JBER ORC_FY20_Enclosure 2 - GFI List_20200424.xlsx
XLSX spreadsheet 25 KB Posted
- Solicitation number
- W911KB20R0006
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JBER
| GOVERNMENT-FURNISHED INFORMATION (GFI) | |
| ORC Name: | JBER |
| Installation: | JBER |
| Date: | 7/18/19 |
| Item | Document Date | Document Title | Site | CD Number | CD File Name |
| 1 | Jan-18 | JBER 2018 Conceptual Site Modes Tech Memo | 1 | JBER_2018_CSM Tech Memo | |
| 2 | Apr-09 | Contractor's Guide (Draft) | 1 | Contractor's Guide Draft (2009) | |
| 3 | Apr-17 | Environmental Restoration Program Atlas | 1 | JBER_2017_ERP Atlas | |
| 4 | May-16 | Environmental Restoration Program Installation Overview (Wall Map) | 1 | JBER_2016_ERP Wall Map | |
| 5 | Apr-09 | Environmental Staging Facility Operations & Maintenance Plan | 1 | JBER-R ESF_2009_O&M Plan | |
| 6 | Apr-09 | Environmental Staging Facility Work Plan (Final) | 2 | JBER-R ESF_2009_WP | |
| 7 | Environmental Staging Facility 2016 System Operation Annual Report | 2 | JBER-R ESF_2016_Annual Rpt | ||
| 8 | Environmental Staging Facility 2017 System Operation Annual Report | 2 | JBER-R ESF_2017_Annual Rpt | ||
| 9 | Mar-19 | Environmental Staging Facility 2018 System Operations Annual Report | 2 | JBER-R ESF 2018 Annnual Report March 2019(reduced) | |
| 10 | Jul-11 | Joint Base Elmendorf-Richardson Community Involvement Plan | 1 | JBER_2011_Community Involvement Plan | |
| 11 | Mar-13 | Final UFP-QAPP Basewide (Alaska Group PBR) | 1 | Basewide UFP-QAPP (2013) | |
| 12 | Dec-19 | Revision of the Federal Facility Agreement Document Schedule for JBER-Elmendorf | 2 | JBER-E_2019_FFA Doc Schedule | |
| 13 | Dec-19 | Revision of the Federal Facility Agreement Document Schedule for JBER-Richardson | 2 | JBER-E_2019_Document Schedule | |
| 14 | May-11 | 673d ABW Instruction 32-7003 Land Use Control Management | 2 | 673ABWI32-7003_LUC Mgt | |
| 15 | Jan-10 | Memorandum to the Site File, Operable Units (OUs) 1, 2, 4, and 5, Sites LF059, ST041, FT023, SD024, SD025, SD028, SD029 and ST037 | LF059, ST041, FT023, SD025, SD029, ST037 | 1 | OU 1, 2, 4, 5 LUC Memo to Site File (2010) |
| 16 | Mar-11 | Memorandum to the Site File, Operable Unit 2, Site ST041 | ST041 | 1 | OU2 Surface Water and Seep Sampling Frequency Memo to Site File (2015) |
| 17 | Jan-10 | Memorandum to the Site File, OU4, FT023 | FT023 | 1 | OU4 FT023 Memo to Site File (2010)-signed |
| 18 | Sep-03 | Memorandum to the Site File, OU4, GW Sampling Frequency | SD024, SD025, SD028, SD029, FT023, SS010 | 1 | OU4 GW Sampling Frequency Memo to Site File (2003) |
| 19 | Jun-11 | Memorandum to the Site File, Operable Unit 5, ST37 | ST037 | 1 | OU5 Wetland Remediation System Optimization Memo to Site File (2011) |
| 20 | Aug-07 | Explanation of Significant Differences Operable Unit 6 | LF002, LF003, SD015, WP014 | 1 | OU6 ESD (2007) |
| 21 | Nov-16 | Memorandum to the Site File, OU6, LF004 | LF004 | 1 | OU6 LF04 Reduction in Debris Removal Frequency Memo to Site File (2016)-signed |
| 22 | Jan-17 | Interim Remedial Action Completion Report Site LF059 | LF059 | 1 | LF059 I-RACR (2017) |
| 23 | Apr-11 | OUB Memo to Site File | CG039 | 1 | OUB_ Memo to Site File (signed 2011) |
| 24 | Mar-17 | Explanation of Significant Differences SD025 | SD025 | 1 | SD025 ESD (signed 2018) |
| 25 | Sep-03 | Memorandum to Site File Operable Unit 6 (OU6) and Source Area SS019 | WP014 | 1 | OU6 GW Sampling Frequency and SS019 Memo to Site File (2003) |
| 26 | Feb-19 | SS041 Memo to Site File | SS041 | 1 | SS041 2019.02.27 Final MemoToSite FIle OUA RR PCB Site |
| 27 | Nov-11 | XU022 Memo to Site File Clarifying ROD Schedule | XU022 | 1 | XU022_2011_Memo to Site File Clarifying ROD Schedule |
| 28 | Mar-19 | Fifth Five-Year Review for JBER-Elmendorf, Alaska (Draft) | DP098, FT023, LF002, LF003, LF004, LF059, SD015, SD025, SD029, ST037, ST041, WP014 | 1 | Draft JBER-E Five-Year Review_Jan 19 |
| 29 | Aug-18 | Fourth Five-Year Review Report for CERCLA Sites JBER-Richardson, Alaska | CG039, DA089, SS044, SS090, XE023, XU022 | 1 | 2018_JBER-R 4th Five-Year Review (signed) |
| 30 | Jun-19 | CG114 Technical Memorandum Decision Document (Pre-Draft) | CG114 | 1 | CG114_2019_PreDraft DD Tech Memo |
| 31 | Feb-18 | SS047 Decision Document | SS047 | 1 | SS047_2017_DD (signed 02-20-18) |
| 32 | Nov-18 | PROPOSED PLAN Mortar Range 1A (FR002), Mortar Range 2A (FR001), and Mortar Range 2C (FR001b) (Draft Final) | FR001, FR002 | 1 | FR001 and FR002 Proposed Plan_Draft Final |
| 33 | May-19 | 2018 Annual Report Monitoring of State-Regulated Sites (Draft) | Elmendorf CG527, CG536, CG539, ST032, ST068, Richardson SS041, TU037, TU064, TU101, TU102, TU103 | 1 | 2018 Draft STATE Annual RA-O |
| 34 | Jul-19 | 2018 Technical Project Report JBER IC Inspections (Draft) | CG509, CG529, CG530, CG543, CG551, CG702, SO501, SO507, SO508, SO510, SO544, SO547, SO549, SS418, SS522, ST048, ST408, TS003, TU107 | 1 | 2018 Draft Letter Report JBER IC Inspections |
| 35 | May-19 | 2017 Annual Report Monitoring of State-Regulated Sites | Elmendorf CG527, CG536, CG539, SO552, ST032, ST068; Richardson SS041, TU037, TU064, TU101, TU102, TU103 | 1 | 2017 STATE_Annual RA-O |
| 36 | Mar-19 | 2017 Technical Project Report JBER IC Inspections | CG509, CG529, CG530, CG543, CG551, CG702, SO501, SO507, SO508, SO510, SO544, SO547, SO549, SS418, SS522, ST048, ST408, TS003, TU107 | 1 | 2017 Letter Report JBER IC Inspections |
| 37 | Feb-19 | 2016 Annual Report Monitoring of State-Regulated Sites | Elmendorf CG527, CG536, CG539, SO552, ST032, ST036, ST068; Richardson SS041, TU037, TU064, TU101, TU102, TU103 | 1 | 2016 STATE_Annual RA-O |
| 38 | Apr-19 | 2016 Technical Project Report JBER IC Inspections | CG509, CG529, CG530, CG543, CG551, CG702, SO501, SO507, SO508, SO510, SO544, SO547, SO549, SS418, SS522, ST048, ST408, TS003, TU107 | 1 | 2016 Letter Report JBER IC Inspections |
| 39 | Jul-19 | 2015 Annual Report Monitoring of State-Regulated Sites | SO552, ST036 | 1 | 2015 STATE Annual RA-O |
| 40 | Jun-15 | 2014 Annual Report Monitoring of State-Regulated Sites | ST036 | 1 | 2014 STATE Annual RA-O |
| 41 | May-19 | 2018 Annual Remedial Action-Operations and Monitoring Report for Select CERCLA Sites (Draft) | Elmendorf DP098, FT023, LF002, LF003, LF004, LF059, SD015, SD025, SD029, ST037, ST041, WP014; Richardson CG039, DA089, SS044, SS090, XE023, XU022 | 1 | 2018_Draft CERCLA Annual RA-O |
| 42 | Dec-18 | 2017 Annual Remedial Action-Operations and Monitoring Report for Select CERCLA Sites | Elmendorf DP098, FT023, LF002, LF003, LF004, LF059, SD015, SD025, SD029, ST037, ST041, WP014; Richardson CG039, DA089, SS044, SS090, XE023, XU022 | 1 | 2017_CERCLA_Annual RA-O |
| 43 | May-18 | 2016 Annual Remedial Action-Operations and Monitoring Report for Select CERCLA Sites | Elmendorf DP098, FT023, LF002, LF003, LF004, LF059, SD015, SD025, SD029, ST037, ST041, WP014; Richardson CG039, DA089, SS044, SS090, XE023, XU022 | 1 | 2016_CERCLA Annual RA-O |
| 44 | Dec-15 | 2014 Annual Field Activities Report CERCLA Sites | SS013 | 1 | 2014 CERCLA Annual RA-O |
| 45 | Aug-17 | 2016 Remedial Action Long-Term Management Report XU022 – Eagle River Flats, Operable Unit C | XU022 | 1 | XU022_2017_RAO LTM Rpt |
| 46 | Jul-18 | Site Characterization Report CG111 | CG111 | 1 | CG111_2018_Site Char Rpt |
| Dec-19 | Incorporation of CG111- Johnson Avenue Plume into JBER-Elmendorf (JBER-E) Federal Facility Agreement (FFA) | CG111 | 2 | CG111 - FFA Doc Schedule (2019) | |
| 47 | Jul-18 | Site Characterization Report CG112 | CG112 | 1 | CG112_2018_Site Char Rpt |
| 48 | Jun-18 | Site Characterization Report CG114 | CG114 | 1 | CG114_2018_Site Char Rpt |
| 49 | Dec-18 | CG703 RI (Draft) | CG703 | 1 | CG703 Draft RI Report |
| 50 | Dec-19 | CG703 (Northern Plume) Feasibility Study (Draft) | CG703 | 2 | CG703 Draft FS |
| 51 | Jan-19 | CG704 Southern Plume Limited Field Investigation Report | CG704 | 1 | CG704_2019_LFI Rpt |
| 52 | Jul-18 | DA115 PCB Soil Pile Limited Field Investigation Report | DA115 | 1 | DA115 LFI RPT Final |
| 53 | Feb-17 | DA119 Airlifter Boran Drum Response | DA119 | 1 | Airlifter and Boram Dr Drum Removal Final |
| 54 | Jan-19 | DA119 DA122 Geophysical Report (Draft) | DA119, DA122 | 1 | DA119_DA122_Draft Geophysical_Report_01.16.2019 |
| 55 | Feb-18 | Orphaned Drum Removal and Sampling (DA122) | DA122 | 1 | DA122 Orphan Drum Removal_Sept 2016.docx |
| 56 | Sep-15 | Oil-Water Separator (OWS) Closure After Action Report, JBER, Alaska | OW118 | 1 | JBER OWS Closures Report (2015) |
| 57 | Sep-15 | Soil Pile Removal and Disposal Report, Building 5374, JBER, Alaska | OW118 | 1 | Bldg 5374 OWS Soil Disposal Rpt (2015) |
| 58 | Jun-19 | Limited Field Investigation Report ST036, TU091, SO552 (Draft) | SO552, ST036, TU091 | 1 | LFI Report - ST036,TU091,SO552 (Draft) |
| 59 | Aug-19 | Draft SS109 Vapor Extraction System Operation and Maintenanc - Work Plan Addendum dated August 2019 | SS109 | 2 | 2019.08.26 WP Addndm SS109 ADEC comment letter |
| 60 | May-11 | 2011 Engineering Evaluation and Cost Analysis F-22 Weapons Release Shop | SS109 | 2 | 2011 EECA_F22 Weapons Release Shop |
| 61 | Jun-11 | 2011 Action Memorandum F-22 Weapons Release Shop | SS109 | 2 | Final Signed ELM300 Action Memorandum |
| 62 | Dec-11 | Final Approval Memorandum ELM300 Non-Time Critical Removal Action | SS109 | 2 | FINAL ELM300 APPROVAL MEMORANDUM with Figures |
| 63 | Jan-18 | JBER SS109 Ventilated Stockpile Soil Vapor Extraction System - 2017 Monitoring Summary | SS109 | 2 | SS109 2017 Ventilated Stockpile SVE - 2017 Monitoring Report |
| 64 | Dec-18 | Joint Base Elmendorf-Richardson (JBER) SS109 Ventilated Stockpile Soil Vapor Extraction System - 2018 Monitoring Summary Report | SS109 | 2 | JBER Site SS109_DRAFT VSP SVE 2018 Monitoring Summary Report_12Dec2018 |
| 65 | Dec-19 | Monthly Letter Report for the Ventilated Stockpile Soil Vapor Extration Systems Operations, Maintenance and Sampling at SS109 Site during September 2019 | SS109 | 2 | SS109 SVE Monthly Summary Letter_Sep2019 |
| 66 | Jul-18 | SS109 (F-22) Weapons Release Shop)Remedial Investigation and Human Health Risk Assessment Report | SS109 | 1 | SS109_2018_RI-HHRA |
| 67 | Apr-19 | SS109 (F-22) Weapons Release Shop)Feasibility Study Report (Draft) | SS109 | 1 | SS109 FS Draft |
| 68 | Jun-19 | SS116 Site Characterization Work Plan | SS116 | 1 | SS116 SC WP Final |
| 69 | Feb-19 | SS116 Phase 2 Letter | SS116 | 1 | SS116 Phase II Letter_2.15.2019 |
| 70 | Aug-18 | SS117 RIRA Management Plan | SS117 | 1 | SS117 RI-RA Management Plan FINAL |
| 71 | Jun-19 | SS117 VI Work Plan (Draft) | SS117 | 1 | SS117_VI_WP_Draft |
| 72 | Feb-17 | SS124 Utility Trench Near Building 10551 Contaminated Soil Sampling | SS124 | 1 | SS124 Bldg 10551 Utility Trench Sample Rpt |
| 73 | Jun-19 | ST037 Seep Assessment Report | ST037 | 1 | JBER_ST037_SeepAssessment_Final |
| 74 | Oct-18 | WP014 Limited Site Investigation Report | WP014 | 1 | Final WP014 Limited Site Investigation Report - October 2018 |
| 75 | Jan-19 | AT029 Supplemental RI Report (Draft) | AT029 | 1 | AT029_RIReport_2018_Draft |
| 76 | Sep-17 | AT035 Remedial Investigation/Feasibility Study Management Plan | AT035 | 1 | JBER_TO0003_AT035_WP_Final |
| 77 | Jul-15 | AT035 Preliminary Source Evaluation (PSE) 2 Report | AT035 | 1 | AT035_2015_PSE2 Rpt |
| 78 | Jan-19 | AT035 Vapor Intrusion Work Plan Addendum (Draft) | AT035 | 1 | JBER_AT035_VI_WP_Draft |
| 79 | Jun-14 | Treatability Study Implementation Report CG039 - Poleline Road Disposal Area | CG039 | 1 | CG039_2014_PRDA Treatability Implementation Rpt |
| 80 | Apr-15 | Treatability Study Report CG039 - Poleline Road Disposal Area | CG039 | 1 | CG039_2015_PRDA Treatability Study Rpt |
| 81 | Aug-17 | Treatability Study Report DA089 – Armored Vehicle Maintenance Area | DA089 | 1 | DA089_2017_Treatability Study Rpt |
| 82 | Oct-18 | DA090 Remedial Investigation (Draft Final) | DA090 | 1 | DA090 Draft RI |
| 83 | Feb-19 | DA090 Feasibility Study (Draft Final) | DA090 | 1 | DA090 FS-Draft-Final |
| 84 | Feb-17 | DA121 Utility Power Pole Excavation Contaminated Soil Sampling | DA121 | 1 | DA121 Utility Pole 8783 Excavation Soil Sampling Rpt |
| 85 | May-19 | DP009 RI Report (Draft) | DP009 | 1 | DP009_RIReport_2018_Draft |
| 86 | Aug-18 | RI/FS Mortar Range 1A (FR002) and Mortar Range 2A (FR001) Munitions Response Sites | FR001, FR002 | 1 | Final_RI-FS Mortar Range 1A_Mortar Range 2A_JBER_August 2018_with Appendices |
| 87 | Nov-19 | Fire Hydrant Replacement Project - DU Project No. P8271/Summary of Environmental Related Activities (Draft) | SS090 | 2 | SS090_Draft P8271 Summary Report and Sample Results |
| 88 | Dec-18 | Remedial Investigation/Risk Assessment Report SS013 - Building 791 MP Barracks Site | SS013 | 1 | SS013 RIRA Final |
| 89 | Dec-18 | Feasibility Study SS013- Building 791 MP Barracks Site | SS013 | 1 | JBER SS013 Feasibility Study (Final) |
| 90 | Apr-19 | SS019 RI Report (Draft) | SS019 | 1 | SS019_RIReport_Draft |
| 91 | Apr-15 | Preliminary Assessment Report for Perfluorinated Compounds at JBER | SS044 | 1 | JBER PFC_2015_Prelim Assessment |
| 92 | May-18 | Site Inspection Report for Aqueous Film Forming Foam Areas JBER | SS044 | 1 | JBER PFC_2018 AFFF Areas SI Rpt |
| 93 | Jan-15 | SS044 Summary of Site Status | SS044 | 1 | SS044_2015_Summary of Site Status |
| 94 | Sep-19 | SS047 Final Field Activities Report | SS047 | 2 | SS047 Field Activies Report_Sep 2019 |
| 95 | Apr-19 | SS120 PSE2 Report | SS120 | 1 | SS120_PSE2_Report_Final |
| 96 | Nov-18 | TU117 Supplemental RIRA Report (Pre-Draft) | TU117 | 1 | TU117 SRI-RA Report (Pre-Draft) |
| 97 | Jul-16 | Remedial Action Work Plan XU022 - Eagle River Flats | XU022 | 2 | Final_XU022_ERF_2016_Workplan |
| Jul-19 | AT029 - Ruff Road Fire Training Area Supplemental Remedial Investigation (Final) | AT029 | 3 | AT029_RIReport_2018_Final | |
| Sep-19 | DP009 - Building 986 Dry Well Supplemental Remedial Investigation Report (Final) | DP009 | 3 | DP009_RIReport_2018_Final | |
| Sep-19 | SS019 - Building 755 Remedial Investigation Report (Final) | SS019 | 3 | SS019_RIReport_Final | |
| Jan-20 | Supplemental Remedial Investigation/Risk Assessment Report TU117 - Former Building 772 (Draft, Revision 1) | TU117 | 3 | TU117 SRI_RA Report (Draft Rev 1) | |
| Nov-19 | CG114 - 22ND Street Decision Document | CG114 | 3 | CG114_DecisionDocument_Draft_Nov2019 | |
| Mar-17 | JBER VI Study Sampling #2 | Multiple | 320-25717-1 Std_Tal_L4 Final Report | ||
| Jun-18 | Final Vapor Intrusion Study Report, JBER | Multiple | 3 | Final_JBER_VI_StudyReport | |
| Nov-18 | Limited Field Investigation Report SA110 - Investigation-Derived Wast Yard | SA110 | 3 | SA110_2018_LFI Rpt | |
| Oct-19 | Vapor Intrusion Assessment Addendum - AT035 Remedial Investigation/Feasibility Study Management Plan Final | AT035 | 3 | JBER_AT035_VI_WP_Final | |
| Dec-19 | SS124 Site Chartacterization Report Draft | SS124 | 3 | SS124_Draft Report_Combined | |
| Dec-19 | DA121 - Site Characterization Report Draft | DA121 | 3 | DA121 Draft Report_Combined | |
| Jul-19 | CG703 (Northern Plume) Remedial Investigation Report Final | CG703 | 3 | CG703 RI Report (Final) | |
| Feb-20 | Fifth Five-Year Review for JBER-Elmendorf, Alaska (Final) | Multiple | 3 | JBER-E_cercla_final_feb_2020_02_07 | |
| Jul-14 | Memorandum to Site File for SS013 PCB Time Critical Removal Action, Remaining PCB Contamination, and Required Interim Land Use Controls | SS013 | 4 | SS013 - Memo to Site File (2014) | |
| Jan-07 | Decision Document for ST68 | ST068 | 4 | ST068_2007_Decision Doc | |
| Jan-15 | Summary of Site Status - SS044 - Building 35-752 PCB Site | SS044 | 4 | SS044_2015_Summary of Site Status | |
| 2006 Annual Report Final, Operable Unit 1 Landfill, Evapotranspiration Cover Placement and Monitoring, April 2007 | Multiple | 5 | 2006_Annual_Report_Final_OU1 | ||
| DA115 PCB Soil Pile Limited Field Investigation Work Plan, Final, September 2017 | DA115 | 5 | 2017 DA115 LFI Work Plan Final | ||
| 2006 Annual Report Final, Operable Unit 1 Landfill, Appendix A, Correspondence | Multiple | 5 | 2006_OU1_App_A_Correspondence | ||
| 2006 Annual Report Final, Operable Unit 1 Landfill, Appendix B, Lysimeter Study | Multiple | 5 | 2006_OU1_App_B_Lysimeter_Study | ||
| 2006 Annual Report Final, Operable Unit 1 Landfill, Appendix C, Evapotranspiration Cover Specifications | Multiple | 5 | 2006_OU1_App_C_ET_Cover_Specs | ||
| 2006 Annual Report Final, Operable Unit 1 Landfill, Appendix D, Earthwork | Multiple | 5 | 2006_OU1_App_D_Earthwork | ||
| 2006 Annual Report Final, Operable Unit 1 Landfill, Appendix E, Vegetation | Multiple | 5 | 2006_OU1_App_E_Vegetation | ||
| 2006 Annual Report Final, Operable Unit 1 Landfill, Appendix F, Field Documentation | Multiple | 5 | 2006_OU1_App_F_Field_Documentation | ||
| 2006 Annual Report Final, Operable Unit 1 Landfill, Appendix G, Long Term Monitoring Program | Multiple | 5 | 2006_OU1_App_G_LTM_Program | ||
| 2006 Annual Report Final, Operable Unit 1 Landfill, Appendix H, Photos | Multiple | 5 | 2006_OU1_App_H_Photos | ||
| CG703 Geophysical Investigation Technical Memorandum, August 2017 | CG703 | 5 | CG703 Draft Geophysical Tech Memo_cmp | ||
| CG703 Test Pit Sampling Procedures, Analytical Methods, and Laboratory Information (Final), October 2017 | CG703 | 5 | CG703 Test Pit Sampling FINAL | ||
| Remedial Investigation/Feasibility Study Management Plan, CG703 - Northern Plume, Final, May 2018 | CG703 | 5 | Final CG703_RIFS Plan3 | ||
| DA121 Site Characterization Report, Final, January 2020 | DA121 | 5 | Final _DA121_SC_Report_All | ||
| Doyon Utilities, Sampling and Analysis Plan, P8271 Water Distribution System Upgrades (H6-8), September 2019 | SS090 | 5 | P8271_SAP_v2 | ||
| Site Closure Report ST527, Final, December 2012 | ST527 | 5 | SO510_ST527_JBER_FNL | ||
| Site Closure Report ST409, Final, December 2012 | ST409 | 5 | SO547_ST409_JBER_FNL | ||
| SS124 Site Characterization Report, Draft, December 2019 | SS124 | 5 | SS124_Draft Report_Combined | ||
| Site Closure Report SS704, Final, December 2012 | SS704 | 5 | SS522_SS704_JBER_FNL_with Labs | ||
| Limited Field Investigation Report, ST036, TU091, and SO552, Final, March 2020 | Multiple | 5 | ST036,TU091,SO552 LFI Rpt-Final | ||
| Memorandum to the Site File, TU117, FTR271A (Building 772) Proposed Headquarters Facility, April 2012 | TU117 | 5 | Memo to the Site File - FTR271A (Bldg 772) | ||
| Site Characterization and Risk Evaluation Report TU091 (AFID 130-OU), Jan 2016 | TU091 | 5 | 2016 TU091 Site Characterization Risk Evaluation Report | ||
| Doyon Utilities, Fire Hydrant Replacement Project – DU Project No. P8271 | SS090 | 5 | Addendum to Summary of Environmental Related Activities (PFAS Sample) | ||
| Uniform Federal Policy Quality Assurance Project Plan Site Characterization Orphan Drum Sites DA119 and DA122, Joint Base Elmendorf-Richardson, AK, October 2019 | DA119, DA122 | 5 | DA119 and DA122 JBER Drum Investigation UFP QAPP-Final October 2019 Signed | ||
| Doyon Utilities, Fire Hydrant Replacement Project – DU Project No. P8271, Feb 2020 | SS090 | 5 | DU H6-8 Summary Report - v1.7 WITH HEADERS | ||
| Final Vapor Intrusion Study Report for Joint Base Elmendorf-Richardson Restoration Program Sites, Alaska, June 2018 | Multiple | 5 | Final_JBER_VI_StudyReport | ||
| Limited Site Investigation Report FT023 (Fire Training Area), June 2015 | FT023 | 5 | FT023_2015_Limited Site Investigation Rpt | ||
| Final Uniform Federal Policy – Quality Assurance Project Plan Addendum, SS124, Mar 2020 | SS124 | 5 | JBER SS124 UFP-QAPP Addendum_Final | ||
| Fifth Five-Year Review Report for CERCLA Sites JBER-Elmendorf, Alaska, Feb 2020 | Multiple | 5 | JBER-E CERCLA Five-Year Review_Final_not Signed yet | ||
| Feasibility Study SS109 - F-22 Weapons Release Shop, Sep 2019 | SS109 | 5 | SS109 FS Final | ||
| Pre-Draft SS116 – ALCOM Building 9480 Exterior Alcove Contamination Site Characterization Report, Mar 2020 (Use Pre-Draft documents with caution) | SS116 | 5 | SS116 predraft RPT | ||
| Vapor Intrusion Assessment Addendum - SS117 Focused VOC Remedial Investigation Management Plan, April 2020 | SS117 | 5 | SS117 VI Focused VOC RI Mgmt Plan (Final) | ||
| Removal of SD15 Monitoring Well OU6MW-18, JBER, Alaska, Jan 2012 | SD015 | 5 | Tech Memo for SD15 Removal of OU6MW-18 | ||
| 2017 Remedial Action Operations, Land Use/Institutional Control, Feb 2019 | Multiple | 5 | Final Report 2017 JBER LTM_Feb2019 | ||
| Dense Nonaqueous Phase Liquid (DNAPL) Evaluation Report DP098, April 2018 | DP098 | 6 | Final DP098 DNAPL Evaluation Report April-2018-with App B | ||
| 2013 SVE System After-Action Report F-22 Weapons Release Shop, Nov 2014 | SS109 | 6 | F22SVE_AAR Final | ||
| Summary of SD015 Limited Site Assessment, January 2012 | SD015 | 6 | SD15_Final_Report |
&"-,Bold"&12PWS Enclosure X GFI List XXX AFB &12Contract Number Enclosure 2 xx Month 2019 Page &P of &N
File details come from the government source that posted it. Updated .