B.08.02 Attachment C-8 Optimization Benefit Template_190520_MD_190710.pdf

PDF 653 KB Posted

Attached to
OPTIMIZED REMEDIATION CONTRACT, JOINT BASE ELMENDORF-RICHARDSON, ALASKA
Solicitation number
W911KB20R0006
Issued by

View the file

Other files

File Type Posted
B.08.03 W911KB20R0006-0004 DBA Wage Rate Update.pdf PDF
DBA Wage Rates for Amendment 0004.pdf PDF
B.08.03 Amendment 0003 KTR Questions and Answers 1 May 2020.pdf PDF
B.08.03 W911KB20R0006-0003 Amendment.pdf PDF
Final DP098 DNAPL Evaluation Report April-2018-with App B.PDF PDF
JBER ORC_FY20_Enclosure 2 - GFI List_20200424.xlsx XLSX spreadsheet
Amendment 0002 - DOD Safe Instructions.docx DOCX document
W911KB20R0006-0002 SF30 and Conformed Copy.pdf PDF
F22SVE_AAR Final.pdf PDF
SD15_Final_Report.pdf PDF
Amendment 0002 - Contractor Questions and Government Answers.pdf PDF
Amendment 0001 - Attachment B-1 CLIN-Sub-CLIN Structure_rev1_20200414.xlsx XLSX spreadsheet
Amendment 0001 - Contractor Questions and Government Answers.pdf PDF
Amendment 0001 - Schedule B JBER ORC.xlsx XLSX spreadsheet
Amendment 0001 - Enclosure 2A - GFI AR Spreadsheet.xlsx XLSX spreadsheet
Amendment 0001 - JBER ORC_FY20_Enclosure 2 - GFI List_20200415.xlsx XLSX spreadsheet
W911KB20R0006-0001 SF30 and Conformed Copy.pdf PDF
Amendment 0001 - L-3 ORC PMP Guidance v1.0_20191115_final.pdf PDF
B.08.02 Attachment L-2 Labor Category Qualifications 4 March 20.pdf PDF
B.08.02 Attachment B-1 CLIN-Sub-CLIN Structure.xlsx XLSX spreadsheet
B.07.01 ORC Virtual Site Visit Draft Final 25 Feb 20.pptx PPTX presentation
B.08.02 Attachment C-2 ORC PMP Guidance v1.0_20191115.pdf PDF
B.08.02 Attachment C-1 PWS Enclosure 1_Acronyms and Definitions.pdf PDF
B.08.02 Attachment J-1 JBER ORC_FY20_Enclosure 2 - GFI List_201911213.pdf PDF
B.08.02 Attachment C-5 Ensuring Chemistry Data Fact Sheet April 2013.pdf PDF
B.08.02 GFP List.pdf PDF
B.08.02 Attachment J-2 QASP_ORC.pdf PDF
B.08.02 Attachment C-6 Field Sampling Protocol PFOA-PFOS-PFBS Guidance__June 2019.pdf PDF
B.08.02 Attachment C-7 nterim Guidance 1-4 Dioxane, Environmental Restoration Program.pdf PDF
B.08.02 Attachment C-4 AFGM2019-32-01,AFFF Related Waste Mgmt Implementation Guidance.pdf PDF
B.08.02 W911KB20R0006.pdf PDF
B.08.02 Attachment C-3 Draft CPSMR template- 25Aug2019.pdf PDF
B.08.02 Attachment L-1 Past Performance Quality Questionaire.docx DOCX document
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OPTIMIZATION EXAMPLES

AFIID_SITEID_CPSMR##_OB##-MMMYYYY

(e.g., MOODY_OT012_CPSMR12_OB01-DEC2020)

Installation Name: (e.g., Moody AFB) Site ID: (e.g., OT012) Reporting Period: (e.g., 1 May 2020 – 30 April 2021)

Site Performance Objective at the Time of Contract Award:

Reduce LCC

& RA-O

☐ Reduce LCC &

LTM

☐ OES ☐ Alternate Objective

☐ Other Site Categories

Optimization activities are defined as any remedial activities and performance monitoring above and beyond what is required to maintain compliance in accordance with an approved decision document.

Optimization Activities Implemented:

1. Describe specific details of optimization activities (see Key Optimization Elements)

Optimization Outcome(s):

1. Results in: a) reduction in contaminant mass, b) reduction in contaminant concentrations,

c) reduction in LCC, or d) any combination of any activities prompting acceleration to RC.

2. Provide supporting information for optimization activities using tables, plots or figures, and/or photos.

3. Identify the need for changes to decision document (e.g., Explanation of Significant Differences [ESD], ROD Amendment [RODA]) to improve the remedy efficiency and/or shorten remedy duration to achieve endpoint.

Issues/Obstacles Encountered:

1. Describe issues that could impact schedule.

Planned Optimization Activities for Next Reporting Period (including Potential Issues):

1. Describe planned optimization activities (see Key Optimization Elements)

2. Identify activities that would shorten restoration life cycle.

(e.g., MOODY_OT012_CPSMR12_OB01-DEC2020)

Key Optimization Elements:

Site Understanding – Updating conceptual site model (CSM) to better understand site conditions Design Optimization Review – Reviewing design of selected remedies to effectively target contaminant source(s) and contaminant plume based on site conditions Remedy Process Optimization – Enhancing remedy effectiveness or efficiency to accelerate remediation timeline; i.e., Operations & Maintenance Monitoring Optimization – Optimizing number and location of monitoring wells and/or minimizing sampling frequency

Site Understanding:

Identify data gaps Use real-time measurements Sequence activities focusing on source control first Conduct strategic sampling

Design Optimization Review Conduct design optimization reviews to evaluate remedy selected and ensure streamlined remedial action operations Address challenges associated with source uncertainties and/or plume uncertainties by the selected remedy as designed Add new nested wells with shortened well screens

Remedial Process Optimization Operations In Situ Treatments (e.g., Enhanced Reductive Dechlorination [ERD], Monitored

Natural Attenuation [MNA], Permeable Reactive Barrier [PRB], In Situ Chemical Oxidation [ISCO]) Contaminant footprint reductions Recirculation of treated extracted groundwater through in situ bioreactors with treated water Application of phytoremediation where appropriate (regulatory agency approval is required for new remedial alternative(s))

Ex Situ Treatments (e.g., Pump and Treat [P&T], Air Sparging [AS], Soil Vapor Extraction [SVE]) >90% uptime with 99.99% off-gas treatment before discharge to the atmosphere Change from energy-intensive thermal/catalytic converter to carbon adsorption to treat off-gas Transition of low mass recovery for an existing P&T system to passive management systems (regulatory agency approval is required for new remedial alternative[s])

Ex Situ Treatment (e.g., Light Non-Aqueous Phase Liquid [LNAPL] Recovery) Evaluation for point-of-termination for product recovery when reaching to asymptotic recovery Use of LNAPL transmissivity data to evaluate LNAPL recoverability

(e.g., MOODY_OT012_CPSMR12_OB01-DEC2020)

Evaluation of Natural Source Zone depletion (NSZD) rates Maintenance In Situ Treatments (e.g., ERD, MNA, PRB, ISCO)

Few optimization opportunities

Ex Situ Treatments (e.g., P&T, AS, SVE) Appropriate process monitoring (e.g., pressure, flowrates, O2/CO2, energy consumptions) to minimize downtimes and prevent system failure Maintain uninterrupted system operation Maintain and replace aging infrastructure to improve remedy efficiency, avoiding well fouling, pump and filter replacements as appropriate Modification of extraction operations from steady rates to pulsed operation or variable frequency/adjustable speed driver use Ex Situ Treatment (e.g., LNAPL Recovery) Maintain aging infrastructure to improve remedy efficiency, avoiding well fouling, pump and filter replacements as appropriate Review process monitoring (operation) performance and identify the source that is less efficient Make necessary changes, as appropriate and required, to overcome site-specific conditions that affected performance Monitoring Optimization Performance Monitoring

Use decision logic and decision support tools to manage and track remedy progress (e.g., Monitoring and Remediation Optimization System [MAROS])

Progress may be on track, but evaluate chlorinated compound degradation pathways or Edible Vegetable Oil partitioning by Compound-specific Isotope Analysis

Progress may be on track, but evaluate a potential contaminant rebound after injectant is depleted

Review performance monitoring data to evaluate the effectiveness and appropriateness of key performance metrics/standards

Change from active remediation to natural attenuation Compliance Document decision to comply with alternative performance expectations and goals, if all remedial alternatives fail to achieve performance expectations and if remedial technologies are more harmful than the site conditions

Revisit Applicable or Relevant and Appropriate Requirements (ARARs), Remedial Action Objectives (RAOs), and the selected remedy in the context of updated information and performance monitoring data

Data Management

Improved data management including improving data management planning, data acquisition, data processing, data analysis (using 3-D visualization analysis), data preservation and storage, and data publication and sharing.

References

AFCEC. 2014. Optimizing Remedies with Performance-Based Contracts. Presented by. Dr. Kent Glover.

AFCEC/CZTE. Presented at FRTR Meeting. November.

ITRC. 2004. Remediation Process Optimization: Identifying Opportunities for Enhanced and More Efficient Site Remediation

(e.g., MOODY_OT012_CPSMR12_OB01-DEC2020)

NAVFAC. 2017. Portfolio Optimization (P-OPT) Review of the Navy’s IRP Site- Phase I Overview and Findings. Open Environmental Restoration Resource (OER2) Webinar. Presented by NAVFAC Environmental Restoration Program. August 23.

U.S. EPA. 2017. Superfund Optimization Progress Report 2011-2015. Office of Land and Emergency Management. EPA-542-R-17-002. June.

File details come from the government source that posted it. Updated .