JBER ORC_FY20_Enclosure 2 - GFI List_20200424.xlsx

XLSX spreadsheet 25 KB Posted

Attached to
OPTIMIZED REMEDIATION CONTRACT, JOINT BASE ELMENDORF-RICHARDSON, ALASKA
Solicitation number
W911KB20R0006
Issued by

View the file

Other files

File Type Posted
B.08.03 W911KB20R0006-0004 DBA Wage Rate Update.pdf PDF
DBA Wage Rates for Amendment 0004.pdf PDF
B.08.03 Amendment 0003 KTR Questions and Answers 1 May 2020.pdf PDF
B.08.03 W911KB20R0006-0003 Amendment.pdf PDF
Final DP098 DNAPL Evaluation Report April-2018-with App B.PDF PDF
Amendment 0002 - DOD Safe Instructions.docx DOCX document
W911KB20R0006-0002 SF30 and Conformed Copy.pdf PDF
F22SVE_AAR Final.pdf PDF
SD15_Final_Report.pdf PDF
Amendment 0002 - Contractor Questions and Government Answers.pdf PDF
Amendment 0001 - Attachment B-1 CLIN-Sub-CLIN Structure_rev1_20200414.xlsx XLSX spreadsheet
Amendment 0001 - Contractor Questions and Government Answers.pdf PDF
Amendment 0001 - Schedule B JBER ORC.xlsx XLSX spreadsheet
Amendment 0001 - Enclosure 2A - GFI AR Spreadsheet.xlsx XLSX spreadsheet
Amendment 0001 - JBER ORC_FY20_Enclosure 2 - GFI List_20200415.xlsx XLSX spreadsheet
W911KB20R0006-0001 SF30 and Conformed Copy.pdf PDF
Amendment 0001 - L-3 ORC PMP Guidance v1.0_20191115_final.pdf PDF
B.08.02 Attachment L-2 Labor Category Qualifications 4 March 20.pdf PDF
B.08.02 Attachment C-8 Optimization Benefit Template_190520_MD_190710.pdf PDF
B.08.02 Attachment B-1 CLIN-Sub-CLIN Structure.xlsx XLSX spreadsheet
B.07.01 ORC Virtual Site Visit Draft Final 25 Feb 20.pptx PPTX presentation
B.08.02 Attachment C-2 ORC PMP Guidance v1.0_20191115.pdf PDF
B.08.02 Attachment C-1 PWS Enclosure 1_Acronyms and Definitions.pdf PDF
B.08.02 Attachment J-1 JBER ORC_FY20_Enclosure 2 - GFI List_201911213.pdf PDF
B.08.02 Attachment C-5 Ensuring Chemistry Data Fact Sheet April 2013.pdf PDF
B.08.02 GFP List.pdf PDF
B.08.02 Attachment J-2 QASP_ORC.pdf PDF
B.08.02 Attachment C-6 Field Sampling Protocol PFOA-PFOS-PFBS Guidance__June 2019.pdf PDF
B.08.02 Attachment C-7 nterim Guidance 1-4 Dioxane, Environmental Restoration Program.pdf PDF
B.08.02 Attachment C-4 AFGM2019-32-01,AFFF Related Waste Mgmt Implementation Guidance.pdf PDF
B.08.02 W911KB20R0006.pdf PDF
B.08.02 Attachment C-3 Draft CPSMR template- 25Aug2019.pdf PDF
B.08.02 Attachment L-1 Past Performance Quality Questionaire.docx DOCX document
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JBER

GOVERNMENT-FURNISHED INFORMATION (GFI)
ORC Name:JBER
Installation:JBER
Date:7/18/19
ItemDocument DateDocument TitleSiteCD NumberCD File Name
1Jan-18JBER 2018 Conceptual Site Modes Tech Memo1JBER_2018_CSM Tech Memo
2Apr-09Contractor's Guide (Draft)1Contractor's Guide Draft (2009)
3Apr-17Environmental Restoration Program Atlas1JBER_2017_ERP Atlas
4May-16Environmental Restoration Program Installation Overview (Wall Map)1JBER_2016_ERP Wall Map
5Apr-09Environmental Staging Facility Operations & Maintenance Plan1JBER-R ESF_2009_O&M Plan
6Apr-09Environmental Staging Facility Work Plan (Final)2JBER-R ESF_2009_WP
7Environmental Staging Facility 2016 System Operation Annual Report2JBER-R ESF_2016_Annual Rpt
8Environmental Staging Facility 2017 System Operation Annual Report2JBER-R ESF_2017_Annual Rpt
9Mar-19Environmental Staging Facility 2018 System Operations Annual Report2JBER-R ESF 2018 Annnual Report March 2019(reduced)
10Jul-11Joint Base Elmendorf-Richardson Community Involvement Plan1JBER_2011_Community Involvement Plan
11Mar-13Final UFP-QAPP Basewide (Alaska Group PBR)1Basewide UFP-QAPP (2013)
12Dec-19Revision of the Federal Facility Agreement Document Schedule for JBER-Elmendorf2JBER-E_2019_FFA Doc Schedule
13Dec-19Revision of the Federal Facility Agreement Document Schedule for JBER-Richardson2JBER-E_2019_Document Schedule
14May-11673d ABW Instruction 32-7003 Land Use Control Management2673ABWI32-7003_LUC Mgt
15Jan-10Memorandum to the Site File, Operable Units (OUs) 1, 2, 4, and 5, Sites LF059, ST041, FT023, SD024, SD025, SD028, SD029 and ST037LF059, ST041, FT023, SD025, SD029, ST0371OU 1, 2, 4, 5 LUC Memo to Site File (2010)
16Mar-11Memorandum to the Site File, Operable Unit 2, Site ST041ST0411OU2 Surface Water and Seep Sampling Frequency Memo to Site File (2015)
17Jan-10Memorandum to the Site File, OU4, FT023FT0231OU4 FT023 Memo to Site File (2010)-signed
18Sep-03Memorandum to the Site File, OU4, GW Sampling FrequencySD024, SD025, SD028, SD029, FT023, SS0101OU4 GW Sampling Frequency Memo to Site File (2003)
19Jun-11Memorandum to the Site File, Operable Unit 5, ST37ST0371OU5 Wetland Remediation System Optimization Memo to Site File (2011)
20Aug-07Explanation of Significant Differences Operable Unit 6LF002, LF003, SD015, WP0141OU6 ESD (2007)
21Nov-16Memorandum to the Site File, OU6, LF004LF0041OU6 LF04 Reduction in Debris Removal Frequency Memo to Site File (2016)-signed
22Jan-17Interim Remedial Action Completion Report Site LF059LF0591LF059 I-RACR (2017)
23Apr-11OUB Memo to Site FileCG0391OUB_ Memo to Site File (signed 2011)
24Mar-17Explanation of Significant Differences SD025SD0251SD025 ESD (signed 2018)
25Sep-03Memorandum to Site File Operable Unit 6 (OU6) and Source Area SS019WP0141OU6 GW Sampling Frequency and SS019 Memo to Site File (2003)
26Feb-19SS041 Memo to Site FileSS0411SS041 2019.02.27 Final MemoToSite FIle OUA RR PCB Site
27Nov-11XU022 Memo to Site File Clarifying ROD ScheduleXU0221XU022_2011_Memo to Site File Clarifying ROD Schedule
28Mar-19Fifth Five-Year Review for JBER-Elmendorf, Alaska (Draft)DP098, FT023, LF002, LF003, LF004, LF059, SD015, SD025, SD029, ST037, ST041, WP0141Draft JBER-E Five-Year Review_Jan 19
29Aug-18Fourth Five-Year Review Report for CERCLA Sites JBER-Richardson, AlaskaCG039, DA089, SS044, SS090, XE023, XU02212018_JBER-R 4th Five-Year Review (signed)
30Jun-19CG114 Technical Memorandum Decision Document (Pre-Draft)CG1141CG114_2019_PreDraft DD Tech Memo
31Feb-18SS047 Decision DocumentSS0471SS047_2017_DD (signed 02-20-18)
32Nov-18PROPOSED PLAN Mortar Range 1A (FR002), Mortar Range 2A (FR001), and Mortar Range 2C (FR001b) (Draft Final)FR001, FR0021FR001 and FR002 Proposed Plan_Draft Final
33May-192018 Annual Report Monitoring of State-Regulated Sites (Draft)Elmendorf CG527, CG536, CG539, ST032, ST068, Richardson SS041, TU037, TU064, TU101, TU102, TU10312018 Draft STATE Annual RA-O
34Jul-192018 Technical Project Report JBER IC Inspections (Draft)CG509, CG529, CG530, CG543, CG551, CG702, SO501, SO507, SO508, SO510, SO544, SO547, SO549, SS418, SS522, ST048, ST408, TS003, TU10712018 Draft Letter Report JBER IC Inspections
35May-192017 Annual Report Monitoring of State-Regulated SitesElmendorf CG527, CG536, CG539, SO552, ST032, ST068; Richardson SS041, TU037, TU064, TU101, TU102, TU10312017 STATE_Annual RA-O
36Mar-192017 Technical Project Report JBER IC InspectionsCG509, CG529, CG530, CG543, CG551, CG702, SO501, SO507, SO508, SO510, SO544, SO547, SO549, SS418, SS522, ST048, ST408, TS003, TU10712017 Letter Report JBER IC Inspections
37Feb-192016 Annual Report Monitoring of State-Regulated SitesElmendorf CG527, CG536, CG539, SO552, ST032, ST036, ST068; Richardson SS041, TU037, TU064, TU101, TU102, TU10312016 STATE_Annual RA-O
38Apr-192016 Technical Project Report JBER IC InspectionsCG509, CG529, CG530, CG543, CG551, CG702, SO501, SO507, SO508, SO510, SO544, SO547, SO549, SS418, SS522, ST048, ST408, TS003, TU10712016 Letter Report JBER IC Inspections
39Jul-192015 Annual Report Monitoring of State-Regulated SitesSO552, ST03612015 STATE Annual RA-O
40Jun-152014 Annual Report Monitoring of State-Regulated SitesST03612014 STATE Annual RA-O
41May-192018 Annual Remedial Action-Operations and Monitoring Report for Select CERCLA Sites (Draft)Elmendorf DP098, FT023, LF002, LF003, LF004, LF059, SD015, SD025, SD029, ST037, ST041, WP014; Richardson CG039, DA089, SS044, SS090, XE023, XU02212018_Draft CERCLA Annual RA-O
42Dec-182017 Annual Remedial Action-Operations and Monitoring Report for Select CERCLA SitesElmendorf DP098, FT023, LF002, LF003, LF004, LF059, SD015, SD025, SD029, ST037, ST041, WP014; Richardson CG039, DA089, SS044, SS090, XE023, XU02212017_CERCLA_Annual RA-O
43May-182016 Annual Remedial Action-Operations and Monitoring Report for Select CERCLA SitesElmendorf DP098, FT023, LF002, LF003, LF004, LF059, SD015, SD025, SD029, ST037, ST041, WP014; Richardson CG039, DA089, SS044, SS090, XE023, XU02212016_CERCLA Annual RA-O
44Dec-152014 Annual Field Activities Report CERCLA SitesSS01312014 CERCLA Annual RA-O
45Aug-172016 Remedial Action Long-Term Management Report XU022 – Eagle River Flats, Operable Unit CXU0221XU022_2017_RAO LTM Rpt
46Jul-18Site Characterization Report CG111CG1111CG111_2018_Site Char Rpt
Dec-19Incorporation of CG111- Johnson Avenue Plume into JBER-Elmendorf (JBER-E) Federal Facility Agreement (FFA)CG1112CG111 - FFA Doc Schedule (2019)
47Jul-18Site Characterization Report CG112CG1121CG112_2018_Site Char Rpt
48Jun-18Site Characterization Report CG114CG1141CG114_2018_Site Char Rpt
49Dec-18CG703 RI (Draft)CG7031CG703 Draft RI Report
50Dec-19CG703 (Northern Plume) Feasibility Study (Draft)CG7032CG703 Draft FS
51Jan-19CG704 Southern Plume Limited Field Investigation ReportCG7041CG704_2019_LFI Rpt
52Jul-18DA115 PCB Soil Pile Limited Field Investigation ReportDA1151DA115 LFI RPT Final
53Feb-17DA119 Airlifter Boran Drum ResponseDA1191Airlifter and Boram Dr Drum Removal Final
54Jan-19DA119 DA122 Geophysical Report (Draft)DA119, DA1221DA119_DA122_Draft Geophysical_Report_01.16.2019
55Feb-18Orphaned Drum Removal and Sampling (DA122)DA1221DA122 Orphan Drum Removal_Sept 2016.docx
56Sep-15Oil-Water Separator (OWS) Closure After Action Report, JBER, AlaskaOW1181JBER OWS Closures Report (2015)
57Sep-15Soil Pile Removal and Disposal Report, Building 5374, JBER, AlaskaOW1181Bldg 5374 OWS Soil Disposal Rpt (2015)
58Jun-19Limited Field Investigation Report ST036, TU091, SO552 (Draft)SO552, ST036, TU0911LFI Report - ST036,TU091,SO552 (Draft)
59Aug-19Draft SS109 Vapor Extraction System Operation and Maintenanc - Work Plan Addendum dated August 2019SS10922019.08.26 WP Addndm SS109 ADEC comment letter
60May-112011 Engineering Evaluation and Cost Analysis F-22 Weapons Release ShopSS10922011 EECA_F22 Weapons Release Shop
61Jun-112011 Action Memorandum F-22 Weapons Release ShopSS1092Final Signed ELM300 Action Memorandum
62Dec-11Final Approval Memorandum ELM300 Non-Time Critical Removal ActionSS1092FINAL ELM300 APPROVAL MEMORANDUM with Figures
63Jan-18JBER SS109 Ventilated Stockpile Soil Vapor Extraction System - 2017 Monitoring SummarySS1092SS109 2017 Ventilated Stockpile SVE - 2017 Monitoring Report
64Dec-18Joint Base Elmendorf-Richardson (JBER) SS109 Ventilated Stockpile Soil Vapor Extraction System - 2018 Monitoring Summary ReportSS1092JBER Site SS109_DRAFT VSP SVE 2018 Monitoring Summary Report_12Dec2018
65Dec-19Monthly Letter Report for the Ventilated Stockpile Soil Vapor Extration Systems Operations, Maintenance and Sampling at SS109 Site during September 2019SS1092SS109 SVE Monthly Summary Letter_Sep2019
66Jul-18SS109 (F-22) Weapons Release Shop)Remedial Investigation and Human Health Risk Assessment ReportSS1091SS109_2018_RI-HHRA
67Apr-19SS109 (F-22) Weapons Release Shop)Feasibility Study Report (Draft)SS1091SS109 FS Draft
68Jun-19SS116 Site Characterization Work PlanSS1161SS116 SC WP Final
69Feb-19SS116 Phase 2 LetterSS1161SS116 Phase II Letter_2.15.2019
70Aug-18SS117 RIRA Management PlanSS1171SS117 RI-RA Management Plan FINAL
71Jun-19SS117 VI Work Plan (Draft)SS1171SS117_VI_WP_Draft
72Feb-17SS124 Utility Trench Near Building 10551 Contaminated Soil SamplingSS1241SS124 Bldg 10551 Utility Trench Sample Rpt
73Jun-19ST037 Seep Assessment ReportST0371JBER_ST037_SeepAssessment_Final
74Oct-18WP014 Limited Site Investigation ReportWP0141Final WP014 Limited Site Investigation Report - October 2018
75Jan-19AT029 Supplemental RI Report (Draft)AT0291AT029_RIReport_2018_Draft
76Sep-17AT035 Remedial Investigation/Feasibility Study Management PlanAT0351JBER_TO0003_AT035_WP_Final
77Jul-15AT035 Preliminary Source Evaluation (PSE) 2 ReportAT0351AT035_2015_PSE2 Rpt
78Jan-19AT035 Vapor Intrusion Work Plan Addendum (Draft)AT0351JBER_AT035_VI_WP_Draft
79Jun-14Treatability Study Implementation Report CG039 - Poleline Road Disposal AreaCG0391CG039_2014_PRDA Treatability Implementation Rpt
80Apr-15Treatability Study Report CG039 - Poleline Road Disposal AreaCG0391CG039_2015_PRDA Treatability Study Rpt
81Aug-17Treatability Study Report DA089 – Armored Vehicle Maintenance AreaDA0891DA089_2017_Treatability Study Rpt
82Oct-18DA090 Remedial Investigation (Draft Final)DA0901DA090 Draft RI
83Feb-19DA090 Feasibility Study (Draft Final)DA0901DA090 FS-Draft-Final
84Feb-17DA121 Utility Power Pole Excavation Contaminated Soil SamplingDA1211DA121 Utility Pole 8783 Excavation Soil Sampling Rpt
85May-19DP009 RI Report (Draft)DP0091DP009_RIReport_2018_Draft
86Aug-18RI/FS Mortar Range 1A (FR002) and Mortar Range 2A (FR001) Munitions Response SitesFR001, FR0021Final_RI-FS Mortar Range 1A_Mortar Range 2A_JBER_August 2018_with Appendices
87Nov-19Fire Hydrant Replacement Project - DU Project No. P8271/Summary of Environmental Related Activities (Draft)SS0902SS090_Draft P8271 Summary Report and Sample Results
88Dec-18Remedial Investigation/Risk Assessment Report SS013 - Building 791 MP Barracks SiteSS0131SS013 RIRA Final
89Dec-18Feasibility Study SS013- Building 791 MP Barracks SiteSS0131JBER SS013 Feasibility Study (Final)
90Apr-19SS019 RI Report (Draft)SS0191SS019_RIReport_Draft
91Apr-15Preliminary Assessment Report for Perfluorinated Compounds at JBERSS0441JBER PFC_2015_Prelim Assessment
92May-18Site Inspection Report for Aqueous Film Forming Foam Areas JBERSS0441JBER PFC_2018 AFFF Areas SI Rpt
93Jan-15SS044 Summary of Site StatusSS0441SS044_2015_Summary of Site Status
94Sep-19SS047 Final Field Activities ReportSS0472SS047 Field Activies Report_Sep 2019
95Apr-19SS120 PSE2 ReportSS1201SS120_PSE2_Report_Final
96Nov-18TU117 Supplemental RIRA Report (Pre-Draft)TU1171TU117 SRI-RA Report (Pre-Draft)
97Jul-16Remedial Action Work Plan XU022 - Eagle River FlatsXU0222Final_XU022_ERF_2016_Workplan
Jul-19AT029 - Ruff Road Fire Training Area Supplemental Remedial Investigation (Final)AT0293AT029_RIReport_2018_Final
Sep-19DP009 - Building 986 Dry Well Supplemental Remedial Investigation Report (Final)DP0093DP009_RIReport_2018_Final
Sep-19SS019 - Building 755 Remedial Investigation Report (Final)SS0193SS019_RIReport_Final
Jan-20Supplemental Remedial Investigation/Risk Assessment Report TU117 - Former Building 772 (Draft, Revision 1)TU1173TU117 SRI_RA Report (Draft Rev 1)
Nov-19CG114 - 22ND Street Decision DocumentCG1143CG114_DecisionDocument_Draft_Nov2019
Mar-17JBER VI Study Sampling #2Multiple320-25717-1 Std_Tal_L4 Final Report
Jun-18Final Vapor Intrusion Study Report, JBERMultiple3Final_JBER_VI_StudyReport
Nov-18Limited Field Investigation Report SA110 - Investigation-Derived Wast YardSA1103SA110_2018_LFI Rpt
Oct-19Vapor Intrusion Assessment Addendum - AT035 Remedial Investigation/Feasibility Study Management Plan FinalAT0353JBER_AT035_VI_WP_Final
Dec-19SS124 Site Chartacterization Report DraftSS1243SS124_Draft Report_Combined
Dec-19DA121 - Site Characterization Report DraftDA1213DA121 Draft Report_Combined
Jul-19CG703 (Northern Plume) Remedial Investigation Report FinalCG7033CG703 RI Report (Final)
Feb-20Fifth Five-Year Review for JBER-Elmendorf, Alaska (Final)Multiple3JBER-E_cercla_final_feb_2020_02_07
Jul-14Memorandum to Site File for SS013 PCB Time Critical Removal Action, Remaining PCB Contamination, and Required Interim Land Use ControlsSS0134SS013 - Memo to Site File (2014)
Jan-07Decision Document for ST68ST0684ST068_2007_Decision Doc
Jan-15Summary of Site Status - SS044 - Building 35-752 PCB SiteSS0444SS044_2015_Summary of Site Status
2006 Annual Report Final, Operable Unit 1 Landfill, Evapotranspiration Cover Placement and Monitoring, April 2007Multiple52006_Annual_Report_Final_OU1
DA115 PCB Soil Pile Limited Field Investigation Work Plan, Final, September 2017DA11552017 DA115 LFI Work Plan Final
2006 Annual Report Final, Operable Unit 1 Landfill, Appendix A, CorrespondenceMultiple52006_OU1_App_A_Correspondence
2006 Annual Report Final, Operable Unit 1 Landfill, Appendix B, Lysimeter StudyMultiple52006_OU1_App_B_Lysimeter_Study
2006 Annual Report Final, Operable Unit 1 Landfill, Appendix C, Evapotranspiration Cover SpecificationsMultiple52006_OU1_App_C_ET_Cover_Specs
2006 Annual Report Final, Operable Unit 1 Landfill, Appendix D, EarthworkMultiple52006_OU1_App_D_Earthwork
2006 Annual Report Final, Operable Unit 1 Landfill, Appendix E, VegetationMultiple52006_OU1_App_E_Vegetation
2006 Annual Report Final, Operable Unit 1 Landfill, Appendix F, Field DocumentationMultiple52006_OU1_App_F_Field_Documentation
2006 Annual Report Final, Operable Unit 1 Landfill, Appendix G, Long Term Monitoring ProgramMultiple52006_OU1_App_G_LTM_Program
2006 Annual Report Final, Operable Unit 1 Landfill, Appendix H, PhotosMultiple52006_OU1_App_H_Photos
CG703 Geophysical Investigation Technical Memorandum, August 2017CG7035CG703 Draft Geophysical Tech Memo_cmp
CG703 Test Pit Sampling Procedures, Analytical Methods, and Laboratory Information (Final), October 2017CG7035CG703 Test Pit Sampling FINAL
Remedial Investigation/Feasibility Study Management Plan, CG703 - Northern Plume, Final, May 2018CG7035Final CG703_RIFS Plan3
DA121 Site Characterization Report, Final, January 2020DA1215Final _DA121_SC_Report_All
Doyon Utilities, Sampling and Analysis Plan, P8271 Water Distribution System Upgrades (H6-8), September 2019SS0905P8271_SAP_v2
Site Closure Report ST527, Final, December 2012ST5275SO510_ST527_JBER_FNL
Site Closure Report ST409, Final, December 2012ST4095SO547_ST409_JBER_FNL
SS124 Site Characterization Report, Draft, December 2019SS1245SS124_Draft Report_Combined
Site Closure Report SS704, Final, December 2012SS7045SS522_SS704_JBER_FNL_with Labs
Limited Field Investigation Report, ST036, TU091, and SO552, Final, March 2020Multiple5ST036,TU091,SO552 LFI Rpt-Final
Memorandum to the Site File, TU117, FTR271A (Building 772) Proposed Headquarters Facility, April 2012TU1175Memo to the Site File - FTR271A (Bldg 772)
Site Characterization and Risk Evaluation Report TU091 (AFID 130-OU), Jan 2016TU09152016 TU091 Site Characterization Risk Evaluation Report
Doyon Utilities, Fire Hydrant Replacement Project – DU Project No. P8271SS0905Addendum to Summary of Environmental Related Activities (PFAS Sample)
Uniform Federal Policy Quality Assurance Project Plan Site Characterization Orphan Drum Sites DA119 and DA122, Joint Base Elmendorf-Richardson, AK, October 2019DA119, DA1225DA119 and DA122 JBER Drum Investigation UFP QAPP-Final October 2019 Signed
Doyon Utilities, Fire Hydrant Replacement Project – DU Project No. P8271, Feb 2020SS0905DU H6-8 Summary Report - v1.7 WITH HEADERS
Final Vapor Intrusion Study Report for Joint Base Elmendorf-Richardson Restoration Program Sites, Alaska, June 2018Multiple5Final_JBER_VI_StudyReport
Limited Site Investigation Report FT023 (Fire Training Area), June 2015FT0235FT023_2015_Limited Site Investigation Rpt
Final Uniform Federal Policy – Quality Assurance Project Plan Addendum, SS124, Mar 2020SS1245JBER SS124 UFP-QAPP Addendum_Final
Fifth Five-Year Review Report for CERCLA Sites JBER-Elmendorf, Alaska, Feb 2020Multiple5JBER-E CERCLA Five-Year Review_Final_not Signed yet
Feasibility Study SS109 - F-22 Weapons Release Shop, Sep 2019SS1095SS109 FS Final
Pre-Draft SS116 – ALCOM Building 9480 Exterior Alcove Contamination Site Characterization Report, Mar 2020 (Use Pre-Draft documents with caution)SS1165SS116 predraft RPT
Vapor Intrusion Assessment Addendum - SS117 Focused VOC Remedial Investigation Management Plan, April 2020SS1175SS117 VI Focused VOC RI Mgmt Plan (Final)
Removal of SD15 Monitoring Well OU6MW-18, JBER, Alaska, Jan 2012SD0155Tech Memo for SD15 Removal of OU6MW-18
2017 Remedial Action Operations, Land Use/Institutional Control, Feb 2019Multiple5Final Report 2017 JBER LTM_Feb2019
Dense Nonaqueous Phase Liquid (DNAPL) Evaluation Report DP098, April 2018DP0986Final DP098 DNAPL Evaluation Report April-2018-with App B
2013 SVE System After-Action Report F-22 Weapons Release Shop, Nov 2014SS1096F22SVE_AAR Final
Summary of SD015 Limited Site Assessment, January 2012SD0156SD15_Final_Report

&"-,Bold"&12PWS Enclosure X GFI List XXX AFB &12Contract Number Enclosure 2 xx Month 2019 Page &P of &N

File details come from the government source that posted it. Updated .