) TO BE FURNISHED UPON CONTRACT

AWARD

Service Acceptor (DoDAAC) TO BE FURNISHED UPON CONTRACT

AWARD

Accept at Other DoDAAC NA

LPO DoDAAC NA

DCAA Auditor DoDAAC TO BE FURNISHED UPON CONTRACT

AWARD

Other DoDAAC(s) NA

(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert “See Schedule” or “Not applicable.”)

(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

Helen Copeland, helen.a.copeland.civ@mail.mil

Michael J. Adams, Michael.j.adams214.civ@mail.mil

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

TO BE FURNISHED UPON CONTRACT AWARD

(Contracting Officer: Insert applicable information or “Not applicable.”)

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

TAX EXEMPTION CERTIFICATE ARL

Exemption certificate number 30005004 covers exemption from Maryland retail sales and use tax.

The Federal Tax Identification number for the Army Research Laboratory is: 53-0215803.

PAYMENT INSTRUCTIONS

The payment office shall allocate and record the amounts paid to the accounting classification citations in the contract using the table at DFARS PGI 204.7108(b)(2) [link below] based on the type of payment request submitted and the type of effort.

https://www.acq.osd.mil/dpap/dars/pgi/pgi_htm/current/PGI204_71.htm#payment_instructions

Section H - Special Contract Requirements

REQUIRING ACCESS TO COMPUTER

PERFORMANCE REQUIRING ACCESS TO COMPUTER SYSTEMS

All contractor personnel, to include both U.S. Citizens and Foreign Nationals, shall have a completed, favorably adjudicated National Agency Check (NAC) prior to accessing any U.S. Army Garrison computer. The NAC shall remain on file at either the contractor's Security Office or the resident ARL Security Office or both. For contract performance requiring access to any U.S. Army Garrison computer system a completed/approved ARL Form 135-R (Guest Researcher and Contractor Information Systems Access Request) shall be on file for review and retention by the resident ARL Security office.

RECEIVING ROOM – APG

RECEIVING ROOM REQUIREMENTS - ALTERNATE I (APG)

At ABERDEEN PROVING GROUND truck shipments are accepted Monday through Friday (except holidays) from 8:00 AM to 3:30 PM only at Logistics Warehouse, Building 321, 6375 Johnson Road, Aberdeen Proving Ground, MD 21005. Suppliers shall affix packing slips to the outside of any packages delivered under this contract. Packing slips must be clearly identified and easy to retrieve enclosed packing papers. To coordinate/schedule deliveries, contact Bldg. 321 at 410-278-4406.

PAYMENT OF FIXED FEE

PAYMENT OF FIXED FEE (Reference: 52.216-8)

Pursuant to the clause at FAR 52.216-8, "Fixed Fee", and subject to withholding provisions contained therein or elsewhere in the contract, fixed fee shall be paid to the Contractor on a pro rata basis derived from the ratio of the fixed fee to the estimated cost of the contract and shall be included in the vouchers submitted by the Contractor for reimbursement under the terms of the contract.

LIMITATION OF COST / FUNDS

LIMITATION OF COST/LIMITATION OF FUNDS

This contract is incrementally funded. The Contract Clauses Section hereof include both of the FAR clauses at 52.232-20, "Limitation of Cost", and 52.232-22, "Limitation of Funds". The latter clause is operative as long as this contract is incrementally funded. If and when the contract becomes fully funded, the "Limitation of Cost" clause shall become effective and the "Limitation of Funds" clause shall cease to be operative.

Both of the above cited clauses (52.232-20 and 52.232-22), apply to each CLIN separately. Costs of performing work set forth in one CLIN shall not be chargeable or payable under any other CLIN.

INVOICING

(a) The Contractor shall segregate and bill separately for work performed under each task order issued under this contract. Costs of performing work set forth in one task order shall not be chargeable or payable under any other task order. In addition, if the task order contains multiple CLINS, the Contractor shall segregate and bill separately for work performed under each CLIN of the task order. Costs of performing work set forth in one CLIN shall not be chargeable or payable under any other CLIN.

(b) Each order will be numbered as it is issued to the Contractor by the Contracting Officer or his authorized representative. This order number is to appear on all work accomplished and on all invoices. Invoices may be submitted on a monthly basis.

SUPERVISION OF EMPLOYEES

The Contractor's employees shall remain under the Contractor's direct supervision at all times. Although the Government will issue tasks and coordinate directions within the scope of the contract, detailed instructions for Contractor employees and supervision of individual workers shall remain the responsibility of the Contractor.

WORK HOURS

Normal work hours are from 7:45 A.M. through 4:15 P.M, Monday through Friday. Contractors will not be permitted to work on Saturdays, Sundays or legal holidays (or hours/days on which the installation is officially opening late, closing early, or is closed entirely, for any reason, unless otherwise authorized by the Contracting Officer. Furthermore, if the Contractor chooses to pay its' employees for these days, such costs shall not be charged as a direct expense to this contract. However, Saturdays, Sundays and legal holidays are included in computation of performance of this contract. The following legal holidays will be observed:

January 1st 3rd Monday of January 3rd Monday of February Last Monday of May July 4th 1st Monday of September 2nd Monday of October November 11th 4th Thursday of November December 25th

When one of the above designated legal holidays falls on a Sunday, the following Monday will be observed as a legal holiday. When a legal holiday falls on a Saturday, the preceding Friday is observed as a holiday by U.S.

Government Agencies.

ID OF CONTRACTOR EMPLOYEES

IDENTIFICATION OF CONTRACTOR EMPLOYEES

All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties, are required to identify themselves as such.

All contractor communications made in writing must clearly identify the author as a contractor employee. In contractor communications made via telephone or email (where it is impossible for the other party to view a contractor badge or know that they are not communicating with another Government employee), the contractor must clearly identify themselves as a contractor employee. All contractor email messages must contain the contractor name in full text.

If using ARL mailroom services, the contractor may utilize ARL office symbols only in combination with their contractor name. All name plates displayed on desks and door openings on Government facilities must also include the contractor’s corporate/business name.

ARL regulations are clear that identification badges shall be prominently worn by all personnel at all times while on Government property.

GOV’T-CONTRACTOR RELATIONSHIPS

GOVERNMENT-CONTRACTOR RELATIONSHIPS

a. The Government and the contractor understand and agree that the services to be delivered under this contract by the contractor to the Government are non-personal services and the parties recognize and agree that no employer-employee or master-servant relationships exist or will exist under the contract between the Government and the contractor and/or between the Government and the contractor’s employees. It is therefore in the best interest of the Government to afford the parties a full and complete understanding of their respective obligations.

b. Contractor personnel under this contract shall not:

(1) be placed in a position where they are appointed or employed by a Federal Officer, or are under the supervision, direction, or evaluation of a Federal Officer, Military or Civilian.

(2) be placed in a staff or policy making position.

(3) be placed in a position of command, supervision, administration or control over DA Military or Civilian personnel, or personnel of other contractors, or become a part of the Government organization.

(4) be used for the purpose of avoiding manpower ceilings or other personnel rules and regulations of DA or the Civil Service Commission.

(5) be used in administration or supervision of military procurement activities.

c. Employee Relationships:

(1) The services to be performed under this contract do not require the contractor or its employees to exercise personal judgment and discretion on behalf of the Government, but rather the contractor’s employees will act and exercise personal judgment and discretion on behalf of the contractor.

(2) Rules, regulations, directions, and requirements which are issued by command authorities under their responsibility for good order, administration, and security are applicable to all personnel who enter the installation, or who travel on Government transportation. This is not to be construed or interpreted to establish any degree of Government control which is inconsistent with a non-personal services contract.

KEY PERSONNEL

The Contractor shall notify the Government in the event of a transition (replacing or removal) of key personnel (those individuals addressed in the Contractors proposal) working under this contract. The Government reserves the right to review the qualifications of any Contractor personnel proposed to replace existing personnel and accept/reject the individual based on its judgement that the individual can perform similarly as the transitioned personnel.

CPARS

CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (CPARS) RESPONSIBILITIES &

REPORTING

In order to ensure the timely completion of contractor performance reports/assessments within the Contractor Performance Assessment Reporting System (CPARS), the following individuals are assigned these specific roles within the system:

Assessing Official/(AO) COR or TPOC The AO is responsible for overall program execution and is responsible for preparing, reviewing, signing, and processing the CPAR. The CPAR should be completed not later than 60 calendar days after the end of the evaluation period. AOs are encouraged to discuss contract performance with the contractor during the performance period and CPAR process. The AO must be a Government employee. AOs are responsible for:

• Ensuring that the contract is registered in CPARS

• Input of evaluation information

• Providing a timely and quality narrative “Validate and Send to the Assessing Official”

• Assisting the RO, as necessary

TO BE FURNISHED AT TIME OF AWARD

Assessing Official (AO)/Contracting Official or PCO AO/PCO responsibility includes:

• Ensuring performance input from program management, technical, functional, quality assurance, contracting and other end users of the product or service is included in the evaluation

• Reviewing evaluation information provided by the AO/CORs

• Validates and sends to the Contractor Representative

• Finalizes the CPAR report after acceptance by the Contractor Representative

Designated Contractor Representative The contractor shall designate representatives to whom the evaluations will be sent automatically and electronically. The name, title, e-mail address and phone number of the designated contractor representative shall be provided to the AO who will, in turn, provide that information to the Activity CPARS Focal Point for authorization access. Any changes in designated contractor personnel shall be the sole responsibility of the contractor to inform the AO and the Activity CPARS Focal Point. The designated contractor representative has the authority to:

• Receive the Government evaluation from the AO

• Review/comment/return evaluation to AO within 30 calendar days. If the contractor desires a meeting to discuss the CPAR, it must be requested, in writing, no later than seven calendar days from the receipt of the CPAR.

This meeting will be held during the contractor’s 30-calendar day review period

• Request RO review

Reviewing Official (RO) The RO provides the check-and-balance when there is disagreement between the AO and the contractor. The RO must review and sign the assessment when the contractor indicates non-concurrence with the CPAR. The RO must be a Government employee. The RO has the authority to:

• Provide narrative comment (the RO’s comments supplement those provided by the AO; they do not replace the ratings/narratives provided by the AO)

• Sign the CPAR (at this point, it is considered final and is posted in the CPARS AIS and is available for source selection official use in the PPIRS)

TO BE FURNISHED AT TIME OF AWARD

Training for all persons responsible for the preparation and review of performance assessments is available online at https://www.cpars.gov/cpcbtdlf.htm.

Frequency of Reporting Interim Reports: An interim CPAR is limited to contractor performance occurring after the preceding CPAR. To improve efficiency in preparing the CPAR, it is recommended that the CPAR be completed together with other reviews (e.g., award fee determinations, major program events, program milestones and quality assurance surveillance records).

Interim Reports for New Contracts: An interim CPAR is required for new contracts meeting the thresholds identified in Table 1 that have a period of performance greater than 365 calendar days. The first interim CPAR must reflect evaluation of at least the first 180 calendar days of performance under the contract, and may include up to the first 365 calendar days of performance. For contracts with a period of performance of less than 365 calendar days, see “Final Reports” below.

Annual Interim Reports: Interim CPARs are also required every 12 months throughout the entire period of performance of the contract up to the final report. An interim CPAR is also required:

• Upon a significant change within the agency, provided that a minimum of six months of performance has occurred, such as: Change in program or project management responsibility or Transfer of contract, BPA, or BOA order to a different contracting activity.

• An interim CPAR shall be started prior to transfer of Assessing Official Representative or Assessing Official duties from one individual to another if there is six or more months performance to go prior to the next CPAR to ensure continuity.

Final Report: A final CPAR will be completed upon contract completion or delivery of the final major end item on contract. Final Reports are to be prepared on all contracts meeting the thresholds established with a period of performance of less than 365 calendar days. The final CPAR does not include cumulative information but is limited to the period of contractor performance occurring after the preceding CPAR. The CPAR Focal Point has the authority to approve extensions when special circumstances arise.

Addendum Reports: Addendum reports may be prepared, after the final past performance evaluation, to record the contractor’s performance relative to contract closeout, warranty performance and other administrative requirements.

Quality review of the entire evaluation consists of:

• Forwarding the Government evaluation information to the contractor (check with local policy whether the RO or Contracting Officer should be forwarded a copy prior to its submittal to the contractor)

• Reviewing comments from the designated contractor representative once the evaluation has been returned by the contractor or after 30 calendar days have lapsed

• Modifying the CPAR comments and/or ratings after review of contractor comments, as determined by the AO. After receiving and reviewing the contractor’s comments on the CPAR, the AO may revise the assessment, including the narrative. The AO will notify the contractor of any revisions made to a report as a result of the contractor’s comments. Such a revised report will not be sent to the contractor for further comment. The contractor will have access to both the original and revised reports in the CPARS AIS when the Government finalizes the evaluation.

• Forwarding evaluations to the RO which are in disagreement or when requested by the contractor or, in the alternative,

• Completing the evaluation if it does not require further RO review.

Section I - Contract Clauses

CLAUSES INCORPORATED BY REFERENCE

52.202-1 Definitions NOV 2013 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-7 Anti-Kickback Procedures MAY 2014 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or

Improper Activity

MAY 2014

52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014 52.203-12 Limitation On Payments To Influence Certain Federal

Transactions

OCT 2010

52.203-13 Contractor Code of Business Ethics and Conduct OCT 2015 52.203-17 Contractor Employee Whistleblower Rights and Requirement

To Inform Employees of Whistleblower Rights

APR 2014

52.203-18 Prohibition on Contracting With Entities That Require Certain Internal Confidentiality Agreements or Statements-- Representation

JAN 2017

52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements

JAN 2017

52.204-2 Security Requirements AUG 1996 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber

Content Paper

MAY 2011

52.204-7 System for Award Management OCT 2018 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier

Subcontract Awards

OCT 2018

52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.204-19 Incorporation by Reference of Representations and

Certifications.

DEC 2014

52.204-21 Basic Safeguarding of Covered Contractor Information Systems

JUN 2016

52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities.

JUL 2018

52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment.

AUG 2019

52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.

AUG 2019

52.209-2 Prohibition on Contracting with Inverted Domestic Corporations--Representation

NOV 2015

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment

OCT 2015

52.209-7 Information Regarding Responsibility Matters OCT 2018 52.209-9 Updates of Publicly Available Information Regarding

Responsibility Matters

OCT 2018

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations

NOV 2015

52.210-1 Market Research APR 2011 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017

52.215-1 Alt I Instructions to Offerors--Competitive Acquisition (Jan 2017) - Alternate I

OCT 1997

52.215-2 Audit and Records--Negotiation OCT 2010 52.215-8 Order of Precedence--Uniform Contract Format OCT 1997 52.215-10 Price Reduction for Defective Certified Cost or Pricing Data AUG 2011 52.215-11 Price Reduction for Defective Certified Cost or Pricing Data--

Modifications

AUG 2011

52.215-12 Subcontractor Certified Cost or Pricing Data OCT 2010 52.215-13 Subcontractor Certified Cost or Pricing Data--Modifications OCT 2010 52.215-14 Integrity of Unit Prices OCT 2010 52.215-15 Pension Adjustments and Asset Reversions OCT 2010 52.215-16 Facilities Capital Cost of Money JUN 2003 52.215-18 Reversion or Adjustment of Plans for Postretirement Benefits

(PRB) Other than Pensions

JUL 2005

52.215-19 Notification of Ownership Changes OCT 1997 52.215-20 Requirements for Certified Cost or Pricing Data or

Information Other Than Certified Cost or Pricing Data

OCT 2010

52.215-21 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data -- Modifications

OCT 2010

52.215-22 Limitations on Pass-Through Charges--Identification of Subcontract Effort

OCT 2009

52.215-23 Limitations on Pass-Through Charges OCT 2009 52.216-8 Fixed Fee JUN 2011 52.219-8 Utilization of Small Business Concerns OCT 2018 52.219-9 Small Business Subcontracting Plan AUG 2018 52.219-14 Limitations On Subcontracting JAN 2017 52.219-16 Liquidated Damages-Subcontracting Plan JAN 1999 52.222-3 Convict Labor JUN 2003 52.222-4 Contract Work Hours and Safety Standards - Overtime

Compensation

MAY 2018

52.222-17 Nondisplacement of Qualified Workers MAY 2014 52.222-19 Child Labor -- Cooperation with Authorities and Remedies JAN 2018 52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-26 Equal Opportunity SEP 2016 52.222-35 Equal Opportunity for Veterans OCT 2015 52.222-36 Equal Opportunity for Workers with Disabilities JUL 2014 52.222-37 Employment Reports on Veterans FEB 2016 52.222-38 Compliance With Veterans' Employment Reporting

Requirements

FEB 2016

52.222-40 Notification of Employee Rights Under the National Labor Relations Act

DEC 2010

52.222-41 Service Contract Labor Standards AUG 2018 52.222-46 Evaluation Of Compensation For Professional Employees FEB 1993 52.222-50 Combating Trafficking in Persons JAN 2019 52.222-54 Employment Eligibility Verification OCT 2015 52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2017 52.223-6 Drug-Free Workplace MAY 2001 52.223-10 Waste Reduction Program MAY 2011 52.223-18 Encouraging Contractor Policies To Ban Text Messaging

While Driving

AUG 2011

52.223-22 Public Disclosure of Greenhouse Gas Emissions and Reduction Goals -- Representation.

DEC 2016

52.224-3 Privacy Training JAN 2017 52.225-13 Restrictions on Certain Foreign Purchases JUN 2008

52.225-25 Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-- Representation and Certifications.

AUG 2018

52.226-1 Utilization Of Indian Organizations And Indian-Owned Economic Enterprises

JUN 2000

52.227-1 Authorization and Consent DEC 2007 52.227-1 Alt I Authorization And Consent (Dec 2007) - Alternate I APR 1984 52.227-2 Notice And Assistance Regarding Patent And Copyright

Infringement

DEC 2007

52.227-10 Filing Of Patent Applications--Classified Subject Matter DEC 2007 52.227-14 Rights in Data--General MAY 2014 52.228-7 Insurance--Liability To Third Persons MAR 1996 52.232-17 Interest MAY 2014 52.232-18 Availability Of Funds APR 1984 52.232-20 Limitation Of Cost APR 1984 52.232-22 Limitation Of Funds APR 1984 52.232-23 Assignment Of Claims MAY 2014 52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

OCT 2018

52.232-40 Providing Accelerated Payments to Small Business Subcontractors

DEC 2013

52.233-1 Disputes MAY 2014 52.233-1 Alt I Disputes (May 2014) - Alternate I DEC 1991 52.233-3 Protest After Award AUG 1996 52.233-3 Alt I Protest After Award (Aug 1996) - Alternate I JUN 1985 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.237-1 Site Visit APR 1984 52.237-2 Protection Of Government Buildings, Equipment, And

Vegetation

APR 1984

52.237-3 Continuity Of Services JAN 1991 52.242-1 Notice of Intent to Disallow Costs APR 1984 52.242-3 Penalties for Unallowable Costs MAY 2014 52.242-4 Certification of Final Indirect Costs JAN 1997 52.242-5 Payments to Small Business Subcontractors JAN 2017 52.242-13 Bankruptcy JUL 1995 52.242-15 Stop-Work Order AUG 1989 52.242-15 Alt I Stop-Work Order (Aug 1989) - Alternate I APR 1984 52.243-2 Changes--Cost-Reimbursement AUG 1987 52.243-2 Alt I Changes--Cost-Reimbursement (Aug 1987) - Alternate I APR 1984 52.243-2 Alt V Changes--Cost-Reimbursement (Aug 1987) - Alternate V APR 1984 52.244-5 Competition In Subcontracting DEC 1996 52.244-6 Subcontracts for Commercial Items AUG 2019 52.245-1 Government Property JAN 2017 52.245-9 Use And Charges APR 2012 52.246-5 Inspection Of Services Cost-Reimbursement APR 1984 52.246-25 Limitation Of Liability--Services FEB 1997 52.247-63 Preference For U.S. Flag Air Carriers JUN 2003 52.247-64 Preference for Privately Owned U.S. - Flag Commercial

Vessels

FEB 2006

52.249-6 Termination (Cost Reimbursement) MAY 2004 52.249-14 Excusable Delays APR 1984 52.251-1 Government Supply Sources APR 2012 52.253-1 Computer Generated Forms JAN 1991 252.201-7000 Contracting Officer's Representative DEC 1991

252.203-7000 Requirements Relating to Compensation of Former DoD Officials

SEP 2011

252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense- Contract-Related Felonies

DEC 2008

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7003 Agency Office of the Inspector General AUG 2019 252.203-7005 Representation Relating to Compensation of Former DoD

Officials

NOV 2011

252.204-7000 Disclosure Of Information OCT 2016 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Antiterrorism Awareness Training for Contractors. FEB 2019 252.204-7007 Alternate A, Annual Representations and Certifications JUN 2019 252.204-7009 Limitations on the Use or Disclosure of Third-Party

Contractor Reported Cyber Incident Information

OCT 2016

252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting

OCT 2016

252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support

MAY 2016

252.209-7004 Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism

MAY 2019

252.211-7007 Reporting of Government-Furnished Property AUG 2012 252.219-7003 Small Business Subcontracting Plan (DOD Contracts) MAY 2019 252.219-7011 Notification to Delay Performance JUN 1998 252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements DEC 2010 252.225-7001 Buy American And Balance Of Payments Program-- Basic DEC 2017 252.225-7002 Qualifying Country Sources As Subcontractors DEC 2017 252.225-7012 Preference For Certain Domestic Commodities DEC 2017 252.225-7048 Export-Controlled Items JUN 2013 252.226-7001 Utilization of Indian Organizations and Indian-Owned

Economic Enterprises, and Native Hawaiian Small Business Concerns

APR 2019

252.227-7013 Rights in Technical Data--Noncommercial Items FEB 2014 252.227-7014 Rights in Noncommercial Computer Software and

Noncommercial Computer Software Documentation

FEB 2014

252.227-7016 Rights in Bid or Proposal Information JAN 2011 252.231-7000 Supplemental Cost Principles DEC 1991 252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

DEC 2018

252.235-7011 Final Scientific or Technical Report JAN 2015 252.237-7010 Prohibition on Interrogation of Detainees by Contractor

Personnel

JUN 2013

252.239-7000 Protection Against Compromising Emanations JUN 2004 252.239-7001 Information Assurance Contractor Training and Certification JAN 2008 252.239-7016 Telecommunications Security Equipment, Devices, Techniques, And Services

DEC 1991

252.242-7006 Accounting System Administration FEB 2012 252.243-7002 Requests for Equitable Adjustment DEC 2012 252.245-7001 Tagging, Labeling, and Marking of Government-Furnished

Property

APR 2012

252.245-7002 Reporting Loss of Government Property DEC 2017 252.245-7003 Contractor Property Management System Administration APR 2012 252.245-7004 Reporting, Reutilization, and Disposal DEC 2017 252.247-7022 Representation of Extent of Transportation by Sea. JUN 2019 252.247-7023 Transportation of Supplies by Sea FEB 2019

CLAUSES INCORPORATED BY FULL TEXT

52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006)

(a) Except as provided in (b) of this clause, the Contractor shall not enter into any agreement with an actual or prospective subcontractor, nor otherwise act in any manner, which has or may have the effect of restricting sales by such subcontractors directly to the Government of any item or process (including computer software) made or furnished by the subcontractor under this contract or under any follow-on production contract.

(b) The prohibition in (a) of this clause does not preclude the Contractor from asserting rights that are otherwise authorized by law or regulation.

(c) The Contractor agrees to incorporate the substance of this clause, including this paragraph (c), in all subcontracts under this contract which exceed the simplified acquisition threshold.

52.204-20 Predecessor of Offeror (JUL 2016)

(a) Definitions. As used in this provision--

Commercial and Government Entity (CAGE) code means--

(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Commercial and Government Entity (CAGE) Branch to identify a commercial or government entity;

or

(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support and Procurement Agency (NSPA) to entities located outside the United States and its…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .