B.08.03 Amendment 0003 KTR Questions and Answers 1 May 2020.pdf

PDF 413 KB Posted

Attached to
OPTIMIZED REMEDIATION CONTRACT, JOINT BASE ELMENDORF-RICHARDSON, ALASKA
Solicitation number
W911KB20R0006
Issued by

View the file

Other files

File Type Posted
B.08.03 W911KB20R0006-0004 DBA Wage Rate Update.pdf PDF
DBA Wage Rates for Amendment 0004.pdf PDF
B.08.03 W911KB20R0006-0003 Amendment.pdf PDF
Final DP098 DNAPL Evaluation Report April-2018-with App B.PDF PDF
JBER ORC_FY20_Enclosure 2 - GFI List_20200424.xlsx XLSX spreadsheet
Amendment 0002 - DOD Safe Instructions.docx DOCX document
W911KB20R0006-0002 SF30 and Conformed Copy.pdf PDF
F22SVE_AAR Final.pdf PDF
SD15_Final_Report.pdf PDF
Amendment 0002 - Contractor Questions and Government Answers.pdf PDF
Amendment 0001 - Attachment B-1 CLIN-Sub-CLIN Structure_rev1_20200414.xlsx XLSX spreadsheet
Amendment 0001 - Contractor Questions and Government Answers.pdf PDF
Amendment 0001 - Schedule B JBER ORC.xlsx XLSX spreadsheet
Amendment 0001 - Enclosure 2A - GFI AR Spreadsheet.xlsx XLSX spreadsheet
Amendment 0001 - JBER ORC_FY20_Enclosure 2 - GFI List_20200415.xlsx XLSX spreadsheet
W911KB20R0006-0001 SF30 and Conformed Copy.pdf PDF
Amendment 0001 - L-3 ORC PMP Guidance v1.0_20191115_final.pdf PDF
B.08.02 Attachment L-2 Labor Category Qualifications 4 March 20.pdf PDF
B.08.02 Attachment C-8 Optimization Benefit Template_190520_MD_190710.pdf PDF
B.08.02 Attachment B-1 CLIN-Sub-CLIN Structure.xlsx XLSX spreadsheet
B.07.01 ORC Virtual Site Visit Draft Final 25 Feb 20.pptx PPTX presentation
B.08.02 Attachment C-2 ORC PMP Guidance v1.0_20191115.pdf PDF
B.08.02 Attachment C-1 PWS Enclosure 1_Acronyms and Definitions.pdf PDF
B.08.02 Attachment J-1 JBER ORC_FY20_Enclosure 2 - GFI List_201911213.pdf PDF
B.08.02 Attachment C-5 Ensuring Chemistry Data Fact Sheet April 2013.pdf PDF
B.08.02 GFP List.pdf PDF
B.08.02 Attachment J-2 QASP_ORC.pdf PDF
B.08.02 Attachment C-6 Field Sampling Protocol PFOA-PFOS-PFBS Guidance__June 2019.pdf PDF
B.08.02 Attachment C-7 nterim Guidance 1-4 Dioxane, Environmental Restoration Program.pdf PDF
B.08.02 Attachment C-4 AFGM2019-32-01,AFFF Related Waste Mgmt Implementation Guidance.pdf PDF
B.08.02 W911KB20R0006.pdf PDF
B.08.02 Attachment C-3 Draft CPSMR template- 25Aug2019.pdf PDF
B.08.02 Attachment L-1 Past Performance Quality Questionaire.docx DOCX document
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

# Document Questions/GFI Request Answer 1 Section L Volume I - Contract Documentation. The Validity Statement is listed twice in Table

2.2 of the ITO, in the cover letter as described in paragraph 3.5, and separately after Standard Proposal Information. Based on the tab indexing instructions, the validity statement would appear twice in Volume I. Please confirm.

Validity statement was combined with Contact information to read a) Contact Information and Validity Statement. The Government had intended to remove d) Validity Statement from Table 2.2. Section 3.1 Volume Organization includes the Validity Statement as a) Contact Information and Validity Statement. If an Offeror includes the Validity Statement in two locations it will be acceptable. However it is only required to be presented in one location as prescibed in section 3.1.

2 Section L Volume II - Factor 1, IMS and MPS. Would it be acceptable to include the IMS and MPS without costs as Appendices to Volume II rather than be included after between Factors 1 and 2?

The IMS and MPS without price information shall be submitted as prescribed in section 4.4. Inclusion as an appendices is not acceptable.

We would respectfully request an extension of one week to allow more time to evaluate the GFI provided on Tuesday, 28 April.

An extension will not be provided.

ORC at JBER ALASKA - QUESTIONS 05.01.2020 (Amendment 0003)